Loading...
474 Hansom Pkwy 17-157; ROOF3 n f J 67 CITY OF SANFORD BUILDING & FIRE PREVENTION PERMIT APPLICATION Application No: Documented Construction Value: $ 5363.00 Job Address: 474 Hansom Parkway, Sanford, FL. 32771 Historic District: Yes No 0 Parcel ID: 12-20-30-300-0130-0000 Residential Q Commercial Type of Work: New Addition Alteration Repair Demo Change of Use Move Description of Work: Roof Replacement - IKO Cambridge Asphalt Shingles Plan Review Contact Person: Justin Shelton Phone: 321-441-2300 Name Michael Seaman Fax: 321-441-2313 Email: Property Owner Information Title: Re -Roof Department Manager Phone: 407-574-1770 Street: 474 Hansom Parkway Resident of property? City, State Zip: Sanford, FL. 32771 Contractor Information Name Collis Roofing, Inc. Phone: Street: P.O. Box 520668 Fax: City, State Zip: Longwood, FL. 32752 Name: n/a Street: City, St, Zip: Bonding Company: n/a Address: 321-441-2300 321-441-2313 yes State License No.: CCC05802 Architect/Engineer Information Phone: Fax: E-mail: Mortgage Lender: n/a Address: WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for electrical work, plumbing, signs, wells, pools, furnaces, boilers, heaters, tanks, and air conditioners, etc. FBC 105.3 Shall be inscribed with the date of application and the code in effect as of that date: 51' Edition (2014) Florida Building Code Revised: June 30, 2015 Permit Application NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may befoundinthepublicrecordsofthiscounty, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. Acceptance of permit is verification that I will notify the owner of the property of the requirements of Florida Lien Law, FS 713 The City of Sanford requires payment of a plan review fee at the time of permit submittal. A copy of the executed contract is required in order to calculate a plan review charge and will be considered the estimated construction value of the job at the time of submittal. The actual construction value will be figured based on the current ICC Valuation Table in effect at the time the permit is issued, in accordance with local ordinance. Should calculated charges figured off the executed contract exceed the actual construction value, credit will be applied to your permit fees when the permit is issued. OWNER'S AFFIDAVIT: I certify that all of the foregoing information is accurate and that all work will be done in om li ce with all applicable laws regulating construction and zoning. ignatur er/A nt / ate Signatur 4ofContraAdAgent Date Print 0%vne1/ gent' ,ame . Print Con ct eent's h e/ I cr f(WE J. WILLIAMS,-'a..PU ------NotarPublic • ;=o : STEPHANIE J. WILLIAMS yStateofFloidaaoCommission # GG 008373 - Not Public -State of Florida F,„;° My Comm. = •o; Commission # GG 008373 ExpiresOct29, 2020 'FpFFI` My Comm. Expires Oct 29, 2020 Owner/ Agent is Person n to Me or TZ 11, nown to Me or Produced 1D Type of ID Produced ID Type of 1D BELOW IS FOR OFFICE USE ONLY Permits Required: Building Electrical Mechanical Plumbing Gas[] Roof Construction Type: Occupancy Use: Flood Zone: Total Sq Ft of Bldg: Min. Occupancy Load: # of Stories: New Construction: Electric - # of Amps Plumbing - # of Fixtures Fire Sprinkler Permit: Yes No # of Heads Fire Alarm Permit: Yes No APPROVALS: ZONING: UTILITIES: WASTE WATER: ENGINEERING: FIRE: BUILDING: COMMENTS: Revised: June 30, 2015 Permit Application THIS INSTRUMENT PREPARED BY: Name: Stephanie Williams Address: Collis Roofing. Inc. P_r) Box 520668_ Longwood, FL. 32752 NOTICE OF COMMENCEMENT State of Florida County of Seminole Permit Number: 1111111111111111111111111111111111111111 MARYANNE MORSE, SEMINOLE COUNTY CLERK OF CIRCUIT COURT & COMPTROLLER EK 8933 Py 1201 (Psis) CLERK'S v 2016134620 RECORDED 12/29/2016 10! 42:29 AM RECORDING FEES $10.011 RECORDED BY hdevore Parcel ID Number: i :I 'ao - 3013CID-01 Y) `y00.0 The undersigned hereby gives notice that improvement will be made to certain real property, and In accordance with Chapter 713, Florida Statutes, the following information is provided in this Notice of Commencement. DESCRIPTION OF PROPERTY.: (Legal description of the property and street address If available) Curri'(iCie toilelrV ob" 00)W-fc GENERAL DESCRIPTION OF IMPROVEMENT: Roof Replacement OWNER INFORMATION: Name: / 414 Address: 7l t' !'ts(J/M So l l U d , , d 7 Fee Simple Title Holder (if other than owner) Name: n/a Address: CONTRACTOR: Name: Collis Roofing, Inc. Address: P.O. Box 520668, Longwood, FL. 32752 Persons within the State of Florida Designated by Owner upon whom notice or other documents may be serve x r a as provided by Section 713.13(1)(b), Florida Statutes.T Name: n/a ''•'`•'• Address: In addition to himself, Owner Designates of I^ To receive a copy of the Lienor's Notice as Provided in Ci cy r' Section 713.13(1)(b), Florida Statutes. Expiration Date of Notice of Commencement (The expiration date is 1 year from date of recording unless a different date is specified) WARNING TO OWNER ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE Offf COMMENCEMENT ARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713. PART I, SECTION 713.131; FLORIDA STATUTES, AND CAN RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. i NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRS INSPECTION. IF YOU INT ND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY!•' BEFORE COMMENCI G V JRK • R RECORDING YOUR NOTICE OF COMMENCEMENT. 4 Under penIa ties- penury I d clare that I have read the foregoing and that the facts stated in it are true' to the best of I kndwle a nd belief. Mir VkCA e ( 9-a YYR a K Ownees Signature Owner's Printed Name Florida Statute 713.13(1)(g):' The owner must sign the notice of commencement and no one also may be permitted to sign in Ns or her stead.' y 0 h•- C, c_ ) v c: ua7 c u State of T I (.Y'rri01 County of ? The foregoing instrument was acknowledged before me this day of by by >' I l r l G+?/ //J Who Is personally known to me Name of person making statement 7) i ) OR who has produced Identification El type of Identification pr duce - ! (/ JIIIIy, STEPMANIEJ. WILLIAMS / bt r NotartEp1lc •State of Florida sa • 0 Commission # GG 008373 ydla. signature a A, I My Comm. Expires Oct 29. 2020 FLORM Ot1PARTMYltl7 PRroflassilanalBusiness8FRaouiam7tinn BCIS Home i Log In ! User Registration I Hot Topics I Florida l Y ;Yk °:@ Product Approval IUSER: Public User ct %. ynr Florida Building Code Online Submit Surcharge Slats & Facts I Publications I FBC Staff I BCIS Site Map Links I Search Product Approval Menu > Product or Application Search > Application List > Application Detail FL # FL7006-R9 Application Type Revision Code Version 2014 Application Status Approved Approved by DBPR. Approvals by DBPR shall be reviewed and ratified by the POC and/or the Commission if necessary. Comments Archived Product Manufacturer IKO Industries, Ltd Address/ Phone/Email 40 Hansen Road South Brampton, NON -US L6W 3H4 708) 496-2800 Ext200 rmetzOO1@tampabay. rr.com Authorized Signature Robert Metz rmetzOOI@tampabay. rr.com Technical Representative Bob Metz Address/ Phone/Email REMCO of Pinellas 456 Avila Circle NE Saint Petersburg, FL 33703 727) 776-5261 rmetzOO1@tampabay. rr.com Quality Assurance Representative Don Shaw Address/ Phone/Email IKO Industries LTD 120 Hay Rd. Wilmington, DE 19808 717) 579-6706 don. shaw@iko.com Category Roofing Subcategory Asphalt Shingles Compliance Method Certification Mark or Listing Certification Agency FM Approvals - CER Validated By Locke Bowden Validation Checklist - Hardcopy Received Referenced Standard and Year (of Standard) Standard Year ASTM D3161 modified to 110 mph 2009 ASTM D3462 2009 ASTM D7158 Class H 2O08 ASTM E108 2007 Equivalence of Product Standards Certified By http:// www.floridabui Idi ng.orglprlpr_app_dtl.aspx?param=wGEVXQwtDgse7mYBd2b3K6mXtoZLhN VX122N pl70J 1 E%3d 1/3 1/11/2017 Florida Building Code Online Product Approval Method Method 1 Option A Date Submitted 06/28/2015 Date Validated 06/30/2015 Date Pending FBC Approval Date Approved 07/06/2015 Summary of Products FL # Model, Number or Name Description 7006.1 Cambridge, Cambridge HD and CRC Laminated architectural fiberglass asphalt shingle Biltmore AR manufactured at IKO's Kankakee, IL; Hawkesbury, Ont.; Wilmington, DE; Sylacauga,AL and Toronto, Ont. plants Limits of Use Certification Agency Certificate Approved for use in HVHZ: Yes FL7006 R9 C CAC FM Letter - ASTM d3161 letter - 4-15- 2015 .pdfApprovedforuseoutsideHVHZ: Yes Impact Resistant: N/A FL7006 R9 C CAC FM Letter - ASTM d3462 letter - 5 6 15.pdfDesignPressure: N/A Other: FL7006 R9 C CAC FM Letter - ASTM E 108 letter - 5 3 15 .odf Quality Assurance Contract Expiration Date 12/31/2020 Installation Instructions FL7006 R9 II IKO-133-02-01 Letter - Installation Instructions for FBC FL7006.pdf Verified By: Duc T Nguyen 65034 Created by Independent Third Party: No Evaluation Reports Created by Independent Third Party: 7006.2 Hip and Ridge 12 Cap fiberglass This is a 12" x 12" fiberglass asphalt shingle used to cover shingles the hip and/or ridge of an asphalt shingle roof system manufactured in Toronto, Ont. and Brampton, Ontario Limits of Use Certification Agency Certificate Approved for use in HVHZ: Yes FL7006 R9 C CAC FM Letter - ASTM d3161 letter - 4-15- 2015 ,odfApprovedforuseoutsideHVHZ: Yes Impact Resistant: N/A FL7006 R9 C CAC FM Letter - ASTM d3462 letter - 5 6 15.pdfDesignPressure: N/A Other: FL7006 R9 C CAC FM Letter - ASTM E 108 letter - 5 3 15 •Ddf Quality Assurance Contract Expiration Date 12/31/2020 Installation Instructions FL7006 R9 II Hip and Ridge Cap Shingle Installation Instructions. pdf FL7006 R9 II IKO-133-02-01 Letter - Installation Instructions for FBC FL7006,pdf Verified By: Duc T Nguyen PE 65034 Created by Independent Third Party: No Evaluation Reports Created by Independent Third Party: 7006.3 Leading Edge Plus Asphalt Shingle One piece fiberglass asphalt shingle used as a starter strip at Starter Strip the bottom of a roof system manufactured in Brampton and Hawkesbury, Ontario plants Limits of Use Certification Agency Certificate Approved for use in HVHZ: Yes FL7006 R9 C CAC FM Letter - ASTM d3161 letter - 4-15- 2015 .PdfApprovedforuseoutsideHVHZ: Yes Impact Resistant: N/A FL7006 R9 C CAC FM Letter - ASTM d3462 letter - 5 6 15.DdfDesignPressure: N/A Other: FL7006 R9 C CAC FM Letter - ASTM E 108 letter - 5 3 15 .pdf Quality Assurance Contract Expiration Date 12/31/2020 Installation Instructions FL7006 R9 II IKO-133-02-01 Letter - Installation Instructions for FBC FL7006.pdf FL7006 R9 II Roofino- Products- Leading- Edge- Plus- ApDlication- EN(1).Ddf Verified By: Duc T Nguyen PE 65034 Created by Independent Third Party: No Evaluation Reports Created by Independent Third Party: 7006. 4 Marathon 25 AR, CRC Superglass 1 3 tab fiberglass asphalt shingle manufactured at IKO's http:// www.floridabui I di ng.orglprlpr_app_dtl.aspx?param=wGEVXQwtDgse7m YBd2b3K6m XtoZ LhN VXI22N pl7OJ 1 E%3d 26 1/11/2017 w M25AR Limits of Use Approved for use in HVHZ: Yes Approved for use outside HVHZ: Yes Impact Resistant: N/A Design Pressure: N/A Other: Florida Building Code Online Brampton, Ontario, Hawkesbury Ont., Toronto, Ont.; Sylacauga, AL and Kanakakee, IL plants Certification Agency Certificate FL7006 R9 C CAC FM Letter - ASTM d3161 letter - 4-15- 2015 .Ddf FL7006 R9 C CAC FM Letter - ASTM d3462 letter - 5 6 15.Ddf FL7006 R9 C CAC FM Letter - ASTM E 108 letter - 5 3 15 .Ddf Quality Assurance Contract Expiration Date 12/20/2020 Installation Instructions FL7006 R9 II IKO-133-02-01 Letter - Installation Instructions for FBC FL7006.Ddf Verified By: Duc T Nguyen 65034 Created by Independent Third Party: No Evaluation Reports Created by Independent Third Party: Back Next Contact Us :: 2601 Blair Stone Road, Tallahassee FL 32399 Phone: 850-487-1824 The State of Florida is an AA/EEO employer. Copyright 2007-2013 State of Florida.:: Privacy Statement :: Accessibility Statement :: Refund Statement Under Florida law, email addresses are public records. If you do not want your e-mail address released in response to a public -records request, do not send electronic mail to this entity. Instead, contact the office by phone or by traditional mail. If you have any questions, please contact 850.487.1395. -Pursuant to Section 455.275(1), Florida Statutes, effective October 1, 2012, licensees licensed under Chapter 455, F.S. must provide the Department with an email address if they have one. The emails provided may be used for official communication with the licensee. However email addresses are public record. If you do not wish to supply a personal address, please provide the Department with an email address which can be made available to the public. To determine if you are a licensee under Chapter 455, F.S., please click here . Product Approval Accepts: W EN aC heck Credit Card Safe http://www.floridabui Idi ng.org/pr/pr_app_dtl.aspx?param=wGEVXQwtDgse7mYBd2b3K6mXtoZLhN VX122N pl70J 1 E%3d 313 CONSTRUCTION MATERIALS TECHNOLOGIES March 30, 2015 IKO Industries, Ltd 120 Hay Rd. Wilmington, DE 19809 Re: FBC FL7006 Sir(s), PRI Construction Materials Technologies has completed a technical review and attached sealed shingle instructions in compliance the 2014 Florida Building Code. This review was completed based on the receipt of following evidence from IKO Industries, Ltd: 1) IKO Shingle Application Instructions — 3-Tab Shingles EN-3Tab_Appins_8AGXEFS-2012-11_reformatted 2013-02-rev07/13-Florida) 2) IKO Laminated Shingles Application Instructions EN-Laminated_Appins_8TTEFS-2012-04_reformatted 2013-02-rev07/13-Florida) 3) IKO Hip and Ridge 12 Application Instructions EN-HipandRidge12_3HRTri-2013-08_reformatted 2013-08) 4) IKO Leading Edge Plus Shingle Application Instructions EN-3LEP-Tri-2012-06_reformatted 2013-03) 5) ASTM D3161 Test Report (FM Approvals Project No. 3040947) The attached instructions should be used in conjunction with the published manufacturer's application instructions and applicable code. In the event the instructions conflict, these instructions shall govern. Statement of Independence: PRI Construction Materials Technologies and/or Duc T. Nguyen, FL P.E. do not have nor plan to acquire a financial interest in any company manufacturing or distributing products for which the test reports are issued. Signed: C Signed: L^ Brad Grzybo ski Duc T.Aduven Managing rector Florida Re ere Professional Engineer P.E. Number: 65034 Date: April 30, 2015 Date: April 30, 2015 Attachments: A) IKO Shingle Application Instructions - 3-Tab B) IKO Laminated Shingles Application Instructions C)' IKO Hip and Ridge 12 Application Instructions D) IKO Leading Edge Plus Application Instructions II.N1iBB11iYXIM PRI Construction Materials Technologies, LLC. 6412 Badger Drive Tampa, FL 33610 Tel: 813-621-5777 Fax: 813-621-5840 e-mail: matedalstesting@pdcmt.com WebSite: httpJlwww.pdcmt.com IKO Installation Instructions for Asphalt Shingles Page 2 of 5 IKO Shingle Application Instructions — 3-Tab Shingles ASTM D3161, Class F — IKO Marathon 25 AR and CRC Superglass M25AR) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT, THESE INSTRUCTIONS WILL GOVERN. ROOF DECK: Solidly sheathed and fastened deck conforming to 2014 FBC. UNDERLAYMENT: Applied in accordance with building code requirements. For areas where the roof slope is less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code requirements, the first sheet overlapping the eave protection by 19", followed by full 36" widths overlapping each preceding course by 19" or other Approved underlayments in accordance with the qualified application instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of underlayment laid parallel to the eaves, with 2" horizontal laps and 4" end laps. Apply metal drip edges on top of any underlay along rake edges and directly to the deck along eaves in accordance with building code requirements. NAILING: Use galvanized (zinc coated) roofing nails, 11 or 12 gauge, with at least 3/8" diameter heads, long enough to penetrate through plywood or 3/4" into boards. Use 4 nails per shingle placed 6-1/8" above the butt edge, approx. 1" and 13" from each end and 1/2" above each cutout. Drive nails straight so that nail head is flush with, but not cutting into shingle surface. NAILING ON STEEP SLOPES: For steep slopes of 21" per foot (60°) or more, use 6 nails per shingle placed as shown below. Ensure that no nail is within 2" of a joint/cutout of the underlying shingle. Seal down each shingle at time of application with three 1 " diameter (approx. size and thickness of a quarter) spots of asphalt plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle. Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the heat of direct sunlight. EXPOSURE: Installed shingles shall have a maximum average exposure of 5-5/8". STEEP SLOPES SEALING STRIP — i • • f i • 12" I r-1/8" 6-118" 11 t_ NAILS NAILS DO NOT NAIL INTO OR ABOVE THE SEALING STRIP PRI Construction Materials Technologies, LLC. 6412 Badger Drive Tampa, FL 33610 Tel: 813-621-5777 Fax: 813-621-5840 e-mail: matedalstesting@pdcmt.cwm WebSite: hftpl/www.pdcmt.com I KO Installation Instructions for Asphalt Shingles Page 3 of 5 IKO Laminated Shingles Application Instructions ASTM D3161, Class F — Cambridge, Cambridge HD, and CRC Biltmore AR) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT, THESE INSTRUCTIONS WILL GOVERN. ROOF DECK: Solidly sheathed and fastened deck conforming to 2014 FBC. UNDERLAYMENT: Applied in accordance with building code requirements. For areas where the roof slope is less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code requirements, the first sheet overlapping the eave protection by 19", followed by full 36" widths overlapping each preceding course by 19" or other Approved underlayments in accordance with the qualified application instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of underlayment laid parallel to the eaves, with 2" horizontal laps and 4" end laps. Apply metal drip edges on top of any underlay along rake edges and directly to the deck along eaves in accordance with building code requirements. NAILING: Use galvanized (zinc coated) roofing nails, 11 or 12 gauge, with at least 3/8" diameter heads, long enough to penetrate through plywood or 3/4" into boards. Use 4 nails per shingle placed in the nail line 7-3/8" below the top edge, approx. 1" and 13" in from each end. Drive nails straight so that nail head is flush with, but not cutting into shingle surface. NAILING ON STEEP SLOPES: For steep slopes of 21" per foot (60°) or more, use 6 nails per shingle placed as shown below. Ensure that no nail is within 2" of a joint/cutout of the underlying shingle. Seal down each shingle at time of application with three 1" diameter (approx. size and thickness of a quarter) spots of asphalt plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle. Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the heat of direct sunlight. EXPOSURE: Installed shingles shall have a maximum average exposure of 5-7/8". NAIL LINE 6 3/8"t NAILING - STEEP SLOPES APPLICATION Use six nails as shown. mot„ .1" — 1„ F1 1] r] CFMFNT PROPER APPLICATION REQUIRES THAT THE NAILS PENETRATE BOTH THE OVERLAY AND UNDERLAY PORTIONS OFTHE SHINGLE PRI Construction Materials Technologies, LLC. 6412 Badger Drive Tampa, FL 33610 Tel: 813-621-5777 Fax: 813-621-5840 e-mail: matedalstesting@pricmt.com WebSite: httplhvww.pdcmt.com IKO Installation Instructions for Asphalt Shingles Page 4 of 5 IKO Hip and Ridge 12 Application Instructions ASTM D3161, Class F — IKO Hip and Ridge 12) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT, THESE INSTRUCTIONS WILL GOVERN. Cut hip and ridge shingles into thirds, using the perforation marks as a cutting guide. These shingles are designed for a 5 1/8" (130 mm) exposure. (For a neater appearance, the top of each side of each piece has been factory trimmed on a 1" (25 mm) taper (see drawing). Bend each piece over the hip or ridge, and nail 5 5/8" (143 mm) above the butt edge 1" (25 mm) in from each edge, exposing each piece 5 1/8" (130 mm). Apply hip pieces starting at the lower end of the hip, working up toward the ridge. On hip roofs, apply ridge pieces starting at each end, meeting in the middle. On gable roofs, apply ridge pieces starting at the end opposite to the prevailing wind direction and continue to the other end. Note: To obtain a three-dimensional effect, (which is recommended, but not required), apply hip and ridge shingles double thickness by stacking 2 pieces on top of one another, the lower piece extending about 3/4" (19 mm) further than the top piece (see diagram). The final shingle should be set in cement, and the exposed nail heads of the final shingle should be covered with cement. Prior to application in cold weather, storing the shingles in a heated area will allow for easier bending. NOTE: SHINGLES MUST BE APPLIED PROPERLY. THEYARE DESIGNED FOR USE AS HIP AND RIDGE SHINGLES ONLY, AND SHOULD NOT BE USED FOR ANY OTHER APPLICATIONS. WE ASSUME NO RESPONSIBILITY FOR LEAKS OR DEFECTS RESULTING FROM POOR APPLICATION OR FAILURE TO PROPERLY PREPARE THE SURFACE TO BE ROOFED OVER, OR FAILURE TO PROVIDE PROPER VENTILATION IN ACCORDANCE WITH MINIMUM PROPERTY STANDARDS REQUIREMENTS. REVIEW ALL APPLICABLE BUILDING CODES, MINIMUM PROPERTY STANDARDS, AND REQUIREMENTS PRIOR TO APPLYING THESE SHINGLES USING THESE APPLICATION INSTRUCTIONS. cn mm, TAPER CUT PRI Construction Materials Technologies, LLC. 6412 Badger Drive Tampa, FL 33610 Tel: 813-621-5777 Fax: 813-621-5840 e-mail: matedalstesfing@pdcmt.com WebSite: http:/hvww.pricmt.com IKO Installation Instructions for Asphalt Shingles Page 5 of 5 IKO Leading Edge Plus Application Instructions ASTM D3161, Class F — IKO Leading Edge Plus) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT, THESE INSTRUCTIONS WILL GOVERN. 1. Apply any underlayment, eave protection, valley (lashings, or drip edges to roof deck as required. 2. Each 39 3/8" x 131/4" (1000 mm x 336 mm) IKO Leading Edge Plus strip is perforated lengthwise for separation into two (2) shingles. Take one IKO Leading Edge Plus strip and fold flat at perforation to separate. 3. Take one of the separated shingles 39 3/8" x 6 5/8" (1000 mm x 168 mm) and remove approximately 20"(500 mm). Install this shingle on the lower left corner of the roof deck, granule side up, with the factory installed sealant adjacent to the eaves. The shingle should overhang the rake edge and eaves by a nominal 1/4" (6 mm) minimum. Fasten the shingle to the roof deck with nails located 3" to 4" (75 mm to 100 mm) from the eave edge and 1" (25 mm) in from each end. 4. Take the leftover 20" (500 mm) piece shingle. Rotate the piece and align it vertically up the rake edge with the factory installed sealant adjacent to the outer edge of the roof. The shingle should overhang the rake edge by a nominal 1/4" (6 mm) minimum. Fasten the shingle to the roof deck with fasteners located 3" to 4" (75 mm to 100 mm) from the rake edge and 1" (25 mm) in from each end. 5. Repeat Steps 3 — 4 for the right lower corner of the roof deck. NAILING: Use galvanized (zinc coated) roofing nails, 11 or 12 gauge, with at least 3/8" (9 mm) diameter heads, long enough to penetrate through plywood or 3/4" (20 mm) into boards. Use 4 nails per shingle placed 3" to 4" (75 mm to 100 mm) from the eave edge and approximately 1" and 13" (25 mm and 330 mm) in from each end. 6. Apply full-length IKO Leading Edge Plus shingles to the remaining eave edges of the roof deck. Install the shingles granule side up with the factory applied sealant adjacent to the eaves. The shingles should overhang the rake edge and eaves by a nominal 1/4" (6 mm) minimum. Fasten the shingles to the roof deck with nails located 3" to 4" (75 mm to 100 mm) from the eave edge, 4 nails per shingle. 7. Apply roof shingles as per the instructions printed on each product's package. Make certain the first course of field shingle lies flush with the edges of the fastened IKO Leading Edge Plus. In this way, the sealant on the IKO Leading Edge Plus shingles will adhere to the first -course field shingles and help keep them from lifting in high winds. PRI Construction Materials Technologies, LLC. 6412 Badger Drive Tampa, FL 33610 Tel: 813-621.5777 Fax: 813-621.5840 e-mail: matedalstesting@pricmt.com WebSite: hltpltwww.pricmt.com LIMITED POWER OF ATTORNEY Altamonte Springs, Casselberry, Lake Mary, Longwood, Sanford, Seminole County, Winter Springs Date: 1 /11 /2017 I hereby name and appoint: Ray Henderson an agent of: Collis Roofing, Inc. Name of Company) to be my lawful attorney -in -fact to act for me to apply for, receipt for, sign for and do all things necessary to this appointment for (check only one option): t] The specific permit and application for work located at: 474 Hansom Parkway, Sanford, FL. 32771 Street Address) Expiration Date for This Limited Power of Attorney: License Holder Name: J. Douglas Lanier State License Number: CCC058022 Signature of License Holder: a 0a, ) STATE OF FLORIDA COUNTY OF Seminole The foregoing instrument was acknowledged before me this 11 day of January , 200 17 , by J. Douglas Lanier who is LN personally known to me or who has produced as identification and who did (did not) t n o Sign Aure rdrj eTa 1ANIE J. WILLIAMS ary ublic - State of FloridacCommission # GG 008373 My Comm. Expires Oct 29, 2020 Rev. 08.12) Stephanie J. Williams Print or type name Notary Public - State of _ Commission No. My Commission Expires: Florida 0 City of Sanford Roof Permit Application Checklist All permit application packages must be complete prior to acceptance. You must check each box to the left or indicate n/a on this submittal. A complete application package shall include the following: El Building Permit Application completed, signed and notarized. Application must include correct address and complete parcel I.D. number. Copy of applicable contractor's license issued by the State of Florida (if the contractor is the applicant). A site specific notarized power of attorney shall be required from the licensed contractor if he/she appoints an employee of his/her company to sign the permit application as the contractor. Certificate of insurance indicating worker's compensation insurance coverage and naming the City of Sanford as certificate holder, or a copy of a worker's compensation exemption issued by the State .of Florida (must be submitted with each application if contractor is the applicant). D1a Completed and signed Owner Builder Statement / Affidavit (if the owner is the applicant). These guidelines were compiled to assist the applicant in preparing a roofpermit application and may not be complete. The applicant is required to meet all City of Sanford, state, and federal code requirements. COLLIS ROOFING, INC. P.O. Box 520668 Longwood, FL 32752-0663 Ph. (321) 441-2300 Fax (321) 441-2313 Lic. N CCCOSS022 Date: October 24, 2016 Phonc: 407-574-1770 Attention: Michael Seaman Email: Job Address: 1474 Hansom Pk%% — Sanford 32771 Collis Roofing, Inc. proposes to supply the labor and materials necessary to apply your roofing as follows: A) Remove old shingles and underlayment to bare deck and dispose of properly. B) Inspect existing decking for water damage and re -nail according to code. C) ALL NECESSARY NN'OOD-WORK IS BILLED ON A TENIE AND MATERIAL BASIS, AND IS NOT INCLUDED IN THIS PROPOSAL. SEPARATE INVOICE WILL BE SENT TO THE CUSTOMER ONCE, THE JOB IS CONIPLE'TE. (x initinl) I. Supply and install code approved RIIINO U20 synthetic underlayment to deck using simplex nails.(2 layers) 2. Supply and install code approved self -adhered underlayment along all valleys per manufacturer specifications. 3. Supply and install code approved 2 W' galvanized painted drip at all eaves, directly to the deck. ' 4. Supply and install code approved 2 %" galvanized painted cave drip at all rake/gable ends. (Dri. Coplor: UMr4- 5. Secure the cave metal with mastic and then apply starter shingles at all eaves with the seal strip at the edge of the roof. 6. Supply and install all lead tlashings for plumbing penetrations. 7. Supply and install 30 linear feet of aluminum ridge vents. 8. Supply and install standard galvanized preformed valley metal. 9. Supply and install IKO Cambridge di n nsional shin les p r n ianufacturecs specifications and all applicable building codes ( Please specify shingle color: ly,-'fQ - 10. Clean up all debris and walk perimeter with a roll magnet. 11. All materials to be installed to manufacture recommendations. 12. Collis Roofing, Inc. will provide all applicable permits. 13. All workmanship to be warranted for five (5) years from date of completion of building (Sample Attached). The above work shall be performed in a substantial workmanlike manner for the sum of: S $.363 Supply and install (1) 2'x2' self -Bashing glass skylight*"" With payment to be made as follows: Deductible and first check due at signing, balance upon completion. PRICING EXPIRES THIRTY (30) DAN'S FROM THE DATE GIVEN ABOVE. Respectfully Submitted: Joey McVay, Collis Roofing The above prices and scope of %work are satisfactory and Collis Roofing, Inc. is hereby authorized to do the work as set forth above and in accordance with the terms and conditions attached hereto; payments will be made as outlined. Collis Roofing, Inc. Date: Approved By: ACCORDING TO FLORIDA'S CONSTRUCTION LIEN LAW (SECTIONS 713.001-713.37. FLORIDA STATUTES), THOSE WHO WORK ON YOUR PROPERTY OR PROVIDE MATERIALS AND ARE NOT PAID IN FULL IIAVE A RIGHT TO ENFORCE THEIR CLAIM FOR PAYMENT AGAINST YOUR PROPERTY. IF YOUR CONTRACTOR Oil A SUBCONTRACTOR FAILS TO PAN' SUBCONTRACTORS, SUB -SUBCONTRACTORS, OR MATERIAL SUPPLIERS, THE PEOPLE WHO ARE ONYED MONEY MAY LOOK T'O YOUR PROPERTY FOR PAYMENT, EVEN IF YOU HAVE ALREADY PAID YOUR CONTRACTOR IN FULL. IF YOU FAIL TO PAN' YOUR CONTRACTOR, YOUR CONTRACTOR MAY ALSO HAVE A LIEN ON YOUR PROPERTY. THIS MEANS IF A LIEN IS FILED YOUR PROPERTY COULD BE SOLD AGAINST YOUR WILL TO PAY FOR LABOR, MATERIALS, OR OTIIER SERVICES THAT YOUR CONTRACTOR OR A SUBCONTRACTOR MAY HAVE FAILED TO PAN'. TO PROTECT YOURSELF, YOU SHOULD STIPULATE. IN THIS CONTRACT THAT BEFORE ANY PAYMENT IS MADE., YOUR CONTRACTOR IS REQUIRED TO PROVIDE YOU WITH A WRITTEN RELEASE OF LIEN FROM ANY PERSON OR CONIPANY THAT HAS PROVIDED TO YOU A "NOTICE TO OWNER." FLORIDA'S CONSTRUCTION LIEN LAZY IS COMPLEX AND IT IS RECOMMENDED THAT YOU CONSULT AN ATTORNEY. Page I of3 Initial O CONSTRUCTION ENGINEERING LD 1809 West Virginia Drive ! Kissimmee, FL 34744 Office 407-944-9561•, 407=90.8-6257 ,p Fax 407.-944-9563 Wiley@constructionengineering.com www.constructionengineefing.corri i Memo To: City of Sanford Building Department- From: Wiley Jones, PE j RE: 474 Hansom Parkway Sanford, Florida Permit No: 17-157 / 969204 Mr. Wiley Jones, P.E., Senior Engineer with Construction- Engineering LLC, performed.a site visit to the residence located -at 474 Hansom Parkway, Sanford, Florida on'December 5, 2018. The purpose of the site visit was to access the roof to determine if it meets the requirements of the 2017 Florida Building code, Existing Building, 6th edition. Mr. Jones had shingles removed at random locations on the roof and the roofing components were inspected: All roof components inspected by Mr. Jones met'or exceeded the requirement of the 2017.Florid6 Building Code. It is the opinion of Mr. Jones that the shingle roof installed at 474 Hansom Parkway, Sanford, Florida was properly installed and meets the re,'quirements of the 2017.Florida Building code: Please, do not hesitate'to call .Mr. Jones at 4.07=908-6257 if you wish'to discuss this job. Wiley Jones, P.E. FL License No. 64019" .- i i December 9; 2018 _ j