Loading...
130 Spanish Bay Dr 01-76 New SFHSUBDIVISION: n ZONE DATE CONTRACTOR MARONDA HOMES 1101 N. Keller Rd., Ste. F ADDRESS — Orlando, FL 32810 PHONE # (407) 475-9112 LOCATION OWNER � , �:} �. 14L'2 ADDRESS PHONE # PLUMBING CONTRACTOR ADDRESS PHONE # ELECTRICAL CONTRACTOR ADDRESS PHONE # MECHANICAL CONTRACTOR ADDRESS PHONE # MISCELLANEOUS CONTRACTOR ADDRESS SEPTIC TANK PERMIT NO. SOIL TEST REQUIREMENTS (__) FINISHED FLOOR ELEVATION REQUIREMENTS (_) ARCHITECTURAL APPROVAL DATE: PERMIT #� / JOBy�r COST $ �J i UQU FEE $ STATE NO. FEE $ FEE $ FEE $ LOT NO. BLOCK: SECTION: ( I SQUARE FEET: �/ 7- D MODEL: OCCUPANCY CLASS: INSPECTIONS I TYPE DATE OK REJECT BY FEE $ ENERGY SECT EPPII: , (/ 7, CERTIFICATE OF OCCUPANCY ` �00 ISSUED # DATE: _ 1✓ f FINAL DATE`' I r @ERTIFNATE OF @@@UPANCY / COMPLETION This is to certify that the building located at 130 SPANISH Y DR for which permit 01-0000007S has heretofore been issued on 10/09/00 has been completed according to plans and specifications filed in the office of the Build g Off' is1 pr or•to the issuance of said building permit, to wit as n�l� - G,m, ��� dellCe complies with all the building, plumbing, electrical, zoning and subdivision regulations ordinances of the City of Sanford arid with the provisions of these regulations_ STAFF APPROVAL Subdivision Regulations Apply: Yes No DATE APPROVAL DATE APPROVAL BUILDING- Finaled �-�� �� S e� FIRE:: Inspected A J ZONING: Inspected I� UTILITIES: Water N Sewer Lines In ��'�� 11 ���e Lines In Meter S r Set ap Reclaimed Water ENGINEERING: t Street Drainage a""�ePT Paved _ Maintenance Bond PUBLIC WORKS: Street Name n Street Signs a-�lo �� • gPG �I //�) Lights Storm Sewer iv sway Street Work DESCRIPTION DATE AMOUNT WATER -SEWER IMPACT FEES 01-APPLCTN FEE -ELECTRIC 10/10/00 10.00 01-APPLCTN FEE -BUILDING 10/10/00 10.00 01-APPLCTN FEE -MECHANIC 10/10/00 10.00 01-APPLCTN FEE -PLUMBING 10/10/00 10.00 01-FIRE IMPACT - RESIDENT 10/10/00 59.27 01-LIBRARY IMPACT FEE 10/10/00 54.00 01-OPEN SPACE 10/10/00 279.61 01-POLICE IMPACT - RESID 10/10/00 91.93 PAGE: 2 This is to certify that the building located at 130 SPANISH BAY DR ____ for which permit 01-OQ000076 has heretofore been issued on IO/09ZQO has been completed according to planE; and specifications filed in the office of the Building Official prior to the issuance of said building permit, to wit as complies with all the building, plumbing, electrical, zoning and subdivision regulations ordinances of the City of Sanford and with the provisions of these regulations. STAFF APPROVAL Subdivision Regulations Apply: Yes No 01-RADON GAS TAX FEE 10/10/00 10.71 01-ROAD IMPACT FEES 10/10/00 847.00 01-RECOVERY FD/CERT. PGM. 10/10/00 10.72 01-SCHOOL IMPACT FEE 10/10/00 1384.00 WD IMPACT:SINGLE FAMILY 10/10/00 650.00 SD IMPACT:SINGLE FAMILY 10/10/00 1700.00 OWN R BUILDING OFFICIAL / DAT REQUEST FOR FIIJAL INSPECTION CERTIFICATE OF OCCUPANCY ****SINGLE FAMILY RESIDENCE**** 1 DATE :q I PERMIT # --7 ADDRESS SUBDIVISION _fi�1,�1 C)C4 ,S CONTRACTOR Maronda Homes Fema Rec'd ✓ Slab Rec'd jy Inspector AppId,�-i�-Vj S . ec The Building Division has received a request for a final inspection and a Certificate of Occupancy for the above referenced address. We would appreciate a final inspection of the site by your department. Approval by your department would result in a granting a C.O. for the address. If you have any issues that the contractor will need to address, please submit a statement for denial of C.O. or a conditional agreement to be attached to the C.O. Thank you for your cooperation. 6711 Engineering 5 w Public Works Utilities Conditions: (to be completed only if approval is conditional)_ Fema Rec'd Slab Rec'd t Inspector App'd REQUEST FOR FINAL INSPECTION CERTIFICATE OF OCCUPANCY ****SINGLE FAMILY RESIDENCE**** DATE ,q© ( PERMIT # ( I --](� ADDRESS- i ,-Y) o SUBDIVISION)0j- CONTRACTOR Maronda Homes The Building Division has received a request for a final inspection and a Certificate of Occupancy for the above referenced address. We would appreciate a final inspection of the site by your department. Approval by your department would result in a granting a C.O. for the address. If you have any issues that the contractor will need to address, please submit a statement for denial of C.O. or a conditional agreement to be attached to the C.O. Thank you for your cooperation. Engineering ,L� Public Works_ Utilities Conditions: (to be completed only if approval is conditional) Fema Rec'd Slab Rec'd Inspector App'd )UEST FOR FINAL INSPECTION CERTIFICATE OF OCCUPANCY ****SINGLE FAMILY RESIDENCE**** DATE a to 10( PERMIT # () 1 --](n ADDRESS- i ,fin SUBDIVISION r CONTRACTOR Maronda Homes The Building Division has received a request for a final inspection and a Certificate of Occupancy for the above referenced address. We would appreciate a final inspection of the site by your department. Approval by your department would result in a granting a C.O. for the address. If you have any issues that the contractor will need to address, please submit a statement for denial of C.O. or a conditional agreement to be attached to the C.O. Thank you for your cooperation. �.'o./�..�c'. CHEM,�d - UIIL I zi, DEF Engineering iI"Q3y Inspectoes Real -___---_.._ ...�....._�...��. Public Works fDEP CIeomnco e WOW ----'--- " Utilities Conditions C18y mac"s e=As_,.,_..,._..�. Kr2kneram BOW M n 20 I--------------------------®-� o (to be completed only if approval is conditional) o (arc N- ��2T �' .z,►`1[nl Fema Rec'd Slab Rec'd Inspector App'd REQUEST FOR FINAL INSPECTION CERTIFICATE OF OCCUPANCY ****SINGLE FAMILY RESIDENCE**** DATE a � ko 0 ( PERMIT # ADDRESS SUBDIVISION,(CY\Q J CONTRACTOR Maronda Homes The Building Division has received a request for a final inspection and a Certificate of Occupancy for the above referenced address. We would appreciate a final inspection of the site by your department. Approval by your department would result in a granting a C.O. for the address. If you have any issues that'the contractor will need to address, please submit a statement for denial of C.O. or a , conditional agreement to be attached to the C.O. - Thank you for your cooperation. C.O./C.C. CHECKUS1 U 1Lj1ES D1P7. R� i i�ecl TO U`dilpj I �iT1A1.S Engineering DATA >3.% az v �lfty Inspectors F1;' Gi Public Works FDEP Cle-drance - Vk, 4 r Utilities r FaEP Clearance - Sewa __�_......._ ON Vices Imemn s --- - W&;k-W( m Qi)`ir-Xf --------------------------_-� Conditions: (to becompleted only if approval is conditional) F0U1\ID/�\T101\1 Pl_�1\1 1/41. - It_o„ 281-r lnf�............ nr�ll\�I��i�cglrilil� 51_ABm0RC1-1 LOCATION SUNBURY REV. r - - - - - 1 I 8" x 8' POURED CONC. MONO FOOTING W/ (1) M5 BAR �(n 3 1/2" CONC. SLAB 0 L NWC f `c=2500 PSI REINF. m ~ WWF. 6X6XW 1.4XW 1.4 ILI 9 4' X T STOOP hi _6 I OPT. 1 112" VTR I '1s31 RE( E55 FOR >'-0' S.GS-G.D. 0 ELEV. ---- r 4I ----.----------------------- --�------- `11 �Tr III I I � i 6 I rn I FROVIDE 15LAND ELEG. t„ N Zcm Qu ++ t FLOOR, I"LAICI f`l O 0 0 SLAWPORCH LOCATION SUNBURY REV. 23'-v I ' I I L I I 1 I 1 I lI IcI'-0 1/2' I -�� IA }ITI01 II (2) 2451-1 E^I/ cSFI FILLED P/C LINTEL P/G LINTEL I '012G I 30 ARC,FI OVER l boob 5-0- D. 5�V 235.F(M ( �) FILLED Rl m7 5 P/G LINTEL — T - -- — c W I I_--- N - - U VINYL FL I GL� . <u I- -- ----- V114YL FL./ 99 GLG.-I- o� M`f IN' r,-4'-10" 5'-I IM" /0 0 Al. RL"-GP. , I OPT- ONLY Kr I tIl_y — — (5) - IG--