1604* SE Cline Change Order No 2-3-4 I (oO (iL i7NfO11) ' I'h7 •RIB Wednesday, Januar , 2013 c4,,1 —1877-4 r"t� PURCHASING DEPARTMENT TRANSMITTAL MEMORANDUM a' To: City Clerk r a RE: S. C/44,01,A714YeA-e+-• ��I1Q'LNt-Q� 4 Pu.6tervc faedi The item(s) noted below is/are attached and forwarded to your office for the following action(s): Development Order Mayor's signature Final Plat(original mylars) I I Re •_..i._ Letter of Credit Rendering Maintenance Bond 171 • - --sing (Vault) n Ordinance !-: _ • • . ager n Performance Bond Payment Bond Resolution n City Manager Signature ❑ n City Clerk Attest/Signature Once completed, please: Return originals to Purchasing Return copies Special Instructions: Marisol Ordoiiez i/_/) ✓f_. /a From Date T:\Dept_forms\City Clerk Transmittal Memo-2009.doc DATE: 08/27/13 PURCHASE ORDER PO NUMBER 033517 '` CITY OF SANFORD CHANGE # : 2 .^ P.O. BOX 1788 I DATE CHG: 09/25/13 a_: PURCHASING OFFICE:407.688.5030 (300 NORTH PARK AVENUE) SUBMIT INVOICES TO:ACCOUNTS PAYABLE ACCOUNTS PAYABLE:407.688.5020 SANFORD, FLORIDA 32772 FINANCE DEPT. q...1 P.O.BOX 1788 FACSIMILE:407.688.5021 FLORIDA TAX EXEMPT NO.:858012621681C-8 SANFORD, FL 32772 °'! IN 4! VENDOR NO.: 11969 :: TO: SHIP TO: ": S E CLINE CONSTRUCTION, INC CITY OF SANFORD 18 UTILITY DR 300 N. PARK AVENUE PALM COAST, FL 32137 SANFORD, FL 32771 DELIVER BY TERMS F.O.B.DESTINATION BID OR QUOTATION NO. REQUISITION NO. UNLESS OTHERWISE INDICATED 09/30/13 NET/30 63852 ACCOUNT NO.: 310-4048-572 . 63-00 PROJECT NO.: pW 110 3 NO DEVIATION FROM THIS PURCHASE ORDER WILL BE ALLOWED UNLESS AUTHORIZED BY THE PURCHASING MANAGER-CITY OF SANFORD UNIT OF ITEM NO. DESCRIPTION QUANTITY ISSUE UNIT COST EXTENDED COST *********************************** * * CHANGE ORDER 1 * i *********************************** 1 PUBLIC DAY DOC FACILITY; 342325 . 00 NA 1 . 00 342325 . 00 CONSTRUCTION OF FLOATING DOCKS & ACCESS RAMPS PROJECT; IFB 12/13-18 AT THE SANFORD MARINA Change Order No. 1 Decrease PO for -$7, 000 fixed Dock value enaineerinq. . . 9 .25 . 13 decreasing 2 INCREASE PO 14664 .48 NA 1 . 00 14664 . 48 SIDED KIOSK . 3 INCREASE PO (CK \v' 18483 . 00 NA 1 . 00 18483 . 00 breAIwS TO 0, /� (\/breakwater �j additions a backs at fi concrete Pi bumper rail boats using piling. 4 CHANGE ORDER NO. 4 DECREASE PO 2752 . 50- NA 1 . 00 2752 . 50- REMOVE PROJECT sign deletion from contract. SUB-TOTAL 372719 . 98 TOTAL 372719 . 98 r'N ;?/4)"8 ,'/7 46/1V APPROVED BY: / ;. ,��f APPROVED BY: %) / PURCHA AGE /.' CITY MAN ER ALL PACKAGES AND INVOICES ASSOCIATED WITH THIS P.O.MUST BEAR THIS PURCHASE ORDER NUMBER. THE VENDOR IS RESPONSIBLE TO CAREFULLY READ AND COMPLY WITH ALL OF THE STANDARD TERMS AND CONDITIONS PROVIDED ON THE REVERSE SIDE OF THIS PURCHASE ORDER AND AT HTTP://WWW.SANFORDFL.GOV/DEPARTMENTS/PURCHASE/TERMS.HTML COPIES TO: VENDOR ORIGINATING DEPARTMENT PURCHASING DATE: 08/27/13 PURCHASE ORDER p0 NUMBER 033517 -, CITY OF SANFORD CHANGE # : 2 =r P.O. BOX 1788 DATE CHG: 09/25/13 ,, PURCHASING OFFICE:407.688.5030 (300 NORTH PARK AVENUE) SUBMIT INVOICES TO:ACCOUNTS PAYABLE "t"! ACCOUNTS PAYABLE:407.688.5020 SANFORD, FLORIDA 32772 FINANCE DEPT. , P.O.BOX 1788 FACSIMILE:407.688.5021 FLORIDA TAX EXEMPT NO 858012621681C-8 SANFORD, FL 32772 VENDOR NO.: 11969 TO: SHIP TO: S E CLINE CONSTRUCTION, INC CITY OF SANFORD 18 UTILITY DR 300 N. PARK AVENUE PALM COAST, FL 32137 SANFORD, FL 32771 DELIVER BY TERMS F.O.B.DESTINATION BID OR QUOTATION NO. REQUISITION NO. UNLESS OTHERWISE INDICATED 09/30/13 NET/30 63852 ACCOUNTNO.: 310-4048-572 . 63-00 PROJECT NO.• PW11O3 NO DEVIATION FROM THIS PURCHASE ORDER WILL BE ALLOWED UNLESS AUTHORIZED BY THE PURCHASING MANAGER-CITY OF SANFORD UNIT OF ITEM NO. DESCRIPTION QUANTITY ISSUE UNIT COST EXTENDED COST * -A * CHANGE ORDER '` * '' *********************************** REMARKS: APPROVED BY: APPROVED BY: PURCHASING AGENT CITY MANAGER ALL PACKAGES AND INVOICES ASSOCIATED WITH THIS P.O.MUST BEAR THIS PURCHASE ORDER NUMBER. THE VENDOR IS RESPONSIBLE TO CAREFULLY READ AND COMPLY WITH ALL OF THE STANDARD TERMS AND CONDITIONS PROVIDED ON THE REVERSE SIDE OF THIS PURCHASE ORDER AND AT HTTP://WWW.SANFORDFL.GOV/DEPARTMENTS/PURCHASE/TERMS.HTML COPIES TO: VENDOR ORIGINATING DEPARTMENT PURCHASING SECTION 00950 CHANGE ORDER FORM Change Order No. 2 Project Name: Public Dock Facility @ Sanford Marina Bid No.: 12/13-18 Owner: City of Sanford Contractor: S .E. Cline Construction, Inc . Agreement Date: 22 July 2013 This Change Order is necessary to cover changes in the work to be performed under this Agreement. The GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, and STANDARD SPECIFICATIONS apply to and govern all work under this Change Order. THE FOLLOWING CHANGES ARE MADE TO THE CONTRACT DOCUMENTS: (1) Original Contract Price $349, 325 . 00 (2) Current Contract Price (Adjusted by Previous Change Orders) $342 , 325 . 00 (3) Total Proposed Change in Contract Price $ 14 , 664 .48 (4) New Contract Price (Item 2 + Item 3) $356, 989 . 48 10 /q. ;3 (5) Original Contract Time 150 Days (6) Current Contract Time (Adjusted by Previous Change Orders) 150 Days (7) Total Proposed Change in Contract Time 0 Days (8) New Contract Time (Item 6 + Item 7) 150 Days (9) New Contract Substantial Completion Date 14 January 2 014 Public Dock Facility CHANGE ORDER FORM @ Sanford Marina 00950-1 SPECLIB040811 CHANGES ORDERED ITEM 1 Description of Change: Three (3) Sided Kiosk Sign Reason for Change: Three (3) Sided Kiosk Sign Change in Contract Price: $ 14 , 664 .48 Change in Contract Time: 0 Days orod m � ITEM 2 Description of Change: Reason for Change: Change in Contract Price: $ Change in Contract Time: Days ITEM 3 Description of Change: Reason for Change: Change in Contract Price: $ Change in Contract Time: Days Public Dock Facility CHANGE ORDER FORM @ 00950-2 SPECL04081I Sanford Marina IB ITEM 4 Description of Change: Reason for Change: Change in Contract Price: $ Change in Contract Time: Days ITEM 5 Description of Change: Reason for Change: Change in Contract Price: $ Change in Contract Time: Days ITEM 6 Description of Change: Reason for Change: Change in Contract Price: $ Change in Contract Time: Days Public Dock Facility CHANGE ORDER FORM Sanford Marina 00950-3 SPECLIB040811 CHANGE ORDER SUMMARY No. Description Change in Change in Contract Price Contract Time 1 Three (3) Sided Kiosk Sign $ 14, 664 .48 0 Days TOTAL $ 14 , 664 .48 0 Days WAIVER This Change Order constitutes full and mutual accord and satisfaction for the adjustment of the Contract Price and Contract Time as a result of increases or decreases in cost and time of performance caused directly and indirectly from the change. Acceptance of this Waiver constitutes an agreement between OWNER and CONTRACTOR that the Change Order represents an equitable adjustment to the Agreement and that CONTRACTOR shall waive all rights to file a Contract Claim or claim of any nature on this Change Order. Execution of this Change Order shall constitute CONTRACTOR's complete acceptance and satisfaction that it is entitled to no more costs or time (direct, indirect, impact, etc.) pursuant to this Change Order. Public Dock Facility CHANGE ORDER FORM @ Sanford Marina 00950-4 SPECLIB040811 APPROVAL AND CHANGE ORDER AUTHORIZATION ACKNOWLEDGMENTS The aforementioned change, and work affected thereby, is subject to all provisions of the original Agreement and specifically changed by this Change Order; and It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original Agreement other than matters expressly provided herein. WITNESS to CONTRACTOR: S .E. Cline Construction, Inc . /..� Contractor ,. $1$1 L� C.M. Cameron, Jr. , V.P. r' , i acus Alcindor Printed Name and Title of Officer 9 0) tober 2013 6.141. Cia„v►,e4,00-1,, 21,, /R, Date By (Signature) ; 9 October 2013 Date (Corporate Seal) `, I � ATTEST: a�tt Owner /r0,12ra./ v Cyr ev e,Du, c /�1Alg-yey (Signatur ) Printed Name and Title , y /0//4(g 1 Date By (Sign re) 107/ (Seal) Date PATRICIA A LEE ' MY COMMISSION 1t EE843689 EXPIRES December 18.2016 END OF SECTION (407)7960183 flork104010ryl MOS aan . Public Dock Facility CHANGE ORDER FORM @ Sanford Marina 00950-5 SPECLIB040811 SECTION 00950 CHANGE ORDER FORM Change Order No. 3 Project Name: Public Dock Facility @ Sanford Marina Bid No.: 12/13-18 Owner: City of Sanford Contractor: S.E. Cline Construction, Inc. Agreement Date: 22 July 2013 This Change Order is necessary to cover changes in the work to be performed under this Agreement. The GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, and STANDARD SPECIFICATIONS apply to and govern all work under this Change Order. THE FOLLOWING CHANGES ARE MADE TO THE CONTRACT DOCUMENTS: (1) Original Contract Price $349, 325 . 00 (2) Current Contract Price (Adjusted by Previous Change Orders) $356, 989 .48 � (3) Total Proposed Change in Contract Price $ 18, 483 . 00 10 l� (4) New Contract Price (Item 2 + Item 3) $375, 472 .48 (5) Original Contract Time 150 Days 112` 14 (6) Current Contract Time (Adjusted by Previous Change Orders) 150 Days (7) Total Proposed Change in Contract Time 0 Days (8) New Contract Time (Item 6 + Item 7) 150 Days (9) New Contract Substantial Completion Date 14 January 2014 Public Dock Facility CHANGE ORDER FORM @ Sanford Marina 00950-1 SPECLIB040811 CHANGES ORDERED ITEM 1 Description of Change: Repairs to existing breakwater wall . Reason for Change: Same as Description Change in Contract Price: $ 7, 670 . 00 Change in Contract Time: 0 Days ITEM 2 Description of Change: Add handrail additions and turn-backs at fixed deck next to platform at seawall . Reason for Change: Same as Description Change in Contract Price: $ 1, 538 . 00 Change in Contract Time: 0 Days ITEM 3 Description of Change: Add caps to concrete pile. Reason for Change: Same as Description Change in Contract Price: $ 750 . 00 Change in Contract Time: 0 Days Public Dock Facility CHANGE ORDER FORM @ Sanford Marina 00950-2 SPECLIB040811 ITEM 4 Description of Change: Bumper rail addition for adjacent boats using new piling. Reason for Change: Same as Description Change in Contract Price: $ 8, 525 . 00 Change in Contract Time: 0 Days ITEM 5 Description of Change: Reason for Change: Change in Contract Price: $ Change in Contract Time: Days ITEM 6 Description of Change: Reason for Change: Change in Contract Price: $ Change in Contract Time: Days Public Dock Facility CHANGE ORDER FORM @ Sanford Marina 00950-3 SPECLIB040811 CHANGE ORDER SUMMARY No. Description Change in Change in Contract Price Contract Time 1 Repairs to existing breakwater wall $ 7,760.00 0 Days 2 Add handrail additions at fixed deck $ 1,538.00 0 Days 3 Add caps to concrete pile $ 750.00 0 Days 4 Bumper rail addition for adjacent boats $ 8,525.00 0 Days TOTAL $ 18, 483 . 00 0 Days WAIVER This Change Order constitutes full and mutual accord and satisfaction for the I of increases or decreases in adjustment of the Contract Price and Contract Time as a result o c eases o dec eases cost and time of performance caused directly and indirectly from the change. Acceptance of this Waiver constitutes an agreement between OWNER and CONTRACTOR that the Change Order represents an equitable adjustment to the Agreement and that CONTRACTOR shall waive all rights to file a Contract Claim or claim of any nature on this Change Order. Execution of this Change Order shall constitute CONTRACTOR's complete acceptance and satisfaction that it is entitled to no more costs or time (direct, indirect, impact, etc.) pursuant to this Change Order. Public Dock Facility CHANGE ORDER FORM @ Sanford Marina 00950-4 SPECLIB040811 APPROVAL AND CHANGE ORDER AUTHORIZATION ACKNOWLEDGMENTS The aforementioned change, and work affected thereby, is subject to all provisions of the original Agreement and specifically changed by this Change Order; and It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original Agreement other than matters expressly provided herein. WITNESS to CONTRACTOR: S.E. Cline Construction, Inc. Contractor ■ Ade C.M. Cameron, Jr. , V.P. acus Alcindor Printed Name and Title of Offic r 2" October 2013 rP. Date By (Signature) 25 October 2013 Date (Corporate ATTEST: C1 4 0.{) v- d: • Owner Q� (Signature) Printed Na e d Title l 6 - zq- t3 Date By (Sig ture) J0/29 /J (Seal) Date END OF SECTION Public Dock Facility CHANGE ORDER FORM @ Sanford Marina 00950-5 SPECLIB040811 • SECTION 00950 CHANGE ORDER FORM Change Order No. 4 Project Name: Public Dock Facility @ Sanford Marina Bid No.: 12/13-18 Owner: City of Sanford Contractor: S.E. Cline Construction, Inc. Agreement Date: 22 July 2013 This Change Order is necessary to cover changes in the work to be performed under this Agreement. The GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, and STANDARD SPECIFICATIONS apply to and govern all work under this Change Order. THE FOLLOWING CHANGES ARE MADE TO THE CONTRACT DOCUMENTS: (1) Original Contract Price $349, 325 .00 (2) Current Contract Price (Adjusted by Previous Change Orders) $375, 472 .48 (3) Total Proposed Change in Contract Price ( $ 2, 752 .50 ) (4) New Contract Price (Item 2 + Item 3) $372, 719.98 [1.6 . 13 (5) Original Contract Time 150 Days (6) Current Contract Time (Adjusted by Previous Change Orders) 150 Days (7) Total Proposed Change in Contract Time 0 Days (8) New Contract Time (Item 6 + Item 7) 150 Days (9) New Contract Substantial Completion Date 14 January 2014 Public Dock Facility CHANGE ORDER FORM Sanford Marina 00950-1 SPECL1B040811 CHANGES ORDERED ITEM 1 Description of Change: Project Sign Deletion from Contract Reason for Change: Same as Description Change in Contract Price: - ($ 2, 752 . 50) Change in Contract Time: 0 Days ITEM 2 Description of Change: Reason for Change: Change in Contract Price: $ Change in Contract Time: Days ITEM 3 Description of Change: Reason for Change: Change in Contract Price: $ Change in Contract Time: Days Public Dock Facility CHANGE ORDER FORM p ECLBSanford Oeoatt Marina 00950-2 SP ITEM 4 Description of Change: Reason for Change: Change in Contract Price: $ Change in Contract Time: Days ITEM 5 Description of Change: Reason for Change: Change in Contract Price: $ Change in Contract Time: Days ITEM 6 Description of Change: Reason for Change: Change in Contract Price: $ Change in Contract Time: Days Public Dock Facility CHANGE ORDER FORM Sanford Marina 00950-3 SPECLIBO40811 CHANGE ORDER SUMMARY No. Description Change in Change in Contract Price Contract Time 4 Project Sign Deletion from Contract - ($ 2, 752.50) 0 TOTAL ($ 2, 752.50) 0 Days WAIVER This Change Order constitutes full and mutual accord and satisfaction for the adjustment of the Contract Price and Contract Time as a result of increases or decreases in cost and time of performance caused directly and indirectly from the change. Acceptance of this Waiver constitutes an agreement between OWNER and CONTRACTOR that the Change Order represents an equitable adjustment to the Agreement and that CONTRACTOR shall waive all rights to file a Contract Claim or claim of any nature on this Change Order. Execution of this Change Order shall constitute CONTRACTOR's complete acceptance and satisfaction that it is entitled to no more costs or time (direct, indirect, impact, etc.) pursuant to this Change Order. Public Dock Facility CHANGE ORDER FORM @ Sanford Marina 00950-4 SPECLIB040811 APPROVAL AND CHANGE ORDER AUTHORIZATION ACKNOWLEDGMENTS The aforementioned change, and work affected thereby, is subject to all provisions of the original Agreement and specifically changed by this Change Order; and It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original Agreement other than matters expressly provided herein. WITNESS to CONTRACTOR: S.E. Cline Construction, Inc. Contractor 4 C.M. Cameron, Jr. , V.P. C iacus Alcindor Printed Name and Title of Officer 31 October 2013 Date By(Signature) 31 October 2013 Date (Corporate$ealp j. ATT•ST: C 1Tm. of Sw►->Ff�fi�:�-! . Owner �� i ti > "Tom C7ecatre - DeWN C.I p R. (Signature)-*9 / ' Printed Name and Title 11 /bi Date By (Sign e) / 77/3 (Seal) Date END OF SECTION Public Dock Facility CHANGE ORDER FORM @ Sanford Marina 00950-5 SPECLIB040811 0 SECTION 00626 CERTIFICATE OF SUBSTANTIAL COMPLETION Project Title Public Dock Facility c Sanford Marina Bid No. 12/13-18 Owner: City of Sanford Contractor: S.E. Cline Construction, Inc. Agreement Date: July 22, 2013 This Certificate of Substantial Completion applies to all work under the Contract Documents or the following specified parts thereof if construction is phased by contract: ISSUED TO: Contractor: S.E. Cline Construction, Inc. The work to which this Certificate applies has been inspected by authorized representatives of Contractor, Engineer, and Owner and that Work is hereby declared to be substantially completed in accordance with the Contract Documents on: October 23, 2014 Date of Substantial Completion A list of items to be completed or corrected is attached hereto. This list may not be all-inclusive, and the failure to include an item in it does not alter the responsibility of Contractor to complete and warrant all the Work in accordance with the Contact Documents. All items on the list shall be completed or corrected by Contractor within 30 days of the above date of Substantial Completion. Public Dock Facility CERTIFICATE OF SUBSTANTIAL COMPLETION @ Sanford Marina 00626-1 SPECLIB010704 This Certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release of Contractor's obligations to complete the Work in accordance with the Contract Documents. / Executed by Engineer on /f))/2_ �!��/.� I Date En eer : CPH Engineer Inc. By: G? 7 // ( ignature) Da/V/i( /-nri/i//'-//1&) A'Z'Yi(///\/411eev- (Printed Name and Title) l J Executed by Owner on /0/02-7/4..7 Date Owner: G try D F SIQN�o t� By: (Signature) —1Ori , Geo z fie- y(Printed Name Name anLfitle) Contractor accepts this Certificate of Substantial Completion on / 46,eAr ,Rohr c ?. 1 a Date Contractor: i4 erieo reed,44 ".s a.►,,�✓� By: C; ; —V!4;e7 (Signature) (Printed Name and Title) END OF SECTION Public Dock Facility CERTIFICATE OF SUBSTANTIAL COMPLETION @ Sanford Marina 00626-2 SPECLIB010704 LIST OF DEFICIENT ITEMS A list of items to be completed or corrected is attached below. This list may not be all-inclusive, and the failure to include an item in it does not alter the responsibility of Contractor to complete and warrant all the Work in accordance with the Contact Documents. All items on the list shall be completed or corrected by Contractor within 30 days of the above date of Substantial Completion. 1. Complete Kiosk Sign and required Manatee signage. 2. Complete repairs to breakwater walls in the west basin. 3. Complete the bumper installation at the south end of the Monroe Harbor boat docks. 4. Adjust pier ramp to line up with docks 5. Complete as-builds of completed dock system. 6. Provide material and maintenance bond per City agreement. 7. Install piles caps. 8. Add handrail additions and turn-backs at the fixed pier. 9. Add ADA Hand Rails to the Gangway. Public Dock Facility CERTIFICATE OF SUBSTANTIAL COMPLETION @ Sanford Marina 00626-3 SPECLIB010704 s 1 i ' I1I 11 1 . 81 lDj VI ail trI AI Z.11 N �i O) col m V op tnl A 431 NI -• O/X1� 3 C a n N N 7C 11 T m 2 91 .t .C“ §" ISSVOigg . f.. . a Z g'I 1r .. . . NErs. °) §. E1 It mat m i 1 ti g W E e 8 $ 8 8 8 8 $ 8 $ 8 $ 8 8 $ 8 $ $ $ 8 i 2 O N O N N A tl• V N to A. N N CO 0 g 1 w 4) w w w 43 w w CO w w 4) w w w 0) (..) w w i-— ''. 4) w 4) w w w W 4) w 4) w w CO w CO w 4) 41 w' — — —.— I- r- 1 i ,_,1 p .... co 1 I • i I II4 Itil �', �,th i 5' Ice E. N i A-, I ■ IN I la....., 1 1 hi i41i t , i INI 1 I1 I INI g 14,IW 1 741