2106 Cornell Dr - BR18-004600 - SOLAR PANELSMY 1 2018 CITY OF SANFORD BUILDING & FIRE PREVENTION PERMIT APPLICATION Application No: 100D Documented Construction Value: $ 28,066.50 Job Address: 2106 CORNELL DR SANFORD, FL 32773 Historic District: Yes No X Parcel ID: 31-19-31-513-0000-0220 Residential X Commercial Type of Work: New Addition © Alteration Repair Demo Change of Use Move Description of Work: Installation of photo voltaic solar panels on roof Plan Review Contact Person: Aimee McGurr Title: Permitting Phone: 321-247-6073 Fax: Email: flpermits@momentumsolar.com Property Owner Information Name Alex Brown Phone: 321-247-6073 Street: 2106 CORNELL DR City, State Zip: SANFORD, FL 32773 Name Momentum Solar / Cameron Christensen Street: 8248 Parkline Blvd. Ste 100 City, State Zip: Orlando, FL 32809 Name: Daniel Dunzik Street: 370 Burnt Hill Rd City, St, Zip: Skillman, NJ 38850 Bonding Company: N/A Address: Resident of property? : Yes Contractor Information Phone: 321-247-6073 Fax: State License No.: CVC57036 Architect/Engineer Information Phone: 908-872-3664 Fax: E-mail: Mortgage Lender: N/A Address: WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for electrical work, plumbing, signs, wells, pools, furnaces, boilers, heaters, tanks, and air conditioners, etc. FBC 105.3 Shall be inscribed with the date of application and the code in effect as of that date: 5" Edition (2014) Florida Building Code Revised: June 30, 2015 Permit Application o NOTICE: In addition to the requirements of this permit, there maybe additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. Acceptance of permit is verification that I will notify the owner of the property of the requirements of Florida Lien Law, FS 713. The City of Sanford requires payment of a plan review fee at the time of permit submittal. A copy of the executed contract is required in order to calculate a plan review charge and will be considered the estimated construction value of the job at the time of submittal. The actual construction value will be figured based on the current ICC Valuation Table in effect at the time the permit is issued, in accordance with local ordinance. Should calculated charges figured off the executed contract exceed the actual construction value, credit will be applied to your permit fees when the permit is issued. OWNER'S AFFIDAVIT: I certify that all of the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. Signature of Owner/Agent Date Signature of Contractor/Agent Date Alex Brown Print Owner/Agent's Name Signature of Notary -State ofFlorida Date sc Aimee MCGurr oNOTARY PUBLIC STATE OF FLORIDA Comm# GG200147 V1e:1Exp es 10/233/2021 Owner/Agent is'ersonally Known to Me or Produced ID >- Type of ID _ D L._. Cameron Christensen Print Contractor/Agent's Name Signature of Notary -State of Florida Date Aimee McGurr Q ZPRygoo NOTARY PUBLIC c - STATE OF FLORIDA W Comm# GG200147 Expires 10l23/2021 Contractor/ Agent is K Personally Known to Me or Produced ID Type of ID BELOW IS FOR OFFICE USE ONLY Permits Required: Building Electrical Mechanical Plumbing Gas Roof Construction Type: Total Sq Ft of Bldg: Occupancy Use: Min. Occupancy Load: New Construction: Electric - # of Amps Fire Sprinkler Permit: Yes No # of Heads APPROVALS: ZONING: ENGINEERING: COMMENTS: Flood Zone: of Stories: Plumbing - # of Fixtures Fire Alarm Permit: Yes No UTILITIES: WASTE WATER: FIRE: BUILDING: `;r i V Z- • 1Z Revised: June 30, 2015 Permit Application Grant Malo , Clerk Of The Circuit Court & Comptroller Seminole County, FLInst #2018132419 Book:9252 Page:1919; (1 PAGES) RCD: 11/21/2018 11:19:13 AM REC FEE $10. 00 0 M THIS INSTRUMENT PREPARED BY: Name: Aimee McGurr / Momentum Solar Address: 824ts t3affline v : ble I DO Orlando, FL32809 NOTICE OF COMMENCEMENT Permit Number. Parcel ID Number: 31-19-31-513-0000-0220 CERTIFIE OP GP MALOY CLERK ! r T4iF C' AND i:" 1101E i SEMIIV 't' -0 i';(/ F ?.Ire 4ti BY DEYC f L The undersigned hereby gives notice that improvement will be made to certain real property, and in accordance with Chapter 713, Florida Statutes, the following information is provided in this Notice of Commencement 1. DESCRIPTION OF PROPERTY: (Le al description of the property and street address If available) Lot 22 GroveManorsPB10 }'G 31 2106 CORNELL DR SANFORD, FL 32773 ' 2. GENERAL DESCRIPTION OF IMPROVEMENT: Installation of photo voltaic solar panels 3. OWNER INFORMATION OR LESSEE INFORMATION IF THE LESSEE CONTRACTED FOR THE IMPROVEMENT: Name and address:_ Jessica and Alex Brown 2106 CORNELL DR SANFORD FL 32773 Interest In property: Owner Fee Simple Title Holder (if other than owner fisted above) 4. CONTRACTOR: Name: Cameron Christensen / Momentum Solar Phone Number. 321-247-6073 Address: 8248 Parkline Blvd. Ste 100 Orlando', FL 32809 8. SURETY (If applicable, a copy of the payment bond Is attached): Name: N/A S. LENDER: Name: N/A Address: Phone Number: Amount of Bond: 7. Persons within the State of Florida Designated by Owner upon whom notice or other documents maybe served as provided by Section 713.13(1)( a)7., Florida Statutes. Phone Number: 8. In addition, Owner designates to receive a copy of the Lienor's Notice asprovided in Section 713.13(1)(b), Florida Statutes. Phone number. 9. Expiration Date of Notice of Commencement (The expiration is 1 year from date of recording unless a different date is specified) WARNING TO OWNER: ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENT ARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713, PART I, SECTION 713.13, FLORIDA STATUTES, AND CAN RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE' FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. Alex Brown Owner Sipnalun3 of Otmer or wners or Lessee's (Print Name and Provide Signatorys 'rite/Office) Authorized Officer/DirerAor/ Partner/Manager) State of County of The foregoing Instrument was acknowledged before me this day of 1"99 -) 20 N% by Alex Brown Who Is personally known to me OR Name of person making statementwho has produced Identification br type of identification produced: _ (— AR Aimee McGurr o NOTARY PUBLIC ESTATE OF FLORIDA-" 2 Comma/ GG200147 Notary Signature s4CET Expires 10/ 23/2021 11 /20/2018 SCPA Parcel View: 31-19-31-513-0000-0220 Property Record Card Parcel: 31-19-31-5'13-0000-0220 sE.o+o eoo+ary Property Address: 2166 CORNELL DR SANFORD, FL 32773 Parcel Information Parcel 31-19-31-513-0000-0220 Owner(s) BROWN, JESSICA R - Tenancy by Entirety v BROWN, ALEXANDER D D - Tenancy by Entirety Property Address 2106 CORNELL DR SANFORD, FL 32773 Mailing 2106 CORNELL DR SANFORD, FL 327714512 Subdivision Name GROVE MANORS Tax District S1-SANFORD DOR Use Code 01-SINGLE FAMILY Exemptions n J 2 Ic U Legal Description LOT 22 GROVE MANORS PB 10 PG 31 Taxes 911 Value Summary 2019 Working 2018 Certified Values Values Valuation Method Cost/Market Cost/Market Number of Buildings 1 1 Depreciated Bldg Value i $96,787 93,493 Depreciated EXFT Value i $9,000 8,400 Land Value (Market) f$28,938 28,938 Land Value Ag tv Just/Market Value " 1 $134,725 130,831 Portability Adj Save Our Homes Adj jjj} $0 0 Amendment 1 Adj 0 0 P&G Adj 0 0 Assessed Value i $134,725 j $130,831 Tax Amount without SOH: $2,455.61 2018 Tax Bill Amount $2,455.61 Tax Estimator Save Our Homes Savings: $0.00 Does NOT INCLUDE Non Ad Valorem Assessments Taxing Authority Assessment Value Exempt Values Taxable Value County General Fund i $134,7251 .. 0 $134,725 Schools t $134,725 0 : $134,725 City Sanford 134,725 C $0 ' $134,725 SJWM(Saint Johns Water Management) 134,725 i $0 $134,725 County Bonds I $134,725 I $0 $134,725 Sales Description Date Book Page Amount Qualified Vac/Imp SPECIAL WARRANTY DEED 7/1/2017 08962 0157 195,000 No Improved CERTIFICATE OF TITLE 2/1/2017 08862 1 0217 100 No Improved WARRANTY DEED 10/1/2005 05990 1 1532L 240,000 I Yes i Improved i QUIT CLAIM DEED 12/1/2004 105562 0407i 100 No Improved CORRECTIVE DEED 6/1/2001 04099 1839 100 ! No Improved WARRANTY DEED 9/1/2000 03925 0187 103,000 Yes is Improved WARRANTY DEED 3/1/1997 03218 1718 50,00000 Yes Improved WARRANTY DEED 7/1/197979 01236 1370 53,500 ;Yes Improved WARRANTY DEED 1/1/1977 i 01130 0896 1 1 $42,000 i Yes Improved Find Comparable Sales Land http://parceldetaii.scpafl.org/ParcelDetaillnfo.aspx?PID=31193151300000220 1/2 DocuSign Envelope ID: 2625C78D-C316-4A6F-BFFC-3EDE3EBB009C THIS IS A COPY The Authoritative Copy of this record is held at na2.docusign.net momentum SOLAR SOLAR ELECTRIC INSTALLATION CONTRACT Jessica Renae Brown Customer Name 2106 Cornell Drive Sanford, FL 32771 Service Address City, State, Zip 7723240252 danceallnight22@live.com Phone Email Address Florida Power & Light Co Electric Utility Company rx Hanwha Q CELLS Enphase Energy 10.395 kW Q.PEAK DUO BLK-G5 315 IQ7-60-2-US 3 System Size* Solar Module Make/Type Inverter Make/Type Module, ount IF SYSTEM SIZE IS BIGGER THAN 11.6 KW DC/10.0 KW AC, PLEASE S KT MENY 1 GARDIN LIABILITY INSURANCE REQUIRMENT Payment Schedule and Third -party Financing: Your payments will'b'ecorri`dueadicated below. The "Total Amount Payable to Momentum Solar" shown belowreflects oratWhe a0ount weNcharge for the PV System (asdefinedbelow) and installation, not including any a pllcable sale akc.l you choose to obtain financing from athird -party finance company, your payment schedule and total amour owed will be set out in your agreement with the third -party finance company and may in`Ittde fin nce charges. Yotishould read that agreement carefully to understand your repayment obligatipg E We aie of your lender. The terms of any financing you obtain from a third party, including the amount d"timit of yourayments and any finance charges imposed, are solelydeterminedbyyourthird -party fiance co any. We, are not affiliated with any third -party finance company. TOTAL AMOUNT PAY,A L-E_T,O,tA0E 1M SOLAR: 68,066.50 (PLUS ANY APPLICABLE SALES TAX) FINANCED —BY DIVIDEND FI Refer otyour agreement w. i Di"vidend Finance for a description of your payment obligations, including your paymep schedule, j d total of payments (including any finance charges). TOTAL AMQIJN - PAYABLE TO MOMENTUM SOLAR: $28,066.50 Optional Down Payment: $0.00 Upfront Rebate (if applicable): $0.00 Total Loan Amount: $28,066.50 You acknowledge that, regardless of whether you obtain financing from a third party, we require payment in full upon completion of the installation (and required inspections) and that we are not extending credit to you in connection with this transaction. ACCORDING TO FLORIDA'S CONSTRUCTION LIEN LAW (SECTIONS 713.001-713.37, FLORIDA STATUTES), THOSE WHO WORK ON YOUR PROPERTY OR PROVIDE MATERIALS AND SERVICES AND ARE NOT PAID IN FULL HAVE A RIGHT TO ENFORCE THEIR CLAIM FOR PAYMENT AGAINST YOUR PROPERTY. THIS CLAIM IS KNOWN AS A CONSTRUCTION LIEN. IF YOUR CONTRACTOR OR A SUBCONTRACTOR FAILS TO PAY SUBCONTRACTORS, SUB - SUBCONTRACTORS, OR MATERIAL SUPPLIERS, THOSE PEOPLE WHO ARE OWED MONEY Document.24 FL Page 1 of 9 DocuSign Envelope ID: 2625C78D-C316-4A6F-BFFC-3EDE3EBB009C THIS IS A COPY The Authoritative Copy of this record is held at na2.docusign.net SOLAR MAY LOOK TO YOUR PROPERTY FOR PAYMENT, EVEN IF YOU HAVE ALREADY PAID YOUR CONTRACTOR IN FULL. IF YOU FAIL TO PAY YOUR CONTRACTOR, YOUR CONTRACTOR MAY ALSO HAVE A LIEN ON YOUR PROPERTY. THIS MEANS IF A LIEN IS FILED YOUR PROPERTY COULD BE SOLD AGAINST YOUR WILL TO PAY FOR LABOR, MATERIALS, OR OTHER SERVICES THAT YOUR CONTRACTOR OR A SUBCONTRACTOR MAY HAVE FAILED TO PAY. TO PROTECT YOURSELF, YOU SHOULD STIPULATE IN THIS CONTRACT THAT BEFORE ANY PAYMENT IS MADE, YOUR CONTRACTOR IS REQUIRED TO PROVIDE YOU WITH A WRITTEN RELEASE OF LIEN FROM ANY PERSON OR COMPANY THAT HAS PROVIDED TO YOU A NOTICE TO OWNER." FLORIDRS CONSTRUCTION LIEN LAW IS COMPLEX, AND IT IS RECOMMENDED THAT YOU CONSULT AN ATTORNEY. Pro Custom Solar LLC d/b/a Momentum Solar is a certified solar contractor (Cert. # CVC5703with the Department of Business Professional Regulation. General Terms and Conditions Definitions: In this agreement, the terms "customer', `owner', and "yQ "ru' eftotheustomerrdntifiedcontractor', u n u n ` , above, and the terms contractor' , us and we refer to Pro Custom , blar LOd/b/a o'mentumSolar anditsemployees, agents and subcontractors, as applicable. The term "b4eement' or `contract" refers to this agreement between you and us and any change orO es si e \1 y you aftd us. "PV System" means the solar panels and related parts and the system of Sol r ener, g rie.F en described above. Scope of Work: We agree to sell and install th PV Syst o our r I property. We will not provide, or arrange for, architectural/engineering servlaes or structui ahcl'anges to dwellings or buildings unless we expressly agree to do so in a sepacate writing signed byes. We have the right to determine the method, details, and means of pe .o. ming\h v(ork. We will obtain the necessary building and electrical permits and ensure code compli n You agree to cooperate with us to obtain these permits and meet code compliance. You are sole y responsible fq obtaining, at your own cost and expense, any and all zoning variances reguir_ed by any _ icipalityN& local governing body. We will not obtain a zoning variance for you u less w ;-expr"sly agree to do so in a separate writing signed by us. Change Orders: Kn chan ` to t e work or the installation schedule that you or we request will be set pYg\. r Y q out in a i it#e'r>chab9ae order slgneci by both you and us. You agree that a change order may result in a chang j{o the termq of the a ,feement between you and us, including but not limited to, the contract price andttieanticipatedins.ation schedule. If you request, in writing, a change to the scope or performance of the services provided under this agreement, then we will provide you with a written change order for your a ,, roval w/ithin a reasonable time after such written request. You agree that we may issue a changeorderff-a Force Majeure Event (as defined below) occurs that changes or impairs our ability to perform under the current terms and conditions of this agreement. All change orders, including a change order resulting from a Force Majeure Event, must be approved in writing by you within a reasonable time after receipt, and you agree not to unreasonably withhold your approval of any change order. Time Period: We anticipate beginning work under this agreement within fourteen (14) days after we receive all required paperwork from the applicable state, utility, and municipality. We anticipate that we will complete the work within thirty (30) days after we begin. This is our best estimate and is subject to change according to various factors outside of our control. We are not responsible for delays resulting from any Force Majeure Event (as defined below). Force Maieure: We will not be liable to the you for any failure or delay in performance under this agreement caused by events beyond our control including, without limitation: negligence or delay by any governmental entity or utility company; your noncompliance with this agreement; your failure to furnish necessary information or furnishing of incorrect information; legal encumbrances on your property; your property' s non-conformance with building codes or zoning requirements; your credit rating or financing Document. 24 FL Page 2 of 9 DocuSign Envelope ID: 2625C78D-C316-4A6F-BFFC-3EDE3EBB009C THIS IS A COPY The Authoritative Copy of this record is held at na2.docusign.net momentum SOLAR arrangements; acts of God, nature, government or any third parties; war or acts of terrorism; labor strife or disputes; shortages of labor, fuel, raw materials or equipment; technical failures; accidents; sabotage; failure or delays in transportation or communication; failures or substitutions of equipment; or hidden or unforeseen physical or hazardous conditions, including but not limited to, environmental hazards such as mold, asbestos, and lead paint (each, a "Force Majeure Event"). Your Responsibilities: You agree to pay us for merchandise delivery and/or installation of the PV System according to the terms and conditions of this agreement. If your service address is subject to any easements, covenants or other legal encumbrances that could affect the Installation, you agree to notify us in writing, including by electronic mail or by certified mail, within five (5) business days of your becoming aware of the encumbrance or prior to our beginning work, whichever is earlier. Yqqu agree to ensure that work areas are free of preexisting hazards, including, but not limited to unsaf physical conditions or environmental hazards and building/zoning code violations. You agree t"atlow N access to work areas during work hours. If you have a security system, you agree to ensurg y t itA oes not interfere with installation. You agree not to allow unattended minors at the servi addre s,SZt3iiY we areperformingtheinstallation. You agree to control pets and keep them awayom w r• areas. o agree that, if anyone under your control interferes with or delays inst Ilation, you ay` e s b ect to transportation and/or storage charges or other resulting charges. n Payments: All payments must be made in cash, by credit bard or Vy checks) made payable to Momentum Solar" as specified in this agreement. Any paymetnts y(ki W \i.n er your agreement with tthehem. third -party finance company must be made in ace Fdance ith th to ors of your agreement with el 1I Failure to Pay: You will be in breac"Qo is agreement if yob<fdil to make any scheduled payment on time, in full, and otherwise in accorda ce \QtQHIis agreement. If we have not received the full amount of any scheduled payment withinn-days after- he scheduled due date, you will incur a late fee equal to one percent (1 %) of the unp-id amoupt)due. IfN& installation is not completed when the breach occurs, we reserve the right tosuspTd all.4york until all past-due amounts have been paid in full. If the PV System is in operatar gq- thi each occurs, we reserve the right to remotely shut off the PV System until all past -due amounts p been paid in full. Subject to applicable law, we may also pursue amountsyouoweusthroughlegalalon'' ich may include perfecting or enforcing a lien against your property or the P Sy,tem, ,If we take 1ega action to enforce this agreement, you agree, to the maximum extent permifid by applible_lavif``„ to pay reasonable attorney's fees and costs we incur before and after judgment and any, othe r..osts permitted under applicable law. If you fail to pay your third -party finance company pursuant to the terms of your agreement with them, you may be subject to any of the terms and rembdies seyforth in that agreement. Please consult that agreement to determine your liability and rights reg dirl'gthe third -party finance company. Inspection of System: You agree to allow us, our designees, and any state or local governmental authority or utility company to inspect the PV System at the service address. Cancellation by Customer: If you cancel this agreement at any time after the cancellation period described in this agreement or otherwise prevent us from completing the installation, you agree to reimburse us in full for the cost of materials, labor, and services provided up to the date and time of cancellation. Termination by Momentum: Prior to beginning design and permitting work, we will perform a physical assessment of the installation site, including suitability of the existing electrical panel and wiring, roof condition and shading of the intended location of the PV System to verify the suitability of the site for the PV System. If we determine that existing site conditions will not allow for installation of a PV System as described at the top of page 1, we may terminate this agreement if you and we are unable to agree to modifications needed to provide for additional work needed to make the site suitable for the PV System. Document. 24 FL Page 3 of 9 DocuSign Envelope ID: 2625C78D-C316-4A6F-BFFC-3EDE3EBB009C THIS IS A COPY The Authoritative Copy of this record is held at na2.docusign.net SOLAR If we do so terminate this agreement, we will refund your initial deposit in full. We may also terminate this agreement after completion of our site assessment without further obligation if either (a) you breach this agreement, or (b) we discover or become aware of: (1) previously undisclosed legal encumbrances or easements affecting the service address, (ii) building/zoning code violations at the service address, or iii) hidden or unforeseen hazardous conditions such as the presence of mold, asbestos, lead paint, or any other conditions not disclosed to us. Component Manufacturer's Warranty: The manufacturers of certain of the PV System's major components warrant their components against certain defects. We have provided you with copies of all manufacturer's warranties which govern your rights to seek a remedy from the respective manufacturer with respect to covered defects. n Limited Warranty: You agree to contact us in writing, including by electronic mail or'6Kce ifled mail, with any problems or issues with the installation as soon as possible, but in any, even %.thin hirty (30) days from the date you become aware of such problem. We will take reasonableteas des remedy or otherwise resolve the problem within thirty (30) days after we receive.5r r n2fce. You roe and acknowledge that our limited warranty covers the Installation only fore c te%`yeers. The tiimited warranty does not apply if: (1) you fall to notify us of the proble n wI iIn ttaf'y (30) ays, or (2) it is reasonably determined, upon Inspection, that any of the foil *ki g c 1 tions cause the need for service: (a) damage resulting from accidents, acts of God, elterations o misuse, (b) your failure to properly follow the operating instructions; (c) damage caused by\anim4I,s Fd') alterations to your premises; or (e) alterations to the PV System made any, ur request, 00pade-necessary by a change to your premises, damage to your premises; or any other cause, beyoryd our control. The PV System includes a monitoring platform that allows I115 to remotely *a cess performance information for thepurposeofassessingthesourceofperformanceissuesthattoberemediated. Additionally, we warrant that any penetrations of.,y-o. `r o"eld in the installation will not leak for a period of five (5) years. The limited roof penetrations warran1y`does not apply if: (1) you fail to notify us of the problem within thirty (30) days, or (if is reaIsonably\determined, upon inspection, that any of the following conditions caused the need fo`r serrvacey: (a) damage resulting from accidents, acts of God, alterations or misuse, (b) damage - u d by a Imals; (c) alterations or damage to your premises; or (d) any other cause beyond ouVgontrol. NO Q R; ;WARRANTIES.J EXCEPT AS EXPRESSLY PROVIDED ABOVE UNDER "LIMITED WARRANTY" " REI,A,TING /TO OUR INSTALLATION OF THE PV SYSTEM OR "COMPONENT MAN 6 FACTURER'§,&A_ RRANTY" RELATING TO THE VARIOUS COMPONENTS OF THE PV SYSTEM PROVIDED BY THE APPLICABLE MANUFACTURER, WE ARE SELLING THE PV SYSTEM TO YO UAS I ". WE MAKE NO GUARANTEE OR WARRANTY OF ANY KIND THAT EXTENDS BEYOND,,-!T-ft FACE OF THIS AGREEMENT, INCLUDING ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICE PERFORMED OR THE SYSTEMS PROVIDED UNDER THIS AGREEMENT. THEREFORE, EXCEPT FOR OUR LIMITED WARRANTY RELATING TO THE INSTALLATION OF THE PV SYSTEM OR THE MANUFACTURER'S WARRANTY RELATED TO A SPECIFIC GOOD USED IN THE PV SYSTEM, THE ENTIRE RISK AS TO THE QUALITY AND PERFORMANCE OF THE GOODS IS WITH YOU. SHOULD THE PV SYSTEM PROVE DEFECTIVE FOLLOWING PURCHASE, YOU ASSUME THE ENTIRE COST OF ALL NECESSARY SERVICING OR REPAIR. YOUR EXCLUSIVE REMEDY AGAINST US WITH RESPECT TO THE PV SYSTEM AND THE SERVICES PROVIDED IS SET FORTH ABOVE UNDER "LIMITED WARRANTY." By initialing here, you agree to the terms of this paragraph: DS Customer Initials: Document.24 FL Page 4 of 9 DocuSign Envelope ID: 2625C78D-C316-4A6F-BFFC-3EDE3EBB009C THIS IS A COPY The Authoritative Copy of this record is held at na2.docusign.net momentum SOLAR LIMITATION OF DAMAGES: TO THE MAXIMUM EXTENT PERMITTED BY LAW, YOU AGREE TO RELEASE US FROM ALL LIABILITY TO YOU OR ANY OTHER PERSON FOR ANY INCIDENTAL, CONSEQUENTIAL OR PUNITIVE DAMAGES EXCEPT TO .THE EXTENT SUCH DAMAGES ARE CAUSED BY OUR GROSS NEGLIGENCE OR WILLFUL MISCONDUCT. By initialing here, you agree to the terms of this paragraph: DS Customer Initials: Binding Nature: This agreement shall bind and inure to the benefit of the respective heirs, personal representatives, successors, and permitted assigns of each party. Entirety of Contract; Modification; Waiver: This agreement constitutes,,thk\ornplete ageeement between you and us concerning the subject matter of this agreement andupersedes d carc`erls any and all prior communications, representations, and agreements betwee You and us nrf ther wFitten or oral, with respect to the subject matter of this agreement. Thi g-agrle me iay not bt amended or modified unless in writing and executed by you and us. The righ' and r edies of both parties under this agreement are cumulative and not alternative. No waiver of'a 1 breaq or failurb to enforce or insist upon performance any of the provisions of this agreement b either party at-0y'time will in any wayaffect, limit or waive such party s right to enforce and\ o pel strict c pliiake with every provision of this agreement. Severability: The invalidity or unenfor,6eabili of any provisiWof this agreement shall not affect the effecity or enforceability of any otlt rerr pro.vNoof this agreement, which shall remain in full force and Assignment: Neither party max assign, transfeY\.br delegate any or all of its rights or obligations under this agreement, wathor t he prt6r written consent of the other party, which consent shall not be unreasonablywitf'f eld or d'Ilaye provided, however, that (a) the contractor may assign this agreement to any of its affiliates or to, s cEessor of all or substantially all of the contractor's assets through merger ceo ani attion, consolidation or acquisition and (b) such consent is not required for an assig ... pent (absolve, collaferal or otherwise), pledge of, or grant of a security interest In, a right to paym, fit under this age 66tby either party. Disgute\ ResolUti'on: In the event of a dispute, both you and we have the right to have the dispute resolved` irZa- o .rrt law. In this dispute resolution provision, you and we are agreeing to limit that right. If you have any dispute with us or if we have any dispute with you, then both you and we must seek resolution of the dispute in either arbitration or small claims court. If your dispute cannot be resolved in small claims court for any reason, then you must seek resolution of your dispute in arbitration. The arbitration hearing will be held before a nationally recognized provider of arbitration services at a location of your choice within your home state. The rules of the arbitration provider will apply. This dispute resolution agreement does not alter any substantive rights that you may have under state or federal law. By signing below, you agree to comply with this dispute resolution provision, which describes both your and our only procedure for resolving any dispute. Only the arbitrator, not any federal, state, or local court or agency, has the authority to interpret this provision or determine its applicability or enforceability. If any provision of this dispute resolution provision is found to be unenforceable for any reason, such provision will be severed and the remainder of this dispute resolution provision will continue in full force and effect. You understand and accept that arbitration awards are subject to challenge only in limited circumstances. Document. 24 FL Page 5 of 9 DocuSign Envelope ID: 2625C78D-C316-4A6F-BFFC-3EDE3EBB009C THIS IS A COPY The Authoritative Copy of this record is held at na2.docusign.net momentum SOLAR Class Action Waiver: ARBITRATION MUST BE ON AN INDIVIDUAL BASIS. AS A RESULT, NEITHER YOU NOR MOMENTUM MAY JOIN OR CONSOLIDATE CLAIMS IN ARBITRATION BY OR AGAINST OTHER "CUSTOMERS", OR LITIGATE IN COURT OR ARBITRATE ANY CLAIMS AS A REPRESENTATIVE OR MEMBER OF A CLASS OR IN A PRIVATE ATTORNEY GENERAL CAPACITY. By initialing here, you agree to the terms of this paragraph: JDSCustomerInitials: Transfer of Title: The title of the equipment will pass to you upon the delivery of the equipment to your property, or any storage facility you designate. Until the equipment has been delivered and signed for by you or your agent, we retain the title for the equipment. Governing Law: This agreement shall be governed by and construed in all respects ii"ac' d,' ce with the laws of the State of Florida as they apply to a contract entered into and performed in thatta. Taxes: You acknowledge and understand that you are responsible fo 44y and all taxbs tfat a0sd underthisagreement, including, but not limited to, sales and use taxes You `agree-0- execake any certificate or other applicable documents relating to sales or use tax e , tion Vt ensure that` -you or we, as applicable, may claim exemption from paying or collecting a sa s o se taxtat arises under this agreement. You agree to pay all applicable sales or use taxes ' suc taxermined to be due at any time before or after the termination or expiration 6 Ois agreement. FLORIDA HOMEOWNERS' CONSTRUCTION' RECOVERYf UNb PAYMENT, UP TO A LIMITED AMOUNT, MAY BE AVAILABLE FROME 1 RIDA HOME - NERS' CONSTRUCTION RECOVERY FUND IF YOU LOSE AQr'jS'ONAPROJECT PERFORMED UNDER CONTRACT, WHERE THE LOSS RESULTS -IRE) , aSPEGINED VIOLATIONS OF FLORIDA LAW BY A LICENSED CONTRACTOR. FOR INFO KM ATION ABOUiNfiE RECOVERYFUND AND FILING A CLAIM, CONTACT THE FLORIDACONSTR.42TION INOt STRYLICENSING BOARD AT THE FOLLOWING TELEPHONE NUM$MRFD (CfRESS: DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, 201 BLAIR, STQN,E RD., TALLAHASSEE, FL 32399, (850) 487-1395. ACCepta'F:lee, And\Authorization: By signing below, you authorize us to perform the installation. Except as set' forth in this agreeme'r>:t, you agree there are no oral or written representations or inducements, s4 expreed or imlied rway conditioning this agreement, and we expressly disclaim their existence. By si Ing this aReement, you acknowledge that you have read and understand this agreement or have had a competent egal representative explain its terms, and hereby accept this agreement in its entirety. You furthehowledge receivingacompletecopyofthisagreement. You, the buyer, may cancel this transaction at any time prior to midnight of the third business day after the date of this transaction. See the attached notice of cancellation form for an explanation of this right. Customer Signature: Pro Custom Solar LLC d/b/a Momentum Solar: Docuftned by. 11/ 15/18 November 15, 2018 BftnaeclBrown Date Sung Lee Date Chief Financial Officer Document.24 FL Page 6 of 9 DocuSign Envelope ID: 2625C78D-C316-4A6F-BFFC-3EDE3EBB009C THIS IS A COPY The Authoritative Copy of this record is held at na2.docusign.nel momentum SOLAR Notice of Cancellation Date of Transaction: 11/15/18 You may CANCEL this transaction, without any Penalty or Obligation, within THREE BUSINESS DAYS from the above date. If you cancel, any property traded in, any payments made by you under the contract or sale, and any negotiable instrument executed by you will be returned within TEN BUSINESS DAYS following receipt by the seller of your cancellation notice, and any security interest arising out of the transaction will be cancelled. n If you cancel, you must make available to the seller at your residence, in substantially as when received, any goods delivered to you under this contract or sale, or you may, comply with the instructions of the seller regarding the return shipment of thegoo a, expense and risk. ,,/ If you do make the goods available to the seller and the seller the date of your Notice of Cancellation, you may retain or disp obligation. If you fail to make the goods available to the seller, seller and fail to do so, then you remain liable for perfor anceTocancelthistransaction, mail or deliver a signed anayted c other written notice, or send an email, to Momentum Solar -30 07080 (1-888-666-3688), CancelRequest@MoFnentumSolart' THE THIRD BUSINESS DAY AFTER -.3'1-1-1511i I HEREBY CANCEL THIS Date: Buyer's S Document.24 FL Page 7 of 9 asnot'\pck toup within\20 days of off he o ds without an further if yRRagrpe to retufZi the goods to the all o ligatio hs u der the contract. allNkCancellation Notice or any 3 Hamilton BLV, S. Plainfield, NJ, ANOT LATER THAN MIDNIGHT OF DocuSign Envelope ID: 2625C78D-C316-4A6F-BFFC-3EDE3EBB009C THIS IS A COPY The Authoritative Copy of this record is held at na2.docusign.nel momentum SOLAR Notice of Cancellation Date of Transaction: 11/1s/18 You may CANCEL this transaction, without any Penalty or Obligation, within THREE BUSINESS DAYS from the above date. If you cancel, any property traded in, any payments made by you under the contract or sale, and any negotiable instrument executed by you will be returned within TEN BUSINESS DAYS following receipt by the seller of your cancellation notice, and any security interest arising out of the transaction will be cancelled. n If you cancel, you must make available to the seller at your residence, in substantially as when received, any goods delivered to you under this contract or sale, or you may, comply with the instructions of the seller regarding the return shipment of the oo s a expense and risk. If you do make the goods available to the seller and the seller the date of your Notice of Cancellation, you may retain or disp obligation. If you fail to make the goods available to the seller, seller and fail to do so, then you remain liable for performance To cancel this transaction, mail or deliver a signed andNdd:&ted c other written notice, or send an email, to Momentum Sola"K30 07080 (1-888-666-3688), Cancel Request@Mo, entumSolart,, THE THIRD BUSINESS DAY AFTER 1415118 . I HEREBY CANCEL THIS T Date Buyer's Signatu Document.24 FL Page 8 of 9 s,not\pick tt effi up witfii'n 20 days ofohthegoodswithoutanfurtherifyagly,ee to retu, the goods to the all o P gati4 z s id"er the contract. y of t i, Cancellation Notice or any 3 Hamritbn BLV, S. Plainfield, NJ, INOT LATER THAN MIDNIGHT OF DocuSign Envelope ID: 2625C78D-C316-4A6F-BFFC-3EDE3EBB009C THIS IS A COPY The Authoritative Copy of this record is held at na2.docusign.net momentum SOLAR Attachment 1 Mandatory Liability Insurance Obligation The Florida Public Service Commission, pursuant to Section 120.54, Florida Statutes, has adopted Rule 25-6.065, Florida Administrative Code, relating to interconnection and net metering of customer -owned renewable generation. Section (5)(e) requires that the owner of a Tier 2 renewable generation system have general liability insurance for personal and property damage of $1 million. A Tier 2 renewable generation system is one that is 11.6 kW (dc) or 10.0 kW(ac) or larger. Your local utility has interpreted this to mean that, in order to interconnect your solar generation systerrrrk to the local utility grid (and for it to function and provide you with the electricity it generates), you will ha to prbWe proof that you have $1 million of general liability insurance as part of the application for in a tonne lion with their system. By initialing here, you acknowledge that you understand the terms of t is`parragraph**,, t e im'pykaticif you fail to provide and maintain proof of this insurance: \ Cz sto , r i is s: Alternatively, an owner of a Tier 2 renewable generalion system se f-insure is $1 million if it can demonstrate to the utility that the owner has sufficie t financial mea gcover a potential $1 million obligation. As part of the interconnection process, youfocal u ifity will let you know what information it needs from you to make this determination and the timeline -£or sucdelermination. Failure to provide proof of sucllnsurance` or to obta Xapproval from the interconnecting utility to allow you to self - insure will result in a denialf your quest to in a connect your system or, if interconnected, the termination of such interconnectio W ou ' thi-interconnection, your system will not operate, you will not be able to offset any electricitysed in our ome and you will not be able to obtain any benefits of net metering any extra ene .gy ur(system prop ices:, Biniti .11n here,`` \ou ackno,1led a that you understand the terms of this paragraph and the implications Y 9 Y / , 9 Y , if you fall to provide i ttaertheproof of insurance or the local utility's approval to self -insure instead of provi irig this ins'ul-ance. DS Customer Initials: Document. 24 FL Page 9 of 9 8248 Parkline Boulevard, Suite 100 momentum Orlando, FL 32809 Phone: 732.902.6223 DATE: 11 /19/2018 I hereby name and appoint / s Arito of Momentum Solar to be my lawful attorney -in -fact to act for me, and apply to the Division of Building Safety for a Building/Electrical (PHOTO VOLTAIC SOLAR PANELS) permit ONLY (NOC and Permit Application) for work to be performed at a location described as: Owner of Property: Project Address: and to sign my name and do all things necessary to this appointment. Cameron Christensen Contractor Name) (Type or Print) CVC5703(o Contractor's License Number) The foregoing instrument was acknowledged before me this 19 by Cameron Christensen who is personally known to me or who produced D.L. did not: take an oath. Wc - L(C"- Notary Public (Print Name) Notary r c (Signature) 5'z Contr or Signature) day of November Seal of 2018 , as identification and who 2o1PRY,°Q, JANELL WALLACE MY COMMISSION # GG 096020 u oe EXPIRES: April 19, 20219" IQF FL3 Bonded Thru Budget Notary Services REQUMED ENSPECTION' SEQUENCE R- LA>00 Addiress: blnm max Insleectimi Deschd2don. ' Footer / Setback Rernwa- 11 Foundations / Form Board..'Survey Slabo/' Mono S-la-b-Pre pourLintel / Tie',- Beait / Fill Down Cell 1 Sheathing W- aHs- Sheaffiffig- L, Roof I Roof Dry1-nFrame insulation Rough in Tirewall Screw Pattern Drywall / Sheetock Lath Ins pec,tiohFinal Solar I Final Roof Final Stucc6- . Siding sutation Rffial U wilding - Final FinalDoor Finaf? Window Final Screen. Room Final.. Nol S 'creenEnclos=eo Mobile Home Building Final' Pm - Demo Final Demo. Final Single V-amib, Residence, Final. wilding(Other) MaxMnw I1=2ecdom DescLA2dom 11 Electdic, Underground Footeif Slab Steel Bond Electrfe Rough T. U.Q. Pre - Power Final Electric Final I ONIN111M - MMinn N=. I RMIqpe*DIMIDWCn22d= I Plumbing Underground Plumbing Sewer I Plumbing Tub• Set 11 Plumbing Final go - jr, C-;- Dun Max I-ffhspecoomi BreseF Mecham" Cal Rough Mechanical'. Final Mnlm max I Gas Underground I Gas Rough IGas' Final REVISIED-.'Yane 2014 RECORD COPY PLAN KEY PV-1 COVER PAGE PV_ 1.1 COVER PAGE CONT. PV-2 PANEL LAYOUT PV-3 LAYOUT DETAIL PV-4 THREE LINE DIAGRAM PV-4.1 ELECTRICAL CONT. PV-4.2 EQUIPMENT LABELS i HANWHA Q.PEAK DUO BLK-G5 315 315 WATT MODULE 6 (SEEDAiASHEET2,611 BILL OF MATERIALS MODULES 33 INVERTERS 33 CLAMP ASSEMBLY 63 COUPLING ASSEMBLY 32 BONDING CLIP 8 SKIRTS 7 ENPHASE COMBINER BOX 1 SQUARE-D 60A FUSIBLE AC DISCONNECT 1 45A FUSES 2 125A LINE TAPS 2 SYSTEM INFORMATION MODULE HANWHA Q.PEAK DUO BLK-G5 315 INVERTER ENPHASE IQ7-60-2-US RACKING ECOFASTEN ROCK -IT SYSTEM SYSTEM SIZE (DC) 10.395 KW LOCATION 28.791979,-81.257799 GENERAL NOTES: THIS PV SYSTEM HAS BEEN DESIGNED TO MEET THE MINIMUM DESIGN STANDARDS FOR BUILDING AND OTHER STRUCTURES OF THE ASCE 7-10, 6TH EDITION 2017 FLORIDA RESIDENTIAL CODE, 6TH EDITION 2017 FLORIDA FIRE PREVENTION CODE, NEC 2014 AND ALL LOCAL CODES & ORDINANCES. ROOF SHALL HAVE NO MORE THAN TWO LAYERS OF COVERING IN ADDITION TO THE SOLAR EQUIPMENT. INSTALLATION OF SOLAR EQUIPMENT SHALL BE FLUSH MOUNTED, PARALLEL TO AND NO MORE THAN 6-INCHES ABOVE THE SURFACE OF THE ROOF. ANY PLUMBING VENTS ARE NOT TO BE CUT OR COVERED FOR SOLAR EQUIPMENT INSTALLATION. ANY RELOCATION OR MODIFICATION OF THE VENT REQUIRES A PLUMBING PERMIT AND INSPECTION. ALL DESIGN, CALCULATIONS ARE PERFORMED BY DANIEL DUNZIK REGISTERED ARCHITECT. FLORIDA STATE STATUTE 471.003(3) PROVIDES THAT LICENSED ARCHITECTS ARE EXEMPTED FROM THE PROVISIONS OF CHAPTER 471 '€':GINEERING AND NOT PRECLUDED FROM PERFORMING ENGINEERING SERVICES FOR INTEGRATED SYSTEMS AND SERVICES THAT ARE INCIDENTAL TO BUILDINGS AND STRUCTURES. INVERTER PLACEMENT: SYSTEM UTILIZES "ENPHASE" MICRO -INVERTERS WITH RAPID SHUTDOWN CONTROL LOCATED ON THE BACK SIDE OF EACH MODULE. STRUCTURAL STATEMENT: THE EXISTING STRUCTURE IS ADEQUATE TO SUPPORT THE NEW LOADS. IMPOSED BY THE PHOTOVOLTAIC MODULE SYSTEM INCLUDING UPLIFT & SHEAR.EXISTING RAFTER SIZES & DIMENSIONS CONFORM TO 6TH EDITION 2017 FLORIDA RESIDENTIAL CODE MOUNTING BRACKETS AND HARDWARE MEET OR EXCEED FLORIDA CODE REQUIREMENTS FOR THE DESIGN CRITERIA OF THE TOWN. CLIMATIC & GEOGRAPHIC DESIGN CRITERIA:TABLE R301.2(1) SPEED (MPH) 140 TOPOGRAPHIC EFFECTS B SPECIAL WIND REGION NO WIND BORNE DEBRIS ZONE 2 SEISMIC DESIGN CATEGORY C CLIMATE ZONE 2A WIND EXPOSURE CATETORY B RIMME= EMMIN FORANCE d0 a 201it- 9k I L_ DATE , :. SANFORD BUILDING DIVISION A PERMIT ISSUED SHALL BE CONSTRUED TO BE ALICENSETOPROCEEDWITHTHEWORKANDNOTAS AUTHORITY TO VIOLATE, CANCEL, ALTER OR SET ASIDE ANY OF THE PROVISIONS OF THE TECHNICAL CODES, NOR SHALL ISSUANCE OF A PERMIT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING A CORRECTION OF ERRORS IN PLANS, CONSTRUCTION OR VIOLATIONS OF THIS CODE FBC, Residential 2017 TABLE R301.2.1.3 WIND SPEED CONVERSIONSa VUIt 110 115 120 130 140 150 160 170 180 190 200 Vasd 85 89 93 101 108 116 124 132 139 147 155 momentum SOLAR PRO CUSTOM SOLAR LLC D.B.A. MOMENTUM SOLAR 325 HIGH STREET, METUCHEN, NJ 08840 732) 902-6224 MOMENTUM SOLAR.COM ENGINE OF FL Al EL W.; rx`LlAR975 5. TF ED ARC_ ` SOLAR CONTRACTOR CAMERON CHRISTENSEN CERTIFIED SOLAR CONTRACTOR LICENSE NUMBER: CVC57036 MOMENTUM SOLAR 5728 MMOR BLVD. SUITE 307 ORLANDO FL. 32819 7ER TION JESSICA RENAE BROWN 2106 CORNELL DR SANFORD, FL 32771 772) 209-2940 PV SYSTEM INFORMATION SYSTEM SIZE (DC): 10.395 KW 33 MODULES: HANWHA Q.PEAK DUO BLK-G5 315 33 INVERTERS: ENPHASE IQ7-60-2-US I PROJECT INFORMATION I I INITIAL I DATE: 11/20/2018 1 DESIGNER: DT I UForSI: 1 mile per hour = 0.447 m/s. e ILDlIv,REV: I DATE: DESIGNER:, REV: I DATE: DESIGNER: a. Linear interpolation is SANFORDpermitted. 1 8 4 6 0 0 COVER PAGE 1. ALL WIND DESIGN CRITERIA ARE FOR GABLE AND HIP RESIDENTIAL ROOFS CONSIDERED FROM AN ANGLE OF MIN. 9.5 ° (12) TO MAX._450 () NOT TO EXCEED 30' MEAN ROOF HEIGHT WITH A MIN 16" LAG BOLT (ASTE A276)•STAINL'ESS STEEL INTO THE RAFTER OR BLOCKING BETWEEN RAFTERS W/ MIN. EMBEDMENT OF 3" 2. THIS STRUCTURAL DESIGN REFLECTS STRUCTURAL CONNECTIONS TO THE EXISTING STRUCTURE ONLY. MODULE TO RACK -IT LOADING AND CERTIFICATION PER MECHANICAL LOAD TESTS IAW/ANSI UL2703 CONDUCTED ON BEHALF OF ECOLIBRIUM SOLAR BY TUV RHEELAND REFERENCE FILE L2-ELS150128a (REV 1) 3. ROOF SEALANTS SHALL CONFORM TO ASTMC920 AND ASTM 6511 AND IS THE RESPONSIBILITY OF THE CONTRACTOR TO FILL ALL HOLES WATER TIGHT. 4. "ROCK -IT" ATTACHMENTS ARE MANUFACTURED BY ECOFASTEN SOLAR ARIZONA. AND SHALL BE INSTALLED IN STRICT COMPLIANCE WITH MANUFACTURERS PRINTED INSTRUCTIONS. ROCK -IT TO RAFTER ATTACHMENT SPACING SCHEDULE TABLE REFLECTS ATTACHMENT SPACINGS THAT EXCEED MANUFACTURERS SPECIFICATIONS FOR WIND LOADS AS PER ASCE 07-10. RISK CATEGORY II TOPOGRAPHIC EFFECTS B,C, & D AND ROOF WIND ZONES 1,2,& 3. ROOF ZONES 2 & 3 ARE WITHIN 48" OF ANY OUTER EDGE, HIP, RIDGE, OR GUTTER LINE FOR STRUCTURES 30'-0" OR LESS MEAN ROOF HEIGHT. LLY a in J V GUTTER RIDGE ® tiGo GUTTER ROOF WIND ZONES AS PER IRC R301.2(7) ROOF ZONES 2 & 3 ARE 48" FROM OUTER ROOF EDGES, RIDGES, HIPS, RAKES, AND GUTTER EDGES FOR STRUCTURES BELOW 30'-0" MEAN ROOF HT. C< CI A: SOLAR COi CU AT SOLAF SEE ATTACHMENT SCHEDULE FOR MAXIMUM CANTILEVER ECOFASTEN SOLAR ROCK -IT 4.0 MOUNTING DETAIL ECOFASTEN SOLAR ROCK -IT 4.0 RAIL -LESS MOUNTING SYSTEM INTEGRATED WITH FLASHING, COUPLINGS AND ADJUSTABLE CLAMP ATTACHMENTS SEE ATTACHMENT SCHEDULE FOR MAXIMUM CANTILEVER ECOFASTEN SOLAR ROCK -IT 4.0 MOUNTING DETAIL ECOFASTEN SOLAR ROCK -IT 4.0 RAIL -LESS MOUNTING SYSTEM INTEGRATED WITH FLASHING, COUPLINGS AND ADJUSTABLE CLAMP ATTACHMENTS MAXIMUM SOLAR ARRAY ELEVATION: 4.25" MUM CLAMP ATTACHMENT SPACING: 48" SOLID ih ECOFASTEN' ROCK -IT ATACHMENT SYSTEM ECOFASTEN' ' ROCK -IT' FLASHING ECOFASTEN' SKIRT SCAR MODULE FEASTING ROOF MEMBRANE, PLYWOOD DECK, AND RAFTER ALL COMPONENTS SHALL BE AS MANUFACTURED BY 'ECOFASTEN SOLAR' AND INSTALLED IN STRICT COMPLIANCE WITH MANUFACTURERS PRINTED SPECIFICATIONS ATTACHMENT DETAIL FOR SLOPED COMP. SHINGLE ROOF ECOFASTEN' ROC( -IT ATACHMENT SYSTEM ECOFASTEN' SIMPLE GRIP DEC( MOUNT W/ 2 LAG BOLTS TO RAFTER ECOFASTEN' SKIR SOLAR MODULE E)ISTING ROOF MEMBRANE, PLYWOOD DECK AND RAFTER ALL COMPONENTS SHALL BE AS MANUFACTURED BY 'ECOFASTEN SOLAR' AND INSTALLED IN STRICT COMPLIANCE WITH MANUFACTURERS PRINTED SPECIFICATIONS ATTACHMENT DETAIL FOR LOW -SLOPED ROOF ECOFASTEN' ROC( -IT ATACINENT SYSTEM ECOFASTEN' EF-44R-SS-NOD ATTACHMENT AND E1 ASIgNG W/ SOLAR MODULE8 )aIDlS FASTENERS TO DECK EIOSTING ROOF MEMBRANE, ECOFASTEN' SKIRT // /rRAFTER DES AND ALL COMPONENTS SHALL BE AS MANUFACTURED BY 'ECOFASTEN SOLAR' AND INSTALLED IN STRICT COMPUANCE WITH MANUFACTURERS PRINTED SPECIFICATIONS ATTACHMENT DETAIL FOR ROOFS AREA WHERE RAFTERS NOT AVAILABLE momentum PRO CUSTOM SOLAR LLC D.B.A. MOMENTUM SOLAR 325 HIGH STREET, METUCHEN, NJ 08840 732) 902-6224 MOMENTUMSOLAR.COM ENGINEERING DOFF. C:l NIEL VI% AR98795 SOLAR CONTRACTOR CAMERON CHRISTENSEN CERTIFIED SOLAR CONTRACTOR LICENSE NUMBER: CVC57036 MOMENTUM SOLAR 5728 MAIOR BLVD. SUITE 307 ORLANDO FL. 32819 1ESSICA RENAE BROWN 2106 CORNELL DR SANFORD, FL 32771 772)209-2940 i • SYSTEM SIZE (DC): 10.395 KW 33 MODULES: HANWHA Q.PEAK DUO BLK-G5 315 33 INVERTERS: ENPHASE IQ7-60-2-US PROJECT INFORMATION INITIAL DATE: 11/20/2018 1 DESIGNER: DT REV: DATE: DESIGNER: REV: DATE: DESIGNER: COVER PAGE SCALE: 1 NOTE: 1. ROOF COVERING MATERIAL IS COMPOSED OF SINGLE LAYER ROLLED ASPHALT COMPOSITE SHINGLE. 2. REFER TO LAYOUT DETAIL DRAWING PV-3 FOR ALL ROOFTOP DIMENSIONS. ROOF PANEL COUNT TILT AZIMUTH R1 33 W 89° ' tr JJW z w O U W U z IL Q U) W LL 0 z 0 LL SHADING 94% momentum SOLAR PRO CUSTOM SOLAR LLC D.B.A. MOMENTUM SOLAR 325 HIGH STREET, METUCHEN, NJ 08840 732)902-6224 MOMENTUMSOLAR.COM STRUCTURAL ENGINEERING C SOLAR CONTRACTOR CERTIFIED SOLAR CONTRACTOR LICENSE NUMBER: CVC57036 MOMENTUM SOLAR 5728 MAJOR BLVD. SUITE 307 ORLANDO FL. 32819 CUSTOMER INFORMATION JESSICA RENAE BROWN DRIVEWAY SYMBOL LEGEND 2106 CORNELL DR SANFORD, FL 32771 MSP MAIN SERVICE PANEL - ® CHIMNEY (772)209-2940 P Y SYSTEM SP SUB -PANEL SKYLIGHT INFORMATION O UTILITY METER VENT SYSTEM SIZE (DC): 10.395 KW 33 MODULES: HANWHA Q.PEAK DUO AC AC DISCONNECT O PIPE VENT BLK-GS 315 DISC 33 INVERTERS: ENPHASE IQ7-60-2-US UDC UTILITY DISCONNECT FAN LC LOAD CENTER d/ SATELLITE DISH PROJECT INFORMATION INITIAL DATE: 11/20/2018 DESIGNER: DT N3R NEMA 3R BOX W/ EN) FIRE SETBACKS AS PER 6TH REV: EDITION 2017 FFPC DATE: DESIGNER: EilCB COMBINER BOX - COMBINER BOX MIN TxT GROUND ACCESS POINT REV: DATE: DESIGNER: MODULE PITCH DIRECTION nPANELL/"YO UT a' I PV22 OR ADDITIONAL NFO REFER TO R1 - ARRAY 1 LAYOUT DETAIL SCALE: 1/4" = 1'-0" TILT: 4° AZIMUTH: 89° SHADING: 94% 3 -9" 27'-10" 2'-102" I IIIIIIIIIIIIIIIIIIIIIII 23'-11" I III 6'-2" 4'-1„ SOLAR INSTALLER NOTES: NO ADDITIONAL STRUCTURAL SUPPORT REQUIRED i i I I I I I I Iq I I I T I I I 4 I I I P o... . . IIII i. . . . . . i 4i i i P I I lol I I Iq I I IM I I I I I I p i11i i i i i i i i i 27'- 10" i- 2 momentum SOLAR PRO CUSTOM SOLAR LLC D.B.A. MOMENTUM SOLAR 325 HIGH STREET, METUCHEN, NJ 08840 732) 902-6224 MOMENTUMSOLAR. COM STRUCTURAL ENGINEERING OF o, EL W 7 9 AR 7 5 RF® , Rcl SOLAR CONTRACTOR CAMERON CHRISTENSEN CERTIFIED SOLAR CONTRACTOR LICENSE NUMBER: CVC57036 MOMENTUM SOLAR 5728 MAJOR BLVD. SUITE 307 ORLANDO FL. 32819 INFORMATION JESSICA RENAE BROWN 2106 CORNELL DR SANFORD, FL 32771 772) 209-2940 INFORMATION SYSTEM SIZE (DC): 10.395 KW 33 MODULES: HANWHA WEAK DUO BLK- G5 315 33 INVERTERS: ENPHASE IQ7-60-2-US PROJECT INFORMATION INITIAL DATE: 11/20/2018 DESIGNER: DT REV: DATE: DESIGNER: REV: DATE: DESIGNER: LAYOUT DETAIL P® 3 PV MODULE RATINGS INVERTER RATINGS VOLTAGE DROP CALCULATIONS MODULE MAKE HANWHA INVERTER MAKE ENPHASE FORMULA USED PER NEC 2014 HANDBOOK 215.2(A)(4) WHERE APPLICABLE MODEL Q.PEAK DUO BLK-G5 315 MODEL IQ7-60-2-US WIRE RUN Vmp Imp R L (FT) VO VO MAX OUTPUT POWER 240W BRANCH TO ]-BOX 240.00 11 1.98 72.42 3.154 1.31% MAX POWER 315W OPEN CIRCUIT VOLTAGE 40.29V OPEN DC'VOLTAGE 48V J-BOX TO LOAD CENTER 240.00 33 1.24 50.00 4.092 01.71/ NOMINAL AC VOLTAGE 240VMPPVOLTAGE33.46V LOAD CENTER TO AC DISCONNECT 240.00 41.25 0.778 3.00 0.193 0.08% MAX AC CURRENT 1ASHORTCIRCUITCURRENT9.89A MPP CURRENT 9.41A CEC INVERTER EFFICIENCY 97% AC DISCONNECT TO 240.00 41.25 0.491 10.00 0.405 NUMBER OF MODULES 33 NUMBER OF INVERTERS 33 INTERCONNECTION UL1703 COMPLIANT YES UL1703 COMPLIANT YES SUB PANEL OF MODULES PV BREAKER THIS SOLAR PHOTOVOLTAIC SYSTEM COMPLIES WITH THE 2017 BREAKER SIZE PER BRANCH FLORIDA BUILDING CODE AND THE 2014 NATIONAL ELECTRICAL CODE UP TO 16 20A BRANCH CIRCUIT 11 MICRO -INVERTERS BRANCH CIRCUIT B 11 MICRO -INVERTERS BRANCH CIRCUIT C 11 MICRO -INVERTERS 33 HANWHA Q.PEAK DUO BLK-G5 315 315W MODULES PAIRED WITH 33 ENPHASE IQ7-60-2-US MICRO -INVERTERS ENPHASE 80A AC CBOOXINER SOLAR CIRCUIT DISCONNECTING MEANS f f f SQUARE-D 60A FUSIBLE Q AC DISCONNECT V 8 EXISTING GENERAL ELECTRIC 200A MAIN SERVICE PANEL 240 V MAIN BREAKER: 150A INE SIDE HOT TAP 1150A1 10A BREAKER POWERIJOUNCDTC I I 45A FUSES GROUND 1 BOX 2A_C 20A BREAKER (A) 3 4TERMINATIONCAP20ABREAKER (B) INSTALLED ON 20A BREAKER (C) END OF CABLE Wire Tag Conduit Wire Qty Wire Wire Type Temp. Wire Temp. Conduit Derated Inverter NOC (A) NEC Design Gauge Rating Ampacity (A) Derate Fill Derate Ampacity (A) Qty Correction Current (A) 1 OPEN AIR 3 12 AWG Trunk Cable 90°C 30 0.96 1 28.80 11 1 1.25 13.75 2A 1" PVC 2 10 AWG THWN-2 90°C 40 0.96 0.8 30.72 11 1 1.25 13.75 2B 1" PVC 2 10 AWG THWN-2 90°C 40 0.96 0.8 30.72 11 1 1.25 13.75 2C 1" PVC 2 10 AWG THWN-2 90°C 40 0.96 0.8 30.72 11 1 1.25 13.75 3 1" PVC 3 08 AWG THWN-2 75'C 50 0.96 1 48.00 33 1 1.25 41.25 4 1" PVC 3 06 AWG THWN-2 75 C 65 0.96 1 62.40 33 1 1.25 41.25 12 AWG SOLAR 10 AWG PRO CUSTOM SOLAR LLC D.B.A. MOMENTUM SOLAR 325 HIGH STREET, METUCHEN, NJ 08840 732) 902-6224 MOMENTUMSOLAR.COM08AWG STRUCTURAL ENGINEERING06AWG SOLAR CONTRACTOR CAMERON CHRISTENSEN CERTIFIED SOLAR CONTRACTOR LICENSE NUMBER: GRID MOMENTUM SOLAR C57036 5728 MAJOR BLVD. SUITE 307 ORLANDO FL. 32819 CUSTOMER I -ILA- J i JESSICA RENAE BROWN UTILITY 2106 CORNELL DR METER SANFORD, FL 32771 772)209-2940 PV SYSTEM INFORMATION SYSTEM SIZE (DC): 10.395 KW 33 MODULES: HANWHA Q.PEAK DUO BLK-G5 315 33 INVERTERS: ENPHASE IQ7-60-2-US Ground Ground Wire Size Type 12 AWG Trunk Cable PRO)ECTINFORMATION 08 AWG THWN 22 INITIAL DATE: 11/20/2018 DESIGNER: DT REV: DATE: DESIGNER: 08 AWG THWN-2 REV: DATE: DESIGNER: 08 AWG THWN-2 ELECTRICAL 08 AWG THWN-2 THWN-2 SCALE: 1/8" = V-0" CB ACIDISCMSP OM ELECTRICAL EQUIPMENT f` W NOTE: 1. ROOF COVERING MATERIAL IS COMPOSED OF SINGLE LAYER ROLLED ASPHALT COMPOSITE SHINGLE. 2. REFER TO LAYOUT DETAIL DRAWING PV-3 FOR ALL ROOFTOP DIMENSIONS. ROOF R1 LU u Z W 0 Ln L1J LL 0 z 0 Of L- PANEL COUNT TILT 33 4° 0 J JZ 0 u AZIMUTH SHADING 89° 94% momenturr SOLAR PRO CUSTOM SOLAR LLC D.B.A. MOMENTUM SOLAR 325 HIGH STREET, METUCHEN, NJ 08840 732) 902-6224 MOMENTUMSOLAR. COM STRUCTURAL ENGINEERING SOLAR CONTRACTOR CAMERON CHRISTENSEN CERTIFIED SOLAR CONTRACTOR LICENSE NUMBER: CVC57036 MOMENTUM SOLAR 5728 MAJOR BLVD. SUITE 307 ORLANDO FL. 32819 CUSTOMER INFORMATIOP JESSICA RENAE BROWN DRIVEWAY SYMBOL LEGEND 2106 CORNELL DR SANFORD, FL 32771 MSP MAIN SERVICE PANEL CHIMNEY (772) 209-2940pV SYSTEMSP SUB -PANEL SKYLIGHT INFORMATION M OUTILITY METER VENT SYSTEM SIZE (DC): 10.395 KW 33 MODULES: HANWHA Q.PEAK DUO Ac BLK- G5 315 Disc AC DISCONNECT PIPE VENT 33 INVERTERS: ENPHASE IQ7-60-2-US UDC UTILITY DISCONNECT FAN LC LOAD CENTER d/ SATELLITE DISH PROJECT INFORMATION INITIAL DATE: 11/20/2018 DESIGNER: DT N3R HNEMA 3R BOX W1 ENVOY-S FIRE SETBACKS AS PER 6TH EDITION REV: 2017FFPCDATE: DESIGNER: CB ECOMBINER BOX MIN YxT GROUND ACCESS POINT REV: DATE: DESIGNER: PANEL LAYOUT MODULEPITCHDIRECTIONWIND PRESSURE ZONE ONES. REFER TO _ PV- 2.2 FOR ADDITIONAL INFO J R1 - ARRAY 1 LAYOUT DETAIL SCALE: 1/4" = 1'-0" TILT: 4° AZIMUTH: 89° SHADING: 94% 2'- 23 E SOLAR INSTALLER NOTES: NO ADDITIONAL STRUCTURAL SUPPORT REQUIRED 1-2 momentum SOLAR V-2" PRO CUSTOM SOLAR LLC D.B.A. MOMENTUM SOLAR 325 HIGH STREET, METUCHEN, NJ 08840 732) 902-6224 MOMENTUMSOLAR.COM ENGINE j PN1EL. UJ. '•.'T AR 15 yFDARGd, SOLAR CONTRACTOR CAMERON CHRISTENSEN CERTIFIED SOLAR CONTRACTOR LICENSE NUMBER: CVC57036 MOMENTUM SOLAR 5728 MAJOR BLVD. SURE 307 ORLANDO FL. 32819 CUSTOMER INFORMATION 1ESSICA RENAE BROWN 2106 CORNELL DR SANFORD, FL 32771 772) 209-2940 PV SYSTEM INFORMATION SYSTEM SIZE (DC): 10.395 KW 33 MODULES: HANWHA Q.PEAK DUO BLK-G5 31S 33 INVERTERS: ENPHASE IQ7-60-2-US PROJECT INFORMATION INITIAL DATE: 11/20/2018 DESIGNER: DT REV: DATE: DESIGNER: REV: DATE: DESIGNER: LAYOUT DETAIL PV-3 PV MODULE RATINGS INVERTER RATINGS VOLTAGE DROP CALCULATIONS MODULE MAKE HANWHA INVERTER MAKE ENPHASE FORMULA USED PER NEC 2014 HANDBOOK 215.2(A)(4) WHERE APPLICABLE MODEL Q.PEAK DUO BLK-G5 315 MODEL IQ7-60-2-US WIRE RUN VmP I"P R L (FT) V° V° MAX OUTPUT POWER 240W BRANCH TO ]-BOX 240.00 11 1.98 72.42 3.154 1.31% MAX POWER 315W OPEN DC VOLTAGE 48V OPEN CIRCUIT VOLTAGE 40.29V BOX TO LOAD CENTER 240.00 33 1.24 50.00 4.092 1.71% NOMINAL AC VOLTAGE 240VMPPVOLTAGE33.46V LOAD CENTER TO AC DISCONNECT 240.00 41.25 0.778 3.00 0.193 0.08% SHORT CIRCUIT CURRENT 9.89A MAX AC CURRENT 1A MPP CURRENT 9.41A CEC INVERTER EFFICIENCY 97% AC DISCONNECT TO 240.00 41.25 0.491 10.00 0.405 0.17% NUMBER OF MODULES 33 NUMBER OF INVERTERS 33 INTERC O NNECTION UL1703 COMPLIANT YES UL1703 COMPLIANT YES OF MODULES PV BREAKER THIS SOLAR PHOTOVOLTAIC SYSTEM COMPLIES WITH THE 2017SUBPANELPERBRANCH BREAKER SIZE FLORIDA BUILDING CODE AND THE 2014 NATIONAL ELECTRICAL CODE UP TO 16 20A BRANCH CIRCUIT A 11 MICRO -INVERTERS BRANCH CIRCUIT B 11 MICRO -INVERTERS BRANCH CIRCUIT C 11 MICRO -INVERTERS 33 HANWHA Q.PEAK DUO BLK-G5 315 315W MODULES PAIRED WITH 33 ENPHASE IQ7-60-2-US MICRO -INVERTERS J ENPHASE 80A AC CBOXINER SOLAR CIRCUIT DISCONNECTING MEANS SQUARE-D 60A FUSIBLE AC DISCONNECT 8 8 EXISTING GENERAL ELECTRIC 200A MAIN SERVICE PANEL 240 V MAIN BREAKER: 150A LINE SIDE HOT TAP 1150A1 ONDEOCN 10AENVOY)ER rOWER JUNCTION I 45A FUSES GROUND BOX 2A-C 20A BREAKER (A) 3 4TERMINATIONCAP20ABREAKER (B) INSTALLED ON 20A BREAKER (C) END OF CABLE Wire Tag Conduit Wire Qty Wire Wire Type Temp. Wire Temp. Conduit Derated Inverter NOC A NEC Design Gauge Rating Ampacity (A) Derate Fill Derate Ampacity (A) Qty Correction Current (A) 1 OPEN AIR 3 12 AWG Trunk Cable 90°C 30 0.96 1 28.80 11 1 1.25 13.75 2A 1" PVC 2 10 AWG THWN-2 90°C 40 0.96 0.8 30.72 11 1 1.25 13.75 213 1" PVC 2 10 AWG THWN-2 90°C 40 0.96 0.8 30.72 11 1 1.25 13.75 2C 1" PVC 2 10 AWG THWN-2 90°C 40 0.96 0.8 30.72 11 1 1.25 13.75 3 1" PVC 3 08 AWG THWN-2 75°C 50 0.96 1 48.00 33 1 1.25 41.25 4 1" PVC 3 06 AWG THWN-2 75°C 1 65 0.96 1 62.40 33 1 1.25 41.25 WIRE SIZE(0 momentum 12 AWG SOLAR 10 AWG PRO CUSTOM SOLAR LLC D.B.A. MOMENTUM SOLAR 325 HIGH STREET, METUCHEN, NJ 08840 732)902-6224 MOMENTUMSOLAR.COM08AWG STRUCTURAL ENGINEERING06AWG SOLAR CONTRACTOR GRID i CAMERON CHRISTENSEN CERTIFIED SOLAR CONTRACTOR LICENSE NUMB ER: CVC57036 MOMENTUM SOLAR 5728 MAJOR BLVD. SUITE 307 ORLANDO FL. 32819 CUSTOMER m INFORMATION JESSICA RENAE BROWN UTILITY 2106 CORNELL DR METER SANFORD, FL 32771 772)209-2940 PV SYSTEM INFORMATION SYSTEM SIZE (DC): 10.395 KW 33 MODULES: HANWHA Q.PEAK DUO BLK-G5 315 33 INVERTERS: ENPHASE IQ7-60-2-US Ground Ground Wire Size Type 12 AWG Trunk Cable PROJECT INFORMATION 08 AWG THWN-2 INITIAL DATE: 11/20/2018 DESIGNER: DT REV: DATE: DESIGNER: 08 AWG THWN-2 REV: DATE: DESIGNER: 08 AWG THWN-2 ELECTRICAL 08 AWG THWN-2 PV-4THWN-2 ELECTRICAL NOTES: 1. ALL CALCULATIONS FOR VOC, VMAX, IMP AND ISC HAVE BEEN CALCULATED USING THE MANUFACTURED STRING CALCULATOR BASED ON ASHRAE 2% HIGH AND EXTREME MINIMUM TEMPERATURE COEFICIENTS. 2. THE ENTIRE ARRAY IS BONDED ACCORDING TO (NEC 690.46 - 250.120 paragraph Q. THE GROUND IS CARRIED AWAY FROM THE GROUNDING LUG USING #6 BARE COPPER WIRE. 3. THIS SYSTEM COMPLIES WITH NEC 2014 4. BRANCH CIRCUIT CALCULATION FOR WIRE TAG 1 DISPLAYS THE LARGEST BRANCH CIRCUIT IN SYSTEM. OTHER BRANCH CIRCUITS WILL HAVE LOWER DESIGN CURRENT THAN THE ONE SHOWN. IN ADDITION, VOLTAGE DROP CALCULATIONS FROM PANELS TO THE COMBINER BOX WILL BE SHOWN IN A SIMILAR FASHION 5. ALL CONDUCTORS ARE SIZED BASED ON NEC 2014 ARTICLE 310 6. ALL EQUIPMENT INSTALLED IS RATED AT 90°C 7. INVERTER NOC (NOMINAL OPEN CURRENT) OBTAINED FROM EQUIPMENT DATASHEET 8. CONTRACTOR RESPONSIBLE FOR COMPLYING WILL ALL LOCAL OR NATIONAL CODE REQUIREMENTS AND EQUIPMENT INSTALLATION INSTRUCTIONS 9. EACH MODULE MUST BE GROUNDED ACCORDING TO SUNMODULE USER INSTRUCTIONS 10. ALL EQUIPMENT SHALL BE LISTED PER NEC 690.4(D) 11.PER NEC 690.17, PROVIDE A WARNING SIGN AT ALL LOCATIONS WHERE TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION> SIGN SHALL READ 'WARNING - ELECTRIC SHOCK HAZARD - DO NOT TOUCH TERMINALS - OR EQUIVALENT. 12. PER NEC 705.10, PROVIDE A PERMANENT PLAQUE OR DIRECTORY SHOWING ALL ELECTRIC POWER SOURCES ON THE PREMISES AT SERVICE ENTRANCE. 13. INTERCONNECTION METHOD SHALL COMPLY WITH NEC 690.64 14. AND OPTION FOR A SINGLE CIRCUIT BRANCH TO BE SPLIT INTO TWO SUB -CIRCUIT BRANCHES IS ACCEPTABLE. 15. ALL CONDUCTORS MUST BE COPPER. 16. NEUTRAL AND EQUIPMENT GROUNDING CONDUCTOR BONDED AS PER NEC 250.24(C). 17. EQUIPMENT GROUNDING CONDUCTOR IS CONNECTED TO A GROUNDING ELECTRODE SYSTEM PER 250.54(D). 18. FUSES FOR PV DISCONNECT HAVE AIC RATINGS OF 200KA AC AND 20KA DC. 19. SUPPLY SIDE CONNECTION SHALL BE MADE USING ILSCO INSULATION PIERCING CONNECTORS (IPC). MAKE, MODEL, AND RATING OF INTERCONNECTION CAN BE SEEN ON TABLE 1 BELOW. 20. METHOD OF INTERCONNECTION CAN BE SEEN IN FIGURE 1. 21. UTILITY HAS 24-HR UNRESTRICTED ACCESS TO ALL PHOTOVOLTAIC SYSTEM COMPONENTS LOCATED AT THE SERVICE ENTRANCE. 22. WORKING CLEARANCES AROUND THE EXISTING AND NEW ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE WITH NEC ARTICLE 110.26. 23, CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS SUNLIGHT RESISTANT PER NEC ARTICLE 300.6 (C)(1) AND ARTICLE 310.8 (D). 24. CONDUCTORS EXPOSED TO WET LOCATIONS SHALL BE SUITABLE FOR USE IN WET LOCATIONS PER NEC ARTICLE 310.8 (C). 25. TOTAL AREA OF ALL CONDUCTORS, SPLICES, AND TAPS INSTALLED AT ANY CROSS SECTION OF THE WIRING DOES NOT EXCEED 75% OF THE CROSS SECTIONAL AREA OF THE SPACE. NEC 312.8(2). 26. SYSTEM IS CONSIDERED AN AC MODULE SYSTEM. NO DC CONDUCTORS ARE PRESENT IN CONDUIT, COMBINER, JUNCTION BOX, DISCONNECT. AND COMPLIES WITH 690.6 - NO DC DISCONNECT AND ASSOCIATED DC LABELING ARE REQUIRED. 27. SYSTEM COMPLIES WITH 690.12 RAPID SHUTDOWN AND ASSOCIATED LABELING AS PER 690.56(C). AC VOLTAGE AND SYSTEM OPERATING CURRENT SHALL BE PROVIDED 690.52. 28. CONDUCTORS IN CONDUIT ARE AC CONDUCTORS BRANCH CIRCUITS AND NOT PV SOURCE CIRCUITS. 690.6. 29. ALL GROUNDING SHALL COMPLY WITH 690.47(A) IN THAT THE AC MODULES WILL COMPLY WITH 250.64. 30. NO TERMINALS WILL BE ENERGIZED IN THE OPEN POSITION IN THIS AC MODULE SYSTEM 690.17, 690.6. 31. WHERE APPLICABLE: INTERCONNECTION SHALL COMPLY WITH 705.12(D)(3), 705.12(D)(2)(3)(B), 705.12(A) AS PERMITTED BY 230.86(6) TABLE 1: MAKE MODEL VOLTAGE CONDUCTOR CONDUCTOR RATING RANGE MAIN RANGE TAP ILSCO IPC 4020 600 V 4/0-4 AWG 6-14 AWG ILSCO IPC 4006 600 V 4/0-2 AWG 2/0-6 AWG FIGURE 1: 1.Adjust the connector nut to suitable location 2.Put the branch wire Into the capsheath fully 3.Insert the main wlre,if there are two lays of insulated lay In the main cables,should strip a certain length of the first Insulated lay from Inserted 4.Turn the nut by hand,and S.Scraw the nut with the sleeve S.Screw the nut continually until the fix the connector In suitable spanner. top pert Is cracked and dropped down. location momentum SOLAR PRO CUSTOM SOLAR LLC D.B.A. MOMENTUM SOLAR 325 HIGH STREET, METUCHEN, NJ 08840 732) 902-6224 MOMENTUMSOLAR.COM STRUCTURAL ENGINEERING SOLAR CONTRACTOR CAMERON CHRISTENSEN CERTIFIED SOLAR CONTRACTOR LICENSE NUMBER: CVC57036 MOMENTUM SOLAR 5728 MA)OR BLVD. SUITE 307 ORLANDO FL. 32819 CU INFC JESSICA RENAE BROWN 2106 CORNELL DR SANFORD, FL 32771 772) 209-2940 INFORMATION SYSTEM SIZE (DC): 10.395 KW 33 MODULES: HANWHA Q.PEAK DUO BLK-G5 315 33 INVERTERS: ENPHASE IQ7-60-2-US I PROJECT INFORMATION I I INITIAL I DATE: 11/20/2018 1 DESIGNER: DT I IREV: I DATE: IDESIGNER: I IREV: I DATE: IDESIGNER: I ELECTRICAL PV-4.1 TAG LABEL QUANTITY LOCATION NOTE EXAMPLES momentum SOLAR AO 1 MAIN SERVICE PANEL POINT OF INTERCONNECTION O PRO CUSTOM SOLAR LLC D.B.A. MOMENTUM SOLAR 325 HIGH STREET, METUCHEN, NJ 08840 732) 902-6224 MOMENTUMSOLAR.COM STRUCTURAL ENGINEERING lztWARNING ZtWARNING PHOTOVOLTAIC - • • - • EQUIPMENTTHIS . • . • ALL OVERCURRENT DEVICES,COMBINER SUPPLY PHOTOVOLTAIC- EQUIPPED WITH EXCEED AMPACITY OF BUSBAR, 1 COMBINER BOX 1 AT ANY JUNCTION BOX OR DC IF USEDMAINEOFFL a SHUTDOWNRAPID r d CO ZEWARNING HAZARD D • • • 1 JUNCTION BOX 1 AT ANY JUNCTION BOX OR DC COMBINER IF USED msiIIIIIIIIIO s A". . ED A,j, TERMINALS ON BOTH LINE AND SIDES MAY BE ENERGIZED r IN THE OPEN POSITION PHOTOVOLTAIC AC DISCONNECT A! WARNING SOLAR CONTRACTOR I I OLOADSIDES'BE D ELECTRICAL SHOCKHAZARD NOT TOUGHLICENSE VOLTAGEOPERATION • ON BOTH LINE AND ENERGIZED IN THE OPEN • • • PHOTOVOLTAIC HIGH STREET 1 AC DISCONNECT 1 OF EACH AT FUSED AC DISCONNECTAC COMPLETE VOLTAGE AND]m CURRENT VALUES ON DISCONNECT LABEL325WARNING CAMERON CHRISTENSEN CERTIFIED SOLAR CONTRACTOR NUMBER: CVC57036 MOMENTUM SOLAR 5728 MAJOR BLVD. SUITE 307 ORLANDO FL. 32819 CUSTOMER INFORMATION JESSICA RENAE BROWNMETUCHEN, NJ 08840 PHONE 732-902-6224 Op 2106 CORNELL DR SANFORD, FL 32771 772)209-2940 PV SYSTEMLINESIDETAPA NUAL POWER SOURCE INFORMATION OE SYSTEM 1 MAIN DISCONNECT PANEL 1 OF EACH AT BUILDING MAIN DISCONNECT PANEL SYSTEM SIZE (DC): 10.395 KW 33 MODULES: HANWHA Q.PEAK DUO BLK-G5 315 OPERATINGRATEDAC j O I O 33INVERTERS: ENPHASE IQ7-60-2-US PROJECT INFORMATION INITIAL DATE: 11/20/2018 DESIGNER: DT WARNING POWER SOURCE SYSTEM 1 UTILITY METER 1 AT UTILITY METERDUAL 4}l0.cti S. 7yl REV: DATE: DESIGNER: REV: DATE: DESIGNER: EQUIPMENT LABELS PV-4.2 Daniel W. Dunzik Architect LEED-AP 370 Burnt Hill Rd. Skillman, NJ. 08558 908-872-3664 Studiogdesign@comcast.net November 20, 2018 Sanford, FL Attn: Construction Official Re: Proposed Photovoltaic Solar Panel Installation Jessica Renae Brown 2106 Cornell Dr. Sanford, FL 32771 Dear Sir: Certification: I have reviewed the engineering testing reports for the racking and attachments to be used on this project and I certify that the products are capable of supporting the code required loads and are suitable for this installation when installed in strict compliance with the manufacturers printed instructions. Regarding the solar panel array installation on the above referenced project please note that An inspection was performed and analysis of the existing structure was conducted. There is adequate structural capacity for the installation of the array with the following recommendations: 1. The array will be installed on the existing roof. The roof is constructed of 2"x8" wood rafters @ 16" O.C. spanning 17' with 1 "x6" T&G sheathing. The new array (See Site map by contractor) will add 2.63 Lb. / Sf. overall to the roof. No additional structure support is required for the existing roof structure. 2. The system shall be secured to the roof using the "Ecofasten Solar" "Rock -IT" ® attachment system. The installation shall be in strict compliance with manufacturers printed instructions. The attachment system shall be UL 1703 approved tested. The attachments shall be min. 5/16" x 4" long stainless -steel lags with a min. embedment of 3.25" into the rafters. Attachments shall be @ 48" o.c. Max. in roof wind zone 1 and @ 24" o.c. Max. in roof wind zone 2 and 3 lags to alternate rafters. Provide 6 mil. vapor barrier between dissimilar metals. Provide water tight gasket and sealant at all penetrations. Attachments shall follow panel rows as specified by the system manufacturer's installation manual. The panel angle shall match the roof slope. Structural Design Loads per ASCE 7-10 Dead Loads 10 psf (+2.6psf, New Solar Panels) = 12.6 psf.- Live Load =20psf Total dead weight on attachment = 19Lb. Max. Ch. 30 Wind Loads Components and Cladding windloads = 140 mph Exposure B zone 1=+/- 31.4 psf., Zone 2&3=+/-77.7psf. Area of Panels largest array = 591.6sf Tributary area panels/attachment max. 591.6sf/ 73min = 8si Min Number of Attachments =73. Wind pressure 31.4 x Area 591.6/ 73 No. Attachments = 629 TABLE 10.3.1 NDS Pull out strength of 5/16"x4 lags in rafter =W'= WxCdxCt=2661bs/in embedment x 3.25"embedment = 864.5 xl.6Cd x1.0Ct = 1,383 Lbs Max. > 6291bs/attachment OK Daniel W. Dunzik Architect LEED-AP 370 Burnt Hill Rd. Skillman, NJ. 08558 908-872-3664 Studiogdesigns@comcast.net 3. Solar modules shall be UL-1703 rated. Refer to manufacturers specifications sheets. 4. Positive drainage of the system shall be so as not to void the existing roof warrantee. 5. Florida Administrative Code, 2017 Florida Building Code - Residential Sixth Edition, ASCE-7-10, 2017 Florida Building Code — Energy Conservation, Sixth Edition, 2014 National Electric Code, All Local Governing County and Municipal Ordinances adopted by reference or enacted by law. All components used meet the criteria of the Florida Solar Energy Center. If you have any questions relating to this matter, please contact me at your earliest convenience. Thank you. Pf 10 F' FL O!Q W. Ah98 95 FRED ARG Daniel W. Dunzik, RA. LEED-AP FL. Lic. No. AR98795 Digitally signed by: Daniel W. Dunzik DN: CN = Daniel W. Dunzik email STUDIOGDESIGN@COMCAST. NET C = AD O = RA. LEED-AP OU = Fl. Lin. No.AR98795 Date: 2018.11.20 11:38:15-05'00' NSFL W D AR9 7 5 d vt F'D A-dO Daniel W. Dunzik Architect LEED-AP 370 Burnt Hill Rd. Skillman, NJ. 08558 908-872-3664 January 29, 2018 Building Department Attn: Plan Reviewer Re:Proposed Photovoltaic Solar Panel Installation Dear Sir: I have reviewed the following documents related to the " EcoFasten Solar" ROCK -IT SYSTEM 4.0 and certify that the attachment system when installed in strict compliance with the manufacturers Installation Manual appropriate for this application and is in compliance with the latest building codes including Florida Administrative Code, 2017 Florida Building Code - Residential Sixth Edition, ASCE-7-10, 2017 Florida Building Code - Energy Conservation, Sixth Edition, 2014 National Electric Code, All Local Governing County and Municipal Ordinances adopted by reference or enacted by law. I make this certification for the following listed documents: 1. ROCK -IT SYSTEM 4.0 Installation Manual 2. PZSE, Inc Structural Engineers Certification. 3. EcoFasten Solar Certificate No. US 82150026 4. ROCK -IT SYSTEM 4.0 Cut Sheet for Coupling, Hybrid Coupling, and Mount. If you have any questions relating to this matter, please contact me at your earliest convenience. Thank you. Daniel W. Dunzik, RA. LEED-AP Fl. Lic. No. AR98795 Digitally signed by: Daniel W. Daniel Dunzik DN: CIS- Daniel W. Dunzik D'' II , mail 1 nzik / studiggdesign@comcast.net f` C = AD O = Lic No AR98795 OU& Architect Date: 2018.01.29 18:19:35 - 05,00, powered by DUO The new i.PEAK DUO BLK-G5 solar module from Q CELLS impresses with its outstanding visual appearance and particularly high performance on a small surface thanks to the innovative 11ANTUM PIX-1 Technology. UNTUM's world -record -holding cell concept has now been combined with state-of-the-art circuitry half cells and a six-busbar design, thus achieving outstanding performance under real conditions — both with low -intensity solar radiation as well as on hot, clear summer days. Q.ANTUM TECHNOLOGY: LOW LEVELIZED COST OF ELECTRICITYGHigheryieldpersurfacearea, lower BOS costs, higher power classes, and an efficiency rate of up to 19.3 %. l4INNOVATIVE ALL-WEATHER TECHNOLOGY Optimal yields, whatever the weather with excellent low -light and temperature behavior. ENDURING HIGH PERFORMANCEnia, Long-term yield security with Anti LID Technology, Anti PID Technology', Hot -Spot Protect and Traceable Quality Tra.QTM EXTREME WEATHER RATING High-tech aluminum alloy frame, certified for high snow 5400 Pa) and wind loads (4000 Pa) regarding IEC. 0 A RELIABLE INVESTMENT Inclusive 12-year product warranty and 25-year linear performance guarantee'. STATE OF THE ART MODULE TECHNOLOGY Q.ANTUM DUO combines cutting edge cell separation and innovative wiring with Q.ANTUM Technology. THE IDEAL SOLUTION FOR: Rooftop arrays on residential bullomgs Engineered in Germany i C'"u's TorEwa fv 2018 ouaNty Tested 10.40032587 -_-- APT test conditions according to IEC/TS 62804-1:2015, method B (-1500V, 168h) See data sheet on rear for further information. OCELLS MECHANICAL SPECIFICATION Format 66.3in x 39.4 in x 1.26in (including frame) 1685mm x 1000mm x 32mm) WeltM 41.21bs (18.7 kg) a a Frond Cover 0.13 in (3.2 mm) thermally pre -stressed glass with anti -reflection technology aZ rr Back Corer Compos to film New Frame Brack anodized aluminum ® Iaeer.r Cell 6 x 20 monocrystalline MANTLIM solar half -cells 1\`yJunctionboa2.76-3.35 in x 1.97-2.76 in x 0.51-0.83 in 70-135mm x 50-70mm x 13-21 mni decentralized, IP67 Cable 4mmeSolar cable; (+)a43.3in(I100mm),(-)t43.3in(1100mm) _ • H urrvae°o Connector Multi -Contact MC4, IP68 ELECTRICAL CHARACTERISTICS L POWER CLASS 300 305 310 315 320 MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS, STC' (POWER TOLERANCE +5W /-OW) Power at MPFPar [WI 300 305 310 315 320 Shari Circuit Curnerrl I" (A] 9.72 9.78 9.83 9.89 9.94 e Open Circuit Voltage V. IV] 39.48 39.75 40.02 40.29 40.56 Current at MPP I[A] 9.25 9.31 9.36 9.41 9.47 Vo[lags atWIPP V,,,r [V] 3243 32.78 33.12 33.46 33.80 Efficiency' q I%1 z 17.8 a 1H_1 218.4 a 18.7 a 19.0 MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS, NMOT2 Power at MPPParr 1W) 224.1 227.8 231.6 235.3 239.1 E Short Circtdt Current I„ [A] 7.83 7.88 7.92 7.97 8.01 Open CircutVoltage Vt IV] 37.15 37.40 37.66 37.91 38.17 ls Cutreet M MPP 1,., IA] 7.28 7.32 7.37 7.41 7.45 Voltage at MPP Va„ IV] 30.78 31,11 31.44 31.76 32.08 Measurement loleranras P°„.3%;l,,,Va35%at STC, I000Wtrn2,2612`C, AM 1.6G according to IEC 60904-3 1800 WIW, NMOT, spmtrum AM I.5G 0 CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE r" - - - Al least 98°roolrominalPower duringhrstyear. 10--T-----r----r-- r----+ a»xaea.rrwr Rases. r . a.wwrerarn. e...ca Thereafter max. 0.54$ degradation per year. ly $ At lead 93 1 % of nominal power up to 10 years. , _____ _ ' ' _ i F _ _ At least 85 % of rominal power up to 25 years. i a>: All datawithinmeasurementtolerances. -____ r_______-._____.r er I Full warranties in accordance with the warranty ' r terms of the Q CELLS sales organization of your respective ccurdry. 1-- J- g are w • aw >• IRRADLWU Jeri e Typical module performance under low imadlance conditions in ea•.»m»,cw<,.,., wags YP nary.. ,.00r„2oue,, ss.,,e„men comparison to STC conditions (25°C, 1000W/m2). TEMPERATURE COEFFICIENTS Tunlperatura Cueflicield of Ir a [%/q +0.04 Terperature Corafficitrd of Vo, P [%/K] -0.28 Temperature Coefficient of P_ y [%/Kl -0.37 Normal Operating Models Temperature NMOT [°F] 109 35.4 (43 t3°C) PROPERTIES FOR SYSTEM DESIGN Maximum System Voltage Yin IV1 1000 (IEC) 11000 (UL) Salmly Clare )I Maximum Series Fast Rating [A DCJ 20 Fire Rating C (IEC) / TYPE 1 (UL) Max. Desigo Load, Push / Pull (Ulf IIII&MI 75 (3600 Pa) 1 55 (2667 Pa) Permitted module temperature -40°F up to +185°F on continuous duty (- 40'C up to+85°C) Max. Test Load, PRO / Pull (LILY [IDS/11'1 113 (5400 Pa) 184 (4000Pa) 0 see Installation manual QUALIFICATIONS t CERTIFICATES PACKAGING INFORMATION UL 1709; VDE Qua@ty TMadl CE-compliant; Numberof Madales per Pallet 32 IEC 61215:2016: IEC 61730:2016, Application clan A Number of Palled per 53' Tuiltr30 DVE / OF.- Nurrrber of Pallets par 40' Nigh cube Contamell 26 C Pallet Dimensions ( L x W x H) 69.3 in x 45.3 in x 46.9 in C 1760mm x1150mm x 1190mm) Pallet Weight 1415 bs (642 kg) NOTE! Instal ation instructions must be followed. See the installation and operating manual or contact our technical service department for further information on approved installation and use of this product. Haewbs DCELL6 America Inc. 300 Spectrum Center Drive, Suite 1250, Irvine, CA 92618, USA I TEL+1 949 748 59 96 1 EMAIL Inquiryli q cells.com I WED www•q-ce;ls.us Data Sheet Enphase Microinverters Region: AMERICAS Enphase IQ 7 and IQ 7+ Microinverters To learn more about Enphase offerings, visit enphase.com The high-powered smart grid -ready Enphase IQ 7 Micro- and Enphase IQ 7+ Micro'" dramatically simplify the installation process while achieving the highest system efficiency. Part of the Enphase IQ System, the IQ 7 and IQ 7+ Microinverters integrate with the Enphase IQ Envoy", Enphase IQ Battery", and the Enphase Enlighten" monitoring and analysis software. IQ Series Microinverters extend the reliability standards set forth by previous generations and undergo over a million hours of power -on testing, enabling Enphase to provide an industry -leading warranty of up to 25 years. Easy to Install Lightweight and simple Faster installation with improved, lighter two -wire cabling Built-in rapid shutdown compliant (NEC 2014 & 2017) Productive and Reliable Optimized for high powered 60-cell and 72-cell* modules More than a million hours of testing Class II double -insulated enclosure UL listed Smart Grid Ready Complies with advanced grid support, voltage and frequency ride -through requirements Remotely updates to respond to changing grid requirements Configurable for varying grid profiles Meets CA Rule 21 (UL 1741-SA) The IQ 7+ Micro is required to support 72-cell modules ENPHASE. Enphase IQ 7 and IQ 7+ Microinverters INPUT DATA (DC) IQ7-60-2-US / IQ7-60-B,US IQ7PLUS-72-2-US / IQ7PLUS-72-B-US Commonly used module pairings' 235 W - 350 W + 235W - 440 W + Module compatibility 60-cell PV modules only 60-cell and 72-cell PV modules Maximum input DC voltage 48 V 60 V Peak power tracking voltage 27 V - 37 V 27 V - 45 V Operating range 16 V - 48 V 16 V - 60 V Min/Max start voltage 22 V / 48 V 22 V / 60 V Max DC short circuit current (module Isc) 15 A 15 A Overvoltage class DC port II II DC port backfeed current 0 A 0 A PV array configuration 1 x 1 ungrounded array; No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA (AC) IQ 7 Microinverter IQ 7+ Microinverter Peak output power 250 VA 295 VA Maximum continuous output power 240 VA 290 VA Nominal (L-L) voltage/range2 240 V / 208 V / 240 V / 208 V / 211-264 V 183-229 V 211-264 V 183-229 V Maximum continuous output current 1.0 A (240 V) 1.15 A (208 V) 1.21 A (240 V) 1.39 A (208 V) Nominal frequency 60 Hz 60 Hz Extended frequency range 47 - 68 Hz 47 - 68 Hz AC short circuit fault current over 3 cycles 5.8 Arms 5.8 Arms Maximum units per 20 A (L-L) branch circuit' 16 (240 VAC) 13 (208 VAC) 13 (240 VAC) 11 (208 VAC) Overvoltage class AC port III III AC port backfeed current 0 A 0 A Power factor setting 1.0 1.0 Power factor (adjustable) 0.7 leading ... 0.7 lagging 0.7 leading ... 0.7 lagging EFFICIENCY @240 V @208 V @240 V @208 V Peak CEC efficiency 97.6 % 97.6 % 97.5 % 97.3 % GEC weighted efficiency 97.0 io 97.0 % 97.0 % 97.0 % MECHANICAL DATA Ambient temperature range 400C to +65°C Relative humidity range 4°i to 100% (condensing) Connector type (IQ7-60-2-US & IQ7PLUS 72-2-US) MC4 (or Amphenol H4 UTX with additional Q-DCC-S adapter) Connectortype (IQ7-60-B-US & IQ7PLUS-72-B-US) Friends PV2 (MC4 intermateable). Adaptors for modules with MC4 or UTX connectors: PV2 to MC4: order ECA-S20-S22 PV2 to UTX: order ECA-S20-S25 Dimensions (WxHxD) 212 mm x 175 mm x 30.2 mm (without bracket) Weight 1.08 kg (2.38 Ibs) Cooling Natural convection - No fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double -insulated, corrosion resistant polymeric enclosure Environmental category / UV exposure rating NEMA Type 6 / outdoor FEATURES Communication Power Line Communication (PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options. Both options require installation of an Enphase IQ Envoy. Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load -break disconnect required by NEC 690. Compliance CA Rule 21 (UL 1741-SA) UL 62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO. 107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC-2014 and NEC-2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according manufacturer's instructions. 1. No enforced DC/AC ratio. Seethe compatibility calculator at https:/Ienphase com/en-us/support/module-com ati_v.. 2. Nominal voltage range can be extended beyond nominal if required by the utility. 3. Limits may vary. Refer to local requirements to define the number of microinverters per branch in your area. To learn more about Enphase offerings, visit enphase.com u EN PHAS E. 2018 Enphase Energy. All rights reserved. All trademarks or brands used are the property of Enphase Energy, Inc. 2018-05-24 Cut Sheet - Rock4t7-4..0-Coupling 1. Installation to be completed in accordance with manufacturer's written specifications and installation instructions, 2. See spec sheet or contact manufacturer for detailed material, finishes, and configuration options. 3. Contact manufacturer for detailed layout. 4. Do not scale drawings. 5. Subject to change without notice. 3.17in 80.54mml 7.00in 7 -177.80mml i 2.02in 51.38mml, 32mm L - a__ 2.14in 54.37mm 35mm 2.34in 59.36mm Z — 40mm ii.PINE SN,s,v *EcoFas ten Solar; 4741 W Polk Stree Ste. 4VYYVUAjPhoenix, AZ 85043 Toll Free Phone 1.888-766.4273 Toll Free Phone 1.877.859.3947 `Material: See Spec SheetTollFreeFax1.888.766.9994 Toll Free Fax 1.888.766.9994 1 Scale: 1:4 6/28/2017 ASG: - EFS: x Cut Sheet - Rock-It-4:0-Hybrid Coupling 1. Installation to be completed in accordance with manufacturer's written specifications and installation instructions. 2. See spec sheet or contact manufacturer for detailed material, finishes, and configuration options. 3. Contact manufacturer. for detailed layout. 4. Do not scale drawings. 5. Subject to change without notice. 3.16in 80.29mm] 7.00in 177.80mm] [- 2.02in 51.38mm] _ 32mm 2.14in 54.37mm] a:;_ 35mm tNXG1UARDT1*EcoFastent.E 1a,. Toll Free Phone 1.888.766.4273 ! Toll Free Phone 1.877.859.3947 Toll Free Fax 1.888.766.9994 Toll Free Fax 1.888.766.9994 i 5.00in [ 127mm] i __ 2.34in d 59.36mm] 40mm 4741 W Polk Street Ste. 4 Phoenix, AZ 85043 Material: See Spec Sheet Scale; 1:1 6/28/2017 AS - EFS: x K-IT 5Y5 I EM`4.0 RAIL -FREE RACKING UTILIzes ECOFasTen sOLars PaTenTeD TecHnOLOG,J A Q> EcoFasten Solar A o EcoFasten Solae d Committed to the connection Document Date: 9.8.2017 Contents Pg. 1................................................................................................................................................... Assets of Design Features System Components Pg. 2............................................................................................................................. Rock -It 4.0 Mount Assembly Rock -It 4.0 Coupling Assembly Pg. 3........................................................................................................... Rock -It 4.0 Hybrid Mount Assembly Rock -It Clip SS Assembly Rock -It Clip 2.0 Assembly Pg. 4......................................................................................................................................................... Array Layout GreenFasten Flashing Install Pg. 5................................................................................................................................... Rock -It System 4.0 Install Pg. 6................................................................................................................................................ Ground Lug Install Pg. 7.......................................................................................................................................... Rock -It Clip SS Install Rock -It Clip 2.0 Install Pg. 8 -12............................................................................................................................. Standoff Spacing Tables Snow Load 0-20 psf Snow Load 21-30 psf Snow Load 31-40 psf Snow Load 41-50 psf Snow Load 51-60 psf Pg. 13................................................................................................................................... Grounding Information Bonding Assembly and Bonding Path Pg. 14................................................................................................................ Thermal Expansion and Bonding Bracket Spacing Staggered Layout Cantilever Pg. 15-16................................................................................................................................... System Specifications Evaluated, Compatible Modules ROCK -IT SY STeM 4.0 Designed with the installer In mind. EcoFasten Solar specializes in solar roof attachments that are fast and easy to install, straightforward, secure and cost-effective. EcoFasten offers a wide variety of standard products as well as custom solutions, for a one -stop source for all of your rooftop anchoring needs. Products are rigorously tested and approved above and beyond industry standards in-house and by third party agencies. EcoFasten's patented conical sealing system has been in service in the snow guard and solar industries for two decades. FeaTures New and improved design Fastest, easiest to level system on the market Integrated electrical bonding SIMPLE- only 4 components North -South adjustability Only one tool required (1/2"deep well socket) Vertical adjustment of 3'-4" SYSTem comPonenTS* - reouireD pip' c r y ROCK -IT SLIDe ROCK -IT 4.0 ROCK -IT 4.0 COUPLInG 4' For comp sHinGLe MounT 8t LoaD BearinG FOOT8" For TiLe SYSTem comPonenTs* - OPTIonaL Jworpl'44 ROCK -IT CLIP SS ReFer TO PG, 6) c ROCK -IT 4.0 H=JBrID mounT ReFer TO PG. 5) ROCK -IT CLIP 20 ReFer TO PG. 6) ROCK -IT 4.0 Array SKIrT a D EcoFasten Solaro v EcoFasten Solar products are protected by the following US. Patents: 8,151,522 8,153,700 8,181,398 8.166,713 8,146,299 ROCK -IT 4.0 8,209,914 8,245,454 8,272,174 8,225557 9,010,038 Array SKIrT 9,134,040 9,175,478 9,212,833 Er1D Caps eno caps come pre-InSTaueo on EasT eno of SKlrr secTions) Components for use with 32mm modules are available as special order, Components for use with 32mm modules are labeled as such on system packaging. Please refer to evaluated, compatible modules grid on page 15 to identify system compatible 32mm modules. www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 ROC1<-IT 4.O MOI.. nT ASSemBLY NOTe: ITems 1-7 SHIP assemBLea 1 5/16"-18 x 1.75" Hex Serrated Flange Bolt 300 Series SS 2 Rock -It 4.0 Mid -Clamp 6000 Series AL 3 Rock -It 4.0 Shelf 6000 Series AL 4 Flange Level Nut 300 Series SS 5 Rock -It 4.0 Te Plate 6000 Series AL 6 Rock -It Pedestal 6000 Series AL 7 5/16"-18 x 3/8" Hex Serrated Flange Bolt 300 Series SS 8 3/8" ID Star Washer 300 Series SS 9 3/8"-16 x 3" Hex Tap Bolt 300 Series SS r ROCK -IT SLIDes are accePTaBLe BraCKeTS For Use WITH ROCK -IT 4.0 (SOLD separaTeLY) ROCK -IT 4.0 COUPLING aSSeMBLY NOTe: ITems 1-3 SHIP assemBLeD 1 5/16"-18 x 1.75" Hex Serrated Flange Bolt 300 Series SS fl 2 Rock -It 4.0 Coupling Mid -Clamp 6000 Series AL J 3 Rock -It 4.0 Coupling Shelf 6000 Series AL1 4 Rock -It Load Bearing Foot Clip 5 Rock -It Load Bearing Foot Base f www.ecofastensolar.com info@ecofastensolarcom 877-859-3947 2 ROCK -IT 4.0 HYB.RID MounT ASSeMBL9 NOTe: ITemS 1-lo SHIP assemBL_eD C) moo_ ROCK -IT CLIP SS ASSeMBLJ- NOT& I-cros 1 3 SHIP aSSemBLCD 1 Stainless Steel Carriage Bolt - .313-18X.75 2 Rock -It Clip SS 3 Stainless Steel Flange nut .313-18 M 1 Rock -It 4.0 Shelf 6000 Series AL 2 Rock -It 4.0 Coupling Mid -Clamp 6000 Series AL 3 Rock -It 4.0 Coupling Tie Plate6000 Series AL 4 Flange Level Nut 300 Series SS 5 Rock -It Pedestal 6000 Series AL 6 Rock -It Slide 6000 Series AL 7 3/8"-16 x 3" Hex Tap Bolt 300 Series SS 8 3/8" ID Star Washer 300 Series S 9 5/16"-18 x 3/8" Hex Serrated Flange Bolt 300 Series SS 10 5/16"-18 x 1.5"Hex Serrated Flange Bolt 300 Series SS ROCK -IT CLIP 2.0 ASSemBLY Nore: ITems 1-3 SHIP assemBLeD 1 Rock -It Clip 2.0 2 Stainless Steel Flange nut .313-18 3 Bolt .3125-18xl xl -S ems. www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 3 Array LaYouT Find the required structural attachment points. Mark these using a vertical (N-S) chalk line on the center of the rafters. Spacing may vary depending upon project specific structural requirements; i.e. high snow and wind load areas may require lesser bracket spacing in the E-W axis vs. the maximum spacing. Max spacing is 48"for portrait orientation and 72"for landscape orientation. Consult project layout diagram for project specific bracket spacing on the roof. Install Rock -It Mounts to predetermined mount spacing. The Rock -It Array Skirt sections are the width of a typical 60 cell module — use the Rock -It Array Skirt as a guide to lay out module placement. Note: The distance between the rows of mounts is calculated by the module dimension N-S plus 1 3/8" 35mm). Lag screw should be installed as close to center of exposed shingle as possible. The minimum distance between the lag screw and the edge of the shingle is 1 /2". GreenFaSTen` FLASH nG InSTaLL vertical lines to mark the installation position for each GreenFasten flashing. 2 Drill a pilot hole (1/4" diameter) for the lag bolt. Backfill with sealant EcoFasten Solar recommends an EPDM mastic. 3 Insert the flashing so the top part is under the next row of shingles and pushed far enough up slope to prevent water infiltration through vertical joint in shingles. The leading edge of flashing must butt against upper row of nails to prevent turning when torqued. 4 Line up pilot hole with GreenFasten flashing hole, Insert the lag bolt through the EPDM bonded washer, the Rock -It slide, the gasketed hole in the flashing and into the rafter. Torque: The range is between 100-140 torque inch -pounds depending on the type of wood and time of year. The visual indicator for proper torque is when the EPDM on the underside of the bonded washer begins to push out the sides as the washer compresses. If using an impact wrench to install the fasteners be careful not to over torque the fastener. You may need to stop and use a ratchet to finish the install. The Engineer of Record shall check capacity of rafter to support lag screw loading. www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 4 ROCK -IT SYSTeM 4.O inSTaLL I Install EcoFasten Solar Flashing with Rock -It Mounts Follow EcoFasten Solar Install Irntructions for flashing and bracket Install (GreenFasten shown above). Optimum vertical distance between lag boltsIs 1 3/8•plus module dimension. Set mounts on eave most row so that the Rock -It Pedestal Is on the South end of Rock R Slide Set mounts on all upper rows so that the RockAt Pedestal Is on the North end of Rode -It Slide. 2 Install Rock -It Array Skirt onto Eave MountsSlideRock -It Array Skirt Into front channel on Rock -It Shelf. Array Skin End Caps are pre -Installed on the East end of each skirt section, and are used to couple the skirt sections where needed (see Fig. A). Tighten Mid -Clamp bolt, damping Rock -It Array Skirt to mount. Torque to 200in4bs.(1301nAbs.when installing with 32mm modules). 3/ Install Rock -It Couplings (when joining 4 panels with a Coupling, the use of a load bearing foot Is required) 4 Prior to mounting on the roof, snap Load Bearing Foot Into the bottom ofRockAt Coupling If required. Each Load Bearing Foot Is set to same height as the Rock-k Mounts - adjust accordingly) On eave row only, slide Rock -It Array Skirt onto Rock -It Coupling Shelf. Torque to specified value. NOTE! If a coupling lands on a rafter, the Hybrid Mount• should be used in place of the Rock It Coupling (refer to image 3a). Hybrid Mount can be made In the field by assembling a coupling to a mount pedestal, or by purchasing separately. Align and Straighten First Row of the Rock -It System with Rock -It Array Skirt5UseNorth -South adjustment ofthe Rockat Pedestal to straighten Rockat Array Skirt and align module with Array Skirt. Torque screw on sideof Rock -It Pedestal to 150 In-lbs to secure It to the Rodrtt Slide. Adjust Flange Level Nut to level the system (optional - can be leveled during or after Installation). 9 Install 1st Row of PV Modules6_ 7 Slide upslope Rock -It Mounts down to engage top offirst module. Install Rock -It Couplings on the upslope side of 1st row of panels. Torque 2nd row ofMkt{lamps on Rock -It Mounts and Rode -ItCouplings to specified value. Install balance of PV modules, ensuring that the Rock -itPedestals are In the appropriate position, then torque Mid -Clamps to secure modules. 10 Level the Rock -It SystemWhenassemblyiscomplete, level the entire system by adjusting Flange Level Nuts (Flange Level Nuts have notorque value). Height between roof surface and underside of modules should be Yor less, when installed with Type 2 modules. INSTALLATION NOTE: Modules should be installed so that the Junction box is installed upslope, away from the leading edge of the array. www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 GrounDInG LUG InSTaLL a Necessary Components: One ofthe following ground lugs (or any UL 2703 compliant ground lug): Burndy CL50-1TN Ground Lug (UL 2703 - E351343 / UL 467 - E9999) ILSCO SGB-4 Ground Lug (UL 2703 - E354420 / UL 467 - E34440) ILSCO GBL-4DBT (UL 2703 - E354420 / UL 467 - E34440) ILSCO GBL-4DBTH (UL 2703 - E354420 / UL 467 - E34440) ILSCO GBL-4SS (UL 2703 - E354420 / UL 467 - E34440) Note: Drill and deburr hole in Ground Lug prior to installation 14 AWG - 4 AWG Copper Ground Wire* Torque Values: 8-32 x 0.5" Serrated Flange Head Bolt (300 Series SS) 14-10 AWG= 20 in-Ibs. 8-32 Serrated Flange Nut (300 Series SS) 8 AWG= 25 in-Ibs. 11 /32" and 1 /4" wrenches or ratchets/sockets 6-4 AWG= 35 in-Ibs. Insert the flange bolt into the module ground hole. Place Star Washer over bolt. Place ground lug over the bolt and Star Washer, and turn to desired orientation. 2 Install Flange Nut. 3 Tighten Flange Nut/Bolt. 4 Place wire in Ground Lug channel and tighten setscrew to complete assembly. Wire should be sized in accordance with the National Electrical Code, NFPA 70, Section 690.45, and a minimum of 1/4"clearance required between bare copper wire and aluminum. FI il Drill hole per grounding lug manufacturers specifications in the upslope part of Rock -It Coupling for attaching grounding lug. Note: Deburr hole in Ground Lug and Rock -It Coupling prior to installation. www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 6 ROCK -IT CLIP SS inSTaLL NAcLq i*Mourdara)LocatLms Y Mn. from 1"nef.ar. Roy 1 Locate all parts Locate the Rock -It Clip SS, micro-inverter/power optimizer, and the section of the module frame in which you will be mounting the micro-Inverter/power optimizer. See fig. A for acceptable mounting locations. Install the Rock -It Clip SS Slide the Rock -It Clip SS onto the lip of the module frame. Slide the micro-inverter/power optimizer into the opposite lip of the Rock -It Clip SS. Tighten the bolt to 150 in -lb minumum to clamp the Rock -It Clip SS to the module frame and the micro-inverter/power optimizer to the Rock -It Clip SS. Ensure that the lip on the clip is tight against the frame and that the micro-inverter/power optimizer flange is tight against the clip flange to avoid rotation during tightening. ROCK -IT CLIP 2.O inSTaLL nverter Flange Rock -It -Clip 2.0 1 Locate all parts Locate the Rock -It Clip 2.0, micro-inverter/power optimizer, and the section of the module frame in which youwillbemountingthemicro-Inverter/power optimizer. Install the Rock -It Clip 2.0 (See below detail) Slide the Rock -It Clip 2.0 onto the lip of the micro-inverter/power optimizer. Slide the micro-inverter/power optimizer into the opposite lip of the module frame. Tighten the bolt to 150 in -lb to clamp the Rock -It Clip 2.0 to the module frame and the micro-inverter/power optimizer to the Rock -It Clip 2.0. Ensure that the lip on the clip is tight against the frame and that the micro-inverter/power optimizer flange is tight against the clip flange to avoid rotation during tightening. www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 Snow Load 0-20 psf Modules in Landscape Wind Speed Exposure Category 2:12 < Root Pitch < 6:12 7:12 < Roof Pitch < 12:12 ASCE 7-05 ASCE 7-10 Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 B 159 93 59 85 mph 110 mph C 114 67 42 88 88 91D965635 74 74 B 146 85 54 98 80 8090mph115mphC1046138 D 88 51 32 83 68 68 B 123 72 45 95 95 83100mph125mphC885132 68 68 D 74 43 27 70 57 57 B 98 57 36 93 76 76 110 mph 140 mph C 70 41 26 66 54 54 D 59 34 22 56 46 46 120 mph 150 mph B C 85 61 50 36 31 22 81 58 66 47 66 47 D 51 30 19 49 40 40 Notes: Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2.) Maximum allowed spacing approved by EcoFasten Solar is 72" 3.) Maximum allowed standoff capcity = 547# (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity 5.) Values based on a maximum module width of 40" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site specific engineering is included in this table Snow Load 0-20 psf Wind Speed Exposure Category 2:12 < Roof Pitch 6:12 1 7:12 < Roof Pitch 12:12 ASCE 7-05 ASCE 7-10 Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 B 91 53 33 61 50 5085mph110mphC653824 D 55 32 20 52 4.2 42 B 83 49 30 56 46 4690mph115mphC593522 D 50 29 18 47 38 38 B 70 41 26 54 54 47100mph125mphC502918 39 39 D 42 26 15 40 32 32 B 56 33 20 53 43 43 110 mph 140 mph C 40 23 14 38 31 31 D 34 19 12 32 26 26 B 49 28 18 46 37 37 120 mph 150 mph C 35 20 12 33 27 27 D 29 17 10 28 22 22 NOW5. Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.) Maximum allowed spacing approved by EcoFasten Solar is 48" 3.) Maximum allowed standoff capcity = 547# (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity 5.) Values based on a maximum module length of 70" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site specific engineering is included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 8 Snow Load 21-30 psf Modules In Landscape Wind Speed Exposure Cate or 2:12 Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12 ASCE 7-05 ASCE 7-10 Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 B 93 59 85 mph 110 mph C 67 42 D 96 56 35 B 85 54 90 mph 115 mph C 104 61 38 D 88 51 32 B 72 45 a8100mph125mphC 51 32 D 74 43 27 57 57 B 98 57 36 110 mph 140 mph C 70 41 26 66 54 54 D 59 34 22 56 46 46 120 mph 150 mph B C 85 61 50 36 31 66 66 22 58 47 47 D 51 30 19 49 40 40 Notes: SpaGng Governed by Snow Load 1.) Values In above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2.) Maximum allowed spacing approved by EcoFasten Solar is 72" 3.) Maximum allowed standoff cepcity - 547# (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity 5.) Values based on a maximum module width of 40" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site specific engineering is Included In this table Snow Load 21-30 psf 1VVIeb. Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.) Maximum allowed spacing approved by EcoFasten Solar is 48" 3.) Maximum allowed standoff capclty = 547# (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity 5.) Values based on a maximum module length of 70" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site speck engineering is included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 Snow Load 31-40 psf Modules in Landscape Wind Speed Exposure 2:12 < Roof Pitch 6:12 L 7:12 < Roof Pitch 12:12 ASCE 7-05 ASCE 7-10 Cate o Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 B 59 85 mph 110 mph C 67 42 D 56 35 B 54 90 mph 115 mph C 61 38 D 51 32 B 45 100 mph 125 mph C 51 32 D 74 43 27 B 57 36 110 mph 140 mph C 70 41 26 D 59 34 22 46 46 B 50 31 120 mph 150 mph C 61 36 22 47 47 D 51 30 19 49 40 40 Notes: Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EeoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2_) Maximum allowed spacing approved by EeoFasten Solar is 72" 3.) Maximum allowed standoff capcity = 547# (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity 5.) Values based on a maximum module width of 40" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site specific engineering is included in this table Snow Load 31-40 psf Wind Speed Exposure142,12 Category ne 1 Roof Pitch Zone 2 6:12 7:12 < Roof Pitch 12:12 SCE 7-05 ASCE 7 10 Zone 3 Zone 1 Zone 2 Zone 3 B 33 85 mph 110 mph C 3S' 24 D 32 B 49 30 90 mph 115 mph C 35 22 D 29 18 B 41 2 100 mph 125 mph C 29 D 42 20 B 33 20 110 mph 140 ruph C 0 23 14 D 34 19 12 28 6 B 49 28 18 120 mph 150 mph C 35 20 12 102FM2227727D291710 Notes: Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EeoFasten Solar standofl 2.) Maximum allowed spacing approved by EeoFasten Solar Is 48" 3.) Maximurr allowed standoff capcity = 547# (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity 5.) Values based on a maximum module length of 70" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site specific engineering is included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 10 Snow Load 41-50 psf Modules in Landscape Wind Speed Exposure 2:12 < Roof Pitch Cate o Zone 1 Zone 2 6:12 7:12 < Roof Pitch < 12:12 ASCE 7-05 ASCE 7-10 Zone 3 Zone 1 Zone 2 Zone 3 B 59 85 mph 110 mph C 42 D 56 35 B 54 90 mph 115 mph C 61 38 D 51 32 B 45 100 mph 125 mph C 51 32 D 43 27 B 57 36 110 mph 140 mph C 41 26 D 59 34 22 46 46 B 50 31 120 mph 150 mph C 61 36 22 47 47 D 51 30 19 49 40 40 Notes: Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2.) Maximum allowed spacing approved by EcoFasten Solar Is 72" 3.) Maximum allowed standoff capcity = 547# (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity 5.) Values based on a maximum module width of 40" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site specific engineering is included in this table Snow Load 41-50 psf Notes: spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing In Inches for pullout forces only on EcoFasten Solar standoff 2.) Maximum allowed spacing approved by EcoFasten Solar is 48" 3.) Maximum allowed standoff capcity = 547# (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity 5.) Values based on a maximum module length of 70" 6.) Based on Risk Category II (ASCE 7-1 D) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site speck engineering is included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 11 Snow Load 51-60 psf Modules in Landscape Wind Speed Exposure 2:12 < Roof Pitch Cate o Zone 1 Zone 2 6:12 7:12 < Roof Pitch < 12:12 ASCE 7-05 ASCE 7-10 Zone 3 Zone 1 Zone 2 Zone 3 B 85 mph 110 mph C 42 D 35 B 54 90 mph 115 mph C 38 D 51 32 B 45 100 mph 125 mph C 51 32 D 43 27 B 36 110 mph 140 mph C 41 26 D 34 22 B 50 31 120 mph 150 mph C 36 22 D 51 30 19 Notes: Spacing Govemed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2.) Maximum allowed spacing approved by EcoFasten Solar Is 72" 3.) Maximum allowed standoff capcity - 547# (per testing results) 4.) Includes additional factor of safety of 1.6 for lag pullout capacity 5.) Values based on a maximum module width of 40" 6.) Based on Risk Category 11 (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site speclfic engineering is included in this table Snow Load 51-60 psf Notes: Spacing Govemed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.) Maximum allowed spacing approved by Ecol'asten Solar is 48" 3.) Maximum allowed standoff capcity = 547# (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity 5.) Values based on a maximum module length of 70" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site specific engineering is included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 12 GrounDnG InFormaTion The rail -free Rock -It System maybe used to mount and ground PV modules that comply with UL 1703, only when that specific module has been evaluated for mounting and grounding, in compliance with the included installation instructions. Note: Grounding lug must be visible to inspectors from the entire perimeter of the PV array. Multiple Use Grounding Pins Grounding pins within the Mid -Clamp are multiple use bonding/grounding devices, Modules will need to be adjusted ifthe Mid -Clamps are loosened to ensure there is "new"metal to pierce into upon retightening. Grounding Method Rock -It 4.0 Mount bonds N-5 rows of modules Rock -It 4.0 Coupling bonds E-W rows of modules Rock -It Array Skirt bonds E-W along the entire array when installed One Burndy CL50-ITN ground lug is required per PV array, limited to 300 modules placed in either portrait or landscapeorientation. BonDInG AssemBLY anD BonDinG PaTH Bond Path Grounaing Lug Eq=nl GmMmgConductor (EGC} gmerary to earth QnuW Rock-tt coupling Roth It Mount Rock -It Array Skirt Bond Path Grounding Lug Equlpmerx Groundiris Conrlurwr;EfiQ gnkSaNy W e.or gnxlra Rock•k Couping Rock It Mount Rak-1: Array Skirt Integrated Bonding Bond Path Grounding Lug Equppmmrnt Groulo rtgConduCttt (EGQ genr lry la -,I,, grourW r Rock -It Cou®Ilrg 1 Rock -I: Mour2 Nock -It Array Skirt www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 13 THermaL ExPansion anD BonDInG A thermal expansion gap Is required per each continuous 40' length of modules. Omit a coupling and leave a 2e gap in the Rock -It Array Skirt and also between the modules at that point. BracKeT sPacinG Portrait Orientation Maximum east/west bracket spacing is 48"OC. Bond Path Grounding Lug Equipment GroundingConouctortEGC)- gr.nerally to nnthgroord Rock It Coupimg Rock tt Mount Rock It Array Skirt Landscape Orientation T Max east/west bracket spacing is 72"OC. 32mm modules: Max east/west bracket spacing is 48" OC. Spacing may vary depending upon project specific structural requirements; i.e. high snow and wind load areas may require lesser spacing E-W than the maximum. sTaGGereD LAYOUT F canTiLever anD oFFseT Staggered Mounting Points Rock -It Mount _Rock -It Coupling Cantilever: Maximum cantilever is 1/3 bracket spacing. For portrait orientation installations, check layout prior to installing. The array layout instructions in this installation manual offer a general overview of layout. Periodically, due to a variety of Offset: offset from all roof edges depends on wind speed, snow factors (roof obstacles, shading, etc) other layouts are required. loads, local fire and building codes per location — _I www.ecofastensolarcom info@ecofastensolarcom 877-859-3947 14 4 1 ROCK -IT SY STeM 4.0 sysTem SPeclFicaTlonS Max No. of Panels 300 Modules per ground lug Materials 300 SeriesStainless, 6000 Series Aluminum Max System Voltage 100DVDC Coating Black Andodization/Mill Finish Class A Fire Rating With UL1703Type 1 Rated Lug Specifications Bumdy CLSO-iTN Ground Lug Modules, see note below. UL Listing AImER E9999) Leveling Range 3-4" Ground Wire 14 AWG- 4 AWG Copper Per above Lug spec Ground Wire Rock -It Slide Comp Range 3' Max Module Size 64.9611650mm) x Rock -It SlideTile 7' 39A5"(992mm) x 2"(50mm) Min/Max Roof Slope 1/2:12/12:12 Max Downforce/Uplift Rating 45 PSF Max Anchor Spacing (35mm/4omm) 72" Rock -It Mount Load Rating 547lbs with Single 5/16'Lag 3.0 Max Anchor Spacing (32mm) 4W Safety Factor Skirt Box QTY 6 units Slide Fastening Hole 5/16"diameter Mount Box CITY 12 units Module Cantilever Maximum cantilever is 1/3 Rock -It Slide Box CITY 50 units bracket spacing Coupling Box QTY 12 units Warranty 20Year Material and Workman- ship Codes: National Electric Code, ANSI/NFPA 70, NEC 250, NEC 690, IRC, IBC Standards: UL 2703: First Edition, UL 1703 p«l YDDa.iOfYiaiiutrnSOIU" MoawT4121 .M MPG IDCODEGST-Q2•M 6 CfMPoRa6TOUl17M CONFORMS EOutam w.ma. ObMM QlwiIl4ATl" I„IOw,MIO/JIMiY,LI ram- Sf00Mtmg t.fliK,CR[YOutR.R The EcoFasten Solar Rock -It System is a rooftop PV racking system consisting of 6000 Series Aluminum and 300 Series Stainless Steel components. The Rock -It System includes the rack components but does not include the PV panels, Inverters or electrical components. The PV modules to be used with Rock -It shall be certified under UL 1703. The system shall be used on steep slope roofs mounted over a Class A fire rated roofing material and attached to the roof structure using 5/16" diameter, minimum 4' long 300 series Stainless Steel lag bolts with minimum thread embedment depth of 2 1/2" into the roof structure. Periodic re -inspection for loose components The system is subject to re -inspection as required by the PV module manufacturer or by the Authority Having Jurisdiction. Re -inspection, as required, should include evaluation of any loose components or loose fasteners. All loose components and fasteners should be secured In accordance with these instructions. The system should also be evaluated for any evidence of corrosion. Any corrosion should be removed. Any affected part should be cleaned or replaced in accordance with these instructions. www.ecofastensolar.com info@ecofastensolar.com v11AEC0ka ;Solar 877-859-3947 15 FeaTures New and improved design • North -South adjustabllityFastest, easiest to level system on the market • Only one tool required (1/2"deep well socket) Integrated electrical bonding 0 Vertical adjustment of 3"4• SIMPLE- only 4 components EvaWaTeo, comPaTiBLe MODuLes MOduleManJfacturer Model Type Cx"used ta IndMatevadabletest) ModuleDMen50ns(mm) ModuleDimen9onspn) Downward Pressure DesipltLoad(psf) U wardPressure Design Load ( psfl Downalo Desl Load(psf) Mexhnum0amp Spadng(In) TnnaSolar TSM- xx)r-MS.08 1640x992x40 64.95"xa9A5"xLS7" 33.3 93.9 20 72 Canadian Solar C56P-xxxM 1638x922x40 64.48"338.66"xL57" 33.3 33.3 20 72 Canadian Solar CSSP-x"P 1638 x 982 x 40 64.511x3a.7'Sd.57' 33.3 33.3 20 72 Jinko Solar XMzzxP-60 1650 z 992 x 40 64.96"x99.05"d.57" 30 30 20 72 Jlnko Solar JKMxWA-60 1650 x 992 x 40 64.96"x39.05"x1.57" 30 30 20 73 Anko Solar JKMmuPP-GO 1650 x 992 x 40 64.96`49.05' Id.57" 30 30 20 72 JmkoSolar JDAMWM- 60 1650x992x40 64.96"x99A5"xL57' 30 30 20 72 VingliSoler YL2W- 29b 1650 x 990 x40 64.96"338.97"&57' 30 30 20 72 LG Eloetmnics LG300rdC.83 1640 x 1000 K35 64.57"x39.37'x1.38" 30 30 20 72 LG Ekatronks LG300N1K-G4 164D 11000 K 40 64.57"x39.37'Id.57" 30 30 20 72 AxltecSolar AGxxxMA56- 6OS 1640x992 x40 645"x39.06'Sd.38" 30 30 20 48 REOOM RWI. 2xx-6MB 2640x992x35 64.56"49.05"x1.37" 30 30 20 72 Silfab SlA2xxP 1650 x 990 x38 64.96"138.97 &49" 30 30 20 72 Solaria PoweW)= R-OX 1621 x 1056 x 40 63.89"x41.53"A.57" 30 30 20 48 Hanwha -Q Oak* Q,PRO G4 2xx 267D x 1000 x 3265.754'49.371Id.25" 30 30 20 48 Han whit- Q 0elk' 0,PR0 G4 2xx 267D x 1000 x 9265.75"x39.37'x1.25" 30 30 20 72 Sunpreme GxB- 3xxT 1670x997x40 65.751109.25'9d.57" 30 90 20 48 REC REC- xxx-6MB 1675x997x38 65.94"x39.25'k1.5" 20 20 20 72 WC REC- UX.6ma 1675x997x98 65.9009.25'k1.5' 90 30 20 48 SolarWorld SW xxx Mono Black 1675x 961 x33 65.95"x37.8"x1.30" 20 20 20 72 SolarWodd SW xxx Mono Black 1675 x 962 x 33 65.95"07.9114.30" 30 30 20 46 Hanwhe 0- Cells 32mm modules to be used with special order Rock -It System components. Call for details. A 3; 1,- EcoF,'1,Sten Solar www.ecofastensolar. com info@ecofastensolar.com 877-859-3947 16 1. Installation to be completed in accordance with manufacturer's written specifications and installation instructions. 2. See spec sheet or contact manufacturer for detailed material, finishes, and configuration options. 3. Contact manufacturer for detailed layout. 4. Do not scale drawings. 5. Subject to change without,notice. 2.0 r L51.3 3.17in 80.54mm] 32mm 2.50in 63.50mm j [ i 2.14ir 54.37rr 35mm 2.3- 59.36 40m m ALpm Eco ten Solari°; 4741 W Polk Street Ste. 4SUASIPhoenix, AZ 85043 Toll Free Phone 1.888.766.4273 Toll Free Phone 1.877.859.3947 Material: See Spec SheetTollFreeFax1.888.766.9994 i Toll Free Fax 1.888.766.9994 Scale: 1:2 6/28/2017 ASG: - EFS: x 4 Data Sheet Enphase Networking Enphase AC Combiner Box The Enphase AC Combiner Box' with Enphase Envoy-S' consolidates interconnection equipment into a single enclosure and streamlines PV installations by providing a consistent, pre -wired solution for residential applications. Smart Includes Envoy-S for communication and control Flexible networking supports Wi-Fi, i Ethernet, or cellular Simple Three pre -installed 20 A / 240 VAC circuit breakers Pre -configured revenue -grade metering available I Reliable Durable NRTL-certified NEMA type 3R enclosure Five-year warranty LISTED To learn more about Enphase offerings, visit enphase.com ENPHASE Enphase AC Combiner Box MODEL NUMBERS XAM1-120-8 (880-00834) or AC Combiner with Enphase Envoy-S Metered- for integrated revenue grade PV productionXAM1-120 (880-00211) metering (ANSI C12.20 +/- 0.5%) and optional consumption monitoring (+/- 2.5%). ACCESSORIES (order separately) Enphase Mobile Connect- Plug and play industrial grade cellular modem with five-year data plan for systems up to 60CELLMODEM-01 (3G) or microinverters. (Available in the US, Canada, Mexico, Puerto Rico, and the US Virgin Islands, CELLMODEM-03 (413) where there Is adequate cellular service in the installation area.) Consumption Monitoring CT Split core current transformers enable whole home consumption metering (+/- 2.5%). CT•200-SPLIT ELECTRICAL SPECIFICATIONS Rating Contlnuous duty Solar branch circuit breakers Three 2-pole 20 A / 240 VAC DIN rail -mounted breakers Maximum system voltage 240 VAC Rated output current 48 A Rated Input current, each input 16 A Maximum fuse/circuit breaker rating (output) 60 A Production Metering CT 200 A solid core pre -installed on solar busbar and wired to Envoy-S MECHANICAL DATA Dimensions (WxHxD) Weight Ambient temperature range Cooling Enclosure environmental rating Altitude Wire size: Model XAMI-120-B Model XAMI.120 38.0 x 38.7 x 20.3 cm (15.0' x 15.3'x 8.0') 5.1 kg (11.2 Ibs) 400 C to +460 C (-400 to 1150 F) Vented, natural convection, plus heat shield Outdoor, NRTL-certified, NEMA type 3R, polycarbonate construction To 2000 meters (6,560 feet) Follow local code requirements for conductor sizing. 14 to 6 AWG copper conductors for branch inputs. 14 to 4 AWG copper conductors for combined output. 12 to 6 AWG copper conductors for branch inputs. 12 to 4 AWG copper conductors for combined output. INTERNET CONNECTION OPTIONS Integrated Wi-Fi 802.11b/g/n Ethernet 802.3, Cat5E (or Cat 6) UTP Ethernet cable - (not included) Cellular Optional, CELLMODEM-01 (3G) or CELLMODEM-03 (413) - (not included) COMPLIANCE Compliance, Combiner Box Compliance, Envoy-S UL 1741 UL 916 CAN/CSA C22.2 No. 61010 1 47 CFR, Part 15, Class B, ICES CO3 IEC/EN 61010-1:2010, EN50065-1, EN61000-4-5, EN61000.6-1, EN61000-6-2 Metering: ANSI C12.20 accuracy class 0.5 To learn more about Enphase offerings, visit enphase.com C 2017 Enphase Ene-gy Al rights reser ved Ail trade ment are registered by their respective owner. n E N P H A S E0. 2017 14 r, SoIaDeek FED IN R=-MMRT COMSINOVENCLOSURE Basic Features e Stamped Seamless Construction 18 Gauge Galvanized Steel Powder Coated Surfaces e Flashes into the roof deck e 3 Roof deck knockouts .5", .7511, 1" e 5 Centering dimples for entry/exit fittings or conduit 2 Position Ground lug installed e Mounting Hardware Included w, k Fuse holders and terminal blocks added In the field must be UL listed or recognized and mast 600 VDC 30AMP 110C for fuse holden, 600V 50 AMP 90C for rail mounted termlmd blocks and 600 V 175 AMP 90C for Power Distribution Blocks. Use Copper Wire Conductors. SolaDeck Model SD o7s3 SolaDeck UL50 Type 311 Enclosures Available Models: Model SD 0783 - W fixed Din Rail) Model SD 0786 - (6' slotted Din Rai) SolaDeck UL 1741 Combiner/Enclosures Models SD 0783-41 and SD 078&41 are labeled and ETL listed UL STD 1741 according to the UL STD 1741 for photovoltaic combiner enclosures. Max Rated - 60OVDC, 120AMPS Model SD 0783-41 3' Fixed Din Rail fastened using Noriock System lypkal System Configuration 4- Din Ralf Mounted Fuse Holders 60OVDC 30AMP 1- Power Distribution Block 60OVDC 17SAMP 1- Bus Bar with UL lug Model SD 078641 6' Slotted Din Rail fastened using steel studs Typical System Conflguration 4- Din Rail Mounted Fuse Holders 60OVDC 30 AMP 4- Din Rail Mounted Terminal Blocks Bus Bars with UL lug Cover is trtinmed to avow conduit or fiWngs, base Is center dimpled for Btting locations. Model SD 0783-41. wired with Model SD 0786 41, wired with Din ReH mounted fuse holders, Din Rail mounted fuse holders, bus bar and power distribution terminal blocks and bus bars. block. RSTC Enterprises, Inc . 2219 Heirnstead Road • Eau Chare, WI 54703 For product information call 1(866) 367-7782