Loading...
1233-Whaton Smith Ch OrderFa PROJECT: (Name and Address) TO CONTRACTOR: (Name and Address) Sanford Public Safety Building 911 West 13' Street Sanford, FL 32771 Wharton-Smith, Inc. P.O. Box 471028 Lake Monroe, FL 32747-1028 /� 5 j e * CHANGE ORDER NO: 00 1 INITIATION DATE: August 13, 2009 PROJECT NO.: 09-042 CONTRACT FOR: General Construction CONTRACT DATE: July 1, 2008 OWNER ARCHITECT CONTRACTOR U0 FIELD OTHER 'C THE CONTRACT IS CHANGED AS FOLLOWS: Estimated initial amount of Owner Direct Purchases for the Sanford Public Safety Building. Purchases may include items such as sitework structures and piping, base material, asphalt, reinforcing steel, concrete, masonry materials, structural steel, miscellaneous steel, roofing materials, doors, frames and hardware, storefront materials, drywall materials, floor coverings, ceramic tile materials, pre-engineered steel, elevator equipment, fire sprinkler piping, HVAC material and equipment, electrical switchgear and fixtures. This change is an estimate only and it is agreed to by both parties that should the ODP purchases not exceed this estimate that a change order will be issued to reconcile the contract amount. Estimated ODP Purchases $(3,000,000.00) Sales Tax on ODP Purchases $(180,000.00) Total Deduct $(3,180,000.00) The original Guaranteed Maximum Price was ................................................................................................................. $ 15,930,416.00 Net change by previously authorized Change Orders ....................................................................................................................... $0.00 The Guaranteed Maximum Price prior to this Change Order was .................................................................................... $ 15,930,416.00 The Guaranteed Maximum Price will be decreased by this Change Order ........................................................................ $ 3,180,000.00 The new Contract sum including this Change Order will be ............................................................................................ $ 12,750,416.00 The Contract Time will be unchanged by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is September 3, 20 10. NOT VALID UNTILL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Architect~gn Group, Inc. �TEW MXe)__ �y (*nA&eV-!J Ian Reeves, A.I.A. (Typed Name) M-2ZO-coR Date Attest: adiv /]0Mz J�det Dougherty, City Clerk U a For use and re�ance of the Sanford City Commission only. A7pp I .% vpd ��f? form and le 'e William L. Colbert Wharton-Smith, Inc. CONTRACTA)"Firm!,;�am C- By (Signag ' 7 Eric H. Palmer (Typed Name) Date City Commission of the City of Sanford, Florida OWNER pirm Name) By (Signatuye) Linda Kuhn, Mayor (Typed Name) �— — ;:)- q - C i Date City Attorney