1233 Wharton Smith Chg Ord #8Re
PROJECT:
(Name and Address)
TO CONTRACTOR:
(Name and Address)
Sanford Public Safety Building
815 West 13 Street
Sanford, FL 32771
Wharton- Smith, Inc.
P.O. Box 471028
Lake Monroe, FL 32747 -1028
-� (Z' �3_:�
CHANGE ORDER NO: 008R
INITIATION DATE: June 14, 2010
PROJECT NO.: 09 -042
CONTRACT FOR: General Construction
CONTRACT DATE: July 1, 2008
OWNER
ARCHITECT
CONTRACTOR
FIELD
OTHER F ,
THE CONTRACT IS CHANGED AS FOLLOWS: Estimated initial amount of Owner Direct Purchases for the Sanford Public Safety
Building. Purchases may include items such as sitework structures and piping, base material, asphalt, reinforcing steel, concrete, masonry materials,
structural steel, miscellaneous steel, roofing materials, doors, frames and hardware, storefront materials, drywall materials, floor coverings, ceramic
tile materials, pre - engineered steel, elevator equipment, fire sprinkler piping, HVAC material and equipment, electrical switchgear and fixtures. This
change is an estimate only and it is agreed to by both parties that should the ODP purchases not exceed this estimate that a change order will be
issued to reconcile the contract amount.
Estimated ODP Purchases $(275,000.00)
Sales Tax on ODP Purchases $(16,500.00)
Total Deduct $(291,500.00)
The original Guaranteed Maximum Price was .................................................................................. ............................... $ 15,930,416.00
Net change by previously authorized Change Orders ......................................................................... ............................... $ (4,234,467.20)
The Guaranteed Maximum Price prior to this Change Order was ..................................................... ............................... $ 11,695,948.80
The Guaranteed Maximum Price will be decreased by this Change Order ............................................ ..............................$ (291,500.00)
The new Contract sum including this Change Order will be ............................................................. ............................... $ 11,404,448.80
The Contract Time will be unchanged by ( ) days.
The date of Substantial Completion as of the date of this Change Order therefore is September 22, 2010.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, C
Arc ' ects esign Group, Inc.
(Firm Name)
;nReeves. t e)
A.I.A.
(Typed Name)
0& . 4 2 t 0
Date
Attest:
net Dougherty, City Clerk
For use and reliance of the Sanford City Co ission only.
A to form and legality.
ity Attorney wfie / 6
/9 C14
Ronald F. Davoli, President / CEO
(Typed Name)
June 24, 2010
Date
City Commission of the City of Sanford, Florida
OWNER Name)
By (Signatur
Linda Kuhn, ayor
(Typed Name)
,(2 - -l0
Date