Loading...
115 Spanish Bay Dr 00-1598 New SFHSUBDIVISION: Oa' C ZONE DATE A a -00 CONTRACTOR ADDR PHONE# AL LOCATION - OWNER Ak&/L4AA'0L- ADDRESS PHONE # PLUMBING CONTRACTOR ADDRESS 0a-1(DO 1 PERMIT* # JOB S COST $ LOT NO. S l BLOCK: SECTION: SQUARE FEET: FEE $ MODEL: STATE NO. FEE PHONE # ELECTRICAL CONTRACTOR �17 �) FEE $ 5 ADDRESS PHONE # MECHANICAL CONTRACTOR ADDRESS PHONE # MISCELLANEOUS CONTRACTOR ADDRESS SEPTIC TANK PERMIT NO. ()Orgy toC7Z SOIL TEST REQUIREMENTS () FINISHED FLOOR ELEVATION REQUIREMENTS ARCHITECTURAL APPROVAL DATE: FEE $ 5 3 OCCUPANCY CLASS: FEE $ ENERGY SECT. EPI: CERTIFICATE OF OCCUPANCY ISSUED # / DATE: FINAL DATE 7/ ZO OZJ 4,1\,l CERTIFICATE OF OCCUPAt1CY / COMPLETION This is to certify that the building :Located at 115SPANT,yH BAY DR ,� for Ma k1�U:d6bo+598 has j`he��e ore ahem dJon l id been completed according to p1a�f:3 and v ci£i.cat`ion� -filed'i-Iri Pii office of the Building Official prior to theVissuance of.said bihild►ing permit, to wit as 11:5 complies with all the building, plumbing, elebtrical,. zon'_.ng and subdivision regulations ordinances of the City of Sanford and with the provisions of these regulations. STAFF APPROVAL Subdivision Regulations Apply: Yea No DAT APPROVAL DATE APPROVAL BUILDING: �Q - FIRE: Finaled 8 Inspected ZONING: Inspected UTILITIES: Water Sewer Lines In _ Liners In Meter Sewer Set Tap Reclaimed Water ENGINE IER NG: Drainage ���� Maintenance V Bond /� PUBLIC W RO KS: Street Name r" Signs __1 Jim Storm U0 Sewer Street _ Work Pa •._', -toT+I WATER -SEWER IMPACT FEES 01-APPLCTN FEE -BUILDING 01-FIRE IMPACT - RESIDENT 01-LIBRARY IMPACT FEE 01-OPEN SPACE 01-POLICE IMPACT - RESID 01-RADON GAS TAX FEE 01-ROAD IMPACT FEES 01-RECOVERY FD/CERT. PGM. Street Paved Street Lights Driveway _ .may 161010 3/03/00 10.00 3/03/00 59.27 3/03/00 54.00 3/03/00 279.61 3/03/00 91.93 7.14 1-3/03/00 `J/W/00 847.00 3/03/00 7.14 PAGE: 2 This is to certify that the building :Located at 115 SPANISH BAY DR for which permit 00-00001598 has hez'-etofore been issued on S/02/00 has been completed according to plans and specifications filed in the office of the Building Officia rior to the issuance of said building permit, to wit as �e complies with all the building, plumbing, electrical, zon.ng and subdivision regulations ordinances of the City of Sanford and with the provisions of these regulations. STAFF APPROVAL Subdivision Regulat9.ons Apply: Yes No 01-SCHOOL IMPACT FEE WT IMPACT:SINGLE FAMILY SW IMPACT:SINGLE FAMILY 3/03/00 1384.00 3/03/00 650.00 3/03/00 1700.00 BUILDING OFFICIAL / DA CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION ""RESIDENTIAL SINGLE: FAMILY RESIDENCE"*'t'4 DATE -"I I I'1 Op ADDRESS�� CONTRACTOR The Building department has prepared a C of O for the above location and is requesting final inspection by your department. After your inspection, please sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineering Public Works Utilities/Cross Connection t�t,(AW,WU �0 ff�la-1 'CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION *******RESIDENTIAL SINGLE FAMILY RESIDENCE"'k** DATE '-I I I'I Qp ADDRESS CONTRACTOR `L1 The Building department4as prepared a C of O for the above location and is requesting final inspection by your department. After your inspection, please sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. j Engineering / Public Works Utilities/Cross Connection I 'CERTIFICATE OF OCCUPANCY REQUEST FOR FIIVAL INSPECTION *******RESIDENTIAL SINGLE FAMILY RESIDENCE******* DATE —II 1'1 100 ADDRESS Coo -150) CONTRACTO The Building department has, prepared a C of O for the above location and is requesting final inspection by your department. After your inspection, please sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineering Public Works Utilities/Cross Connection_ C.O./C.C. CHECKUST - UTi° MES Re pest Received 7 U�� ¢.00 Utility Inspects q INITIALS PATE '---`7-� � r s Final 1ltility Inspec o -- FDEP Clearance - Water ---------- ------- _- FDEP Clearance - Sewer ---------- -- ---- City Services Easements -------- - Maintenance Bond (1096 ZYr% ---------- --------- l/ 7�w� LA.) D (0,50 03 00 _ M-F Flo 0 q S uo 3�35 ° ° -\ - 1)c o5,1— FC 5-Z 3� 1 CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION *******RESIDENTIAL SINGLE FAMILY RESIDENCE******* DATE —1I l'I Op ADDRESS�� CONTRACTOR The Building department has prepared a C of O for the above location and is requesting final inspection by your department. After your inspection, please sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. /.s> Engineering' Public Works Utilities/Cross Connection C.U./C.C. ��,._�,,.`�. - s -S oo_¢ �o titi'tity Inspec'or-� z �RegLest F.eceived 7�INMALS ONCE l;tility ln144-1 spec,or's Final -- FDEP Clearance - \dater _--------- ------_ ----- FDEP Clearance - Sewer ---------- ---- -""--- City Services Easements ---------- ---------- Maintenance Bond (10% - 2yr)---------- Other-------------------- --------- iF�`''.,_„y+[3`; �c►eS"„tir��E.Y._,_...T ,,� ti ^�<- `4.. ale •- .,�f.-•.-•.. •:r,,,..;�,..�+,•.[�i]�i.-,tee s:Tt�'4y S.Ef!���-tf.�'��. 3.—u�.e....»�`Lei-',+�+tr'*.t�:•:�firrwt;F�x�.s�..:�� RAkPI® MEMO - T ec /s i ),/ CD/. C ,� / {V �r/�� GAdarrs SC1158