Loading...
1233-Wharton Smith Change Order 2N7 77 1 r o� Il _ is OWNER ARCHITECT 0 a CONTRACTOR FIELD OTHER PROJECT: (Name and Address) TO CONTRACTOR: (Name and Address) Sanford Public Safety Building 911 West 13 Street Sanford, FL 32771 Wharton- Smith, Inc. P.O. Box 471028 Lake Monroe, FL 32747 -1028 CHANGE ORDER NO: 002 INITIATION DATE: November 17, 2009 PROJECT NO.: 09 -042 CONTRACT FOR: General Construction CONTRACT DATE: July 1, 2008 THE CONTRACT IS CHANGED AS FOLLOWS: Scope of work increase to include the following proposal requests and additional requested items: PR#1- Traffic Signalization Conduit, PR#2- Magnetic Door Holds @Door 10le, PR#3 -Soil Remediation, PR#4- Additional Tree Removal/Pond Reconfiguration, Addendum #2 Strucutral Steel Changes, and Additional 2 year Maintenance Bond. The original Guaranteed Maximum Price was .................................................................................. ............................... $ 15,930,416.00 Net change by previously authorized Change Orders .......................................................................... ..............................$ (3,180,000.00) The Guaranteed Maximum Price prior to this Change Order was ..................................................... ............................... $ 12,750,416.00 The Guaranteed Maximum Price will be increased by this Change Order ............................................... ............................... $ 80,625.49 The new Contract sum including this Change Order will be ............................................................. ............................... $ 12,831,041.49 The Contract Time will be increased by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is September 3, 2010. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Architects Design Group, Inc. ARCHITECT (Fir Name) By (Si ature) Ian Reeves, A.I.A. (Typed Name) //' M 4 Date Attest: City Clerk For use and reliance of the Sanford only. Wharton- Smith, Inc. CONTRACTOR (F' jifN e) By (S natur Eric H. Palmer (Typed Name) Date City Commission of the City of Sanford, Florida OWNER m Name) By (Signa e) Linda Kuhn, Mayor (Typed Name) W )z 10 5 Date y ttorney 0 NAPE /V ' � nr N 0 0 m V O a 0 a� c m ae r 0 �a