1233-Wharton Smith CO #004RCHAl�C E ORDER. OWNER O ARCHITECT CONTRACTOR O FIELD OTHER O PROJECT= S Sanford Public Safety Building C CHANGE ORDER NOc 004R (Name and Address) 8 815 West 13`� Street Sanford, FL 32771 I INITIATION DATE= March 11, 2010 TO CONTRACTOR: W Wharton - Smith, Inc_ P PROJECT NO_: 09 -042 (Name and Address] P P_O_ Box 471028 Lake Monroe, FL 3 2747 -1 028 C CONTRACT FOR: General Construction CONTRACT DATE: July 1, 2008 _______________________________________________________________ ______________________________$ (4,159,374_51) The Guaranteed Maximum Price prior to this Change Order The new Contract sum including this Change Order will be ............................................................. ............................... $ 11,700,462_75 TheContract Time will be increased by Nineteen (19) days_ The date of Substantial Completion as of the date of this Change Order therefore is September 22, 2010 NOT VALID iJ 1VTIL SIGNED BY THE ARC HIT EC T CONTRACTOR AND OWNER_ Architects esi n rou ,Inc. Wharton- Smith, Inc. ARCHI CT ( N ej CONTR By Sig a ur By (Signature] Ian A_LA. Eric H_ Palmer (Typed Namej (Typed Namej ro Date Attest: �� �anet Dougherty, ity Cle Date Commission of the �lE (F'Il - m Name) By (S Linda F Sanford, Florida i For use a d reliance of the Sanford iiy C mmission only_ (Typed Name) A gali 3 ,� �2 Date illiam L. Colbert ity //Attorney .iC � f �� Sanford Public Safety Complex Change Order and Proposal Request Log PM= Project Mgr; Nick Mcray ADG PR# WS PR# Description Date Submitted Amount Approval Date Amt Approved Reference Reason/ Dept Requested Add power and data hookups in floor of 6 5 Addl Electric & Data Floor Boxes 12/3012009 $1,043.27 PD Training Room PD Requested Change in stormwater structure configuration at manufacturing plant. City paid via ODP- contractor not 6 Stormwater Structure Change Void Void Void entitled to addl. payment- MEP Designer requested revision to conduit routes in Community Room and 8 Conduit under area 112712010 $2,921.31 Museum IT Department requested IT Closet Doors be prepped for future access 9 Door Prep @ IT Closets 12/21/2009 $946.71 control locks. Gas line to future gas grill near PD Storage Building eliminated (PD 12 10 Gas Line Credit 12/21/2009 - $1,069.91 Requested Revise duct work in server room and revise light fixtures various areas. Revise conduit routing for antennae wire connection to back up radio cabinet. (Permit Issues and Designer requested 9 11 HVAC Duct and Light Fixture Mods 1/25/2010 $3,656. changes Changes to fixtures, wiring and electrical components that occurred during building permit process after 12 Electrical Addenda #2 Changes 1/25/2010 $22,736.82 GMP Bid. 13 Concrete Slab Addenda #2 Chan es 1/2512010 V oid Void Void- No change in slab thickness Change in specified roof concrete. Credit from Contractor. Will meet design Lightweight Insulating Concrete for Roof parameters through FBC Rational 14 Credit for alternate material 1/25/2010 441,029.40 Method Analysis- Add Code required alarm devices caught in subcontractor review. (RFl- 15 Additional Fire Alarm Equipment 1/2512010 $3,023.75 180 Change specified floor stain due to non - compatibility with release agent. Also changed finish from slick to broom finish in utility work areas. Add epoxy floor in 7 21 Floor Finish Revisions 3/7/2010 - $9,775.12 PD Crime Scene Work Room Change doors from Dutch double to 4' Sub Agreed to do single Dutch door at PD Supply. Fire 10 Dutch Door- PD Supply '12118/2009 $0.00 No Char e Change No Charge Code requirement. Add secure vestibule from S. Sally port man door to S. PD entrance. (PD 11 18 Sally Port Security Vestibule 3/7/2010 $12,770.21 Requested Change fire alarm low voltage wiring to be "Free Wire" instead of all in conduit 13 17 Free Wire Fire Alarm System Credit 317/201 - $8,008 per GMP Bid Docs. PM Requested Revise Curbing and inlets at Lake Ave and 13th Street intersection to address field conditions- ponding water. (PM 14 Lake Ave Curb and Inlets Requested Permanent Power Conduit to 19 Transformer 31712010 $1,297.75 Primary Power to FPL Transformer. Black out shades for FD Lieutenant and BC bedrooms were not identified in Finish Plans. Added during shop dwg 16 Additional Black Out / Security Shades 2/9/2010 $583.39 review PM Requested Add four (4) access controlled doors, one (1) monitored door and two interior security cameras and all associated conduit. Request generated during PD Additional Access Control Doors and review of security drawings (PD 15 Cameras Requested 16 Drii eway Concrete- FD Delete drywall and stucco ceiling in ID Stucco Ceiling Deletion in FD Bay Bay. Provide painting under roof for 20 (Credit) 3/7/2010 - $59,675.45 exposed equipment. Total Proposed $10,046.75 ITotal Approved $80,625.49 Previous Changes Difference ($70,578.74) Credit