Loading...
5500 Plantation Lakes Cir - 99-000778 (1999) (Plantation Lakes Apts) (documents)j5 I Qcv ort SUBDIVISION: ZONE CONTRACTOR ADDRESS DATE - / 1 5 5 S e2 4 2?. JOB-L c.. nrnrl Ij PHONE #i vi 3 ff7D v LOCATION 19-0 a/Xtlq tt I OWNER a.-9 6-ew C A ADDRESS PHONE N PLUMBING CONTRACTOR ADDRESS PHONE A ELECTRICAL CONTRACTOR _F I` ADDRESS PHONE N MECHANICAL CONTRACTOR ADDRESS PHONE # MISCELLANEOUS CONTRACTOR ADDRESS SEPTIC TANK PERMIT NO. SOIL TEST REQUIREMENTS ( FINISHED FLOOR ELEVATION REQUIREMENTS ARCHITECTURAL APPROVAL DATE: PERMIT #f 9 014Joe & ct Co [=I rta&CLel COST $ LOT NO. BLOCK: SECTION: SQUARE FEET: /a `/g FEE $ MODEL: STATE NO, FEES FEE $ FEES OCCUPANCY CLASS: INSPECTIONS TYPE DATE OK REJECT BY FEE S ENERGY SECT. EPI: CERTIFICATE OF OCCUPANCY ISSUED N DATE: _ FINAL DATE CERTIFICATE OF OCCUPANCY / COMPLETION This is to certify that the building located at 5500 RI ANTATION TAXES CIR for which permit 9.8=40000778 has heretofore been issued on 2,in/A4 has been completed according to plans and specifications filed in the office ofthe Buildin Offici 1 pribr to the issuance of said building permit, to wit as complies with all the building, plumbing, ilectrfcal,% zoning and subdivision regulations ordinances of the City of Sanford and with the provisions of these regulations. STAFF APPROVAL Subdivision Regulations Apply: Yes No RATE BUILDING: AkoFIRE: j 7Cry' , Finaled / Inspected ZONING: Inspects v UTILITIES: Water gLinesIn lw Meter Set Reclaimed Water ENGINEERING: Drainage Maintenance Bond PUBLIC Street Name Signs Storm Sewer Street Work WORKS: Sewer Lines In Sewer Tap Street Paved Street Lights Driveway WATER -SEWER IMPACT FEES 01-APPLCTN FEE -BUILDING 5/05/99 10.00 01-FIRE IMPACT - NONRES 5/05/99 51.68 01-POLICE IMPACT - NONRES 5/05/99 329.56 9 OWNER BUILDING OFFICIAL /10ATE CERTIFICATE OF OCCUPANCY REQUEST FOR'FINAL INSPECTION NEW COMMERCIAL BUILDING*""""" DATE C+3-DO 70 ADDRESS CONTRACTOR COnS,N'• The Building department has prepared a C of O for the above location and is requesting final inspection by your department. After your inspect• - n, please sign off on the C.O. or submit an addend if it has been denied. Your prompt attenti ill be appreciated. Thank you. A Engineering Fire Dept Public Works Zoning Utilities/Cross Connection CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION NEW COMMERCIAL BUILDING******* DATE ADDRESS CONTRACTOR bC,,C- Con,S-11 q q --n 8 The Building department has prepared a C of O for the above location and is requesting final inspection by your department. After your inspection, please sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineering c1 Fire Dept Public q, Works ; Z. v Zoning9 Utilities/Cross Connection CERTIFICATE OF OCCUPANCY REQUEST FOR'FINAL INSPECTION NEW COMMERCIAL BUILDING******* DATE ADDRESS CONTRACTOR G CanS'• C, q --n Ve5 CIZ. The Building department has prepared a C of O for the above location and is requesting final inspection by your department. After your inspection, please sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineering Fire Dept Public Works Zoning Utilities/Cross Connectio v. 7./s...L. Cain. %" US I - i.i 1 ILIA iES T ... pv_2_se_To Iftititj Inspector INITIALS DATE Utility Inspector's Final Ft -FP Cien-rance - Water ---------- ------ -- FDEP Clearance - Sewer __________ __ ------- City Services Easements --------- ---------- Maintenance Bond (10% -1yd ______ _____________ Other-------------------- ------------------ vv9?,dk d- Sdwrue /V1rP19{7' N119 cl 4 a 9/B/DO 3°19 C)" f(,+1000 CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION NEW COMMERCIAL BUILDING******* DATE I LI ' CnADDRESS CONTRACTOR plc.+.1. The Building department has prepared a C of O for the above location and is requesting final inspection by your department. After your inspection, please sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. `, X'' Engineering Fire Dept Public Works Zoning Utilities/Cross Connection 01her----------------....---------------------- CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION NEW COMMERCIAL BUILDING******* DATE "I 3- ADDRESS CONTRACTOR The Building department has prepared a C of O for the above location and is requesting final inspection by your department. After your inspection, please sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineering Fire Dept--!!!!!L Public Works Zoning Utilities/Cross Connection y/vim CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION NEW COMMERCIAL BUILDING******* it DATE v ADDRESS CONTRACTOR c, V e5 02- q --n 8 The Building department has prepared a C of O for the above location and is requesting final inspection by your department. After your inspection, please sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineering Fire Dept Public Works Zoning Utilities/Cross Connection 31S oo) CITY OFFIO;WLECTRICAL APPLICATION PERMIT NO. —' DATE: " 14 --I"1 THE UNDERSIGNED HEREBY APPLIES FOR A PERMIT TO INSTALL THE FOLLOWING ELECTRICAL WORK: OWNER'S NAM ADDRESS OF JOB: ELECTRICAL Subject to rules and regulations of the city electrical code: Total J By signing this application I am stating I am in compliant vyith he City Electrical Code Applicant's Signature States License# DEVELOPMENT FEE WORKSHEET Project Name: CITY OF SANFORD UTILITY - ADMIN. P. O. BOX 1788 SANFORD, FL 32772-1788 PC l•7-7; o 9hf S P a ya7 s C 9e w91 t e : l0/2 S/j J' Owner/Contact Person: Phone: Address: P!/,.,719171-v 1RC1'f Type of Development: 1) RESIDENTIAL Type of Units (single family or multi -family): Total Number of Units: Type of Utility Connection individual connections or central water meter & common sewer tap): Water Meter Size (3/4", 111, 211, etc.): REMARKS: 2) NON-RESIDENTIAL Type of Units (commercial, industrial, etc.): Total Number of Buildings: Number of Fixture Units each building): Type of Utility Connection individual connections or central water meter & common sewer tap): Water Meter Size (3/4" 1", 2", etc.) REMARKS: C 9RGt 10'7iNJ jv,- s /Co2 A_#CH CONNECTION FEE CALCULATION: Coe Ivr}-rf. R i P ft 23So Z19-CAt C92 w9Jff Qvtc4:-r6 Name - Signature Date REVISED 12/23/97 CITY OF SANFORD, FLORIDA APPLICATION FOR BUILDING PERMIT PERMIT ADDRESS 5500 Plantation Lakes Circle PERMIT NUMBER -1 1 V Total Contract Price of Job Lb Total Sq. Ft. 1,498 _ Describe Work Detached Garage (6-Unit)- _ Type of Construction upP,e' Flood Prone (YES) (NO) X Number of Stories 1 Number of Dwellings Zoning PD _ Occupancy: Residential X Commercial Industrial LEGAL DESCRIPTION See Attached (please attach printout from Seminole County) _ TAX I.D. NUMBER 32-19-30-300-0110-0000 OWNER Altman Development Corporation PHONE NUMBER 561 9978661 _ ADDRESS 2201 Corporate Boulevard NW, Ste 200 _ CITY Boca Raton STATE FL ZIP 33431 TITLE HOLDER (IF OTHER THAN OWNER) Ira William Southward, Trustee ADDRESS c/o James A. Hattaway, Esq. P.O. Box 633 CITY Orlando STATE FL ZIP 32802 BONDING COMPANY ADDRESS CITY N/A STATE ZIP ARCHITECT Cline Davis Architects, P.A. ADDRESS 414 West Jones Street CITY Raleigh STATE NC ZIP 27603 MORTGAGE LENDER N/A ADDRESS CITY n STATE ZIP CONTRACTOR C- /jf'/j^ OI J . C PHONE NUMBER ADDRESS ST. LICENSE NUMBER CITY f STATE ZIP Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL, PLUMBING, MECHANICAL, SIGNS, POOLS, ETC. OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. A COPY OF THE RECORDED COPY OF THE NOTICE OF COMMENCEMENT WILL BE POSTED ON THE JOB SITE WITH PERMITS NO LATER THAN SEVEN (7) DAYS AFTER THE PERMIT HAS BEEN ISSUED. FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOU PAYING TWICE FOR THE IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. ACCEPT I THE G v d a+ u o N a o a0 C n. 3 0 i >• N I w O O 404) aJ N 0. o d >- Z G. EH kNCE OF PERMIT IS VERIFICATION THAT I WILL NOTIFY THE OWNER OF THE PROPERTY OF 4t* EMENTS OF FLORIDA LIEN LAW, FS713. rt P 0 ye O " SignOwner/Agent & Date Sig ure of Contractor & Date a '< y John R. Goodfellow ./'" •c z Type or Print Owner/Agent Name Type or rPriint Contra toi,'d Name c 3 Signature of N ary & Date Signature Official Seal) n ! DA u• .y Joellen Schafer n h • 7! ;1, n ; • i! My Con missoon CC76WW • : UT .. t - i. ; _,1 r q r" Expires September 8. 2002 n ^ " ' ' ' i r ' '. , ^ 'v 0 Application Approved BY: A Q , r Q Date: FEES: Building Jr'.(v Radon Police 32ct.J Fire 5_ o aOpen Space Road Impact Application ('_A,(1 : PERMIT VALIDATION: CHECK C.,SH DATE BY v ORIGINAL ( BUILDING) YELLOW (CUSTOMER) PINK (COUNTY TAX OFFICE) GOLD (CO. ADMIN) N THIS APPLICATION USED FOR WORK VALUED $2500.00 OR MORE LEGAL DESCRIPTION PLANTATION LAKES PHASE ONE DESCRIPTION THAT PART OF THE SOUTHEAST 1/4 OF SECTION 32. TOWNSHIP 19 SOUTH. RANGE 30 EAST, SEMINOLE COUNTY, FLORIDA, BEING DESCRIBED AS FOLLOWS. FOR A POINT OF. REFERENCE. COMMENCE AT THE SOUTHWEST CORNER OF SAID SOUTHEAST 1/4.- THENCE RUN N00-03-46-E ALONG THE WEST LINE OF THE WEST 1/2 OF SAID SOUTHEAST 1/4 FOR A DISTANCE OF 826.04 FEET TO THE POINT OF BEGINNING; THENCE CONTINUE NOO'03.'46'E ALONG SAID WEST LINE FOR A DISTANCE OF 1672.28 FEET TO THE SOUTHEASTERLY RIGHT OF WAY LINE OF RINEHART ROAD; THENCE RUN N69'12'120E ALONG SAID SOUTHEASTERLY RIGHT OF WAY LINE FOR A DISTANCE OF 400.27 FEET TO THE SOUTH RIGHT OF WAY LINE OF HUGHY STREET; THENCE RUN S89'45'490E ALONG SAID SOUTH RIGHT OF WAY LINE FOR A DISTANCE OF 265.76 FEET; THENCE RUN SOO'32'03'E FOR A DISTANCE OF 924.90 FEET; THENCE RUN S12WO3'E FOR A DISTANCE OF 440.00 FEET; THENCE RUN S89'45'490E FOR A DISTANCE OF 566.52 FEET TO THE EAST LINE OF SAID WEST 1/2 OF THE SOUTHEAST 1/4; THENCE RUN SOO'32'03'E ALONG SAID EAST LINE FOR A DISTANCE OF 133.14 FEET; THENCE RUN S76'45156W FOR A DISTANCE OF 735.42 FEET; THENCE RUN Stt'42'43'W FOR A DISTANCE OF 272.03 FEET. THENCE RUN N89'45'44'W FOR A DISTANCE OF 375.22 FEET; THENCE RUN N5532'02'W FOR A DISTANCE OF 197.35 FEET TO THE POINT OF BEGINNING. CONTAINING 30.937 ACRES. MORE OR LESS.