Loading...
1233 Wharton Smith CO #3CHANGE ORDER 'P /V j OWNER = ARCHITECT CONTRACTOR FIELD OTHER PROJECT: (Name and Address) TO CONTRACTOR: (Name and Address) Sanford Public Safety Building 911 West I P Street Sanford, FL 32771 Wharton- Smith, Inc. P.O. Box 471028 Lake Monroe, FL 32747 -1028 CHANGE ORDER NO: 003 INITIATION DATE: February 4, 2010 PROJECT NO.: 09 -042 CONTRACT FOR: General Construction CONTRACT DATE: July 1, 2008 THE CONTRACT IS CHANGED AS FOLLOWS: Estimated initial amount of Owner Direct Purchases for the Sanford Public Safety Building. Purchases may include items such as sitework structures and piping, base material, asphalt, reinforcing steel, concrete, masonry materials, structural steel, miscellaneous steel, roofing materials, doors, frames and hardware, storefront materials, drywall materials, floor coverings, ceramic tile materials, pre- engineered steel, elevator equipment, fire sprinkler piping, HVAC material and equipment, electrical switchgear and fixtures. This change is an estimate only and it is agreed to by both parties that should the ODP purchases not exceed this estimate that a change order will be issued to reconcile the contract amount. Estimated ODP Purchases $(1,000,000.00) Sales Tax on ODP Purchases $(60,000.00) Total Deduct $(1,060,000.00) The original Guaranteed Maximum Price was .................................................................................... ..............................$ 15,930,416.00 Net change by previously authorized Change Orders ........................................................................ ............................... $ (3,099,374.51) The Guaranteed Maximum Price prior to this Change Order was ...................................................... ..............................$ 12,831,041.49 The Guaranteed Maximum Price will be decreased by this Change Order ........................................ ............................... $ (1,060,000.00) The new Contract sum including this Change Order will be .............................................................. ..............................$ 11,771,041.49 The Contract Time will be increased by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is September 3, 2010. NOT ntsDesgn UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Arc it Group, Inc. Wharton- Smith, Inc. m m Name CONTRACT m N e) By Signa e) By (Signature Ia ves, .I.A. Eric H. Palmer yped Name) (Typed Name) Date Date lo Attest: Qlko Janet Dougherty, City Cler use of the Sanford City_ Cc/n4ssion only. City Commission of the City of Sanford, Florida OWNER (F Name) By (Signatur Linda Kuhn, (Typed Name Z, �2_ ( L . Date Attorney