CHANGE ORDER NO: 00 1
INITIATION DATE: August 13, 2009
PROJECT NO.: 09-042
CONTRACT FOR: General Construction
CONTRACT DATE: July 1, 2008
OWNER
ARCHITECT
CONTRACTOR U0
FIELD
OTHER 'C
THE CONTRACT IS CHANGED AS FOLLOWS: Estimated initial amount of Owner Direct Purchases for the Sanford Public Safety
Building. Purchases may include items such as sitework structures and piping, base material, asphalt, reinforcing steel, concrete, masonry materials,
structural steel, miscellaneous steel, roofing materials, doors, frames and hardware, storefront materials, drywall materials, floor coverings, ceramic
tile materials, pre-engineered steel, elevator equipment, fire sprinkler piping, HVAC material and equipment, electrical switchgear and fixtures. This
change is an estimate only and it is agreed to by both parties that should the ODP purchases not exceed this estimate that a change order will be
issued to reconcile the contract amount.
Estimated ODP Purchases $(3,000,000.00)
Sales Tax on ODP Purchases $(180,000.00)
Total Deduct $(3,180,000.00)
The original Guaranteed Maximum Price was ................................................................................................................. $ 15,930,416.00
Net change by previously authorized Change Orders ....................................................................................................................... $0.00
The Guaranteed Maximum Price prior to this Change Order was .................................................................................... $ 15,930,416.00
The Guaranteed Maximum Price will be decreased by this Change Order ........................................................................ $ 3,180,000.00
The new Contract sum including this Change Order will be ............................................................................................ $ 12,750,416.00
The Contract Time will be unchanged by Zero (0) days.
The date of Substantial Completion as of the date of this Change Order therefore is September 3, 20 10.
NOT VALID UNTILL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
Architect~gn Group, Inc.
�TEW MXe)__
�y (*nA&eV-!J
Ian Reeves, A.I.A.
(Typed Name)
M-2ZO-coR
Date
Attest:
adiv /]0Mz
J�det Dougherty, City Clerk U a
For use and re�ance of the Sanford City Commission only.
A7pp I
.% vpd ��f? form and le
'e
William L. Colbert
Wharton-Smith, Inc.
CONTRACTA)"Firm!,;�am
C-
By (Signag ' 7
Eric H. Palmer
(Typed Name)
Date
City Commission of the City of Sanford, Florida
OWNER pirm Name)
By (Signatuye)
Linda Kuhn, Mayor
(Typed Name)
�— — ;:)- q - C i
Date
City Attorney