Loading...
Sailpointe Maintenance Load CalcComponent Performance Method for Commercial Buildings Form 400B-94 ENERGY EFFICIENCY CODE FOR,BUILDING CONSTRUCTION Florida Department of Community Affairs FLA/COM-94 Version 2.1 PROJECT NAME_SAILPOINTE MAINTENANCE ADDRESS: OWNER: AGENT: _ PERMITTING OFFICE: SEM I NOLE COUNTY_ CLIMATE ZONE: 5 PERMIT NO: JURISDICTION N0: 691000 BUILDING TYPE: _Multifamily- CONSTRUCTION CONDITION: New construction DESIGN COMPLETION: _Finished Building CONDITIONED FLOOR AREA: _1373 _- NUMBER OF ZONES: 1 MAX. TONNAGE OF EQUIPMENT PER SYSTEM: COMPLIANCE CALCULATION: METHOD B DESIGN CRITERIA RESULT ENVELOPE PERFORMANCE 41.42 79.07 PASSES OTHER ENVELOPE REQUIREMENTS PASSES LIGHTING INTERIOR LIGHTING 2520.00 2541.41 PASSES EXTERIOR LIGHTING 0.00 640.02 PASSES LIGHTING CONTROL REQUIREMENTS PASSES RVAC EQUIPMENT COOLING EQUIPMENT 1. SEER 10.00 10.00 PASSES HEATING EQUIPMENT 1. Et 1.00 N/A AIR DISTRIBUTION SYSTEM INSULATION LEVEL 1. Unconditioned Space 6.00 4..20 PASSES WATER HEATING EQUIPMENT PIPING INSULATION REQUIREMENTS COMPLIANCE CERTIFICATION: I hereby certify" that he plans and Review of the plans and specifica- specificat-ions c- ered b t is calcu- tions covered by this calculation lation are i.n c li th the indicates compliance with the Florida Energy f'c ode. Florida Energy Efficiency Code. PREPARED BY: Before construction is completed, DATE: 7- ^_- this building will be inspected for compliance in accordance with I hereby certify that this building is Section 553.908, Florida Statutes. in compliance with the Florida Energy BUILDING OFFICIAL: Efficiency Code. DATE:-_._._.-. OWNER/AGENT: DATE: I hereby certify(*) that the system design is in compliance with the Florida Energy Efficiency Code. SYSTEM DESIGNER REGISTRATION/STATE ARCHITECT : MECHANICAL: PLUMBING _--.._--- ELECTR I CAL : — L I GHT I NG- Signature is required where Florida law requires design to be performed by registered design professionals. Typed names and registration numbers may be used where all relevant information is contained on signed/sealed plans. BUILDING INFORMATION COMPLIANCE CHECK 401.------GLAZING--ZONE 1-------:----------------------------------- v- w Elevation Type U SCE' VLT Shading Area(Sgft) South Residential 1.11 9 .8 None 2 South Residential 1.11. 9 .6 Overhang Witho 6 North Residential 1.11 9 .8 None Total Glass Area in Zone 1 = 9 Total Glass Area = 9 402.------WALLS--ZONE 1--------------------- Elevation Type U Added R Gross(Sgft) North STUCCO, 8" BLOCK, AIR 32 0 544 544 South STUCCO, 8" BLOCK, AIR 32 0 579 East STUCCO, 8" BLOCK, AIR 32 0 0 827 West STUCCO, 8" BLOCK, AIR 32 0 248 Adjacent STUCCO, 8" BLOCK, AIR 32 1 = 2740TotalWallAreainZone Total Gross Wall Area = 2740 403.------DOORS=-ZONE 1-----------------------------------U- Area(Sgft) Elevation Type South 1-3/4 Steel Door-Fiberglass/Mineral woo 0.60 40 South 1-3/4 Steel Door-Fiberglass/Mineral woo 0.60 56 Total Door Area in Zone 1 = 96 Total Door Area = 96 404.------ROOFS--ZONE 1--- .---------- U Added R Area(Sgft) Type Color TILE ON PLYWOOD W R-19 CEIL INS Dark .05 0 1488 1488TotalRoofAreainZone1 = Total Roof Area = 1488 405.------FLOORS-ZONE 1------------------ R Area(Sgft) Type ---------- 0 1488 Slab on Grade/Uninsulated Total Floor Area in Zone 1 = 1488 Total Floor Area = 1488 406------- INFILTRATION --------------------------------- IInfiltrationCriteriain406.1.ABC.1 have been met. t 407.------COOLING SYSTEMS-------------------------- IPLV Tons Type No Efficiency 1. Split System 1 5.00 408.------HEATING SYSTEMS---------------------------------- No Efficiency B-/hr Type 1.-Electric Resistance 1 17065 409.------VENTILATION ---------------------------------------------- CHECK Ventilation Criteria in 409.1.ABC.1 have been met. I 410.-----AIR DISTRIBUTION SYSTEM ------------------------------- R-value AHU Type Duct Location 1. Split / PTAC Air Conditioner Unconditioned Space 411.-----PUMPS AND PIPING; -ZONE 1-------- R-value/in Diameter Thickness Type. 412.-----WATER HEATING SYSTEMS -ZONE 1---------------- Efficiency StandbyLoss InputRate Gallons Type-------------------- 413.-----ELECTRICAL POWER DISTRIBUTION ------ =---------------------------- CHECK Metering criteria in 413.1.ABC.1 have been met. T.r_a.n.s_f_.nrmer rrit.erda in 413.1.,ABC.2 have been met. 409.------VENTILATION------- ------------------------- CHECK Ventilation Criteria in 409.1.ABC.1 have been met. I 410.-----AIR DISTRIBUTION SYSTEM- --------------------------- ------------ AHU Type :Duct Location R-value 1. Split / PTAC Air Conditioner Unconditioned Space 6 s 411.-----PUMPS AND PIPING -ZONE 1---------------------------------------- Type R-value/in Diameter Thickness 412.-----WATER HEATING SYSTEMS -ZONE 1---------------------------------- Type Effic,iency'StandbyLoss InputRate Gallons 413.-----ELECTRICAL POWER DISTRIBUTION----=----------------------------- CHECK Metering criteria in 413.1.ABC.1 have been net. Transformer criteria in 413.1.ABC.2 have been net. 414.-----MOTORS ------------------------ ---------------------------- Motor efficiencies in 414.1.ABC.1 have been met. 415.-----LIGHTING SYSTEMS -ZONE 1---------------------------------------- Space Type No Control Type 1- No Control Type 2 No Watts Area(Sgft) Club 1 Programmable T 1 1600 800 Machinery 1 On/Off 2 800 510 Toilet and 1 Occupancy Sens 1 120 33 Total Watts for Zone 1 _ 2520 Total Area for Zone 1 _. 1343 Total Watts = 2520 Total Area _-. 1343 I CHECK Lighting criteria in 415.1.ABC have been met. j 16. HVAC load sizing has been performed. (407.1.ABC.1)" 17. Duct sizing and design have been performed..(410.1.ABC.1.2) B 18. Testing and balancing will be performed. (410.1.ABC.4) 19. Operation/maintenance manual will be provided. to owner.(102.1)