Loading...
115 Sterling Pine St 00-960 New SFHJ i ZONE DATE ! LPL CONTRACTOR ADDRESS ` / !LI• l E'I,' ;! PHONE # LOCATION OWNER l Cf'C G9GL ,mC S i• ADDRESS PHONE # C ,T PLUMBING CONTRACTOR Uu ADDRESS q 5 Vc PHONE # ELECTRICAL CONTRACTOR ADDRESS PHONE # MECHANICAL CONTRACTOR ADDRESS PHONE # MISCELLANEOUS CONTRACTOR ADDRESS SEPTIC TANK PERMIT NO. SOIL TEST REQUIREMENTS () FINISHED FLOOR ELEVATION REQUIREMENTS ARCHITECTURAL APPROVAL DATE: SUBDIVISION: E/ I"1 C PERMIT # JOB COST $ J/ L- FEE $ STATE NO FEE $ FEE$`1. FEE $ LOT NO. / 9 BLOCK: SECTION: SQUARE FEET: I '7 MODEL: OCCUPANCY CLASS: INSPECTIONS 1TYPEDATEOKREJECTBYI FEE $ ENERGY SECT. EPI: CERTIFICATE OF OCCUPANCY 1 ISSUED # DATE: FINAL DATE z(,/k lV Thfs is to certify that the bui ding located at 1 115 ST .R NG' PTNE ST , for w hhpe ,m ,IN ,` has ore b eehR s t oq \ K-X TY00 h B been com+lete d according to pl s and p),Ciii6atio s fi\letl i the office of the Building Off' '//a! prior to the i.dsuance o said uilding permit, to wit as !1 complies with all the building, plumbing, electrical, zoning and subdivision regulations ordinances of the City of Sanford and with the provisions of these regulations. DATE BUILDING: Finaled ZONING: Inspected Subdivision Regulations Apply: Yes No A FIRE: Inspected UTILITIES: Water - Sewer Lines In Lines In _ Meter 2 Sewer 1 /Z/o0 Set (ni Tap / _ Reclaimed Water _ ENGINEERING: Drainage C / i G 1_o r - Street Paved Maintenance Bond PUBLIC WORKS: Street Name f J- Street Z: U• Lights Storm Sewer Driveway Street Work DESCRIPTION FEES PAID DATE AMOUNT WATER -SEWER IMPACT FEES O1-APPLCTN FEE -BUILDING 1/11/00 10.00 O1-FIRE IMPACT - RESIDENT 1/11./00 59.27 O1.-LIBRARY IMPACT FEE 1/11,/00 54.00 O1-OPEN SPACE 1;11/00 279.61 01-P0I. i (;E IMPACT - RESID 1/ 11/00 c :. 913 01-RADON GAS 'TAX FEE 1/11/00 38 01--ROAD IMPACT:' FEES 1/1.1/O% 84'r . Or) O1-RECOVERY FD,'CERT . PGM . 1 / 11/00 9 .3? PAGE: 2 This is to certify that the building locat,ad at 1155 STERLING PT N• ST _,____ f or which permit _ OQ-00000980 has heretofore been issued on 1/07/00 has been completed according to plans and specifications filed in the office of the Building Official --to --to the issuance of: said building permit, to wit as — complies with all the building, plumbing, electrical., zoning and subdivision regulations ordinances of the City of Sanford and with the provisions of these regulations. STAFF APPROVAL Subdivision Regulations Apply: Yes No O1-SCHOOL IMPACT FEE 1/11/00 1384.00 WT IMPACT:SINGLE FAMILY 1/11/00 650.00 SW IMPACT:SINGLE FAMILY 1/11/00 1700.00 rE.,;4., 1 a OWNER a OUILDING OFFICIAL / bVTE CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION RESIDENTIAL SINGLE FAMILY RESIDENCE******* DATE q / 4 op ADDRESS /f 5- k.' tee- Sf CONTRACTOR The Building department has prepared a C of O for the above location and is requesting final inspection by your department. After your inspection, please sign off on the C.O. or submit an addendum if it has been denied. Your prompt att ti will b appreciated. Thank you. I AI. Engineering Public Works Utilities/Cross Connection CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION RESIDENTIAL SINGLE FAMILY RESIDENCE******'k DATE G/ 4 UD ADDRESS // S- CONTRACTOR The Building department hcas prepared a C of O for the above location and is requesting final inspection by your department. After your inspection, please sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineering Public Works "- A Utilities/Cross Connection 0 _WgW " -p 0 4"<6( CITY OF SANFORD. FL UTILITIES DEPARTMENT REQUEST FOR FINAL REINSPECTION DATE ADDRESS CONTRACTOR THE BUILDING DEPARTMENT HAS PREPARED A C.OF 0. FOR. THE ABOVE LOCATION' AND THE INITIAL INSPECTION WAS DENIED DUE 70. UTILITY RELATED ITEMS. THE CONTRACTOR IS REQUESTING A REINSPECTION OF RELATED ITEMS AND IS NOW AS FOLLOWS. INSPECTOR El- 4 11 2 a I/ i OWNER: ADDRESS DATE: QERDrJ CATS Cff MDU NGY AD- o,-4/,y /Tate&s G/2i/oo REASON FOR DISAPPROVAL: y f ) SEwi2 C-664-1 —0-T To 6,e H 4 c.. d- CONDITIONAL AGREEMENT: FIRE DEPARTMENT PUBLIC WORKS PP60 s 7-o Bc Gow co I SCL wo?L E, /7d--r UTILITIES ENGINEERING CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION RESIDENTIAL SINGLE FAMILY RESIDENCE******* DATE G! 4 U0 ADDRESS //S A,* tee. S CONTRACTOR The Building department has prepared a C of O for the above location and is requE!sting final inspection by your department. After your inspection, please sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineering Public Works Utilities/Cross Connection w , 00 " lit 1 o u c.,,.i::.c. c,cceLy l — Ii I iLi I r:> Request Recek-d 8-Sv To Utility InsaeC r yo/_o 8 3ly A (60 0 00 INITIALS DATE Utility Inspector's Final mowj;'l ko O FDEP Clearance - Water __________ FDEP Clearance - Sewer __________ _ ------- City Services Easements _______ _ ---------- Maintenance Bond (10% - 2rr) _ _______ ---------- Other------------------- -------------------- yn I oo w o, ct'Q. S;+ CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION RESIDENTIAL SINGLE FAMILY RESIDENCE**-***** DATE G// -?10D ADDRESS //5- CONTRACTOR The Building department has prepared a C of 0 for the above location and is requesting final inspection by your department. After your inspection, please sign off on 1he C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineering Public Works Utilities/Cross Connection 6A; 6,1241, F D E"? Clearance S-2-;P.,-er ---------- ---------- City Se; rites Easements ---------- ---------- Maintenance Bond (10% - 2yr) ---------- ---------- Other--------------------- ---------- ---------- 7Ci ..-T-17 R, A- P, I E 4e zlello 0 7- 30 -2- TO DATE C,* a SUBJECT ICAdarrIS SC1158 7 NN1.1 jpli. Lry 0 =