1233 Wharton Smith Chg Ord 6CHAN G D
c
OWNER
ARCHITECT
CONTRACTOR
FIELD
OTHER
PROJECT:
(Name and Address)
TO CONTRACTOR:
(Name and Address)
Sanford Public Safety Building
815 West IP Street
Sanford, FL 32771
Wharton- Smith, Inc.
P.O. Box 471028
Lake Monroe, FL 32747 -1028
CHANGE ORDER NO: 006
INITIATION DATE: May 12, 2010
PROJECT NO.: 09 -042
CONTRACT FOR: General Construction
CONTRACT DATE: July 1, 2008
THE CONTRACT IS CHANGED AS FOLLOWS: Estimated initial amount of Owner Direct Purchases for the Sanford Public Safety
Building. Purchases may include items such as sitework structures and piping, base material, asphalt, reinforcing steel, concrete, masonry materials,
structural steel, miscellaneous steel, roofing materials, doors, frames and hardware, storefront materials, drywall materials, floor coverings, ceramic
tile materials, pre - engineered steel, elevator equipment, fire sprinkler piping, HVAC material and equipment, electrical switchgear and fixtures. This
change is an estimate only and it is agreed to by both parties that should the ODP purchases not exceed this estimate that a change order will be
issued to reconcile the contract amount.
Estimated ODP Purchases $(190,000.00)
Sales Tax on ODP Purchases $(11,400.00)
Total Deduct $(201,400.00)
The original Guaranteed Maximum Price was .................................................................................. ............................... $ 15,930,416.00
Net change by previously authorized Change Orders .......................................................................... ..............................$ (4,069,030.16)
The Guaranteed Maximum Price prior to this Change Order was ..................................................... ............................... $ 11,861,385.84
The Guaranteed Maximum Price will be decreased by this Change Order ............................................ ..............................$ (201,400.00)
The new Contract sum including this Change Order will be ............................................................. ............................... $ 11,659,985.84
The Contract Time will be unchanged by ( ) days.
The date of Substantial Completion as of the date of this Change Order therefore is September 22, 2010.
NOT VALIb UNTIE, SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
Inc. Wharton- Smith, Inc.
me) CONTRAC 'rm e
By (Sign Lure)
Ia eeya,- A.I.A.
(Typed Name)
.D�.I� la
Date
Attest:
wg -
14anet Dougherty, City Cle
Eric H. Palmer
(Typed Name)
Date
City Commission of the City of San ford, Florida
OWNE E!qn Name)
By (Sign re)
Linda Ku , Mayor
(Typed Name)
5- 19 -4 -(
Date
CHANGE ORDER
PROJECT:
(Name and Address)
TO CONTRACTOR:
(Name and Address)
Sanford Public Safety Building
815 West 13 Street
Sanford, FL 32771
Wharton- Smith, Inc.
P.O. Box 471028
Lake Monroe, FL 32747 -1028
CHANGE ORDER NO: 007
�Z / OWNER F 7
ARCHITECT
CONTRACTOR
FIELD
OTHER
INITIATION DATE: May 12, 2010
PROJECT NO.: 09 -042
CONTRACT FOR: General Construction
CONTRACT DATE: July 1, 2008
THE CONTRACT IS CHANGED AS FOLLOWS: Scope of work increase to include the following proposal requests and additional
requested items: PR#24- Concrete Pavement Enhancement, PR #26- Secured Doors & Security Cameras, PR #28- Insulated Metal Panel Credit, and
PR#29- Locker Sloping Tops.
The original Guaranteed Maximum Price was .................................................................................. ............................... $ 15,930,416.00
Net change by previously authorized Change Orders .......................................................................... ..............................$ (4,270,430.16)
The Guaranteed Maximum Price prior to this Change Order was ..................................................... ............................... $ 11,659,985.84
The Guaranteed Maximum Price will be increased by this Change Order ............................................... ............................... $ 35,962.96
The new Contract sum including this Change Order will be ............................................................. ............................... $ 11,695,948.80
The Contract Time will be unchanged by ( ) days.
The date of Substantial Completion as of the date of this Change Order therefore is September 22, 2010.
NOT VALAQ NTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
Inc. Wharton- Smith, Inc.
me) CONT C it )
By (Signature)
Eric H. Palmer
(Ty
0 0 5. 1 1 9.10
Date
Attest:
chox �
Janet Dougherty, City Cle
use a eliance of the Sanford City gotrunission only.
S to form nd legality
o e
Attorney ��✓� %L J
(Typed
Name) .
Date
City Commission of the City of Sanford, Florida
(Typed Name)
4� --)-
Date