Loading...
106AOOAESS _ OWNFD nCCIIVAN 106 Wild Elm Court k C A C ificate of ccu a ncv: �,'�?�,� LEGAL I ESCRIPTION Lot 89 Hidden Lake Phase III Date Approved: Vz Vw -' 9UILOING CONTRACToR Sub. Reg's. Apply: Yes No w BUILDING RECORD BUILDING: 4 -4-83 4 -4 -83 Permit #18550 Final Inspection J. Feinstein S° -�' alab- 0 J S FEES: Erect S/F Res Model 1069 n 1 .1 C)Y, - T-S Development Fees // (29,982) - �cf -W3 Franot - c) Streets Paved Unpaved J?, -F, - ai T-S Street Paving Fee UTILITIES: Water Lines Meter Set Sewer Lines Sewer Tap Storm Sewer OVER ENGINEERINGIPUB. WORKS: Drainage Street Paving Street Name Signs Street Lights Maintenance Bond PLUME31NG ELECTRICAL MECHANICAL 4-15-83 Permit #0517 5-16-83 Permit #9042 5-1283 Permit #2738 CONTRACTOR CONTRACTOR CONTRACTOR Bracewell Palmer Electric Air Flow FIXTURES FIXTURES FIXTURES New Res. 2 Bath New Res 101-200 AMP Install Heat & AC -------------------------- �4-29-83 Permit #0544 Sunbelt Group New Res 2 Bath INSPECTIONS ROUGH IN JLI-'93 Se-U- Ot� - .. 4 - 1 -a(o - Kd�-- D INSPECTIONS ]ROUGH IN 'Y3 FINAL INSPECTIONS ROUGH IN IS FINAL 4 R-3 -- 0