1258 Cloud Branch Ph 2i�S9�t CHANGE ORDER FORM Change Order No. 1 Project Title Cloud Branch Drainage Improvements - Ph. 2 Bid No. IFB 08/09 -14 Owner: City of Sanford Contractor: Central Florida Environmental Corp. Agreement Date: August 31 2009 This Change Order is necessary to cover changes in the work to be performed under this Agreement. The GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, and STANDARD SPECIFICATIONS apply to and govern all work under this Change Order. THE FOLLOWING CHANGES ARE MADE TO THE CONTRACT DOCUMENTS: (1) Original Contract Price (2) Current Contract Price (Adjusted by Previous Change Orders) (3) Total Proposed Change in Contract Price (4) New Contract Price (Item 2 + Item 3) (5) Original Contract Time (6) Current Contract Time (Adjusted by Previous Change Orders) (7) Total Proposed Change in Contract Time (8) New Contract Time (Item 6 + Item 7) (9) New Contract Substantial Completion Date 2.358.902.00 $ 2,358,902.00 $ 225,928.46 $ 2,584.830.46 180 Days 180 Days 97 Days 277 Days 7/2/10 Page 1 of 6 Change Order #1 4 -29 -10 CHANGES ORDERED ITEM 1 Description of Change: Reason for Change Change in Contract Price: Change in Contract Time Revision of project sign ARRA funded job required specific project sign to be installed at project site. $140.00 0 Days ITEM 2 Description of Change Reason for Change Change in Contract Price: Change in Contract Time Remove an existing end wall and build a new end wall The existing endwall located in the Cloud Branch Ditch near 6 Street needs to be removed and rebuilt to accommodate the shift and regrading of the ditch. $3,989.31 6 Days ITEM 3 Description of Change: Reason for Change Change in Contract Price Change in Contract Time Relocation of reclaimed water main (RWM) connection The reconnection of the RWM had to be moved because the existing RWM pipe location was not where it was shown to be. $6,467.94 3 Days Change Order #1 4 -29 -10 Page 2 of 6 ITEM 4 Description of Change: Additional contaminated soil haul off and dump fees, excavation beyond the original defined contaminated limits and earthwork deduction. Reason for Change: Contaminated soil were discovered and removed beyond the initial limits provided in the geotechnical report. Change in Contract Price: $163,260.31 Change in Contract Time: 30 Days ITEM 5 Description of Change: Upgrade the electrical service to Coast Line Park Reason for Change: To provide a larger amp service for future lights or development in the park. Change in Contract Price: $16,909.15 Change in Contract Time: 14 Days ITEM 6 Description of Change: Pond excavation and inlet installation Reason for Change: Need to add an inlet and a pond to collect flow between railroad tracks between 6 Street and 8 Street. Change in Contract Price: $24,370.70 Change in Contract Time: 25 Day ITEM 7 Description of Change: Additional clearing and grubbing Reason for Change: Contractor had to clear and grub an additional .25 acres near 6th Street for the relocation of the Cloud Branch Ditch. There is already a pay item for clearing and grubbing. Change in Contract Price: $908.00 Change in Contract Time: 1 Day Page 3 of 6 Change Order #1 4 -29 -10 ITEM 8 Description of Change: Reason for Change: Change in Contract Price Change in Contract Time Additional concrete for 4'X13' B.C. end wall Additional concrete was needed to finish the footer and end wall. $2,803.50.00 0 Days ITEM 9 Description of Change: Reason for Change: Change in Contract Price: Change in Contract Time: Additional removal of existing 24" storm pipe Additional pipe was found and removed during excavation. $1,396.85 0 Days ITEM 10 Description of Change: Reason for Change: Change in Contract Price: Change in Contract Time: Additional removal of existing 15" storm pipe Additional pipe was found and removed during excavation. $366.00 0 Days ITEM 11 Description of Change: Reason for Change: Change in Contract Price: Change in Contract Time: Additional removal of 8" abandoned water main Additional pipe was found and removed during excavation. $5,316.70 0 Days Change Order #1 4 -29 -10 Page 4 of 6 ITEM 12 Description of Change Reason for Change Change in Contract Price Change in Contract Time Delay of jack and bore CSX flagmen were not available at contractors time of proposed time of jack and bore "ME 18 Days CHANGE ORDER SUMMARY No. Description Change In Contract Price Change In Contract Time 1 Revision of project sign $140.00 0 Days 2 Remove an existing end wall and build a new end wall $3,981.31 6 Days Y 3 Relocation of reclaimed water main (RWM) connection $6,467.94 3 Days 4 Additional contaminated soil haul off and dump fees, excavation beyond the original defined contaminated limits and earthwork deduction. $163,260.31 30 Days 5 Upgrade the electrical service to Coast Line Park $16,909.15 14 Days 6 Pond excavation and inlet installation $24,370.70 25 Days 7 Additional clearing and grubbing $908.00 1 Days 8 Additional concrete for 4'X13' B.C. end wall $2,803.50 0 Days 9 Additional removal of existing 24" storm pipe $1,396.85 0 Days 10 Additional removal of existing 15" storm pipe $366.00 0 Days 11 Additional removal of 8" abandoned water main $5,316.70 0 Days 12 Delay of jack and bore $0.00 18 Days TOTAL $225,928.46 97 Days Change Order #1 4 -29 -10 Page 5 of 6 WAIVER This Change Order constitutes full and mutual accord and satisfaction for the adjustment of the Contract Price and Contract Time as a result of increases or decreases in cost and time of performance caused directly and indirectly from the change. Acceptance of this Waiver constitutes an agreement between OWNER and CONTRACTOR that the Change Order represents an equitable adjustment to the Agreement and that CONTRACTOR shall waive all rights to file a Contract Claim or claim of any nature on this Change Order. Execution of this Change Order shall constitute CONTRACTOR's complete acceptance and satisfaction that it is entitled to no more costs or time (direct, indirect, impact, etc.) pursuant to this Change Order. APPROVAL AND CHANGE ORDER AUTHORIZATION ACKNOWLEDGMENTS The aforementioned change, and work affected thereby, is subject to all provisions of the original Agreement and specifically changed by this Change Order; and It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original Agreement other than matters expressly provided herein. ATTEST (Secretary) to Date Date Central Florida Environmental Corr). Contractor -YJ sWCJw 7 2-114. PrinW Name and Title of Officer Ely (Signature) (Corporate Seal) Date ATTEST: City of Sanford Owner WY Tom George — Interim City Manager (Signature) Printed Name and Title Date By (9i ture) (Seal) Date END OF SECTION Page 6 of 6 Change Order #1 4 -29 -10