Loading...
123 Spanish Bay Dr 00-3755 New SFH)Pon iS��Pic- SUBDIVISION:��` ZONE DATE 2 -,2K 0y CONTRACTOR Pll(--tn%nda--tcm es J) C• ADDRESS I�C>l�L�CJ ��i ►C!1�J, t�L PHONE # Lf /`�_" C'I/�Z _3�23 LOCATION / sh Ac,-14- /-)C OWNER ADDRESS PHONE # /1 PERMIT' # JOB C_J�s��,�Lt� �SI F ees COST $ L C i CUU LOT NO. --7 % BLOCK: SECTION: SQUARE FEET: y� FEE $ MODEL: STATE NO. CI\ e `' OCCUPANCY CLASS: &(j _ �� PLUMBING CONTRACTOR �c, �►l e FEE $ ADDRESS PHONE # ELECTRICAL CONTRACTOR FEE $ Z1 ADDRESS PHONE # Co z -7 MECHANICAL CONTRACTOR :�) G 21 (f- ADDRESS PHONE # MISCELLANEOUS CONTRACTOR ADDRESS SEPTIC TANK PERMIT NO. SOIL TEST REQUIREMENTS �) FINISHED FLOOR ELEVATION REQUIREMENTS (__) ARCH ITECTURALAPPROVAL DATE: FEE $ INSPECTIONS I TYPE DATE OK REJECT BY FEE $ ENERGY SECT CERTIFICATE OF OCCUPANCY ISSUED # FINAL DATE " �•� DO EPI: DATE: _ a -I T O Z:) _ w CERTIFICATE OF OCCUPANCY / COMPLETION rz this'?to''tiify/�hat;-the''building,:loc�atgd atr(= ii���r 1� �� �, 123 SPANISH BAI DR 7' ' fbr which permit 00-00003755 has heretofore been issued on 8/28/00 has been completed according to plans and specifications filed in the office of the Building Official prior to the issuance of said building permit, to wit as kna `I) �I'Fr complies with all the building, plumbing,'eiectrical, zoning and subdivision regulations ordinances of the City of Sanford and with the provisions of these regulations. STAFF APPROVAL Subdivision Regulations Apply: Yes No DATE APPROVARATE APPROVAL BUILDING: FIRE: Finaled 1gAvda-) L Inspected ZONING: Inspected UTILITIES: ' Water Sewer M Lines In � P li l k l�f e� Lines In Meter"�- Set ap Reclaimed Water ENGINEERING: Street , Drainage -�— Paved Maintenance 'ug Bond PUBLIC WORKS: Street Name Signs t Z �' �k?, Street Lights _- Storm U1 Sewer Driveway Street Work _ FEES PAID WATER -SEWER IMPACT FEES 01-APPLCTN FEE -BUILDING 01-FIRE IMPACT - RESIDENT 01-LIBRARY IMPACT FEE 01-OPEN SPACE 01-POLICE IMPACT - RESID 01-RADON GAS TAX FEE 01-ROAD IMPACT FEES 01-RECOVERY FD/CERT_ PGM. 8/29/00 10.00 8/29/00 59.27 8/29/00 54.00 8/29/00 279.61 ".8%29/00 91.93 8/29/00 10.72 8/29/00 847.00 8/29/00 10.71 PAGE: 2 This is to certify that the building located at 123 SPA_NISH BAY DR for which permit 00-00003755 has heretofore been issued on _8/28/00 has been completed according to plans and specifications filed in the office of the Building Off 1,prior to the issuance of said building permit, to wit as � Vf '-3-11:::- complies with all the building, plumbing, electrical, zoning and subdivision regulations ordinances of the City of Sanford and with the provisions of these regulations. STAFF APPROVAL Subdivision Regulati.ons Apply: Yes No O1-SCHOOL IMPACT FEE 8/29/00 1384.00 WT IMPACT:SINGLE FAMILY 8/29/00 650.00 SW IMPACT:SINGLE FAMILY 8/29/00 1700.00 n- M t c. k tiJ - I2 CCU I� OWNER •BUILDING OFFICIAL / DATWO �n Fema Rec'd Slab Rec'd AF� Inspector App'd REQUEST FOR FINAL INSPECTION CERTIFICATE OF OCCUPANCY ****SINGLE FAMILY RESIDENCE**** DATE ��'�`-i'0D PERMIT# 00-3-1�L- ADDRESS SUBDIVISION CONTRACTOR Maronda Homes The Building Division has received a request for a final inspection and a Certificate of Occupancy for the above referenced address. We would appreciate a final inspection of the site by your department. Approval by your department would result in a granting a C.O. for the address. If you have any issues that the contractor will need to address, please submit a statement for denial of C.O. or a conditional agreement to be attached to the C.O. Thank you for your cooperation. co./C.C. CHECKLIST - UTILITIES DEFT. 6Request Received te;-4 Ao 14 To Utility Inspector INITIALS DATE Engineering Utility Inspector's Final-------------------- FDEP Clearance - Water ---------- ---------- Public Works FDEP Clearance - Sewer ------- Utilities City Services Easements -------- ----------- Mointencince Bond (10% - 2yr)------L ------------ Other-------------------- ---------- ---------- Conditions: to be com feted onl if a roval is conditional u� Fema Rec'd Slab Rec'd Inspector App'd REQUEST FOR FINAL INSPECTION CERTIFICATE OF OCCUPANCY `"""SINGLE FAMILY RESIDENCE""" DATE �,� PERMIT # C;0 ADDRESS SUBDIVISION L) CONTRACTOR Maronda Homes The Building Division has received a request for a -final inspection and a Certificate of Occupancy for the above referenced address. We would appreciate a final inspection of the site by your department. Approval by your department would result in a granting a C.O. for the address. If you have any issues that the contractor will need to address, please submit a statement for denial of C.O.. or a conditional agreement to be attached to the C.O. Thank you for your cooperation. Engineering Public Works Utilities C.O./C.C. CHECKLIST - UTZLiTiES DE:'T. &Request Received Lz1z0 ?y-_<_To utility Inspector t',.�s INITIALS DATE _ Utility Inspector's Final_`-°----f-- 10` P �p Clearance - Water -------------------- FDEP Clearance - Sewer -------------------- City Services Easements ------------------- Maintenance Bond (10% - 2yi) Other-------------------- --- Conditions: (to be completed only if approval is conditional Fema Rec'd l� Slab Rec'd Inspector App'd REQUEST FOR FINAL INSPECTION CERTIFICATE OF OCCUPANCY ****SINGLE FAMILY RESIDENCE**** DATE I L- N - O-0 PERMIT # ADDRESS NU SUBDIVISION CONTRACTOR Maronda Homes The Building Division has received a request for a final inspection and a Certificate of Occupancy for the above referenced address. We would appreciate a final inspection of the site by your department. Approval by your department would result in a granting a C.O. for the address. If you have any issues that the contractor will need to address, please submit a statement for denial of C.O. or a conditional agreement to be attached to the C.O. Thank you for your cooperation. I� Qt7 Engineering Public Works Utilities Conditions: (to be completed only if approval is conditional)_ Fema Rec'd Slab Rec'd Inspector App'd REQUEST FOR FINAL INSPECTION CERTIFICATE OF OCCUPANCY ****SINGLE FAMILY RESIDENCE**** DATE D-HZ'O PERMIT # ADDRESS 1 �3 SOcan lS k SUBDIVISION C)C, �S CONTRACTOR Maronda Homes The Building Division has received a request for a final inspection and a Certificate of Occupancy for the above referenced address. We would appreciate a final inspection of the site by your department. Approval by your department would result in a granting a C.O. for the address. If you have any issues that the contractor will need to address, please submit a statement for denial of C.O. or a conditional agreement to be attached to the C.O. Thank you for your cooperation. Engineering Public Works' « 1 Utilities Conditions: (to be completed only if approval is conditional) I ST FL-00 PL_AN 1/4.4-0" 20'-0" I 1 14 I I � I I3' 5.W.5. 23 5.H. 6065 5.6D. Ll las I N (vl\ -la y 5LAWPOR61-1 LOCATION 5UNBURY 0 Iq'-O 1/2" (2) 245H IN I 3SW5 30 ARGH OVER lr9 REGE55 PREGA5T LINTEL W LINTEL BLOCK OVER n O_ UI i O _ N FAMILY RM. l'-4 ta 1.3' 5.W.5.