Loading...
101 Spanish Hill Ct - BR00-000352 - SFRt o k vllztl- - SUBDIVISION: ZONE DATE i 3 CONTRACTOR ADDRESS a ' ' - • LOCATION OWNER ADDRESS PHONE # PLUMBING CONTRACTOR ADDRESS PHONE # Oro. 553 ELECTRICAL CONTRACTOR ADDRESS PHONE # p jrjQ MECHANICAL CONTRACTOR ADDRESS PHONE # MISCELLANEOUS CONTRACTOR ADDRESS SEPTIC TANK PERMIT NO, SOIL TEST REQUIREMENTS FINISHED FLOOR ELEVATION REQUIREMENTS ARCHITECTURAL APPROVAL DATE: PERMIT* # C` C •- LOT NO. (741 JOB S)pBLOCK: COST $ FEE $ STATE NO. FEE $ FEE $ 45 FEE $ S3 SECTION: SQUARE FEET: MODEL' OCCUPANCY CLASS: INSPECTIONS TYPE DATE OK REJECT BY FEE $ ENERGY SECT. EPI: CERTIFICATE OF OCCUPANCY ISSUED # DATE: FINAL DATE l In 1'tO f-E:PxA? WHjT11-Ct I P. M %J A- , ' l for which permit 100-00000352 has/`her. etof6re been isbued on' 1 IZ0' /gEi has been completed according;,to plants and specifications filed in the office of the Building Official prior to the issuance of said building permit, to wit as 4,)}-' complies with all the building, plumbing, electrical, zoning and subdivision regulations ordinances of the City of Sanford and with the provisions of these regulations. DATE BUILDING: 4Finaled 2 ZONING: Inspected UTILITIES: Subdivision Regulatj'_ons Apply: Yes No _ APPROVAL DATE APPROVAL FIRE: Inspected Water j Sewer 2LinesIn4 C Liners In _ Meter '`V Sewer Set Tap _ Reclaimed Water ENGINEERING: Drainage Street Paved Maintenance w Bond i PUBLIC WORKS: Street Name ` Street Signs ' Lights Storm `U Sewer Driveway Street Work_ WATER -SEWER IMPACT FEES 01-APPLCTN FEE -BUILDING 01-FIRE IMPACT - RESIDENT 01-LIBRARY IMPACT FEE 01-OPEN SPACE 01-POLICE IMPACT - RESID 01-RADON GAS TAX FEE 01-ROAD IMPACT FEES 01-RECOVERY FD/CERT. PGM. 11/09/99- 11/09/99 11/09/99 11/09/99 117 49,/99 117dV99 11/09/99 11/09/99 10.00 59.27 ((( 54.00 279.61 91.93 10.71 847.00 10.72 r" N, PAGE: 4 This is to certify that the building located at 101 S ANTSH HT L CT for which permit 00-00000 5. ° has heretofore been issued on 11_/03/99 has been completed according to plans and specifications filed in the office of the Building Official rior to the issuance of said building permit, to wit as .15_ complies with all the building, plumbing, electrical, zoning and subdivision regulations ordinances of the City of Sanford and with the provisions of these regulations. STAFF APPROVAL Subdivision Regulations Apply: Yea No 01-SCHOOL IMPACT FEE 11/09/99 1384.00 WT IMPACT:SINGLE FAMILY 11/09/99 650.00 SW IMPACT:SINGLE FAMILY 11/09/99 1700.00 r9 i AT) Or 191- . 6WNER ` a4n -)O'n . qk-k BUILDING OFFICIAL / qDATE CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION RESIDENTIAL SINGLE: FAMILY RESIDENCE' "' DATE I Z-40 ADDRESS CONTRACTOR The Building department has prepared a C of O for the above location and is requesting final inspection by your department. After your inspection, please sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineering Public Works / 7''`"VIY c, a 7-L,a Utilities/Cross Connection D CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION RESIDENTIAL SINGLE: FAMILY RESIDENCE******* DATE iiqlw ADDRESS /0 CONTRACTOR -I(Y\-- /\' \-C . k-Cy)-,-LlY The Building department ha:; prepared a C of O for the above location and is requesting final inspection by your department. After your inspection, please sign off on the C.O. or submit an addlendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineering Public Works Utilities/Cross Connection 4110 70Q C.O./C.C. CHECKL ST - UTILITIES DyEt`'T. t v t vso Request Received :Y_d-f --LZ2 ±,_do utility Inspector Ojp_Z-& 7 INITIALS DATE Utility Inspector's Final -4-zOoK z b QP,f- oo —35Z FDEQ Clearance - Water ---------- R yi3s FDEP Clearance - Sewer ---------- ---- ---- City Services Easements _______ r A Maintenance Bond (10%--2yr)-------------------- Other 6 y = 00 CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION RESIDENTIAL SINGLE FAMILY RESIDENCE******* DATE ADDRESS vo CONTRACTOR The Building department has prepared a C of O for the above location and is requesting final inspection by your department. After your inspection, please sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineering Public Works Utilities/Cross Connection C.O./C.C. CHECKUST - UTILIT ES GJ^c. ' U.. 4ee,lest Received __1 __do Utility Inspector IN'T"ALS BATE cLar fb4 L!ility Inspectnr's Final e,,W 3*0-ZJ/ oo FDFP t.-!earcance - Water -------------------- II I Fl`CP Clearance - Sewer ---------- ---------- City Services Easements ---------- ---------- Maintenance Bond 0 0% - 2yr)-------------------- Other--------------------- -------------------- CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION RESIDENTIAL SINGLE: FAMILY RESIDENCE******* DATE ADDRESS CONTRACTOR The Building department has prepared a C of O for the above location and is requesting final inspection by your department. After your inspection, please sign off on the C.O. or submit an addlendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineeringt lam' Public Works Utilities/Cross Connection