Loading...
108ADDRESS OWNER OCCUPANCY 108 Silver Maple Terrace R C A Certificate of Occupancy:] LEGAL DESCRIPTION Date Approved; Lot 6 Hidden Lake Phase III BUILDING CONTRACTOR Sub. Reg's. Apply: es No BUILDING: 3 -17 -83 Permit #18423 BUILDING RECORD f / r� Final Inspection J. Feinstein Erect S/F Res Model #1266 I FEES: 1L � �' �� !;, Development Fee 0kV,) I'` , 3 4 / g 1 , p (36,318) 1� �YZ �Y E y�0 > Streets Paved Unpaved Street Paving Fee UTILITIES: 3 0 D Water Lines Meter Set Sewer Lines Sewer Tap Storm Sewer ENGINEERING /PUB. WORKS: Drainage Street Paving Street Dame Signs Street Lights [OVER] Maintenance Bond PLUMBING ELECTRICAL MECHANICAL ® - ermi 5-11-83 Permit # 9029 5 -11 -83 Permit X2733 CONTRACTOR CONTRACTOR CONTRACTOR Bracewell Palmer Electric Air Flow Designs FIXTURES FIXTURES FIXTURES New Res. 2 Bath New Res. 101 -200 AMP Install Teat & AC 5 -4 -83 Permit ##0579 Sunbelt -New res.2 bath INSPECTIONS { (} ROUGH IN ;1 7_3 iLz. FINAL JD- l -_ �S INSPECTIONS ROUGHIN FINAL INSPECTIONS ROUGH IN FINAL �C)-T