1233 Wharton Smith CO #3CHANGE ORDER
'P /V j OWNER =
ARCHITECT
CONTRACTOR
FIELD
OTHER
PROJECT:
(Name and Address)
TO CONTRACTOR:
(Name and Address)
Sanford Public Safety Building
911 West I P Street
Sanford, FL 32771
Wharton- Smith, Inc.
P.O. Box 471028
Lake Monroe, FL 32747 -1028
CHANGE ORDER NO: 003
INITIATION DATE: February 4, 2010
PROJECT NO.: 09 -042
CONTRACT FOR: General Construction
CONTRACT DATE: July 1, 2008
THE CONTRACT IS CHANGED AS FOLLOWS: Estimated initial amount of Owner Direct Purchases for the Sanford Public Safety
Building. Purchases may include items such as sitework structures and piping, base material, asphalt, reinforcing steel, concrete, masonry materials,
structural steel, miscellaneous steel, roofing materials, doors, frames and hardware, storefront materials, drywall materials, floor coverings, ceramic
tile materials, pre- engineered steel, elevator equipment, fire sprinkler piping, HVAC material and equipment, electrical switchgear and fixtures. This
change is an estimate only and it is agreed to by both parties that should the ODP purchases not exceed this estimate that a change order will be
issued to reconcile the contract amount.
Estimated ODP Purchases $(1,000,000.00)
Sales Tax on ODP Purchases $(60,000.00)
Total Deduct $(1,060,000.00)
The original Guaranteed Maximum Price was .................................................................................... ..............................$ 15,930,416.00
Net change by previously authorized Change Orders ........................................................................ ............................... $ (3,099,374.51)
The Guaranteed Maximum Price prior to this Change Order was ...................................................... ..............................$ 12,831,041.49
The Guaranteed Maximum Price will be decreased by this Change Order ........................................ ............................... $ (1,060,000.00)
The new Contract sum including this Change Order will be .............................................................. ..............................$ 11,771,041.49
The Contract Time will be increased by Zero (0) days.
The date of Substantial Completion as of the date of this Change Order therefore is September 3, 2010.
NOT ntsDesgn UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
Arc it Group, Inc. Wharton- Smith, Inc.
m m Name CONTRACT m N e)
By Signa e) By (Signature
Ia ves, .I.A. Eric H. Palmer
yped Name) (Typed Name)
Date Date lo
Attest:
Qlko
Janet Dougherty, City Cler
use
of the Sanford City_ Cc/n4ssion only.
City Commission of the City of Sanford, Florida
OWNER (F Name)
By (Signatur
Linda Kuhn,
(Typed Name
Z, �2_ ( L .
Date
Attorney