Loading...
119 Spanish Bay Dr - BR00-000386 - SFRSUBDIVISION: i L'G S ZONE DATI ` .. CONTRACTOR ADDRESS wQ U kQ QQ-J 'C D LGJT3200 PHONE # TO-7- 4-75--9iia LOCATION ' OWNER ADDRESS PHONE # PLUMBING CONTRACTOR / ADDRESS PHONE # ELECTRICAL CONTRACTOR ADDRESS PHONE # MECHANICAL CONTRACTOR 00 ADDRESS PHONE # MISCELLANEOUS CONTRACTOR ADDRESS SEPTIC TANK PERMIT NO. SOIL TEST REQUIREMENTS ) FINISHED FLOOR ELEVATION REQUIREMENTS ) ARCHITECTURAL APPROVAL DATE: PERMIT* # (1)0 v JOB S / r COST $? 31 000 LOT NO. -7 1 BLOCK: SECTION: / SQUARE FEET: FEE $ MODEL: STATE NO. FEE S FEE 9 FEE! OCCUPANCY CLASS: G 7. J INSPECTIONS TYPE DATE OK REJECT BY FEE $ ENERGY SECT. CERTIFICATE OF OCCUPANCY ISSUED # FINAL DATE DATE: EPI: If CERTIFICATE OF OCCUPANCY / COMPLETION stpfce.iJ,fy that the building l.oca ed a 6- SPA I'ISI_hAY tDI.J - .SY t' - (Cf I I , ?(Ior which permit' bb-0000038S.7 has Xeretofor,6 `been issued o`n 1 1./d3j00 has been completed according to plans and specifications filed irk the office of the Building Official prior to the issuance of said building permit, to wit as s-51r complies with all the building, plumbing, electrical, zoning and subdivision regulations ordinances of the City of Sanford and with the provisions of these regulations. DATE BUILDING: Finaled ZONING: Inspected UTILITIES: Subdivision Regulations Apply: Yes No FIRE: Inspected Water I ,\' Sewer Lines In G' [ Lines In Meter UY Sewer Set Tap Reclaimed --- Water / ENGINEERING•l Drainage Z Maintenance Bond PUBLIC Street Name Signs Storm Sewer Street Work WORKS: o cs L-1— * 14 DESCRIPTION WATER -SEWER IMPACT FEES 01-APPLCTN FEE -BUILDING 01-FIRE IMPACT - RESIDENT 01-LIBRARY IMPACT FEE 01-OPEN SPACE 01-POLICE IMPACT - RESiD 01-RADON GAS TAX FEE 01-ROAD IMPACT FEES 01-RECOVERY FD/CERT. PGM. Street Paved Street Lights Driveway 1/04/00 10.00 1/04/00 59.27 1/04/00 54.00 1/04/00 279.61 1/04/00 91.93 1/04/00 9.37 1/04/00 847.00 1/04/00 9.38 PAGE: 2 This is to certify that the building located at 119 SPANISH BAY DR for which permit 00-00000386 has heretofore been issued on 1/03/00 has been completed according to plans and specifications filed in the office of the Building 0 facial prior to the iseuance of said building permit, to wit as complies with all the building, plumbing, electrical, zoning and subdivision regulations ordinances of the City of Sanford and with the provisions of these regulations. 01-SCHOOL IMPACT WT IMPACT:SINGLE SW IMPACT:SINGLE Subdivision Regulations Apply: Yes No FEE 1/04/00 1384.00 FAMILY '1/04/00 650.00 FAMILY 1/04/00 1700.00 QIjJIOr--> UWNERh2))-- Hi can W L - ' z BUILDING OFFICIAL / DATE CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION RESIDENTIAL SINGLE: FAMILY RESIDENCE******* DATE ADDRESS CONTRACTOR The Building department has, prepared a C of O for the above location and is requesting final inspection by your department. After your inspection, please sign off on the C.O. or submit an addendum if it has been denied. Your prompt aftention will be appreciated. Thank you. Engineering Public Works Utilities/Cross Connection .V C.O./C.C. CHEDW-ST - UTIL IC"3 C':L IT. Request Received U2* g=4.f_To Utility Inspector INITIALS DATE Utility Inspector's Final __ ew---- 1zVG FDEP Clearance - Water ------------------ - FDEP Clearance - Sewer __________ ____ ____ City Services Easements ___-____-- Maintenance Bond (10% - 2yr) _______ __ ----------- Other-------------------- - ---------------- 5b (-'Xo Mam 0,0 6W (oSJ, 06 5/ z/o0 4= o¢ CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION RESIDENTIAL SINGLE FAMILY RESIDENCE'"" DATE •5 1 `i (Zi ADDRESS 119 Q'I.i! 1/') CONTRACTOR The. Building department has prepared a C of O for the above location and is requesting final inspection by your department. After your inspection, please sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineering Public Works Utilities/Cross1 Connection C.O./C.C. CHM(LI.ST - UT1LITicS Request Received 1J2* g--To Utility Inspector - 0Ao INITIALS. L—T ele Utility Inspector's Final --- --I - - I O FDEP Clearance - Water ----------- ------_-_._. FIDEP Clearance - Sewer ---------- ---------- City Services Easements ---------- ---------- Maintenance Bond (10% - 1yr)--------------------- Othtr-------------------- --------------------- ti ems, CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION RESIDENTIAL SINGLE: FAMILY RESIDENCE'"" DATE s 1 110b ADDRESS CONTRACTOR The Building department has, prepared a C of O for the above location and is requesting final inspection by your department. After your inspection, please sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineering r Public Works S• yP .av Utilities/Cross Connection b-c 6 qV6 C) CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION RESIDENTIAL SINGLE FAMILY RESIDENCE******* DATES/ ADDRESS III CONTRACTOR The Building department has; prepared a C of O for the above location and is requesting final inspection by your department. After your inspection, please sign off on the C.O. or submit an addendum if it has been denied. Your prompt aftention ill be appreciated. Thank you. Engineering T Public Wor Utilities/Cross Connection LAND SURVEYORS 300 COUNTY ROAD 427 5OUTH LONGWOOD, FLORIDA 32750-5499 TELEPHONE: (407) 930-9080 FAX: (407) 339-3636 CERTIFICATE OF ELEVATION Address: 119' Spanish Bay Dr. Legal Description: Lot 79, Monterey Oaks Phase I, a Replat Plat Book 56, Pages 33 and 34 The Finished Floor Elevation of the house on Loi 79, Monterey Oaks Phase T. a Re,p,lat meets or exceeds the requirements set forth in the City of Sanford Building Code, Sec. 6-7 (a). V41 Lz ( - ominick F. Cavone Florida Land Surveyor S Mapper Reg. No. 2005 Licensed Business -No. 5073 2/29/2000 Date Fieldwork Completed W.O.N 2000-1942