1314 Swell Const. Change Order 1I� r3 PURCHASING DEPARTMENT T RANSMITTAL MEMORANDUM To: City Clerk RE: Swell Construction Change Order #1 The item(s) noted below is /are attached and forwarded to your office for the following action(s): ❑ Development Order ❑ Mayor's signature ❑ Final Plat (original mylars) ❑ Recording ❑ Letter of Credit ❑ Rendering ❑ ❑ Maintenance Bond Ordinance ® Saf keeping (Vaault) �� r° XC K --# I ❑ Performance Bond Payment Bond ❑ Resolution ❑ City Manager Signature ❑ ❑ City Clerk Signature Once completed, please: ❑ Return original ❑ Return copy Special Instructions; For safe keeping Please advise if you have any questions regarding the above. Thank you! From Date TADept_ forms \City Clerk Transmittal Memo - 2009.doc CHANGE ORDER FORM Change Order No. 1 Project Title St. Johns Parkway Construction (Meisch Rd. to Airport Blvd Bid No. IFB No. 09/10 -01 Owner: City of Sanford Contractor: Swell Construction Comr)anv, Inc. Agreement Date: March 8, 2010 This Change Order is necessary to cover changes in the work to be performed under this Agreement. The GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, and STANDARD SPECIFICATIONS apply to and govern all work under this Change Order. THE FOLLOWING CHANGES ARE MADE TO THE CONTRACT DOCUMENTS: (1) Original Contract Price $ 1.014,787.14 (2) Current Contract Price (Adjusted by Previous Change Orders) $ 1,014,787.14 (3) Total Proposed Change in Contract Price $ 69,539.42 (4) New Contract Price (Item 2 + Item 3) $ 1,082,301.56 (5) Original Contract Time 180 Days (6) Current Contract Time (Adjusted by Previous Change Orders) 180 Days (7) Total Proposed Change in Contract Time 15 Days (8) New Contract Time (Item 6 + Item 7) 195 Days (9) New Contract Substantial Completion Date 10/10/10 Page 1 of 5 Change Order No. 1 - SJP 05- 11- 10.doc CHANGES ORDERED ITEM 1 Description of Change: Additional Driveway Aprons Reason for Change: Three extra driveway aprons are proposed to be added: one on the north side west of Martin Luther King, Jr. Blvd ( "MLK" Blvd.) to serve the large Ball property, and two on the south side to serve the Dyson property. Additionally, minor adjustments to the sidewalk and storm pipe quantity are proposed due to an adjustment to the roadway alignment east of MLK Blvd. Change in Contract Price: $7,172.52 Change in Contract Time: 2 Days ITEM 2 Description of Change: Additional Reclaimed Water Services and Stubouts Reason for Change: Stubouts to the reclaimed water main are proposed at Meisch Rd. and MLK Blvd., and services are proposed to all undeveloped parcels on the north and south side of St. Johns Parkway in order to serve future development. Services for future connections are also proposed to the existing residential parcels on the north side of St. Johns Parkway between MLK Blvd. and Airport Blvd. Change in Contract Price: $20,346.90 Change in Contract Time: 4 Days ITEM 3 Description of Change: Additional Water Services and Stubouts Reason for Change: Stubouts to the potable water main are proposed at the undeveloped Ball property and at MLK Blvd., and services are proposed to all undeveloped parcels on the north and south side of St. Johns Parkway in order to serve future development. Services for future connections are also proposed to the existing residential parcels on the north side of St. Johns Parkway between MLK Blvd. and Airport Blvd. Page 2 of 5 Change Order No. 1 - SJP 05- 11- 10.doc Change in Contract Price: $28,359.00 Change in Contract Time: 4 Days ITEM 4 Description of Change: Additional Sewer Services and Stubouts. Reason for Change: A sewer line extension to the undeveloped Ball property is proposed, and sewer laterals are proposed to all undeveloped parcels on the north and south side of St. Johns Parkway in order to serve future development. Services for future connections are also proposed to the existing residential parcels on the north side of St. Johns Parkway between MILK Blvd. and Airport Blvd. At Airport Blvd., two of the manhole rims are proposed to be adjusted due to an elevation change. Change in Contract Price: $11,861.00 Change in Contract Time: 4 Days ITEM 5 Description of Change: Additional Work Associated With Artesian Wells Reason for Change: Existing artesian wells were discovered along the right -of -way. Near station 37 +87, extra work by the Contractor's crew over a period of one day was needed to investigate the source of water and assess the wells. Change in Contract Price: $1,800.00 Change in Contract Time: 1 Day Page 3 of 5 Change Order No. 1 - SJP 05- 11- 10.doc CHANGE ORDER SUMMARY No. Description Change In Contract Price Change In Contract Time 1 Additional Driveway Aprons $7,172.52 2 Days 2 Additional Reclaimed Water Services and Stubouts $20,346.90 4 Days 3 Additional Water Services and Stubouts $28,359.00 4 Days 4 Additional Sewer Services and Stubouts $11,861.00 4 Days 5 Additional Work Associated With Artesian Wells $1,800.00 1 Day TOTAL 1 $69,539.42 1 15 Days WAIVER This Change Order constitutes full and mutual accord and satisfaction for the adjustment of the Contract Price and Contract Time as a result of increases or decreases in cost and time of performance caused directly and indirectly from the change. Acceptance of this Waiver constitutes an agreement between OWNER and CONTRACTOR that the Change Order represents an equitable adjustment to the Agreement and that CONTRACTOR shall waive all rights to file a Contract Claim or claim of any nature on this Change Order. Execution of this Change Order shall constitute CONTRACTOR's complete acceptance and satisfaction that it is entitled to no more costs or time (direct, indirect, impact, etc.) pursuant to this Change Order. Page 4 of 5 Change Order No. 1 - SJP 05- 11- 10.doc APPROVAL AND CHANGE ORDER AUTHORIZATION ACKNOWLEDGMENTS The aforementioned change, and work affected thereby, is subject to all provisions of the original Agreement and specifically changed by this Change Order; and It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original Agreement other than matters expressly provided herein. ATTEST: Swell Construction Company. Inc. Contractor Marion O. Wren, Jr. - President / Owner (Secretary) Printed Name and Title of Officer OS' Date 6y (Signature) (Corporate Seal) Date ATTEST: City of Sanford Owner (Signature) Printed Name and Title 6-1- Date By (Signatu e) (Seal) Date Page 5 of 5 Change Order No. 1 - SJP 05- 11- 10.doc CITY OF SANFORD ST. JOHNS PARKWAY CONSTRUCTION (MEISCH RD. TO AIRPORT BLVD.) ATTACHMENT TO CHANGE ORDER NO. 1 ITEM 1 - Additional Driveway Aprons DESCRIPTION UNITS QUANTITY UNIT PRICE TOTAL PRICE 18" RCP Storm Sewer LF 5 $26.00 $130.00 Deduct Type 'F' Curb and Gutter LF 84 $8.42 $707.28 A dd Drop Curb LF 84 $10.20 $856.80 Open Cut Remove and Replace Concrete Driveway 6" Thick SY 98 $30.00 $2,940.00 A djust S -22 LS 1 $225.00 $225.00 Install New Concrete Driveway Aron 6" Thick Concrete Sidewalk 4" Thick SY SY 131 3 $28.00 $20.00 $3,668.00 $60.00 VIAL ITEM 2 - Additional Reclaimed Water Services and Stubouts $7,172.52 UNIT DESCRIPTION UNITS QUANTITY PRICE TOTAL PRICE 8" Reclaimed Water Main PVC or D. I.) LF 167 $12.00 $2,004.00 Fittings D.I. TN 0.41 $3,590.00 $1,471.90 8" Gate Valve EA 3 $1,170.00 $3,510.00 Blowoff in Capped End of Main EA 3 $350.00 $1,050.00 1" Service Line LF 76 $11.00 $836.00 8" x 1" Service Saddle and Corp. Stop EA 13 $325.00 $4,225.00 Single Service Double Service EA EA 11 2 $550.00 $600.001 $6,050.00 $1,200.00 ULVA F?101 ITEM 3 - Additional Water Services and Stubouts $20,346.90 DESCRIPTION UNITS QUANTITY UNIT PRICE TOTA PRICE 12" Water Main PVC or D.I.) LF 45 $22.00 $990.00 8" Water Main PVC or D.I. LF 66 $15.00 $990.00 Fittings D.I. TN 0.17 $4,200.00 $714.00 12" Gate Valve EA 1 $2,010.00 $2,010.00 8" Gate Valve EA 1 $1,458.00 $1,458.00 12" x 12" Tapping Sleeve and Valve Blowoff in Capped End of Main EA EA 1 2 $5,395.00 $350.00 ($5,395.00) $700.00 1" Service Line LF 707 $11.00 $7,777.00 8" x 1" Service Saddle and Corp. Stop EA 1 $325.00 $325.00 12" x 1" Service Saddle and Corp. Stop EA 6 $350.00 $2,100.00 10" x 1" Service Saddle and Corp. Stop (Existing Main EA 2 $450.00 $900.00 Sin le Service EA 8 $550.00 $4,400.00 Double Service EA 1 $600.00 $600.00 10 "x10" Tapping Sleeve & Valve, "10 "x12" Red., 12" Sleeve TAT A 1 EA 1 2 $5,395.00 $10,790.00 I V I P%L $28,359.00 J: \S0638.06 \Documents \Change Orders \SJP Change Order No. 1 Attachment 05- 11- 10.xis Page 1 of 2 ITEM 4 - Additional Sewer Services and Stubouts DESCRIPTION UNITS QUANTITY UNIT PRICE TOTAL PRICE 8" PVC Sanitary Sewer 6.01' -12' LF 63 $24.00 $1,512.00 Sanitary Sewer Manhole 6.01' -12' EA 1 $1,700.00 $1,700.00 Connect New Sewer to Existing Manhole w/ Drop Connection EA 1 $5,850.00 $5,850.00 A djust Top of Sewer Manholes C and D EA 2 $242.50 $485.00 Sewer Lateral LF 122 $16.00 $1,952.00 Sewer Service (Single Service EA 1 $362.00 $362.00 TOTAL ITEM 5 - Additional Work Associated With Artesian Well $11,861.00 DESCRIPTION UNITS QUANTITY UNIT PRICE TOTA PRICE Extra Crew Time Work Relating to Existing Artesian Wells HR 8 $225.00 $1,800.00 TOTAL CHANGE ORDER SUMMARY DESCRIPTION Changein Cost Change Tim ITEM 1 - Additional Driveway Aprons $7,172.52 2 Da ITEM 2 - Additional Reclaimed Water Services and Stubouts $20,346.90 4 Da ITEM 3 - Additional Water Services and Stubouts $28,359.00 4 Da s ITEM 4 - Additional Sewer Services and Stubouts $11,861.00 4 D2 ITEM 5 - Additional Work Associated With Artesian Wells $1,800.00 1 Da TOTAL $69,539.42 15 Da Original Contract Amount $1,014,787.14 Proposed C.O. No. 1 $69,539.42 Proposed New Contract Amount $1,084,326.56 Original Contract Time 180 Da s Proposed Contract Time for C.O. No. 1 15 Days Proposed New Contract Time 195 Days NTP Date 3/29/201 New Contract Time 195 Da New Substantial Completion Date 10/10/201 T ime From Subst. to Final 30 New Final Completion Date 11/9/201 $1,800.00 J: \S0638.06 \Documents \Change Orders \SJP Change Order No. 1 Attachment 05- 11- 10.x1s Page 2 of 2