301 CPH-AmendmentAmendment No. 27
To Agreement For Continuing Services
For
Final Design and Construction Plans For
Utility Improvements / Relocation:
Associated With
Lake Mary Boulevard Phase 111,
East Lake Mary Boulevard (Airport Entrance Road to S.R. 46)
and Airport Boulevard Phase 11 B (Beltway Overpass to C.R. 46 A)
Between
The City of Sanford, Florida
Conklin, Porter and Holmes - Engineers, Inc.
This Agreement made on the day of , 1997 between the CITY OF
SANFORD, FLORIDA (hereinafter called the City) and CONKLIN, PORTER AND
HOLM ES -ENG INEERS, INC. (hereinafter called the Engineer), is mutually agreed upon
and declared an authorized Amendment to an Agreement dated December 17, 1987,
between the parties, herein setting forth the scope, terms and conditions of the work herein
authorized.
In case of any conflict between this Amendment and the aforementioned Agreement of
December 17, 1987, this Amendment shall govern for the work described herein.
):\JOBS\26382.00\WP%PROPOSAL\DAG\DAG0703.RLP 1
WHEREAS, the construction of the widening of Airport Boulevard and widening and
extension of East Lake Mary Boulevard creates the need for relocation and extension of
City utilities, and
WHEREAS, the City has requested the Engineer to perform certain professional
engineering services in connection with this work
The City and the Engineer for the considerations named herein agree as follows:
SECTION 1
General
1.1 Introduction
1.1.1 The Engineer is assisting the City in Design of several utility projects as shown on
Table A which lists the projects, opinion of probable cost and year to be
constructed. Figure A shows project locations. The tables shows ten projects,
three of which are the subject of this proposal. These projects are "C", "F" and
"H". As part of the overall planning for the utility projects the City determined as
part of project F ( East lake Mary Boulevard, 17 & 92 to Sanford Avenue) and H
(East Lake Mary Boulevard end Silver Lake Drive to Plant Site and S.R. 46) that
utility upgrades and extensions should be constructed in support of growth in the
vicinity of the Airport. As a result a new 16" watermain is proposed from 17 & 92
to Sanford Avenue on East Lake Mary Boulevard (project F). In addition a new
12" watermain and 8" forcemain is proposed from the existing end of Silver Lake
Drive to State Road 46 on proposed East Lake Mary Boulevard extension (project
H) and to the future wastewater plant location on the Airport property.
1.1.2 In addition to the above described work Seminole County has taken the position
to have all utilities on future road widening projects located in the area provided
between the back of curb and the right-of-way line. As a result the existing
utilities on Airport Boulevard from the S.R. 417 overpass to C.R. 46 A must be
relocated from beneath proposed pavement. A new 18" forcemain and 18"
watermain will be installed along Airport Boulevard from 17 & 92 to Old Lake Mary
Road. The existing 12" watermain from Old Lake Mary Road to C.R. 46 A along
Airport Boulevard will remain but a new 12" watermain will be installed on Old
Lake Mary Road from C.R. 46 A to Airport Boulevard.
1.1.3 The purpose of this proposal is to provide Final Design, preparation of plans and
specifications and permitting of the utility improvements described above.
):'JOBS\Z6582,OONWP�PROPOSAL\DAGNDAGO703,RLP 2
SECTION 2
Scope of Services
General Work Description
The Scope of Services for each road section is shown below. A Plan of Study is
attached as Exhibit B which shows the estimated man-hours for each work item
identified below.
2.1 Airport Boulevard from 17 & 92 to C.R. 46 A and Old Lake Mary Road
from Airport Boulevard to C.R. 46 A (Project C)
2.1.2 This project includes a new 18" watermain and 18" forcemain from 17 & 92 to Old
Lake Mary Road on Airport Boulevard and a new 12" watermain on Old Lake Mary
Road from Airport Boulevard to C.R. 46 A. Specific services proposed include the
following:
2.1.3 Meeting and coordinating with the City of Sanford and Seminole County to obtain
available data and information on existing plan availability and existing utility and
other information in the project area.
2.1.4 Determine in conjunction with the City, if the work should be performed under a
JPA or separately contracted by the City. Discuss possible alternatives for the
project area with City and make recommendations.
2.1.5 Review and discuss the proposed utility relocations with the County and City
within the project limits. Provide the County with preliminary marked -up roadway
plans showing the location of the proposed utilities for the County's use for
updating their plans.
2.1.6 Obtain soils investigation data from the County's geotechnical consultant which
will be provided by the County for use in design. The City will provide additional
data, if required.
2.1.7 Employ surveyor to provide survey of Old Lake Mary Road from Airport Boulevard
to C.R. 46 A to serve as base for preparation of plans for 12" watermain
extension.
2.1.8 Utilize AutoCAD or Mylar roadway base drawings and survey base for Old Lake
Mary Road at a 1 "= 20' scale as a base for preparation of construction plans for
utility relocation work. The City shall be responsible for obtaining base roadway
drawings or AutoCAD files for Engineer's use in preparation of final plans.
Prepare the following plans:
J: UOBS tZ65 8 !,W W P�PROPOSAUOAGN DAGO703. RLP
1 Cover Sheet
2-3 General Note Sheet / Quantity Sheet / Specifications
4-20 Single Plan and Profile Utility Improvement Plan at a 1"= 20' scale
21-22 Miscellaneous Detail Sheet
2.1.9 Prepare Technical Specifications and Contract Documents.
2.1.10 Develop quantities and opinion of probable construction costs.
2.1.11 Provide the City and County with a copy of final engineering plans to update the
utility locations on the roadway plans prior to sending the plans for bidding.
2.1.12 Provide the City with Mylar reproducibles and two signed and sealed record sets
of drawings.
2.1.13 Coordinate with FDEP and assist the City in obtaining FDEP Wastewater
Collection System/Potable Water Distribution System permits.
2.1.14 Assist the City in preparation of a Seminole County Right -of -Way Utilization Permit
and CSX Railroad Right of Way Consent Agreement.
2.1.15 Coordination and reviews with the City, Seminole County, FDOT, CSX and
Seminole County Roadway Design Engineering Consultants.
2.2 East Lake Mary Boulevard from 17 & 92 to Sanford Avenue (Project F)
2.2.1 This project includes a new 16" watermain from 17 & 92 to Sanford Avenue on
East Lake Mary Boulevard and forcemain relocations. Specific Services proposed
include the following:
2.2.2 Meeting and coordinating with the City of Sanford and Seminole County to review
available data and information on existing plan availability and existing utility and
other information in the project area. We will assist the City in planning for
upgrades to the water and sewer utilities along Lake Mary Boulevard from 17 &
92 to Sanford Avenue.
2.2.3 Review proposed roadway plans and check and review the potential conflict
locations, evaluate the utility relocations including evaluation of water mains and
force mains in the project area. Determine in conjunction with the City, if the work
should be performed under a JPA or separately contracted by the City. Discuss
possible alternatives for the project area with City and make recommendations.
):UOBS\Z6582.0(1WFI%PROPOSAL%DAGNDAC-0703.R1-P
2.2.4 Review and discuss the proposed utility relocations with the County and City
within the project limits. Provide the County with preliminary marked -up roadway
plans showing the location of the proposed utilities for the County's use for
updating their plans.
2.2.5 Obtain soils investigation data from the County's geotechnical consultant which
will be provided by the County for use in design. The City will provide additional
data, if required.
2.2.6 Utilize AutoCAD or Mylar roadway base drawings at a 1 "= 20' scale as a base for'
preparation of construction plans for utility relocation work. The City shall be
responsible for obtaining base roadway drawings or AutoCAD files for Engineer's
use in preparation of final plans. Prepare the following plans:
1 Cover Sheet
2-3 General Note Sheet / Quantity Sheet / Specifications
4-17 Single Plan and Profile Utility Improvement Plan at a 1 "= 20' scale
18-19 Miscellaneous Detail Sheet
2.2.7 Prepare Technical Specifications and Contract Documents.
2.2.8 Develop quantities and opinion of probable construction costs.
2.2.9 Provide the City and County with a copy of final engineering plans to update the
utility locations on the roadway plans prior to sending the plans for bidding.
2.2.10 Provide the City with Mylar reproducibles and two signed and sealed record sets
of drawings.
2.2.11 Coordinate with FDEP and assist the city in obtaining FDEP Wastewater
Collection System/Potable Water Distribution System permits.
2.2.12 Assist the City in preparation of a Seminole County Right -of -Way Utilization
Permit.
2.2.13 Coordination and reviews with the City, Seminole County, FDOT and Seminole
County Roadway Design Engineering Consultants.
2.3 East Lake Mary Boulevard from Existing End of Silver Lake Drive to State
Road 46 and to the Future Wastewater Plant site located on the Airport
Property (Project H)
2.3.1 This project includes a new 12" watermain and 8" forcemain on East Lake Mary
Boulevard from the existing end of Silver Lake Drive to S.R. 46 and to the future
wastewater plant location on the Airport property. Specific services proposed
include the following:
1:\JOBS1Z6582.WWFI\PROPOSAL\DAGIDAG0703,RLP
2.3.2 Meeting and coordinating with the City of Sanford and Seminole County to review
available data and information on existing plan availability and existing utility and
other information in the project area.
2.3.3 Review proposed roadway plans and check and review proposed utility locations
within the road right-of-way. Coordinate and employ surveyor to obtain route
survey from East Lake Mary Boulevard to the future Wastewater Plant site.
2.3.4 Review and discuss the proposed utility relocations with the County and City
within the project limits. Provide the County with preliminary marked -up roadway
plans showing the location of the proposed utilities for the County's use for
updating their plans.
2.3.5 Obtain soils investigation data from the County's geotechnical consultant which
will be provided by the County for use in design. The City will provide additional
data, if required.
2.3.6 Utilize AutoCAD or Mylar roadway base drawings and route survey data to the
future wastewater plant site at a V= 20' scale as a base for preparation of
construction plans for utility relocation work. The City shall be responsible for
obtaining base roadway drawings or AutoCAD files for Engineer's use in
preparation of final plans. Prepare the following plans:
1 Cover Sheet
2-3 General Note Sheet / Quantity Sheet / Specifications
4-32 Single Plan and Profile Utility Improvement Plan at a V= 20' scale
33-34 Miscellaneous Detail Sheet
2.3.7 Prepare Technical Specifications and Contract Documents.
2.3.8 Develop quantities and opinion of probable construction costs.
2.3.9 Provide the City and County with a copy of final engineering plans to update the
utility locations on the roadway plans prior to sending the plans for bidding.
2.3.10 Provide the City with Mylar reproducibles and two signed and sealed record sets
of .drawings.
2.3.11 Coordinate with FDEP and assist the city in obtaining FDEP Wastewater
Collection System/Potable Water Distribution System permits.
2.3.12 Assist the City in preparation of a Seminole County Right -of -Way Utilization
Permit.
2.3.13 Coordination and reviews with the City, Seminole County, FDOT and Road
. Consultants.
J.UOBS�Z6582.001WPXPROPOSAL\DAGkDAM03.RLP
2.4 Miscellaneous
2.4.1 Please note the utility relocation drawings will be prepared using the roadway
drawings prepared by others and we will have no immediate knowledge of the
accuracy of the existing information provided to us. We will recommend dig ups
by the City of a few target locations to field verify the existing utility locations. If
the existing utility locations are found to be different from what is shown on the
County's or FDOT's plans, we may request additional survey for proper
development of the engineering plans which can be provided as an additional
service.
2.4.2 The subsurface investigation report for each project will be provided to us by the
County. If additional soil borings are needed for proper development of our final
engineering plans, additional soils work may be needed. This service would need
to be obtained as an additional service to our contract or contracted separately
with the information provided to us.
SECTION 3
Additional Services of the Engineer
3.1 If authorized by the City, the Engineer shall furnish or obtain from others the
following additional services, or the City may provide these services separately or
directly with the provider. Such additional services will be paid for by the City as
outlined in Section 5.
3.1.1 Additional services due to significant changes in the scope of the project or its
design including, but not limited to, changes in size, complexity, character of
construction or due to time delays in initiating or completion of the work as
described herein.
3.1.2 Provide through sub -consultants, soils, environmental scientist (jurisdictional and
permitting) services, construction quality control testing, or other specialist
services including real estate/right-of-way agents, project/construction
management, financial/budgetary consultant, and bookkeeping/accounting
services. If these services are subsequently determined advisable during the
course of the work, they may be considered for authorization as an additional
service under this Section or separately provided by the City.
3.1.3 Except as otherwise provided herein, services or additional costs associated with
revising previously accepted studies, reports, or other documents prepared by the
Engineer when such revisions are due to causes beyond the Engineers control.
3.1.4 Additional services resulting from public protests. administrative hearings, or
. similar matters.
1!UOBS1Z6582.MWPIPROPOSALSDAGkDAG0703.RLP
3.1.5 Preparing to serve and/or serving as an Expert Witness for the City in any
litigation, public hearing, condemnation proceeding, right-of-way or easement
acquisition or negotiation, or other legal / administrative proceeding.
3.1.6 Furnishing additional sets of prints of drawings and other Documents beyond
those designated in Section 2.
3.1.7 Additional engineering services required by revisions to regulations (after the date
of this Amendment) as applicable to the Florida Department of Environmental
Protection, the St. Johns River Water Management District, Corps of Engineers,
Seminole County, FDOT, or other regulatory agency requirements or revisions
necessary due to changes in the Road Improvement Plans.
3.1.8 Additional services in connection with the project including services normally
furnished by the City as described in Section 4 herein and services not otherwise
provided for in this Agreement.
SECTION 4
City Responsibilities
4.1 The City will:
4.1.2 Advise the Engineer of his requirements for the project and designate a person
to act as the City's representative with respect to the work to be performed under
this Amendment, and such person shall have complete authority to transmit
instructions, receive information, interpret and define the City's policies and
decisions pertinent to the work covered by this Amendment.
4.1.3 Obtain and provide data requested that is reasonably available on the project
along with operational and maintenance requirements and easement and right-of-
way requirements.
4.1.4 Guarantee access to and make all provisions for the Engineer to enter upon public
and private lands as required for the Engineer to perform his work under this
Amendment.
4.1.5 Make facilities accessible for inspection.
4.1.6 Examine all studies, reports, sketches, schedules, and other documents
presented by the Engineer and render decisions pertaining thereto within a
reasonable time so as not to delay the work of the Engineer.
JAJOBSV Z6582. 00) WFI PROPOSA Lk DAG% DAG0703. R LP
4.1.7 Assist in obtaining approval of all governmental authorities having jurisdiction over
the project, and such approvals and consents from such other individuals or
bodies as may be necessary for completion of the Project.
4.1.8 Furnish or direct the Engineer in writing to provide at the City's expense, any sub -
consultant services not designated in Section 2, if advised by the Engineer and
City concurs that they are necessary.
4.1.9 Provide such legal, accounting, financial and insurance counseling services as
may be required for the project, and such auditing services as the City may
require.
4.1.10 Give prompt written notice to the Engineer whenever the City observes or
otherwise becomes aware of any defect in the Project.
4.1.11 Obtain AutoCAD or Mylar base drawings of the Road Improvement Plans to serve
as a base for preparation of the Utility Relocation Plans.
4.1.12 Designate location of Water Reclamation Facility site on the Airport property and
acquire right -or -way or easement for water and sewer lines from Wast Lake Mary
Boulevard to new Water Reclamation Facility site.
SECTION 5
Payment
5.1 Payment for services and expenses of the Engineer to be as set forth below:
5.1.1 Principals and Employees of the Engineer.
5.1.2 Compensation paid Engineer for services described herein and rendered by
principals and employees assigned to the Project will be computed by multiplying
Direct Personnel Expense (defined in paragraph 5.2.3 herein) times a factor of
1.95 plus all reimbursable expenses. The fee for the engineering services
described in Section 2, plus out of pocket expenses as described in 5.2.1 below
at actual cost thereof , plus sub -consultant expenses at actual cost thereof shall
not exceed $197,987.93. A "Task" breakdown is attached as Exhibit B and
provides a proposed Man-hour and Expenses cost breakdown and fee calculation.
5.2 Reimbursed Expenses
1:UOBS\Z6582,00kWP�PROPOSALDAG\DAGO703.RLP 9
5.2.1 Expenses for items not specifically valued herein are to be reimbursed to the
Engineer at the actual cost thereof. Said expenses shall include transportation
and subsistence of principals and employees, when traveling in connection with
the project, toll telephone calls, telegrams, prints, photocopies, and similar project -
related items. Monies collected from plan holders in the form of "non-refundable
bid deposits" for Contract Document purchase, will be deposited in Engineers
account and at the conclusion of the bidding process, a check for total bid
deposits received will be issued to the City.
5.2.2 The City will make prompt monthly payments in response to Engineers monthly
statements without retention for all categories of services rendered under this
Agreement and for reimbursable expenses incurred.
5.2.3 Direct Personnel Expense used as a basis for payment shall mean the salaries
and wages paid to principals and employees of all classifications engaged directly
on the Project, plus the cost of fringe benefits including but not limited to, social
security contributions, worker's compensation, health and retirement benefits,
bonuses, sick leave, vacation and holiday pay applicable thereto. For purposes
of this Amendment, Direct Personnel Expense shall be considered an amount
equal to 1.48 times applicable salaries and wages.
5.2.4 Charges for the services rendered by principals and employees as witnesses in
any litigation, hearing or proceeding will be computed at a rate of $600.00 per day
or any portion thereof (but compensation for time spent in preparing to appear in
any such litigation, hearing or proceeding will be computed in accordance with the
payment method as set forth in Paragraphs 5.1.2 and 5.2.1 herein).
5.2.5 If this Agreement is terminated during prosecution of the services prior to
completion of the services of Section 2, payments to be made in accordance with
Paragraph 5.1.2 and 5.2.1 on account of that and all prior work under this
Amendment shall be due and payable, and shall constitute total payment for
services rendered. In addition, upon termination, the Engineer shall be paid for
any additional services authorized and rendered under Section 3.
5.2.6 Services provided by outside sub -consultants will be billed at the direct cost
without increase.
)!UOBS\Z6582,00\WKPROPOSALIDAG\DAC-0703.RU 10
SECTION 6
General Conditions
6.1 Since the Engineer has no control over the cost of labor, materials, or equipment
or over any construction Contractor's method of determining prices, any opinion
of probable construction cost which may be provided in the services of this
Amendment are made on the basis of his experience and qualifications and
represent his best judgment as a design professional familiar with the construction
industry, but the Engineer cannot and does not guarantee that bids or the
construction cost will not vary from opinions of probable cost prepared by him.
Similar limitations apply to construction schedules reviewed or prepared by the
Engineer.
6.2 The City and the Engineer each binds himself and his partners, successors,
executors, administrators and assigns to the other party of this Agreement and to
partners, successors, executors, administrators, and assigns of such other party
in respect to all covenants of this Amendment. Nothing herein shall be construed
as creating any personal liability on the part of any officer or agency of any public
body which may be a party hereto, nor shall it be construed as giving any rights
or benefits hereunder to anyone other than the City and the Engineer.
6.3 The Engineer agrees to initiate work promptly upon receipt of authorization to
proceed and to prosecute the work in an expeditious and timely manner until the
Project is completed.
IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment
the day and year first above written.
(ATTEST & SEAL) ff
0
(ATTEST & SEAL)
CITY:
City of Sanford, Florida
ENGINEER:
Conklin, Porter & Holmes - Engineers, Inc.
By
Paul E. Porter, P.E.
President
Date: -71 /,0 1 '? 7
1:UOBS�Z6582,00�W'P\PROPOSAL\DAGkDAr,0703.RLP 11
EXHIBIT A
Project Summary Table
and Figure
1:QOBS\Z6582.00\WP�PROPOSAL\DAG\DAGO703.RLP 12
co
I-.
0�
Co
co
4.0
W
U.
oo),
06
9)
>-
00O
IL
ce)
I-
()Y
OD
OD
(D
t-
q
Cl)
0).
ti
OD
00
fA
C14
LO
R
C-0
0
to
6F3,
Cl)
w
69.
M
0 G�
m
Cl)
V).
w
619
(%I
':
01
v
0
GF>
0
V)
q
C14
v>
0
0
�
to
»
O
0)(e)
MLf)
11-L
LRQ Q
R
LO
Lf)
OD
V3.
Ln
8
6%
'n
LL
00 LO
P -I
to
C11
W3,
O
m 0)
to
—0
0
uO
0
0
16
;>
E
4)
0
0
Citf)
M
E
CD
0
0 0
V
lb
co
m
E
C14
Q)
4)
M
ct
LL
0
r_
0)
W
x
ul
c
F-
0
LL
z
C'i
UA
Z
C14
C>
!�
V
a)
E
-Nd
m
a)
_j
0
yE
>
<
-6
ui
to
0
CL
>
C
>
s
0
-0
o
'r
0
cj
21
0)
a
w
.>
-
u
f-
v
PL
—
<
Q
<
cn
vi
0
,
a
M
'D
0
cc
C6
in
M
cl
*5Z
W
ca
_j
CO
—0
0
0
(L
29r,2sq
c
-6-
>
0
(j
co
a)
M
0
C4
v
()
0
<
6
am
w
x
0
ca
0
0
CL
cL
a-
6
0
0
0
-2
7E72vMMMM—
o
1
0
0
0
<
Ot!
v
b
0
EL
0
LL
0
E'
v
C6
Q
Q
;-:Z
to
w
w
w
14C
ca
U
Q
uj
UL
0
W
co
t2
to
»
.2
a.
R
Ln
'n
00 LO
P -I
to
C11
W3,
O
m 0)
to
—0
0
uO
0
0
16
;>
E
4)
0
0
Citf)
M
E
CD
0
0 0
V
lb
co
m
E
Q)
4)
M
ct
0
r_
4i
W
x
ul
c
F-
0
Z
C'i
UA
EXHIBIT B
Plan of Study
1:VOBSIZ6582.MWP\PROPOSALtDAG1DAC4703.W 15
1. Airport Boulevard from 17 & 92 to CR 46 A
ITEM
DESCRIPTION
P
E
T
D
S
ESTIMATED
EXPENSES
1.
Meeting and Coordinating with City and County, to
4
8
4
$25.00
obtain data and information on existing plan
availability & existing utilities.
2.
Review proposed roadway plans, check & review
2
16
16
4
potential conflict locations, evaluate utility relocation
including evaluation of water mains & forcemains.
Discuss alternatives with City.
3.
Review & discuss proposed utility relocations with the
2
4
8
16
12
$100.00
City and County. Provide County with preliminary
marked -up roadway plans w/ proposed utility
locations.
4.
Obtain Soils investigation data from geotechnical
4
consultants
5.
Obtain survey of Old Lake Mary Road from Airport
$5,400.00
Blvd. To C.R. 46 A
Survey Sub -
Consultant
6.
Utilize AutoCAD or Mylar roadway base drawings and
survey of Old Lake Mary Road at 1 "=20' scale as base
for preparation of construction plans for utility
relocation. Prepare the following plans:
a. Cover Sheet
1
4
8
2
$25.00
b. General Note Sheet / Quantity Sheet
2
4
8
12
8
$50.00
Specifications (2 sheets)
C. Single Plan & Profile Utility Improvement Plan @
17
102
170
340
15
$675.00
1"=20' (17 sheets)
d. Miscellaneous Detail Sheet (2 sheets)
4
4
8
12
4
$50.00
7.
Prepare Technical Specifications & Contract
3
24
12
Documents
8.
Develop Quantities & Opinion of Probable
2
4
16
4
Construction Cost
9.
Provide City and County with a final engineering plans
2
4
6
6
$100.00
prior to bidding.
10.
Provide the City with Mylar reproducibles & two signed
4
4
4
$400.00
and sealed record sets of drawings.
Coordinate wl FDEP and the City in obtaining FDEP
12
24
6
6
$100*00
111.
Wastewater Collection System / Potable Water
I
Distribution System Permit
1'QOBS\26582.00\WNPROPOSA L\ DAG\ DAG0703 . RLP 16
1. Airport Boulevard from 17 & 92 to CR 46 A
Principal
37
x
92.93
$3,438.41
E
Engineer
210
x
68.85
EXPENSES
12.
Assist the City in obtaining Seminole County Right of
16
32
16
8
$150.00
Way Utilization Permit and CSX Railroad Right -of -
D
Draftsman
432
x
41.30
Way Consent Agreement.
$17,841.60
S
Secretary
97
13.
Coordination & Revisions w/ the City, FDOT,
2
8
12
12
8
$100.00
Seminole County, Road Construction & road
$1,775.00
Surveyor
$5,400.00
TOTAL
$63,847.37
P
Principal
37
x
92.93
$3,438.41
E
Engineer
210
x
68.85
$14,458.50
T
Technician
306
x
59.06
$18,072.36
D
Draftsman
432
x
41.30
$17,841.60
S
Secretary
97
x
29.50
$2,861.50
Expenses
$1,775.00
Surveyor
$5,400.00
TOTAL
$63,847.37
17
2. East Lake Mary Boulevard from 17 & 92 to Sanford Avenue
ITEM
DESCRIPTION
P
E
T
D
S
ESTIMATED
EXPENSES
14.
Meeting and Coordinating with City and County, to
4
8
4
$25.00
obtain data and information on existing plan availability
& existing utilities.
15.
Review proposed roadway plans, check & review
2
8
8
4
potential conflict locations, evaluate utility relocation
including evaluation of water mains and forcemains.
Discuss alternatives with City.
16.
Review & discuss proposed utility relocations with the
2
4
8
16
12
$100.00
City and County. Provide County with preliminary
marked -up roadway plans w/ proposed utility locations.
17.
Obtain Soils investigation data from geotechnical
4
consultants
18.
Utilize AutoCAD or Mylar roadway base drawings at
1 "=20' scale as base for preparation of constructions
plans for utility relocation. Prepare the following plans:
a. Cover Sheet
1
4
8
2
$25.00
b. General Note Sheet / Quantity Sheet /
2
4
8
12
8
$50.00
Specifications (2 sheets)
C. Single Plan & Profile Utility Improvement Plan Cia
14
42
70
140
15
$675.00
1"=20' (14 sheets)
d. Miscellaneous Detail Sheet (2 sheets)
4
4
8
12
4
$50.00
19.
Prepare Technical Specifications & Contract Documents
3
24
12
20.
Develop Quantities & Opinion of Probable Construction
2
4
16
4
Cost
21.
Provide City and County with a final engineering plans
2
4
6
6
$100.00
prior to bidding.
22.
Provide the City with Mylar reproducibles & two signed
4
4
4
$400.00
and sealed record sets of drawings.
23.
Coordinate w/ FDEP and the City in obtaining FDEP
12
24
6
6
$100.00
Wastewater Collection System / Potable Water
Distribution System Permit
24.
Assist the City in preparation of Seminole County Right
8
16
8
4
$75.00
of Way Utilization Permit
25.
Coordination & Revisions w/ the City, FDOT, Seminole
2
8
16
16
6
$100.00
County &road Consultants.
TOTAL
34
134
186
228
91
$1,700.00
1: JOBS%Z6582.00%W P\PROPOSAL1DAG%DAG0703.RLP 18
2. East Lake Mary Boulevard from 17 & 92 to Sanford Avenue
P =
Principal =
34
X
92.9
=
$3,159.62
E =
Engineer =
134
X
68.8
=
$9,225.90
T =
Technician =
186
X
59.0
-
$10,985.16
D =
Draftsman =
228
X
41.3
=
$9,416.40
S =
Secretary -
91
X
29.5
-
$2,684.50
Expenses _
$1,700.00
TOTAL
$37,171.58
7:UOBS\Z6582.=WPNPROPOSAL\DAGNDAG0703.RLP 19
3. East Lake Mary Boulevard from End of Silver Lake Drive to State Road 46
to the future Wastewater Plant Site Located on the Airport Property
ITEM
DESCRIPTION
P
E
T
D
S
ESTIMATED
EXPENSES
1.
Meeting and Coordinating with City and County, to
4
8
4
$25.00
obtain data and information on existing plan
availability.
2.
Review proposed roadway plans, and evaluate utility
16
16
16
4
$8,200.00
locations within the right-of-way. Employ surveyor for
Survey Sub -
route survey to the future wastewater plant location on
Consultant
the airport site.
3.
Assist the City in planning for utilities to serve
24
24
40
16
development at the airport and in the area surrounding
the airport..
4.
Review & discuss proposed utility locations with the
8
8
24
40
12
$200.00
City and County. Provide County with preliminary
marked -up roadway plans w/ proposed utility
locations.
5.
Obtain Soils investigation data from geotechnical
4
consultants
6.
Utilize AutoCAD or Mylar roadway base drawings and
route survey at 1"=20'scale as base for preparation of
constructions plans for utility improvements. Prepare
the following plans:
a. Cover Sheet
1
4
8
2
$25.00
b. General Note Sheet / Quantity Sheet
2
4
8
12
8
$50.00
Specifications (2 sheets)
C. Single Plan & Profile Utility Improvement Plan @
29
145
232
464
30
$1,350.00
1 "=20' (29 sheets)
d. Miscellaneous Detail Sheet (2 sheets)
4
1 4
8
1 12
4
$50.00
7.
Prepare Technical Specifications & Contract
3
24
12
Documents
8.
Development Quantities & Opinion of Probable
4
8
32
8
Construction Cost
9.
Provide City and County with a final engineering plans
2
4
6
6
$200.00
prior to bidding.
10.
Provide the City with Mylar reproducibles & two signed
4
4
4
$800.00
and sealed record sets of drawings.
11.
Coordinate w/ FDEP and the City in obtaining FDEP
12
24
6
6
$200.00
Wastewater Collection System / Potable Water
Distribution System Permit
J: 'JOBS, Z65 82.00\ WF\ PROPOSA UDAGI DAGO703. RLP 20
3. East Lake Mary Boulevard from End of Silver Lake Drive to State Road 46
to the future Wastewater Plant Site -Located on the Airport Property
ITEM
DESCRIPTION
P
E
T
D
S
ESTIMATED
285
X
68.8
$19,622.25
T =
EXPENSES
12.
Assist the City in preparation of Seminole County
59.0
8
16
8
4
$150.00
584
Right of Way Utilization Permit
41.3
=
$24,119.20
1
Secretary
13.
Coordination & Revisions w/ the City, FDOT,
16
16
24
24
6
$200.00
Seminole County & road Consultants.
Expenses
TOTAL
109
285
436
584
126
$11,450.00
P =
Principal =
109
X
92.9
=
$10,129.37
E =
Engineer
285
X
68.8
$19,622.25
T =
I Technician =
436
X
59.0
=
$25,750.16
D =
Draftsman =
584
X
41.3
=
$24,119.20
S =
Secretary
126
X
29.5
$3,717.00
Expenses
$11,450.00
TOTAL
$94,787.98
1:\JORS\26582.00\WP\PROPOSAL%DAG'\DAGM03.RLP 21
MEMORANDUM
DATE: August 29, 1997
TO: City Clerk
FROM: Utility Director (6
RE: CP&H Amendment No. 27 - Engineering Services
Jan -
Attached is one original executed agreement from CP&H. Please file for
safekeeping.
Thank You.
PM/ap
attachment
C� )a,&(
Al, �Q/ � /-2 � a6 t z
UTILITY DEPARTMENT
MEMORANDUM
DATE: July 31, 1997
TO: City Manager
FROM: Utility Director r-117
RE: Engineering Services - CP&H Amendment No. 27
Attached is an amendment from CP&H for engineering services related to three
(3) utility projects. Two (2) projects involve utility relocates due to County road
improvements and the third project is extending lines around the Airport for
future growth. The projects are:
1) Lake Mary Blvd. Phase III (Highway 17-92 to Sanford Avenue)
2) East Lake Mary Blvd. (Airport Entrance Road to S.R. 46)
3) Airport Blvd. Phase 1113 (Beltway Overpass to C.R. 46A)
The attached amendment gives details on the various services provided and a
breakdown of the costs. The total engineering cost for all three (3) projects is
$197,987.93.
It is recommended that the City approve this amendment. Funds for this work are
not budgeted and are recommended to come from utility reserves.