Loading...
1233 Wharton Smith Chg Ord 6CHAN G D c OWNER ARCHITECT CONTRACTOR FIELD OTHER PROJECT: (Name and Address) TO CONTRACTOR: (Name and Address) Sanford Public Safety Building 815 West IP Street Sanford, FL 32771 Wharton- Smith, Inc. P.O. Box 471028 Lake Monroe, FL 32747 -1028 CHANGE ORDER NO: 006 INITIATION DATE: May 12, 2010 PROJECT NO.: 09 -042 CONTRACT FOR: General Construction CONTRACT DATE: July 1, 2008 THE CONTRACT IS CHANGED AS FOLLOWS: Estimated initial amount of Owner Direct Purchases for the Sanford Public Safety Building. Purchases may include items such as sitework structures and piping, base material, asphalt, reinforcing steel, concrete, masonry materials, structural steel, miscellaneous steel, roofing materials, doors, frames and hardware, storefront materials, drywall materials, floor coverings, ceramic tile materials, pre - engineered steel, elevator equipment, fire sprinkler piping, HVAC material and equipment, electrical switchgear and fixtures. This change is an estimate only and it is agreed to by both parties that should the ODP purchases not exceed this estimate that a change order will be issued to reconcile the contract amount. Estimated ODP Purchases $(190,000.00) Sales Tax on ODP Purchases $(11,400.00) Total Deduct $(201,400.00) The original Guaranteed Maximum Price was .................................................................................. ............................... $ 15,930,416.00 Net change by previously authorized Change Orders .......................................................................... ..............................$ (4,069,030.16) The Guaranteed Maximum Price prior to this Change Order was ..................................................... ............................... $ 11,861,385.84 The Guaranteed Maximum Price will be decreased by this Change Order ............................................ ..............................$ (201,400.00) The new Contract sum including this Change Order will be ............................................................. ............................... $ 11,659,985.84 The Contract Time will be unchanged by ( ) days. The date of Substantial Completion as of the date of this Change Order therefore is September 22, 2010. NOT VALIb UNTIE, SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Inc. Wharton- Smith, Inc. me) CONTRAC 'rm e By (Sign Lure) Ia eeya,- A.I.A. (Typed Name) .D�.I� la Date Attest: wg - 14anet Dougherty, City Cle Eric H. Palmer (Typed Name) Date City Commission of the City of San ford, Florida OWNE E!qn Name) By (Sign re) Linda Ku , Mayor (Typed Name) 5- 19 -4 -( Date CHANGE ORDER PROJECT: (Name and Address) TO CONTRACTOR: (Name and Address) Sanford Public Safety Building 815 West 13 Street Sanford, FL 32771 Wharton- Smith, Inc. P.O. Box 471028 Lake Monroe, FL 32747 -1028 CHANGE ORDER NO: 007 �Z / OWNER F 7 ARCHITECT CONTRACTOR FIELD OTHER INITIATION DATE: May 12, 2010 PROJECT NO.: 09 -042 CONTRACT FOR: General Construction CONTRACT DATE: July 1, 2008 THE CONTRACT IS CHANGED AS FOLLOWS: Scope of work increase to include the following proposal requests and additional requested items: PR#24- Concrete Pavement Enhancement, PR #26- Secured Doors & Security Cameras, PR #28- Insulated Metal Panel Credit, and PR#29- Locker Sloping Tops. The original Guaranteed Maximum Price was .................................................................................. ............................... $ 15,930,416.00 Net change by previously authorized Change Orders .......................................................................... ..............................$ (4,270,430.16) The Guaranteed Maximum Price prior to this Change Order was ..................................................... ............................... $ 11,659,985.84 The Guaranteed Maximum Price will be increased by this Change Order ............................................... ............................... $ 35,962.96 The new Contract sum including this Change Order will be ............................................................. ............................... $ 11,695,948.80 The Contract Time will be unchanged by ( ) days. The date of Substantial Completion as of the date of this Change Order therefore is September 22, 2010. NOT VALAQ NTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Inc. Wharton- Smith, Inc. me) CONT C it ) By (Signature) Eric H. Palmer (Ty 0 0 5. 1 1 9.10 Date Attest: chox � Janet Dougherty, City Cle use a eliance of the Sanford City gotrunission only. S to form nd legality o e Attorney ��✓� %L J (Typed Name) . Date City Commission of the City of Sanford, Florida (Typed Name) 4� --)- Date