Loading...
105 Spanish Bay Dr - BR00-000060 - SFRgas s1004tiah SUBDIVISION: L ZONE DATE CONTRACTOR YI/I .m ADDRESS //OI N•/e i % cla" li PHONE # LOCATION OWNER _ ADDRESS PHONE # _ d Q PLUMBING CONTRACTOR 00,0 ADDRESS PHONE # J PERMIT' # 60— (o JOB S11,1/t?4 " COST $GI FEE $ STATE NO. FEE $ ELECTRICAL CONTRACTOR FEE $ ADDRESS PHONE # MECHANICAL CONTRACTOR ADDRESS PHONE # MISCELLANEOUS CONTRACTOR ADDRESS SEPTIC TANK PERMIT NO. SOIL TEST REQUIREMENTS FINISHED FLOOR ELEVATION REQUIREMENTS ARCHITECTURAL APPROVAL DATE: FEE $ LOT NO. BLOCK: SECTION: / SQUARE FEET: MODEL: OCCUPANCY CLASS: INSPECTIONS TYPE DATE OK REJECT BY FEE It ENERGY SECT CERTIFICATE OF OCCUPANCY ISSUED # DATE: FINAL DATE EPI: A CA T CERTIFICATE OF OCCUPANCY / COMPLETION This is to certify that the building located at 1-05 ByANTSH 8AY nR for which permit nn-0..00nnnap has heretofore been issued on 1n/nd/4A has been completed according to plans and specifications filed in the office of the Buildin Off' 1al pri r to the issuance of said building Rectrical, zoning and subdivision regulationspermit, to wit as _ complies with all the building, plumbing, zoning and subdivision regulations ordinances of the City of Sanford and with the provisions of these regulations. STAFF APPROVAL Subdivision Regulations Apply: Yea No DATE APPROVAL BUILDING: FIRF;: ll Finaled Z-`1lC.0 k V_ Inspected ZONING: l Inspected r UTILITIES: Water IZS Sewer Lines In , SOL P Lines In Meter Sewer Set Tap Reclaimed Water ENGINEERING• ff Street Drainage ?Lv OIc-Cs Paved Maintenance Bond PUBLIC WORKS: Street Name Street Signs 4; Lights Storm Sewer Driveway Street Work . t DESCRIPTION WATER -SEWER IMPACT FEES DATE 14i. AMOUNT 01-APPLCTN FEE -BUILDING 10/11/99 10.00 01-FIRE IMPACT - RESIDENT 10/11/99 59.27 01-LIBRARY IMPACT FEE 10/11/99 54.00 01-OPEN SPACE 10/11/99 279.61 01-PLAN ALTERATIONS 12/09/99 70.00 lo 01-POLICE IMPACT - RESID 10/11/99 91.93 01-RADON GAS TAX FEE 10/11/99 8.60 01-ROAD IMPACT FEES 10/11/99 847.00 I PAGE: 2 This is to certify that the building :Located at 105 SPANISH BAY DR for which permit 00-OOOOOO60 has heretofore been issued on 1O/06/99 has been completed according to plans and specifications filed in the office of the Buildi g Of cial prior to the issuance of said building permit, to wit as 5 I-'j., complies with all the building, plumbing, electrical, zoning and subdivision regulations ordinances of the City of Sanford and with the provisions of these regulations. STAFF APPROVAL Subdivision Regulations Apply: Yes No O1-RECOVERY FD/CERT. PGM. 10/11/99 8.60 O1-SCHOOL IMPACT FEE 10/11/99 1384.00 WT IMPACT:SINGLE FAMILY 10/11/99 650.00 SW IMPACT:SINGLE FAMILY 10/11/99 1700.00 OWNER BUILDING OFFICIAL / DATE CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION NEW RESIDENTIAJS,nlIE FAMILY BUILDING**** r1/ C) s 5% DATE: / Z_(j ADDRESS: i0 S CONTRACTOR/ PROJECT NAME: The Building Dept. Has prepared a_certificate of occupancy for the above location and is. requesting a -final inspection by your department. After your inspection, please contact the Building Dept. To sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. ec, oo q:c7 ToHTIALS t „ Finnl 7 . Engineering: r'_`„ "1}:L:...• - Cl`'f ---- -- t- Ctt, ---------------------- sc: ntenonce Bo;id (10% - 1`r'c)---------------------- Public Works: r---------- - CL ` — Utilities/ Cross Connection: om ff 0 1 od CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION NEW RESIDENTIAW',n jE FAMILY BUILDING**** DATE: I L(Pila) ADDRESS:) D CONTRACTOR/PROJECT NAME: Mw-N&Cx- The Building Dept. Has prepared a certificate of occupancy for the above location and is requesting a final inspection by your department. After your inspection, please contact the BuildingDept. To sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineering: Public Works:" o Utilities/Cross Connection: CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION NEW RESIDENTIALOS',n6jEL FAMILY BUILDING**** DATE: i ZCo ADDRESS:_ I 0-5 CONTRACTOR/PROJECT NAME: Ma%. The Building Dept. Has prepared a certificate of occupancy for the above location and is requesting a final inspection by your department. After your inspection, please contact the Building Dept. To sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineering:_ Z)'00 Public Works: Utilities/Cross Connection: