3760 Orlando Dr - BC00-000632 (GAS TANKS) DOCUMENTS0 v-
�5 M
ZONE _ DATE.
CONTRAC
ADDRESS
PHONE # ,l
LOCATION %CPUC f�'1
OWNER _
ADDRESS
PHONE #
PLUMBING CONTRACTOR
nnnoccc
SUBDIVISION:
PERMIT #
LOT NO.
BLOCK:
JOB `i!-
SECTION:
COST $ G`j / / �, UUP
SQUARE FEET:
FEE $
MODEL:
STATE NO.
OCCUPANCY CLASS:
FEE $
PHONE #
ELECTRICAL CONTRACTOR FEE $
ADDRESS
PHONE #
MECHANICAL CONTRACTOR FEE $
ennpp.q.q
PHONE #
MISCELLANEOUS CONTRACTOR
ADDRESS
SEPTIC TANK PERMIT NO.
SOIL TEST REQUIREMENTS �)
FINISHED FLOOR
ELEVATION REQUIREMENTS
ARCH ITECTURAL APPROVAL DATE:
FEEnn$.
rJ
INSPECTIONS
TYPE DATE OK REJECT BY
ENERGY SECT,
,j _ _ I I
CERTIFICATE OF OCCUPANCY
ISSUED #
FINAL DATE
/EPI:
r, ) �f �,j Cvn —IK(
DATE:
SEE SITE PLAN FOR LOCATION
OF TRASH CAN MOUNTS
G
PS4o`
I . SEE SITE PLAN FOR
SPECIFIC ISLAND LAYOUT (S)
2. REFER t0 DETAIL 9/ PS -1 FOR HOSE (�
BIB LOCATION RELATIVE TO BUMPER PS4
POSTS. REFER TO SITE PLAN
FOR LOCATION OF HOSE B I BBS ON SITE.
TYP, PUMP I SLANG DETAIL
TPS`"'T N.T.S.
E
PS4
SEE SITE PLAN FOR LOCATION
OF TRASH CAN MOUNTS 181-011
111 61..111 41-011 61-111 Ili
O
G
PS4 ❑
0
I. SEE SITE PLAN FOR
SPECIFIC ISLAND LAYOUT (5)
2. REFER TO DETAIL 9/ PS -1 FOR HOSE
BIB LOCATION RELATIVE TO BUMPER PS4
POSTS, REFER TO SITE PLAN
FOR LOCATION OF HOSE 1311355 ON SITE.
A , ' ALT, PUMP I SLAN O OETA I L
P'S `'7 N.T.S.
NOTES:
I. ALL CLAMPS ON SECONDARY CONTAINMENT
TO BE TORQUED TO 60 FT. LBS.
2. SEE SITE PLAN FOR SPECIFIC TANK AND
DISPENSER QUANTITIES, LOCATIONS, CAPACITIES, ETC,
3A. ALL THREADED METAL PIPE CONNECTIONS TO BE MADE
UP WITH GASOILA-100 OR JOMAR "THE HEAVYWEIGHT".
NO SUBSTITUTIONS WILL BE ACCEPTED.
3B. ALL CONNECTIONS OF FIBER GLASS PIPE THREADED COUPLINGS
TO FLEX CONNECTORS SHALL BE DONE USING 8000 SERIES ADHESIVE,
4. CONTRACTOR TO CHECK ALL FACTORY
CONNECTIONS ON DISPENSER MOUNTING
BOXES FOR ADEQUATE SEALING OF PRODUCT.
5. ALL FIBERGLASS PIPING E FITTINGS TO BE
SMITH FIBERGLASS RED THREAD 11
6, ALL PIPING (PRODUCT, STAGE TWO VAPOR RECOVERY,
SECONDARY CONTAINMENT) TO SLOPE 1/8"
PER FOOT BACK TO TANK.
7. USE ONLY 8000 SERIES ADHESIVES TO JOIN
PRIMARY PRODUCT AND SECONDARY CONTAINMENT
PIPE AND FITTINGS (05-8014, 05-8024, 05-8055,
OR DS -8069 ADHESIVE KITS) FOR ALCOHOLS
AND ALCOHOL -GASOLINE MIXTURES, WHEN JOINING
SECONDARY CONTAINMENT FITTINGS, A SPECIAL FILLER
FROM SMITH FIBERGLASS PRODUCTS MUST BE ADDED
TO THE 8000 SERIES ADHESIVES. WHEN USING THESE
ADHESIVES, FOLLOW THE INSTRUCTIONS PACKAGED WITH
EACH ADHESIVE KIT.
8. ALL DISPENSER BOX PENETRATIONS TO
BE TESTED WITH WATER FOR LEAKS
PRIOR TO BACKFILLING AROUND BOX,
9 ALL STAGE TWO VAPOR RECOVERY LINES TO BE
BLOCK TESTED BY G.C. PRIOR TO PAVING OVER PIPING,
10. G.G. RESPONSIBLE FOR PAINTING ALL EXPOSED METAL
ON VENT RISERS AND SUPPORTS.
11. ALL GALVANIZED RISER P (PE THAT COMES IN CONTACT
WITH BACKFILL SOIL OR PEA GRAVEL 15 TO BE COATED
WITH A BITUMINOUS COATING AND WRAPPED W/31M
TAPE FOR CORROSION PROOFING.
12. REMOVE CLAMPS AND SLIDE TEST BOOT OR DONUT
FROM SECONDARY SYSTEM, UPON COMPLETION OF
TESTING (IE. AFTER PAVING IS COMPLETE.)
4211
I
SPECIFICATION
QUANTITY
FURNISHED
UNDERGROUND STORAGE TANKS
Qu
cr
1611
w
13 1/2"
WATCO/HIGHLAND
SEE PLANS
1611
ACT -100 DOUBLE WALL COMPOSITE STEEL UST - 10' 0 - 1x/000 GALLONS
WATCO/HIGHLAND
SEE PLANS
14 112"
HOLD DOWN STRAPS/TURNBUCKLES
WATCO/HIGHLAND
3/TANK
I
TANK EQUIPMENT
J
CL
m
2 HP VARIABLE SPEED SUBMERGED TURBINE PUMP
FE PETRO IST -2R
I I I /211
OWNER
9 f/410
FE PETRO VFC
I/STP
I
1" VAPOR
~-_RECOVERY
T_�
42" STP CONTAINMENT SUMPS
°O
i THROUGH SIDE
`i
M
PETRO FIBERGLASS
I/STP
OWNER
4" PIPE CAP
OPW 116-7085
I/STP AND I/TANK
OWNER
FLEXING TEE FLEX CONNECTOR ASSEMBLY
UL-20X17MS-BVTE
2151 TE
OWNER
OPENING FOR 3/4"
SPEAKER CONDUIT
m
FS 4
T54
1`1 Kl
G.C. TO PROVIDE TEST TEE AND I" BRASS BALL
VALVE (FEMALE/FEMALE) WHEN IN A STAGE 11 AREA.
TEST TEE TO ATTACH TO TOP OF VAPOR SHEAR VALVE
VAPOR SHEAR VALVE SUPPLIED BY OWNER. (ONLY IN
STAGE 11 AREAS) . SEE DETAIL.
SHEAR SECTION OF VALVE TO BE AT THE SAME
ELEVATION AS THE TOP OF ISLAND.
(ONLY IN STAGE 11 AREAS) .
0
I" GALV.
PLUG (TYP,)
FLUSH W/ TOP
OF ISLAND
I" GALV.
PIPE
TOP OF ISLAND
METAL BRACE
SUPPLIED W/ °'' o . p ° c
a \
DISPENSER BOX ( .p ° _
p
G I I
V
/
SUMP ENTRY
ADAPTER
(TO BE FIBERGLASSED
TO SUMP BOX)
FIBERGLASS PIPING -� 1
SECONDARY CONTAINMENT
3" X 2" RUBBER BOOT
INSIDE OF A BOXED BUSHING NUT
SEE NOTE 12 BELOW
(j:)O I SPENSER CONNECTION OETAI L
PS4 �
PRESSURE
VENT CAP
3/4" RIGID GALV. CONDUIT
TO BUILDING ELECTRICAL ROOM
' 3" 0 GALV,
VENT RISERS
211 GALV.
CA 5
GALV. ANGLE
W/U-BOLT
ANCHORS
2" GALV.
PI SUPPORTS
ANCHOR SUPPORTS
9 112" FROM
OUTER EDGE OF
FOOTING AT A
FIRE EXTINGUISHER \
p IN BREAK ACCESS CABINET-
N
z
O
11/2" SUPPLY UNIONS
(2 7/16" UP FROM BASE)
"A1l SIDE ELECTRICAL CONDUIT
PLAN VIEW
TYP, n I SPENSER BASE 01 AGRAM
PI PE CON OU I T LOCAT I ONS)
N.T.S.
MULTI -PRODUCT
DISPENSER
SHEAR SECTION OF
VALVE TO BE AT THE
SAME ELEV, AS TOP OF
ISLAND.
SEALED W/BLACK SILICONE
CAULK ALL SIDES
IMPACT / SHEAR
�. VALVE SUPPLIED
W/ DISPENSER BOX
(ATTACHED TO
DISPENSER BOX)
- --- CLAMP
B
sa
"A" SIDE
1 1/2" X 12" TELEFLEX
CONNECTOR
---- SEE NOTE 38
�I 1/2" SHOULDER
NIPPLE
211 X 1 11211
REDUCING BUSHING
2" FIBERGLASS
ELBOW
DISPENSER MTG.
BOX (TYP.)
ANCHORED TO
CONCRETE
SHEAR POINT —
VAPOR SHEAR
VALVE
(TO BE BOLTED
TO CROSS ARM OF
DISPENSER SUMP)
-- E
N. T. S.
PIPES ARE FASTENED
TO 1 1/2" X 1 1/2" X 1/4"
GALV. ANGLE W/ 3/8" 0 f 3 I /2"
GALV. NUTS 4 BOLTS
GALV. ANGLE
DEPTH OF P-6" > > < a
9 t/2" -
P•
P
1011 IQ11
a 12" X 12" X 36"
P pV
GONG. FOOTING
(2) 3" � GALV. ELBOW
PLAN
N.T.S. N.T.S.
F VENT R I SER nETA I LS
�S4 N.T.S.
I" GALV.
PLUG
- I" GALV.
TEE
I" BRASS
BALL VALVE
I" GALV.
VAPOR PIPE
1\,F'54
STAGE I I AREAS ONLY
N.T.S.
-3/4" RIGID GALV. CONDUIT
TO BUILDING ELECTRICAL ROOM
USE LEAK -PROOF
TIGHT CONN.
ON BOX
PENETRATION
(211 BULKHEAD
FITTING SUPPLIED
BY OWNER) .
2" VAPOR RECOVER
LINE (FIBERGLASS)
3/4" GALVANIZED
CONDUIT FOR SPEAKER
13/4" SEAL
V-011
G.C. TO PROVIDE
DUPLEX OUTLET FOR
PUMP TOPPER
0 (WEATHERPROOF)
TOP OF ISLAND
-- --c 2" M I N
3/4" GALVANIZED
MPD POWER
(DEDICATED -EACH MPD)
- 3/4" SEAL OFF
TYP, PUMP ISLAND 5EC710N
I" COPPER LINE
TO VAPOR PUMP
VAPOR RECOVERY nETA I L
PLAN V I EW
S"'f N. T. S.
" ELBOW
90 °) GALV.
DISPENSER
BOX
N. T. S.
IP OF ISLAND
t) PUMP ISLAND ELEVATION
PS4 N.T.6.
PART DESCRIPTION
SPECIFICATION
QUANTITY
FURNISHED
UNDERGROUND STORAGE TANKS
Qu
cr
°0
0�
w
ACT -100 DOUBLE WALL COMPOSITE STEEL UST - 10' 0 - I �/, 000 GALLONS
WATCO/HIGHLAND
SEE PLANS
OWNER
ACT -100 DOUBLE WALL COMPOSITE STEEL UST - 10' 0 - 1x/000 GALLONS
WATCO/HIGHLAND
SEE PLANS
OWNER
HOLD DOWN STRAPS/TURNBUCKLES
WATCO/HIGHLAND
3/TANK
OWNER
TANK EQUIPMENT
J
--�
m
2 HP VARIABLE SPEED SUBMERGED TURBINE PUMP
FE PETRO IST -2R
SEE PLANS
OWNER
VARIABLE FREQUENCY CONTROLLER
FE PETRO VFC
I/STP
OWNER
42" STP CONTAINMENT SUMPS
PETRO FIBERGLASS
I/STP
OWNER
4" SUMP TO TANK ADAPTER
PETRO FIBERGLASS
I/STP
OWNER
4" PIPE CAP
OPW 116-7085
I/STP AND I/TANK
OWNER
FLEXING TEE FLEX CONNECTOR ASSEMBLY
UL-20X17MS-BVTE
2151 TE
OWNER
FLEXING ELBOW FLEX CONNECTOR ASSEMBLY
UL-20X17MS-BV90
2/5ITE
OWNER
5 GALLON SPILL CONTAINER
IG -2100
I/SITE
OWNER
25 GALLON SPILL CONTAINER
OPW 211-25WT
I/TANK
OWNER
VAPOR RECOVERY 4" X 4" ADAPTER
OPW 1611 -AV
I/SITE
OWNER
VAPOR RECOVERY 4" CAP
OPW 17117
I/SITE
OWNER
4" X 4" X 2" TEE EXTRACTOR FITTING
OPW 233-4420
I/SITE
OWNER
4" X 4" X 3" X 2" EXTRACTOR FITTING •+
OPW 233-4432
2/51 TE
OWNER
21" BALL FLOAT VALVE
OPW 30MV-3210
I/TANK
OWNER
4" X 4" BRASS ADAPTER
EBW 778-301-01
I/TANK
OWNER
15' X 4" DROP TUBE
EBW 782-204-14
I/TANK
OWNER
MONITORING WELL CASING WITH LOCKING CAP (ONLY WHERE REQUIRED)
SEE PLAN
SEE PLAN
G, C.
12" MONITORING WELL MANHOLE (ONLY WHERE REQUIRED)
OPW 104AOW-1200
I/WELL
OWNER
18" WATERTIGHT MANHOLE
POMEGO 110-18WT
I/TANK
OWNER
24" WATERTIGHT MANHOLE
POMEGO 110-24WT
!/TANK
OWNER
36" WATERTIGHT MANHOLE
POMECO 107-3618
I/STP
OWNER
4" TIGHT FILL GAP
OPW 634TT-7085
1/TANK
OWNER
SWIVEL ADAPTER -BRASS BASE/TOP
OPW 615A-1020
I/TANK
OWNER
3" SET SCREW
OPW 523-LPS
1/SITE
OWNER
TANK IDENTIFICATION PLATES
SEE PLAN
I/TANK + 1
OWNER
3" X 2" TEST BOOT WITH AIR VALVE
FERNCON/WEAVER/ENVIRON
2/TANK
OWNER
PRODUCT PIPING
2" PRIMARY FIBERGLASS PIPE WITH 3" SECONDARY FIBERGLASS PIPE
AO SMITH RED THREAD II -A
SEE PLAN
G.C.
3" VAPOR RECOVERY TRUNK LINE
AO SMITH RED THREAD II -A
SEE PLAN
G.C.
TANK VENTS
SEE PLAN
SEE PLAN
G. C.
DISPENSER EQUIPMENT
MPD W/SPEAKER KIT AND CRIND (VAPOR ONLY IN STAGE II AREAS)
GILBARCO ADVANTAGE
SEE PLAN
OWNER
MPD CONSOLE
GILBARCO T51000
I/MPD
OWNER
BLANK DOORS (2/MPD) FOR CRIND
GILBARCO
2/MPD
OWNER
MPD BOX WITH 3 GROSS BARS
PETRO FIBERGLASS
1/MP13
OWNER
MODIFIED BOX FOR RETROFIT (ONLY IF PIPING FOR FUTURE MPDS)
PETRO FIBERGLASS
[/FUTURE MPD
OWNER
DISPENSER SUMP ENTRY ADAPTER
SMITH FIBERGLASS 12,08-610-0
3/MPD AND 2/TANK
OWNER
11/2" X 12" FLEX CONNECTOR
TITE FLEX
3/MPD
OWNER
TEST TEE AND 1" BALL VALVE (ONLY IN STAGE II AREAS)
SEE PLAN
I/MPD
G.C.
HOSE/NOZZEL ASSEMBLY - VAPOR (ASSEMBLED BY G.C.)
VARIOUS
6/MPD
OWNER
HOSE/NOZZEL ASSEMBLY - NON VAPOR (ASSEMBLED BY G.C.)
VARIOUS
6/MPD
OWNER
3" X 2" TEST BOOT
FERNCON/WEAVER/ENVIRON
3/MPD
OWNER
1 1/2" EMERGENCY VALVE FEMALE *
OPW IDBF
3/MPD
OWNER
I " X I " VAPOR SAVER SHEAR VALVE (ONLY I N STAGE I I AREAS)
OPW 60VP-1001
I /MPD
OWNER
INTERCOM
3M 0-120V
I/SITE
OWNER
PUMP TOPPERS
SIGN VENDOR
SEE PLAN
OWNER
ISLAND FORMS
FORMER
SEE PLAN
G.C.
MISCELLANEOUS EQUIPMENT
UA
3/4" ELECTRICAL GROMMET
ENVIRON FEB -3075
I/STP AND I/MPD
OWNER
I" ELECTRICAL GROMMET
ENVIRON FEB 3100
2/MPD-2 AND 2/STP-1
OWNER
2" ELECTRICAL GROMMET
ENVIRON FEB 6200
I/MPD
OWNER
EXPLOSION PROOF ELECTRICAL JUNCTION BOX
GROUSE -HINDS
SEE PLAN
G. C.
MONITORING EQUIPMENT
TANK MONITORING SYSTEM WITH ACCESSORIES
VEEDER ROOT TL5350 WITH BIR
I/SITE
OWNER
PLANS RE V I''H`
CITY OF SANFOR
s
E I /1
2E
T REV.
Qu
cr
°0
0�
w
00
w
N
�
<
Q
J
J
--�
m
W
Q
Z
Z
r
j
z
a
o
O
ui
O
W
}
cn
U
1")
O
Z
CD
_i>
-`F-_
C)
0
0
Q
O
Q
d
l.l.l
U
"
zW
I-
z
VI
rr)
Iwn
a
O
Lj
Q
Q
Q
¢
p
w
IL
w
w
I_J
w
Z
Lij
<
O
L,.1
ww
C�
U
Cn
cj'-
Z
Z
w
0
F
O
n
C�
�
%
, �, , ;l
:'
:
- -
,- ;,
,, . . , . , ,: , . ,;; n
,:. .:
! f' s ? i . sx. ! .5.,
i:. 1 i x} � -r ..r 1 ,-: 1 Y1 r n. ;z9 �R at4 Et mrr'. f �, t s� t
:. /
" .. ._... .,. .. .. , .. .,. .,, ,: _ ._. .. _- ... .- ., . _ ._ .x ?4 k.y. �'^!a E ,'": ,✓%i '• a .. t:
» 1 , . , s, . •.,, ,,. a - AF le`> s". s
. _
A, ENERAL , I A LATI N
N
�.
r-..-.�...4.
,'
,
,.,
,
11I 01.
,
a ," , . ! ... 1, , .
E ' 1 RA NTR T E T Y . 1 ,.. _
EF N E U G NE AG OR 1 D NO E ,C. ,,
GO _. S G
R ER, C E Q B ,
-
.
a.l , INS7ALL1 CONTRACT R ALL B `CER71F1 D NPR PER TA 1 A I 6.
. N 0 E .0 0 NK NSTALL TON PROCEDURE
SH E•
2.0
I » .,,
THE WORK COMPLETED UNDER' THESE EC 10 $ .W L I. CLUOE AL ,, , ", , -
.
_ ,, ,
.11
,
::3
.. . , , ,. J. ,. , ., ,
TANK S -PIPING EQUIPMENT AND RELATED INSTALLATION W RK'N ESSA Y. FOR A COMPLE:T
,1.
,4, N ,. A K ILL MATER AL WE1. T MEET, ASTM -448
2 BEDDING A D B C F M ]~ LSH L BE WELL WASHED ANO FREE OF GE AND'SNOW AND MUS S D ,
_ .; _
OPERAT PETROL M PRODUCT ST RAGE: HANDLING ` N I PENS YS E ; .,,,
AND INC EU P DUC Q A D_D S INC S T M, THE
ASTM C 33 ANO AASHTO M 43 QUALITY AND SOUNDNESS. G.C. SHALL PROVIDE SIEVE ANALYSIS ACCEPTABLE TO ii
.- - A
.
a
1 ::
I,
REQUIREMENTS SPEGIFIED`HERE N SHALL 5UPPLEMENT,TH05E SPECIFIED BY THE OWNER,.S
- 7 OWNER ENGINEER, THE FOLLOWING MATERIA MAY
Q S 0 G E LS BE USED
L 1;INSTRUCTIONS
- ,"REQUIREMENTSII
,,
FOR GENERAL CON TRU TI N 1.REF R: TO T E C P OF W RK � P AN 'O
S C 0 E H 5 0 E O L . R
$
FROM THE OWNER SREPRESENTATIVE,FOR SITE SPECIFIC OETAILS'AND REQUIREMENTS, ••
,
. 4,2.1 PEA GRAVEL WITH PARTICLE SIZE NOT LESS THAN 1/8" :OR MORE THAN 3/4" DIAMETER WITH NO MORE 3%
`51
I
3.0
. , � : , .
ALL WORK ; SHAL L BE PERFORMED AS SHOWN ON THE PLANS AND IN 'ACCOROANGE-,WITH FEDERAL ,..
PASSING A NO. 8 EVE
, ^
-
>_
�� ' ° �� 1''
UNDERGROUND 5 ORAGE TANKS, TECHNICAL REQUIREMENTS .;, (4.0GPR PART•2$0), .
A.2,2 CRUSHED STONE WITH PARTICLE SIZE NOT LESS THAN 1/8" OR MORE THAN I/2" DIAMETER WITH NO MORE
.
' .-
_.1
STATE AND MUNICIPAL REQUIREMENTS, AND MOST CURRENT EDITIONS 'OF THE APPLICABLE NPPA, PEI,
THA 3x PAS A N VE. .
N SING O, 8 SIE ,
I',
AND API REFERENCE STANDARDS. •;. , ,, "" _:,• ,. ,
".
��
A:0
.>: ,.; { .,
T
G, C, SHALL KEEP SITE'FREE OF WASTES ANO RUBBISH A7 ALL TIMES,
A.3` STANDARD INSTALLATION
5.0
J . . ' ,: " ;,
G.C. SHALL ENSURE.COMPLIANCE WITH OSHA AND ALL' OTHER REGULATIONS AND ;, ', ' .
4.3.1 ALL TANKS SHALL BE PLACED AT A MINIMUM OF 36 INCHES BELOW FINISHED GRADE OR A5
O
-' �. ",
REQUIRE[) TO AC.COMMOOATE PRODUCT PIPING SLOPE REQUIREMENTS, AND SET ON A 12 I NCH THICK
•
Q
.
RACETRAOS CONTRACTUAL REQUIREMENTS, ASSOCIATED COMPLIANCE, ., : "• ' '
. '; .;
(MINIMUM) BED OF APPROVED BACKFILL MATERIAL, TANK OPENINGS SHALL BE ALIGNED
.
.
EXPENSES„ EXCEPT AS'DESCRIBED IN B-1.3,' SHALL BE;G,C, RESPQNSIBIL:.ITY, •;
, . , .
J VERTICALLY WITHIN A PLANE PERPENDICULAR TO THE TANKS LONGITUDINAL AXIS.
6.0
, ,.
WHERE INSTALLATIONS ARE MADE AT, EXISTING STATION OR STORE,, WORK SHALL BE
4. .2 ET TANKS LEVEL ON BEDOING.MATERIAL, USE ALL'LIFTING LUGS PROVIDE AND GUIDE ROPES AT EACH
3 S D R C
SCHEDULED AND PERFORMED SO AS TO MINIMIZE INTERFERENCE WITH THE OPERATION OF ".
TANK END, (DO NOT SET TANKS DIRECTLY ON OEADMAN IF USED).
°4W
. 11
THOSE FACILITIES, .'ALL DEBRIS, EXCESS EXCAVATED MATER I ALS, MACHINERY, AND , ` .
EQUIPMENT SHALL, BE REMOVED DAILY AND MAINTAINED CLEAR OF "OPEN OR AT ALL11
FI
• A.3.3 ,PLACE 12 BACKFILL MATERIAL EVENLY AROUND TANKS, USE WOODEN DOWEL PROBE TO WORK BACKFILL
. '
I
TIMES, LIGHTED SAFETY BARRICADES' SHALL BE PROVI.DED'FOR THE PUBL.IC'S PROTECTION. `
COMPLETELY UNDER'TANK.
I
11NOTIFIED
WHEN IT BECOMES NECESSARY TO CLOSEA DRIVEWAY, OWNERS REPRESENTATIVE SHALL BE
_ "
4.3.4 REPEAT D A.3.3 FOR NEXT 12 TO FILL ALL VOIDS.
.
V7
72 HRS PRIOR TO CLOSURE. ,
.PROBING
4.3.5 FREELY ADD ADDITIONAL BACKFILL TO TANK TOPS. PROBING NOT REQUIRED).
7.0
ALL EQUIPMENT, MATERIALS, PIPING, .TANKS AND, ACCESSORIES SHALL BE INSTALLED , ;
,(ADDITIONAL
-
IN ACCORDANCE WITH, THE APPLICABLE MANUFACTURER'S INSTRU11
4.4 ALTERNATE INSTALLATION (I N LIEU OF SHORING) ,
11
.
�CTIONS.
B. REMOVAL $ OI$P051TION OF XI TING TANKS (WHEN REQ'q.)
E S '.
4, 4,I 'PLACE MINIMUM 18" BEDDING. MATERIAL AT ENOGAP LOCATIONS. 11
I,0
.
EVACUATE PRODUCT FROM TANKS AND LINES. . ',
4.4.2 -SET TANKS LEVEL ON ENOCAP BEDS. USE ALL FITTING -LUGS PROVIDED AND GUIDE ROPES AT EACH TANK
1.1.:..
END. (00 NOT SET TANKS DIRECTLY ON DEAOMEN IF USED.)
1,1
FOR STP SYSTEM DRAIN LINES INTO TANK BY REMOVING STP CHECK VA VE ANO, OPENING SAFETY VALVE TEST'PORT,
. �. . -. A . ,
A BACKFILL AT EACH N APSTABILIZE TANK. RAM BACKFILL T WITHIN F F T
q; 4.3 DD B C LL E C EOG TO P B CK ILL O W 3 T. O EXCAVATION TOP.
.
, ,: .
DISCONNECT STP UNION /SWING ANO RA N PRODUCT INTO AN APPROVED CONTAINER. .
D. • '
4.A.4 Apo BACKFILL ALONG SIDES OF TANK ADJACENT TO EXCAVATION SI,OEWALLS BY PUMPING A FULL BUCKET
1,2
,
00 NOT BLOW OUT LINES WITH COMPRIrS5EO AIR. � .
.
OF BACKFILL IN ONE PLACE FROM A MINIMUM OF LIFT ABOVE TANK TOP USE A LANG HANDLE PROBE WITH
'
,.�,, . ,_ , •,; .
CURVED ENO (OR AIR JET PER TANK MANUFACTURES SPECIFICATION) WHILE STANDING AT TOP OF EXCAVATION
I
.
I'll,
PRODUCT REMOVED FROM LINES BECOMES PROPERTY& G.C. AND.MAY B11 .E'USED AS MOTOR,FUEL :':
.1. , ;
,
TO,.MOVBAGKFI LL UNDER TANK SIDES. REPEAT THIS PROCEDURE UNTIL BACKFILL I S 121 N, UP THE TANK
.'
1.3
. •
REMOVE LIQUID. ,TANK BOTTOMS USING A'VACUUM:TRUGK ,IN LIEU OF ON-SITE STORAGE CONTAINERS.'
.
SIDE. ,
DEPENDING ON LOCAL.REGULATIQNS, RECOVERED MATERIAL;MAY BE MANAGED, AS OFF -,SPEC PRODUCT,
,
4,5 WET EXCAVATION CONDITIONS r ,. •
,.
T ,a A A AHA AR W T
SQL p INDUSTRIAL"OR HAZARDOUS WASE IF MATERIAL MUST BE.,M AS ,,. Z OOUS AS E,'
.
.
• ,
.N,,,GEO
,FOLLOW OWNER'S ENVIRONMENTAL REQUIREM'' ' ' QR HANDLING 'MANIFESTING AND D.ISPO AL
, ,. S
. •, ,, , ,
. 4.5,1 G.C. SHALL BE RESPONSIBLE TO EVACUATE WATER FROM EXCAVATION. IF CONDITIONS
1.
,.., , .. , . ..
ONLY OWNER APPROVED HAZARDOUS WASTEDI$POSA, FACILITIES.'SHAL E USEQ,' CONSULT THE :'
L,B D
REQUIRE SHORING, CONSULT OWNER'S ENGINEER, METHOD MUST BE APPROVED BY OSHA AND OWNER'S ENGINEER,
APPROPRIATE ENVIRONMENTAL ENGINEERING CONTACT FOR PROCESSING ASSISTANCE IN ALLcCASES.;'
, ,,,
,
4,5.2^ MINIMIZE SURFACE WATER ENTERING EXCAVATION BY CONSTRUCTING DIVERSION DAMS AROUND TANK FIELD
'4 1- •°
1 2.0
EXCAVATE T TANK TOP :REMOVE ALL TANK�A P »RTENANCES PL AL , RENIN S'REMOVE TANK � ' I,
0 7 A P ,U UG , L. G,
•,EXCAVATION AND PIPING TRENCHES.
.
• `. ' `'
',
..
AND PLACE IN A'SECURE LOCATION. ONE TANK, PLUG MUST HAVE AN I/84' HOLE' IN PLUG FOR. VENTING. ` ` ` ' :
'.
3.0
, 1.
.11 "`
REPEAT 5-41.3 T ROUGH ALL TANK. NGS TQ' RENO E REMAINING N I N. RESIDUE. RESIDUE '$HALL BE MANAGED PER 8-1: 3.
H K TI V A
4 5 3 A •CONTINGENCY PLAN SHALL BE DEVELOPED BY G.C. OUTLINING EMERGENCY PROCEDURES FOR
,
11
TANK
OBTAINING THE NECESSARY EQUIPMENT'AND/OR PERSONNEL TO HANDLE UNEXPECTED WATER ENTRY INTO THEA
,,
.
4.0
•
DECREASE TANK T0, LESS THAN 10% 0 THE LOWER EXPLOSION L MIT (LEL) PER 'THE FOLLOWING.;
F F11
TRE WHEN WATER TAN HYDROCARBONS CONSULT OWNER'S
FIELD EXCAVATION OR PIPING TRENCHES. ER MAY CON I H [)CARBON GON
ENVIRONMENTAL ENGINEER.
PREFERRED METHOD (INERTING):
4..5 .3 INSTALL TANKS PER 4:3 OR 4.A
I`
INERT VAPORS BY ADDING A MINIMUM :OF 1,5 R IQ0,'GALLONS OF TANK CAPACITY. -: <_ ,
LBS ORY ICE, PE
A,6 ANCHORING
t
I
ALTERNATE METHOD (PURGING):
• 4.6.1 TANK ANCHORING, WHERE REQUIRED BY EXISTING GROUNDWATER CONDITIONS, SHALL BE
I
VENTILATE TANK _ SING AN EVACATOR R pIFFUSER. E C VATOR MUSTUSING
U 0 (X A '..
*STRAPS U L KS
ACCOMPLISHED IN TRAP ANO TURNB GKLE ASSEMB IES BY THE TAN MANUFACTURER AND
EXTEND 12 FT,'.MINLMUM;ABOVE TAN,K`TQP. , A VENT LINE ;,I. :>
INSTALLED IN STRICT ACCORDANCE WITH THE TANK MANUFACTURER'S REQUIREMENTS. ALL
EXTENDING 12. FT, MINIMUM ABOVE, TANK TOP MUST BE ATTACHED `, '`
TURNBUCKLE ASSEMBLY HARDWARE TO BE COATED WITH KOPPERS 300M EPDXY APPLIED IN
.
;TO TANK WHEN USING A DIFFUSER), `; , , " .
ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
5,0
...
ALL TANKS MUST BE DEGASSED AND CERTIFIED "CLEAN I BY1.0IC
.
ING AN WRA N ,
5,0 RISER COAT D _PPI G
,1. I
. 6.0
. ,
PRIOR TO TRANSPORTING ANY TANK FROM SITE, `LEGIBLY LABEL AS FOLLOWS. ;,
5.1 PRIOR TO COMPLETION OF BACKFILL AND AFTER PRESSURE TESTING TANK, COAT ALL CORRODIBLE COMPONENTS
,,
u T ;; :
TANK' HAS CON A I N ED FLAMMABLE L I QUI DS, ;
` EXPOSED TO BACKFILL WITH COAL TAR EPDXY AND WRAP WITH FELT OR 3M TAPE. ALL COMPONENTS SHALL BE
., .;
CLEAN AND CORROSION FREE BEFORE APPLYING COATING, EXTEND COATING 3" ONTO ADJACENT FRP COMPONENTS.
.
NOT CAS FREE: NOT SUI TABLE r FOR FOOD , `, . ,
,
OR ORINONG WATER," . , .
6.0 BALLASTING
7.0
QWNER'S ENGINEER $HALF INSPECT OPEN EXCAVATION FOR EVIDENCE OF ALL HYDROCARBON
6.1 WATER BALLASTING
,.
RELEASE, I. '
6,1.1 ATTACH ONLY STP RISER ANO MANIFOLD HOUSING TO TANK. G.C, SHALL PROTECT AND STORE REMAINING
"'
' `
STP COMPONENTS. COVER TOP OF STP MANIFOLD WITH PLYWOOD SECURED THROUGH EXISTING BOLT HOLES.
G. EXCAVAT I ON
_ .
.,
I.0
SIDES OF TANK HOLE EXCAVATION SHALL BE SLOPED IN ACCORDANCE WITH O.S:H.A. ' ', :,,
6.1.2 WATER TO BE PROVIDED BY CONTRACTOR. G.C. TO ASSUME RESPONSIBILITY FOR COMPLETE REMOVAL AND
,, ,
I I,
,.
'' ' • :
. ,. .� . i; -
I
CONSTRUCTION SAFETY HEALTH REGULATIONS",SUBPART P-EXCAV TIONS, TRENCHING � �, .
1562650 THRU 1926653, RECOMMENDATIONS. 'FILTER FABRIC, SHALL BE TO UNE ' '
DISPOSAL OF WATER BALLAST AND SCHEDULING GASOLINE DELIVERY PRIOR TO PRODUCT PIPING PURGE
S
'ETC.
'
.CLOTH ;,,
_ SER, START-UP, CALIBRATION,
O I SPEN
:, -,
,:'.- .^
BOTTOM AND 51095 OF HOLE PRIOR TO GRAVEL BACKFILL. FILTER- AERIC CLOTH.SHALL ,
F
_
, :,
. •
_. ..
,TANK
LAP T P F TAN S T PREY NT'INFILTR TI F EARTH IN T NK RE , • -
ALSO . 0 O K 0 E. �► :ON 0 TO A A AS , ..
Y
,I. M V PLYWOOD COVER FROM ,STP MANIFOLD. COMPLETE STP INSTALLATION ONLY AFTERREMOVING WATER
6 3 RE 0 E 0S
;,
, ,
.. .
I „ Y
•
, TANK.
FROM AN
.
20,;
.
EXCAVATION SHALL BE SIZED TO'PROVIDE A MINIMUM IFT TANK BED, 2FT BETWEEN TANKS ANO 2FT
114 -
- -.,
:,.
BETWEEN TANK 51pE5/ENDS AND EXCAVATION WALLS, , ;
7,0 TESTING (AFTER PAVING 15 COMPLETE) .
,
•
1.
..
HAVE PRECISION N PRIMARY TANK AFTER PAVING 15 COMPLETE,
7,1 G.G. SHALL CONTACT R.T. OWNERS ENGINEER TO VE REC S10N TEST 0 E CO E,
{
'
3.0
OWNER RESERVES THE RIGHT TO DESIGN ANO OR CONSTRUCT SH RING UNDER AN AMENDED AGREEMENT
. / Q
"PRODUCT HAS BEEN PLACED IN TANKS DISPENSERS HAVE BEEN INSTALLED AND PRIOR TO FINAL PROJECT ACCEPTANCE.
qU S B L E E
WITH G.C. OR SEPARATELY WITH ANOTHER COMPANY, IF OWNER ENGAGES G.C.,`'G.C, SHALL SUBMIT SHORING
DESIGN TO OWNER'S ENGINEER FOR APPROVAL, SUPPLEMENTAL JOB SCOPE AND COST SHALL BE AGREED E,
PIPING'
TO IN TERMS OF A CONTRACT CHANGE ORDER PRIOR TO COMMENCING WORK, SHORING SHALL.BE REMOVED :
' 1,0 ' PIPE MANUFACTURER'S INSTALLATION CHECKLIST SHALL BE INITIALED AND SIGNED BY G,C AND OWNER'S ENGINEER, AS
PRIOR TO INSTALLING ' PRODUCT PIPING, DO NOT ABANDON SHORING IN PLACE,
.
.
APPROPRIATE, AS EACH STEP 15 COMPLETED.
_
D, TANKS
2.0 ALL MATERIAL WORKMANSHIP AND INSTALLATION PRACTICES SHALL BE IN ACCORDANCE WITH NFPA APPLICABLE CODES.
'
1.0
TANK MANUFACTURER'S INSTALLATION CHECKLIST SHALL BE INITIALEO/SIGNED BY G,C ANO OWNER'S �'
.
'
ENGINEER, AS APPROPRIATE, AS EACH STEP IS COMPLETED,
3.0 MATERIALS
2.0
LIFTING EQUIPMENT .SHALL BE ADEQUATE TO HANDLE TANK WITHOUT DRAGGING. USE ALL LIFTING LUGS AND
3,1 ALL VENT AND VAPOR RETURN SHALL BE FRP SMITH FIBERGLASS "RED THREAD 11-A" (WITH 058000 SERIES ADHESIVES)
„
GUIDELINES WHEN LIFTING TANKS. THE INCLUDED ANGLE BETWEEN LIFTING LINES AND TANKS SHALL NOT
.
.
BE LESS THAN 450. REST TANKS ON .SMOOTH AND DEBRIS FREE GROUND.` CHOCK, TANKS WITH TIRES 7O PREVENT
3.2 PRIMARY PRODUCT AND SECONDARY CONTAINMENT LINES SHALL BE FRP PIPE AS SPECIFIED IN E-3.1
.
ROLLING. DO NOT DRAG TANKS.
'
,
3.3 TANK RISER SHALL BE SCHEDULE 40 (ASTM -5-120) GALVANIZED IRON PIPES, FITTING SHALL BE 300 PSI GALVANIZED
3.0 TANK'TESTING
MALLEABLE IRON.. ALL COUPLINGS AND FITTINGS SHALL BE SHOULDER STYLE. NO STREET COUPLINGS OR FITTING SHALL BE ALLOWED.
.
3.1, STANDARD VACUUM TEST
THE USE OF CLOSE, CONTINUOUSLY THREADED STEEL PIPE NIPPLES SHALL NOT BE PERMITTED.
LY
3, 1 I T RSTLCE VACUUM ON TANKS SHALL BE VERIFIED PRIOR 70 UNLOADING AT SITE AND IMMEDIATE
'
3,4 LOL BE TREATED WITH GASOILA 100 OR JOMAR 100 "THE HEAVY WEIGHT." (IOOx COMPATIBLE -ALL FUEL
OAFTER
UNLOADING AT SITE AND AFTER TANKS ARE SET BACKFILL D. TO ENSURE THAT THE TANKS
.
ARE INTACT. VACUUM LOGS, TO BE MAINTAINED DAILY BY G.C.' 1.
3,5 G,G. SHALL DEMONSTRATE TO OWNER'S ENGINEER ALL INSTALLED MATERIALS ARE NEW AND CONFORM TO ABOVE SPECIFICATIONS.
.
3.2 ALTERNATE PRESSURE TESTING 'a
CAUTION--" DO NOTi . ' .
A.0 INSTALLATION
I) LEAVE PRESSURIZED TANKS UNATTENDED,
A.I INSTALLATION CONTRACTOR SHALL BE CERTIFIED BY PIPING MANUFACTURER.
2) APPROACH TANK ENDS OR PLUGS OF PRESSURIZEO'TANKS,
..
,
3) EXCEED 5,P5I INANNULAR SPACE OR PRIMARY TANK.
4.2 CORRODIBLE COMPONENTS SHALL BE USED ONLY WHERE SPECIFIED AND IN THE ARRANGEMENT SHOWN IN THESE DRAWINGS.
4) ATTEMPT TO REPAIR A DAMAGED TANK.
I 11
5) APPLY AIR PRESSURE TO ANY TANK WHICH HAS CONTAINED MOTOR FUEL,
4.3 BEDDING AND BACKFILL MATERIAL SHALL BE THE SAME A5 THE TANK FIELD, SAND SHALL NOT BE USED UNDER ANY GIRGUMS.TANGES,
,
PRODUCT LINE TRENCH SUB -GRAPE SHALL BE COMPACTED TO 90% PROCTER DENSITY PRIOR TO INSTALLING BEDDING ANO
• ,
3.2.1 TIGHTEN ALL TANK PLUGS. USE MANIFOLD AND TEST GAUGE WITH ,0.15 PSI RANGE IN 1/4LB. INCREMENTS
BACKFILL MATERIAL.
3.2.2
OUTER WALL TEST: r I I I .11
4.4 PIPING SHALL BE MINIMIZED, NOT PLACED UNDER BUILDINGS AND SHALL BE INSTALLED WITH MINIMUM SPACING AND
3.2.2,1 CLOSE MANIFOLD VALVE, PRIMARY TANK TO 5 PSI MAX,
VE, P
CLEARANCES SHOWN BELOW, IF PIPING ROUTING 15 NOT SPECIFIED, G.0 SHALL INSTALL IN THE MOST DIRECT ROUTE, SUBJECT
3.2.2.2 CLOSE AIR SUPPLY VALVE AND DISCONNECT AIR SUPPLY, (THIS STEP GUARDS .
TO APPROVAL BY OWNER'S ENGINEER.
'
AGAINST OVER PRESSURIZING PRIMARY TANK).
4.5 PRODUCT LINE SHALL SLOPE CONTINUOUSLY UPWARD FROM STP SUMP A MINIMUM OF 1/8" PER FT. STAGE I AND STAGE II
3.2.2.3 PRESSURIZE ANNULAR SPACE BY OPENING MANIFOLD VALVE.
VAPOR RECOVERY LINES AND VENT LINES SHALL SLOPE CONTINUOUSLY UPWARD FROM VAPOR MANIFOLD A MINIMUM OF 1/8"
3.2,2,4 MAINTAIN PRESSURE FOR 30;MINUTES MINIMUM, SOAP ENTIRE TANK.- REJECT ANY TANK
PER FT.
WHICH FAILS OUTER WALL TEST,
PAVING (6" THICK)
3.2.3 INNER WALL TEST:•
3.2.3,1 CLOSE MANIFOLD VALVE AND RELEASE PRIMARY TANK PRESSURE BY. OPENING AIR SUPPLY VALVE, o •1.
3,2.3.2 MONITOR ANNULAR SPACE PRESSURE FOR AT LEAST 30 MINUTE5•AND NO MOR THAN PIPE LINES a
60 MINUTES. REJECT ANY TANK WHICH FAILS INNER WALL TEST OR ANY.TAN WHICH 7" MLN, I /
HAS BEEN DROPPED OR IMPACTED. CONTACT TANK MANUFACTURER FOR REPAIR. PRIMARY UNE ��E��L-1-
3.2.3,3 FOLLOWING TANK PRESSURE TEST A VACUUMSECONDARY LINE
SHALL BE. PLACED BACK ON. THE INTERSTICE
• AT THE SAME LEVEL AS WHEN THE. TANKS ARRIVED ON SITE. G.C. SHALL MAINTAIN `A DAILY ,
LOG OF VACUUM READINGS ON ALL TANKS FROM THIS POINT FORWARD UNTILPAVING 15 .
I I� I�I . . I. � ' . �. II I .�I I I I I I . . . :I .I
II
I II
I . I 7� I I
• . COMPLETE. A" MIN
AIR SUPPLY VALVE--- I ,,�
I FOLD HOSE ,
2-1/2"
. ,,
MIN .
„.
"
TO -AIR SUPPLY ANNULAR SPACE :.'' d ,' MIN
PRIMARY TANK PRESSURE GAUGE
- PRE55URE GAUGE MANIFOLD ,. ;, MIN
. _"
u ,
VALVE
. PRESSURIZE PRIMARY. TANK .ANNULAR. SPACE
TO 5. P51 MAXIMUM PRESSURE FITTING
II
MARY T .' -. .
PR ANK
,.,FITTING ,
r ,, Y .r..r'N , t ,V.,}'^ r..,.. "4 f i, x.,a :..:.n >mr .,....W :..:,v.,1 ,•.•: :9.f'.,Y. ... ' nX` ,.--1777 . .,,' - 1.
,Y .+,. f .. 'w - .. ?, ,, , , v�Y.. hf, . - .M..J, 1. , . ,. 1. - J, f:..'.Y. - I , r r ..
as r. - , .<. ,. � �.
-M1 t ,,..f,.s,
�.'.ti
� --- -
F
.,
_
„< _
N I : '
5:0 GO . EC S .
O
. _ ,
T,:
I• HRE DED CONNECTIONS ,
S
A
C
ONS
1.1 THREADS HALL F I I .1 .
5, E OS S E G ` EAN 0 ALL AN AN THREAD CUTTING NG DI L' PRIOR TO JOINING,
B L SAND D U
5.1,2 APPLY THREAD SEALANT PER e- 3.4 START ALL THREADED CONNECTIONS BY HAND, SECURE FRP COMPONENTS USING ONLY A STRAP
RECLEAN. WRENCH. DO NOT FORCE THREADS. IF CONNECTION BINDS RE VE. AND EGLE
C G MO
.1, 3 NOT OVERTI HTE . TORQUE F P T TEL CONNECTIONS TO 7 F.T, LBS, WHEN USING POWER TONGS.
5 DO O G NR 0 5 E C 0 5 5 U
5.2 , FRP BONOED CONNECTIONS: '
5.2.1 TAPER ESCORT PIPE ENDS PER PIPE MANUFACTURER'S INSTRUCTIONS. CLEAN BONDING SURFACEUSING ONLY PIPE MANUFACTURE'S
APPROVED CLEANER. DO NOT ALLOW CLEANER 70 COME INTO CONTACT WITH TANK SURFACE OR SUMP SEALING DEVICES.
5.3.2 MIX ANDI
IAPPLY ADHESIVES PER MANUFACTURE'S INSTRUCTIONS. AVOID SKIN CONTACT WITH CLEANER, ADHESIVES AND HARDENER
DO NOT INHALE FUMES. '
5,'2,3 JOIN COMPONENTS PER MANUFACTURES INSTRUCTIONS. CURE CONNECTION PER PIPE MANUFACTURER'S SPECIFICATIONS USING
• FRP PIPE MANUFACTURER APPROVED ELECTRIC HEATING COLLAR OR CHEMICAL HEAT PACK WHEN TEMPERATURE 15 BELOW OR WILL
. . BE BELOW 60°F PRIOR 70 CURING, HEAT GUNS ARE STRICTLY PROH I B I TED.
5.3 FLEX LINE CONNECTIONS:
. 5,3.1 INSTALL FLEXIBLE LINE CONNECTORS PER MANUFACTURER'S INSTALLATION INSTRUCTIONS,
5.3:2 IMMEDIATELY AFTER INSTALLING FLEX LINE COUPLING, PLACE'CAP OR PLUG ON COUPLINGS TO PREVENT DEBRIS FROM ENTERING
INES.
L .
r 1
6.0 LINE TESTING
. CAUTION: NITROGEN FROM A GROUNDED SOURCE SHALL BE.USED'IN ,
LIEU 0F AIR FOR TESTING IF LINES HAVE BEEN EXPOSED T0
GASOLINE. NOTE: OWNER'S ENGINEER SHALL WITNESS ALL LINE TESTING
6,1 G.C. SHALL NOTIFY OWNER'S ENGINEER TWO DAYS PRIOR TO TESTING,'
CAUTION: CAP FLEX CONNECTOR OR FLEXIBLE LINE AT STP PRIOR
TESTING. APPLY e RELEASE PRESSURE SLOWLY.
6.2 PRODUCT LINE SHALL BE TESTED FROM STP TO SAFETY VALVE.
6.3• VENT/VAPOR. SYSTEM SHALL BE TESTED FROM TOP OF VENT, THROUGH
MANIFOLD, EXTRACTOR BASE AND RISER, STAGE I CONTAINMENT
MANHOLES S 0 TAGS II VAP R LINES TO ISLAND E STAGE II FLEX
CONNECTORS AT OISPENSER'S, REPLACE BALL FLOAT CAGES WITH ' PLUGS. -
AND REPLACE STAGE I VAPOR RECOVERY SPILL CONTAINER DRAIN VALVES
WITH PLUGS. CAUTION ENGINEER ANG G.C. SHALL VERIFY FY EXTRACTOR PLUG
. 1.INSTALLED AND CAP 15 REMOVED FROM TANK MONITOR RISER PRIOR TO
PRESSURE TESTING VENT/ VAPOR SYSTEM.
6.•A FRP LINES
6.4,1 SLOWLY PRESSURIZE PROOUCT:LINES AND VENT/ VAPOR LINES TO 50
PSI. SOAP TEST ENTIRE PIPE SURFACES INCLUDINGJOINTS:ANO FITTINGS, CORRECT ANY LEAKS AND RETEST.
6.4.2 IMMEDIATELY LOWER PRESSURE FROM VAPOR/ VENT SYSTEM`To I I
5 PS1
, REMOVE EXTRACTOR PLUGS, REDUCE PRIMARY LINE PRESSURE TO
30 PSI, MONITOR DAILY UNTIL ALL PAVING 15 COMPLETE..
• 6.4,3 ASSEMBLE SECONDARY SYSTEM AND PRESSURIZE TO 5 PSI.
SOAP TEST ENT I RE PI PE SURFACES I NCLUOI NG 'JOI NTS AQ ,I ITT I NG5.
CORRECT ANY LEAKS AND RETEST. MONITOR DAILY UNT( ALL PAVING IS COMPLETE.
.
6.A.4 AFTER TESTING HAS BEEN SATISFACTORILY COMPLETED AND PRIOR TO BACKFILL, ALL EXPOSED GALVANIZED PIPE THREADS,
JOINTS, WRENCH MARKS AND ANODE CONNECTIONS ARE TO BE COATED WITH COAL TAR 4 3M TAPE, EPDXY APPLIED
. IN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS,
6.5 RT', SHALL PERFORM PRECISION TEST ON PRODUCT LINES AFTER PAVING 15
COMPLETE, PRODUCT HAS BEEN PLACED IN TANKS, OISPENSERS HAVE
BEEN INSTALLED, AND FINAL TO PRIOR PROJECT ACCEPTANCE.
F. DISPENSER; I.
1.0 DISPENSER SHALL BE SECURELY ATTACHED 70 ANCHOR BOLTS WHICH SHALL BE
SET IN CONCRETE ISLAND, QUANTITY AND SIZE OF ANCHOR BOLTS SHALL BE AS
SPECIFIED IN DISPENSER MANUFACTURER'S INSTALLATION INSTRUCTIONS..
,
.0 DISPENSER SHALL BE ACTIVATED ONLY IN PRESENCE OF AN AUTHORIZED'
DISPENSER REPRESENTATIVE, G.C. HAS SOLE RESPONSIBILITY FOR DAMAGE TO
• DISPENSER I F THIS INSTRUCTION I S NOT FOLLOWED,
3,0 PURGING AIR: ,rI 1, ; .
3,1 ACTIVATE ANY 0I SPENSER. DO NOT OPEN A' NOZZLE, LEAVE' DISPENSER
ON FOR 5MINUTES. TURN DISPENSER OFF AND ALLOW TO .STAND FOR 5 MINUTES,
3,2 ACTIVATE DISPENSER MOST REMOTE FROM TP'AND OI P N E (I50 GALLONS FROM THE FARTHEST
EST
TWO DISPENSERS AND 50 GALLONS FROM ALL OTHERS) INTO A`GROUNOEO CONTAINER APPROVED FOR
STORAGE AND HANDLING OF CLASS I FLAMMABLE LIQUIDS. REPEAT FOR EACH HOSE AND DISPENSER.
MOVING PROGRESSIVELY CLOSER TO STP. REPLACE PRODUCT USED FOR LINE PURGE INTO
RESPECTIVE TANK,
4.0 ELECTRICAL CHECKOUT:
4,1 TURNOFF ALL STP CIRCUIT BREAKERS, 11 I
4.2 CONFIRM ALL NOZZLES ARE IN THEIR BOOTS,
4.3 VERIFY ALL STP'S ARE OFF,
A.4 TURN ON CIRCUIT BREAKER FOR ONE STP, ONE HOSE AT A TIME FOR
PRODUCT GRAOE,MATCHING ACTIVATED 5TP, PERFORM THE FOLLOWING AT EACH DISPENSER:
4, A. I REMOVE NOZZLE , .
4.4.2 ACTIVATE OPERATING HANDLE AND DISPENSE PRODUCT INTO AN APPROVED GROUNDED CONTAINER, .
s) 4. A.3 VERIFY ONLY CORRECT STP TURNS ON.
4.4.4 VERIFY BRAND PANELS ON EACH SIDE OF DISPENSER MATCHES PRODUCT BEING DISPENSED BY STP.
4.4,5 VERIFY CORRECT NOZZLE TYPE IS INSTALLED:
REPEAT F -A:4 FOR EACH PRODUCT GRADE, I,
5.0 ACTIVATE ALL STP CIRCUIT BREAKERS ONE HOSE AT A TIME, FOLLOW
F-4.4.2 AND F-4,4.3 FOR EACH HOSE,
6.0 IF MISCONNECTIONS OR OTHER PROBLEMS ARE DETECTED, MAKE CORRECTIONS
AND REPEAT ENTIRE DISPENSER CHECK-OUT PROCEDURE:
NOTE. SUCCE55FUL COMPLETION OF F-4.0 AND F-5.0 WILL. CONFIRM COMPLETE
\ INTEGRITY AND CONTINUITY -OF DISPENSING ELECTRICAL AND PIPING SYSTEMS.
7.0 DISPENSER CALIBRATION: SUBSEQUENT TO START UP OF NEW DISPE145ER_ BY THE
OWNERS AUTHORIZED SERVICE REPRESENTATIVE, THE G,C, SHALL PROVIDE A
STATE CERTIFIED 5 GALLON CALIBRATION CAN ANO ADJUST CALIBRATION OF
EACH DISPENSER HOSE TO ZERO TOLERANCE FOR EACH 5 GALLONS OF PRODUCT
DISPENSE[), ON BOTH FAST AND SLOW RUNS, OR AS DIRECTED BY LOCAL WEIGHTS
AND MEASURES AUTHORITY, PRODUCT USED FOR CALIBRATION OF DISPENSERS SHALL
BE RETURNED TO ITS RESPECTIVE STORAGE TANK, REPLACE ALL METER SEALS.
FURNISH OWNER WITH CALIBRATION REPORT SHOWING FINAL CALIBRATION TO ZERO TOLERANCE.
BEFORE STORE STOCKING,
8.0 INSTALL NEW DISPENSER FILTERS AFTER COMPLETING ALL LIQUIOJESTING.
, • ACTIVATE EACH PRODUCT AND EACH DISPENSER AND INSPECT FILTER FOR LEAKS, •
.RECHECK PRIMARY LINE CONNECTIONS AT DISPENSER BASE AND STP FOR LEAKS,
.CALIBRATION TEST SHALL BE GIVEN 70 RACETRAG ENGINEER PRIOR TO STOCKING STORE.
G, MISCELLANEOUS REQUIREMENT.
11
4.1 SET ALL TANK SLAB MANHOLES AND STREET BOX ELEVATIONS 2" ABOVE FINISHED GRADE.
SLOPE (I 5/16 INCH PER FOOT) CONCRETE AWAY FROM RIM TO MEET SLAB GRADE
4,.2 PRIOR TO INSTALLATION, CONTRACTOR SHALL SET SUBMERGED TURBINE LENGTH SO THAT MOTOR IS 6" OFF OF TANK BOTTOM.
4.3 UNLESS OTHERWISE INDICATED, ALL CONTROL AND ELECTRICAL WIRING SHALL Be RUN IN
3/4" GALVANIZED CONDUIT IN ACCORDANCE WITH NFPA 70 CLASS. I, GROUP D REQUIREMENT,
4,4 PRODUCT DISPENSERS (MPG'S) TO BE SET AND CONNECTED IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS.
INSTALL HOSES, BREAKAWAYS, SWIVELS AND NOZZLES AND CHECK FOR PROPER OPERATION,
REMOVE ALL' PACKAGING MATERIALS, TAPE. TAPE RESIDE AND THOROUGHLY CLEAN EACH DISPENSER TO REMOVE OUST. FINGERPRINTS, SMUDGES, ETC,
4,5 'PRESSURE LINE LEAK DETECTORS- ALL (NEW AND EXI5TING).PRESSURE LINE LEAK DETECTORS SHALL BE CHECKED
AND TESTED FOR PROPER OPERATION. LEAK DETECTOR CHECKS AND TEST SHALL BE WITNESSED BY THE OWNERS REPRESENTATIVE.
H. CONCRETE � .I 11
. 1.0 CONCRETE SHALL BE IN ACCORDANCE WITH OWNER'S PAVING SPECIFICATIONS AND DETAILS.
I
1. A5 -BUILT DRAWINGS , . -.,; r-� _.
WIN T , E
. 0 G.G. SHALL PROVIDE A COMPLETE SET , OF AS BUILT ORA GS O SCALE
DEPICTING PRECISE LOCATION OF ALL COMPONENTS INSTALLEO,(INCLUDING CITY �"'. ,r,•,
��°,�1
PRODUCT/ VAPOR LINE I AND LOCATIONS, CONDUIT SIZES AND LOCATIONS
U / SIZES N LOG S, 0
E.TC.) PRIOR TO OWNER'S ENGINEER PROJECT ACCEPTANCE. '
,., _
, �
ala
III
IN
N
z
0
V)
>
w
O
2
z
v) O
W Q
F-
0 � ry
o
Z > Q
w0
y (f) z
Z Q Q
0-- (p
I-
W
U
4
rn
�
� O
cl�
J CL
7,
12
Ld
0 0
8
x
9.
o
LL
z 0
Ld.
s
Lf)
uj 10
U V)
V) w
s
•
_.
. :.
:
r
:, .
_
�
U.
V--
"
_ . _-_ ,..r _
zu
-
uo
�
::3
O
a
Q
�
o
W
>_
<
k'0
_.1
0
-
I',
AQL
��
f--
O
m
O
Q
0
:lz.---N
°4W
Qo
Vow
<
�
V7
z
v) O
W Q
F-
0 � ry
o
Z > Q
w0
y (f) z
Z Q Q
0-- (p
I-
W
U
4
rn
�
� O
cl�
J CL
7,
12
Ld
0 0
8
x
9.
o
LL
z 0
Ld.
s
Lf)
uj 10
U V)
V) w
s
•
_.
. :.
:
r
:, .
_
.
_-�_
_ . _-_ ,..r _
,
_
N
x. ! v'
r. � �
�.
' � i � .. _ Iii � i� �
�'
It
('
�.,,
1
it
y
t^
�i
.`'
�
~`/
I 4
,
r.
r
_ 1
FIB R LA S
NOTE:
,. A R
y 0 ;.
i
P DUCT P
Q P N
C: 0
R ,
"
1 _
GONG. SLAB W
„ 1 FRP EDU R $ /
R G RY 3 X2 R G
, s . _ _ .. S R TRA EI LD NGINEER
_ . _. . , SAW GUT ,TA K LAB. PER ACE G E E
GONDAR „ . _ N
,
,
A REBAR i . G.
3
; r 8
, ,,
E WAY
,
• r 6 T
7777
REG
w
, , r
: PLUS
,
1
:.'; ..,.. ,.. — — — -- J-- — �". •t. Jam.—�.. !ti. .-_ ..rtA• :. 4L..--.�.. .. •4:�
PA I N•.
.PRE•
III 1 ,
1111 1. 7 1V '. I
ul n v u a
r ,
I, LI E/ J
I II
—_
A R I
,a s 3/ IG D
1
COATED�, I II C0 TED
1 _
,. GALV. CONDUIT 11 ,. ,
. , .. r _. ON U . , _ , � A METAL _; r
r,. .. ,. r I � GAL CONDUIT
/.: .1:1
I _�.I _ ,I,I _ I I Il � I ,., I (I II
V. GONDU
,
. PLANSN
9�6S�C1I '�Cl-1
N KLONGITUDINAL 1ACITY wa Ows.,Jr
rn a
Q
V•
Z
m
V)
z
0
w
C� Of
Q
Z
Z
Q
Z
Q
ill
1,1.1
QL
a<<<<<7
Is.
z
1-
N
N
(n
ry
0.
n
0
z
Z
LLJ
o
C7
3n
Un
V J
-_
Dao
<
(J-)
Li
Q
<Qc).
Q
N
L
W
0
�
w
N
W
Z
z
�ny9Y
(D
E----
(D
ci�ory�-
U)
z
z
Q
I-
-1
O
ED
l�
w
o
W
V)
LAJ
U..
>-
w
Lr.
L
0
1O
K.-.
Ld
1
SHEET NO.
RE'V
op
0
z
1-
N
N
(n
ry
0.
n
0
z
Z
LLJ
o
C7
3n
Un
V J
-_
Dao
<
(J-)
Li
<Qc).
U
V7
W
0
�
w
Qbi
OII�
0
(D
E----
o
ci�ory�-
U)
z
z
I-
-1
O
ED
l�
w
o
W
�-
V)
o.,.
L
0
�1
-C
1
SHEET NO.
RE'V
QW<L�
w
o
>-
U
o
Q
r1r)
V)
ry
op
0
tx
N
(n
n
0
z
Z
LLJ
o
C7
3n
Un
V J
-_
<
(J-)
n,
U
V7
W
0
�
w
Qbi
�
N
E----
o
Q
U)
z
z
ED
Q
w
U
Q
w
�-
V)
V)
Q
PS2
1
SHEET NO.
RE'V
,.
2
SI -IEE C N0.
".
r
cn
,
,
�n1l
—
,
00
g g,,,
D.
N
a -
, ,r
, ,
,
0o
r
,
I
w
U
, r
CITY OF SANFORD
F—
Qry
0
<
P
Q
, ,
2
Q
N
U
Q
�-
, ,
�.
u ,
(n
00
�
�
N
v
O
2
cn
Z
U
w
v
z
F
,
z
O
+r
{
�D
a
Uj
N
X
w
N
�
w
�
w
?
>-w
.
r.
,
r
¢
FCL
i'
UU7
N
w
fi
,
`• r ,
!-
..
f..
is ,
,
, .. .
,.', y �.,
.. :-. •,
m :, r.
,.
.�. ..,. .. .. .. ,.
,•..::. .. a
-(
,
r
a z
ac
T V)
u.► z
z p
O in
O >
w
cv_
c
x
t
ac
T
O
Ez
LLw
ZE N
F U_
� O
z
LU
cn
F- _j
U U
� arc
4n U
Q�G J
C) ►u
>- a
T w
LU 4
l7
z
T �
U tx
Cr
2
SI -IEE C N0.
00
cn
z�c\j
_
�n1l
—
�
00
N
a -
z
(D
0o
_
w
U
a
X111
F—
Qry
0
<
�j
Q
U
2
Q
N
U
Q
�-
W
�.
(n
00
�
�
N
v
O
2
cn
Z
U
w
v
z
F
r
a z
ac
T V)
u.► z
z p
O in
O >
w
cv_
c
x
t
ac
T
O
Ez
LLw
ZE N
F U_
� O
z
LU
cn
F- _j
U U
� arc
4n U
Q�G J
C) ►u
>- a
T w
LU 4
l7
z
T �
U tx
Cr
1�
2
SI -IEE C N0.
00
z�c\j
�n1l
—
�
00
N
a -
z
(D
0o
_
w
U
a
X111
F—
Qry
0
z
?
�j
Q
U
2
Q
Q
U
nK
�-
W
�.
(n
00
N
�
N
v
O
2
cn
Z
U
w
w
z
F
QZ
J
z
O
't!7
z
�D
a
Uj
N
X
w
N
�
w
�
w
?
>-w
.
T
CD
¢
FCL
UU7
N
w
1�
2
SI -IEE C N0.
00
z�c\j
�n1l
—
�
00
N
a -
z
(D
0o
D
U
a
X111
F—
Qry
0
z
?
�j
Q
U
q
Q
U
nK
�-
W
�.
00
C)~
�
o�
cn
Z
U
V)
CL
U
F
z
U
U
z
Q
�
o
Q
T
Lij
a
UU7
N
w
PS3
2
SI -IEE C N0.
00
�n1l
cy)cn
N
a -
z
0
o
F—
Qry
0
z
?
U)
W
W
�.
00
C)~
�
V)
cn
V)
CL
U
z
Q
z
Q
�
o
Q
T
Lij
a
N
w
PS3
2
SI -IEE C N0.
REV:
..y II vr: yr I JL/HV V ry I P
Y,
.. _.' -.E7 - ..: .. eno In/`w'nlnu ne Ixnec:;n loo�nu na•rr , ,_... , .. .... ., ..,. .. .... - -..:, :�.,.. _ - ... � .. �. _. .. �N'R' ,. •' _. .--.s.�,....... V "... .' �. ,-/� � ,. � :�' -. � � �. .. � �'�� �� 1 ,i7 111 �1 .. � 1 I � I,I �DaT
EpS 2
E
R V -,
`° E
Z
Q
00ry
l --
_3
-jy�
w
,.
--
ry00
Cq
W
O
O
U
�
O
00
W1
w
Q
W
J
-
O
n
W
CL
000
_
4
�
W
w
)1
Cl0Cy�_
<C
G
O
Nw
U
O
LJ
zw
N
LL
V)
r
?
O
LAJ
O
�Vh
`J J
<
QLU0
�
Z
ry
W
W
V)(=)
O
z
ry
S
iS
O
Z
po
O
its
0
a
���I�1�rf,A,
ry
V)77
EpS 2
E
R V -,
`° E
Z
Q
00ry
l --
F
--
ry00
Cq
W
O
O
U
�
O
00
Z
w
Q
W
O
N
O
n
W
CL
000
_
4
�
W
w
Cl0Cy�_
<C
G
O
Nw
U
O
LJ
zw
N
LL
V)
O
?
O
LAJ
O
<
QLU0
�
ry
W
W
V)(=)
O
ry
S
iS
O
¢
po
O
its
aw,
a
EpS 2
E
R V -,
`° E
Z
Q
00ry
l --
CN
--
ry00
D
O
` r
�
O
00
Q
W
(Y
o�
Qmo
n
z
000
�
U
Cl0Cy�_
<C
f—
V)
rq
w
O
LJ
zw
U
QLU0
ry
V)(=)
F-
ry
S
W
O
>--
U
O
���I�1�rf,A,
ry
V)77
EpS 2
E
R V -,
`° E
Z
Q
00ry
(n
�wLLJ�
` r
�
EpS 2
E
R V -,
`° E
Z
Q
00ry
(n
�wLLJ�
Q
W
(Y
o�
Qmo
n
z
U
<C
f—
V)
zw
U
V)(=)
S
H
EpS 2
E
R V -,
`° E
(J. C -A
z C4 ckj
:3 Q)
Q)
C4 C4
Lu Ld -ZT
:z
Lu
Z, V-1
(Z)
c1l) (j)
t
jSHEET NO.
r��_
G)
n n:
;d
u�
at
A. G NE RAI_ J. 4
?
1. ALILATION. z L 4
;CONNECTIONS:
t
1.0 RVERENCEilO GEN ERAL` CONTRACTOR, IS-.: DEN t,
r OTEO'BY G. C,.
t,
�31f WORK 'GO
(NST'Al J NK I NSTALLAT 1,
A NO "ChN RACTOR SHALL'LBE,�C RTI'FIE'O ON PROPER TA ON. PROC
t
THREADED CONNECTION3
2. 0. MPL9TEO. UNDER THESE ;SE tt I ON W I LL_ I NCLUQE AL�
t
<
K( Ut, M T`A T, I�TXLLAT ibN
TAN 5),� PI,PI NG, Ea IP eN NO.RELA EO'I� A
NORKiNECrSS RYIFOR� -COMPLE1 ."t'.
-2 ��BEDDI K AL iS WASHED
NG ANO:BAC Fa ILL, MATER I' HALL,�'k WELL'* AN0,FREE OF I CE�a ANP iSNOW AND MUST� MEET ASTM O -A48. -
t
i%
1, THREADS SHALL': BE CLEAN'OF ALL SANO AND THREAD CUTTING OILi'PRIOR 11 TO JOININd'..
<
M, PRoOUC
AND, OPERAT ING PETROLEQ ,T STORAGIE,`H.ANO�IN6 AN
3 QUALITY AND 5OU1 0 C$HALL'P9QVIOF_ AN LYSIS "ACCEPT
ASTM C-33 ANO.-AASHTO -4, AD TO',
N k LE
.5.1
LLJ
V)
iSHALL �SUPPLLEiA�N T''Tr�
REQUI EMENTS, 5P CI IM HEREIN�,, ',Ir!Ec, ER 5
g E Ho iiY14,OWN
SE *PEP
.,
T'5 M A' E:
10�'OWNERIS ENGINEER-� H rOLLO WING T R I ALS MAY BE' us
6 1.2 APPLY THREAD SEALANT PER E-3.4 STARTALL THREADEO CONNECTIONS BY''HAND. SECURE FRP COM PO . NENTS USING ONLY A STRAP
REQUIREMENTS FOR"GE CONSTRUCTION 1.'�tREFER TOTHe'SCOPE WORK,�, A.
NERAL; OF,' PL NS �01?i
R 11: 21'� OEA�GI?AvEL, WITH* PARTiCU. SliE�NOT LESS THAN, I/tr'OR'.mdR -'THAN'�3/4'1 �'OIAMETER WIT NO MORE'3%
IN TRPC OM IE. OWNE1R.S_REPRESrNTATIVE'FOR SITE sPECiFid WAIL,;, "H
5 IT IREMaN
WRENCH :00 NOT FORCE THREADS. I F CONNECTION BINDS REMOVE,ANO RECL_EAN.�,
"IONS
3 AIiL'WORK�'�,N, L THE PLANSANO IN E14ITH,FEOERAL
A .5 N
L,BE PERFORMED AS' HOW ON ACCOROANG,
PA -5511 0 A NO. -6, SIEVE.'
!%
76'HEO'S'TON'E''V'VIT'H.�PAO�i(�L
5.13 00 Of OVERT,IGH.TEN. 'TORaUE FRP. TO STEEL CONNECTIONS TO 75FT., LBS. WHEN'OSING POWER TONGS.
-RO TEGHN1,CA4`RFaUIREMENTS, 40CPR PAR'
UN*OERG NO`SfIORAG� Aks,'' '' , '' ` , :� , , , � �i, -
, LESS'
2'2 'aGR 5 M"
E SIZE No 'THAN 1181 0 MORE JHAN 12 DIAM TER WITH NO ORE
R E
H
STATE ON Id P'&'�REWI REMENTS, NO,MO$f CURRENT -EO ION 0 EAPPd A N
_�,�SIEVE,,
AN 3% PASS NG'A 0.
�FRP BONVED,CONNECTION*.
0
NO API RtF'ERE N��
CE STANDARDS.
EEP,5 REE OF WASf
4 0 'G"C,,'SHALL'Y I TE'FJ ES AND R U B D 15 H "A LL- T I
3 sT 0 RO NSTALLATI I ON
5 1 TAPER ESCORT PIPE ENDS PER PIPE MANUFACTUR
.2 N'BONOING7 SURFACE USING ONL.Y PIPE MANUFACTURE'S
EWS INSTRUCTIONS. CLEA
: '. ., . I " 1 A
COMPLIANCE `65HA AND'�L�L�'OTHER REGULATIONS
�.��A 3. ALI-, TANKS. �HA L�BE PLA A MINIMUM,OF,,:36 INCHES 0 GRADE OR AS,',"
ED, AT
APPROVED CLEANER. 00 NOT ALLOW.GLEANER TO COME INTO CONTACT WITH TANK'SURFACE OR SUMP SEALING OEVICE5.
50ALL�.ENSURE WITH Q
� ; � �4'. �': , ,
0
RAdTRA"C' $ CONTRACTUAL �R.EQU I REM '.G.IkEb C MPLIA E
TO ACCOMMODATE, PRODUCT PIPING, SLOPE REQUIREM NT AND SET,ON_AJ2 INCH THICK�
, - �,� REQU I RED , i.�
E 5
"K,
APPLY
AND': �Ab
-.5 2.2 MIX"' HESIVES PER MANUFACTURE'S INSTRUCTIONS. AVOID SKI N CONTACT VVITH CLEANER,, ADHESIVES AND HARDENER
Ld
_j
<
P AS 1) SCRIBEQ.14 3 "SHALL B G RESP
(MINIMUM) BED A PPROVeO:bA FIL ANK"OPEININGS 5 GNEO it
L, MATE k I X�, HALL D6�Ab
DO. NOT INHALE FUMES.
_QNSI
I PLANEi, PERPEN I? I CMAR. TO T F
VERTICALL.Y TH114 A _JANKS,LONG� 0 1 NAL'AXI 5,
6� 9 A, fl-bWoO Sf6kt.:Wom�s
AT)ON,_ A 1!�ISTING STA
Ei:_ LL 5 "ARE MAI), T HALL BE`
2 SET i4K 5 LeVEL-ON BEO0 I NO MATER I AL USE ALL L 1 FT I NO LUOS. PROVIDED AND GUIDE ROPES �'AT EACH
.2,3 MANUFACTURES INSTRUC
JOIN COMPONENTS PER TI.ONS. CURE CONNECTION,PER PIPE MANUFACTURER'S SPECIFICATIONS USING
RFERENCE-WIT T'I a N
SCHEDULED AND -PERFORMEO,50 AS TO'MINIMIZEa,'INTE H THE OPERA b
j
-3,-'
� W.-
NOT 5 OEAOMAN', I F U �:,
FRP PIPE MANUFACTURER APPROVED ELECTRIC HEATING COLLAR OR CHEMICAL HEAT PACK WHEN -TEMPERATURE 15 BELOW OR WILL
'60OF
R' �ACH I N`E9Y,'
TH FAC T I ES. ALL:� DIED I S,, EXCESS E, GAVXTeD �MATER)
11�1 AND
�,
n 1 1 '� :
6E'BELOW GLINS AR'"STRIC
PRIOR To CURING. HEAT IE TLY PROHIDITED.
w
U I PMENT, SHALI. BE REMOVED D, Y'AND'MAINTAINEP CL AR OF, OP N OR VEWAYS
AIL 15 AT ALL,
A.3.3, P 1ATiR'IALi'EVENLY,AkbQNO TANKS,�`IISE
BACKF I LL N WOOOMOOK To WORK BACKFIL,L
T.I'MES,': LIGHTED SAFETY, 'I'' 1, 1,
BARR, CAOE$ SHALL, BE- PROVI OEO FOR THE PQDiL I C_5'PFOTE T I ON,
,L�'PRO13e
�),i�COMPI__f LY.0 DER, ANK.'
F E_ T
_3,` FLEX E CONNECTIONS.
LIN
il q
�'Wliil 11 .� � .1 1 L i ..,.
IT-DECOMI ",-Yajo EW'AY, 0 NERS,REPRE5EN TATIVE'SHA �13
-WHEN 'ES NECESSAO CL05E A ORV
, : 1 1,,,; '' , I . I 1 -11 , 1 0
'�'A' REPEAT 0 R NEXT 121!,PR051NG TO,FIWALL�VOIOS��,"
F 0
5'3.1 'ASTALL� FLEXIBLE LINE CONNECTORS PER MANOFACTURERIS IN,5TALLATIC)N'INS�k'U"'CTIONS,
j Nor I S,'PRIOR TO,
R CL95URE' a:'
TO:,T,6.NK. TOP$,,. B
ADQ AQI?,ITIONAL,BACKFILL` (AOO1'IT1.1QNP4� PRO ING N T" REWIRED).
0'4
"7, Q P I P I
ALL, - EQU I PMENT,,� MATEk (ALS, N ANK AND ACCESSORIES, S". INSTALL'�q
.-FREELY -
AFTER INSTALLING FLEX,LINE COUPLING., PLACE CAP. OR PLUG -ON COUPL I NOS TO PREVENT DEBRIS FROM ENTERING
IN, OANCE,wiTH 4HE '.APPL (CABLE FAG: 'T`QR E R 5 INSTRUCTIONS`
ACCQR' MAN
4 ALTERNATE INSTALLATION IN LIEU OF 5HORING
LINES.,
WHEN REQ'Q), ��%P 1: - : ,
4`1,"LP�ACE MINIMUM I'D'" a
.,BEOO.ING� MATERIAL,"AT,ENE?CAP,,LOCATIQN$
, 1"� L, 1: �,?� . � 1-11, i, 51' � , ", . I
6 LINE EST NO
,
EVACUATE`PROOUCT FROM TAN0 ANQ�LINES(, t.
�: , - 1'� � 1 -
i'4 2 �:$Ef fXNK6'(�VEL� ON. ENOCAP DEOS,nn'' USE ALL FITTING. LUGS PROVIDED 'AND GUIOE,RQpES!AT EA
A'
'SHALL.
't
tV
E 00 NOT SE ji TANKS 0( YON OEAQMI F., USED.'
CA LIT I ON., N I TROGEN FROM A GROU NoEb SOURCE Be USED I N
I A FOR STP "SYS TEm _RA,1N:LINES INTO' �ANK:BY REM V Ve OPEN I NcP TEST., PORT.
0 AqTYV�LVE
Q ING:�STP CHECK AND
A
4.43, ADO C L AT:EAG L I �:TANK, RAMP BACKFI jO'WI, HN,3FT.�'OF EXCAVATION
Kn, C: -AP, TOP.
H; E N PC, TO, 5TAI31
LIE U OF AIR �FOR TESTING IF. LINES HAVE,DEEN EXPOSED TO t
SCOkN;ECf`6TP LINION1 SWIN MQ, N
DI G, PROPUCT" INTO AN - , '� le. �'. 11�j, �i; , ',:
_QRAI 'APPROVE[) CONTAJNER�' t
4 k��'�CiJXCENT-�TO'EXC-AVATION.,5 DE A'
P LL Y
-OF, �f* T t
4. 4 A 0 DACKP I L'� 'ALONG 51 DES, N S,D 'PUMPING A, FULL" BUM
PA5C� ALL
-IN NOTE: 0 W 5 ALL LINE TESTING
NER'S ENGINEER SH WITNE,5
1 2 0( NOT�:B Oil OUT LINES WITH,COMP9EWO A, R,
�,ior BACKFILL� IN -ADOVE f AN k''T P i�USe,A LONG - HANDLE, PROBE, W1 TH
L CE�:FR6MA MIN .1L FT
ONE P �A MUM `0�
'I
6.1 G.C.."SHALL NOTIFY OWNER'S ENGINEER TWO DAYS PRIOR TO.TE5TING.
OCT*; kE`MoVib` FROM Ll Ni
PROD Of�
S*BECOMES PROP R
e GiC,,��b USEQ'!AS' MOTOR 'FUtL
NI
CLIRVEO END R NK' UFKTURE'S SPECIFICATION L 0 NO TOP OF, E CAVA ON
(0' A19,JET PER, TA e'StAN At! -
A
C
CAUTION:, AP FLEX CONNECTOR OR FLEXIBLE LINE AT STP PRIOR
C, T6
To MOVE� BA KF I W,'� UNDER 4ANK SIOES,":REPEAT� 15��ROCEQU I L,, PA
REt.UNT CKF I LLA S: 12 IN T
Up f�',
TEST I NG,', APPLY 41 RELEASE: PRESSURE 5LOWL y
j -1.,3 :REMPVE.LIQUI9,4 TANK�.bO4,roms TRUCK�IN LIEUQF ON S1,TE STORAGE -,CONTAI.NERS,
t 'U tL FROM
ILATIQNS,,: RE
DEPENDING ON'LOCAL REGIL CO) M t
VERW MATERIALLMAY':Da ANAGED AS OFFSPEQ,!PR(
'scLJO
L
t
5 ET EXCA ION,GQND1ITION,5;.* -
4 VAT
2 PROD C T-1 E'SkALL`BE:.TE5TEO
N STP TO SAFETY VALVE.
AT L NAG 0 AS A . . 1�.. .
INOUSTRIAL:O .;MUST:6E,MA E'
-HAZAR 0
6 0 WASTE.: IF ERiA 66
:,� , , , . I , � t.
'� ' ` "a'". ';1
VENT/VAPOR SY5TEWSHALL�B E TESTED FROM TOP OF VENT, THROUGH
�5,
LLoW:,qYI ENVIR OLI NO.: MANIFESTING NO QISPOSALi''"'i;"�
FO REMEkfS,'r0R'HAN
_ONMENTAL-�RWUI A'
'�
A,-5. 'a-,G.-,'-5HALL'BE RESPONSIBLE,`TO EVACUATe,VVATER -FROM 'IF CONO f
X AV TIO t
E C A. I IONS
-MAN [FOLO, EXTRACTOR BASE AND RISER, �57`AGE`I CONTAI NMENT
R E ZAkQQUS WASTE, 0 1 SPOSAL., FAG L. ALL':DE, USE
ONLY OV.VNER�APP OV Q, H,� ONSULT THE,,,
-Ii .,I.TIES �H.
Q1 -APPROVED '-t
NE' BaYL OSHA NQ OWNER 5
�IRE SHORING, CONSULT �rgl?'S ENO! ER.�METI46Q MUST BE A
MANHOLES, STAPE,11' VAPOR LINES TO ISLAND 4 STAGE I I. FLEX
'C
APPROPRIATE ENVIRONM�NTAL:I.�N.GI.NEERINC;& CON -FACT FOR" PROCfSSINGAS51STANCE� IN.,,A�L
`6
NNECTORS AT DISPENSER'S. REPLACE 5
BALL� FLOAT CAGES WITH PLUG,
t
ZE, SUR C.
4 .2,�MINIMI FA �,iWATERiENTERING EXCAV QNSTR 0 0 Q 5 `A OLIN TANK F,I ELI)
ATION,DYC N AM 0' 1j,
U YPS,
ANOREPLA C E STAGE, I VAPOR RECOVERY �SPI,LL ONTAI*NER DRAIN VALV
C ES
TOP6 PLUG tALL'' OPEN I NOS, REMOVE TANK,
2 0 bItAVATE,"TO TANK REMOI �ALL.l TANK'AOPURft�ANCES,'
1.
EXCAVATION AND PIPING TRENCHES,
WITH PLUGS. �GAUTI,ON ENGINEER ANG G.C,,�$HALL VERIFY EXTRACTOR PLUG'
AND P�Aa I,N,A SE MUST,.HAVE`AN 11611 JG FOR VEN'T
6UR LOCA ONE TANK, PLUC. HOLE"INIP'Ll
T'o
''t
INSTALLED ANO,,QAP 15 REMOVED FROM TANK MONITOR RISER PRIOR TO,,�
t." , r -:. - �:; "', t
"ISI, �ONTiNGEN6"Y" PLAN ',5HALLtE.,:BY'G.C� OUTLINING EMERGENC EOURES FOR
Y, PR6C
PRE55UR E TE5TING'VENT/ VAPOR SYSTEM.
EAT B-�I,�3 THROUGH'ALL E ,13-1.3, , - _ a
IA N U
10: REP], I TTINGS, TO REMOYE REMAINING RESIO E, 0 PER
R 5, 0 E SHALL BgtMANA.0
- In
n OBTAI N NG THE� ECES5A E L HA 'TH JANK,"
k RY, E UIPMENT,ANO/OR. P R$ONNE,, TO NOLE UNEXPECTE �IN
9 WATER ENTR TO El
6.A FRP L INES
4.0 �,QECRIEAS94ANK TO L [0%ii,QF'TH LI�MIIT,'f LEL). PER..THE'F LOWING
E*S: THAW
FIELb=ON 'OR NS CONSULT OWNER 5,�.
PIP-INIG TR'ENGIIt�., WHEN iWATER MAY CONTAIN DO,
ENVIR ENGINE
6. 4 1 'SLOWLY PRESSURIZE PRODUCT LINES AND VENT/ VAPOR LINES TO 50 A
M
'OREFER9 (INERTING
ED, ETH
';'IN T LL." 4A
4 5 3 S A TAN KS PER,A3 OR'
IRE.PIPF SURFACES INCLUDING
SOAP TEST ENT JOINTS AN FITTING5.�'CORRECT ANY LEAKS AND RETEST
DOI NG IN I..MUM f ANK CAPAC IT�
A R, 10.0, G LLONS. Q
ANEFT Y�PoRS'13Y.AO', C� E A
-W dR'I'N.G
c
6 4.2 MMEOIATELY LOWER PRESSURE FROM VAPOR/ VENT SYSTEM TO 5 PSI,�
I
.'REMOVE EXTRACTOR PLUGS. REDUCE PRIMARY LINE PRESSURE TO
A LTERNATE METHOD P URGjNG -
A.6.1 JANK ANCHORING HER�, REQUIRED BY, EXISTING GROUNQW TER CONOITIi N*,, AL
W A 0 sH 1:13E
30 PSI.' MON I TOR DAILY UNTIL ALL�PAVING IS COMPLETE, -
T I LATE TANK�.U� CATOR OR OIFFU5eR (EXCAVATOR
5HEO USING STRAP5.ANO TURN5UCKL MBILIES BY,THI, UFACTUR4ER, AND,'
CcOMPLI e X�SE ElAkS MAN
'TANK
6.4.3 ASSEMBLE SECONDARY SYSTEM AND, PRESSURIZE TO 5 PSI.
,MUST
TEN0,12 K TOP �`A VEk T'L, I N E
EX FT. MINIMUM ABOVE'TAN
1 5 A 0 CT GORDAN E vvi f�H, THE
N T LLE 1,N'S.fRl AC MA UFACTUReR $ REU
N UIREMMTS.�, AL
PJEST ENTIRE PIPE SURFA
SOA NCLUDING JOINTS AN 0 FITTINGS.
EXTENDING OP MUST BE ATTAC n'; i�w
.12 F�,` MIN IMUM,XbQVE:TANK,'T H
OE To BE COA PPERS �00MIPDXY,'APPL I ED: I N CORREG T AN.Y,LEAK 5 AN 0 RETEST. MONITOR DAILY UNTIL ALL PAVING 15�COMPLETE,
L Y HAR WA TEL) WITH,KO
'ER'S'RECOM
TO.,,ifANK 41 USIN G I
E WITH MANUFACTU MENOATIONS,
6 A A 4AFTeR,TESTING HAS BEEN SATISFACTORILY COMPLETED AND PRIOR TO BACKFILL" ALL EXPOSED GALVANIZED PIPE THREADS,
5.0'�ALL T E6A: Q) TI-F'I'EO. if n
WS MUSTBE DEGAS* N C R "'-CLEAN. BY Goc,�T"',,
5,0 RISER COATI NG'ANO, NRAPPI NG
JOINTS WRENCH MARKS AND ANODE CONNECTIONS ARE TO BE COATED WITH COAL TAR 4 3M TAPE, EPDXY APPLIED
INACCOROANCE WITH THE MANUFACTURERS RECOMMENDATIONS,
6. 0' PRIORiTO TRA A
N SPORtIN&MY TA ROM 5 TE,� !LEG I 13LY L. BEL AS FOLLOWS"
5.1 PRIOR TO COMPLETION OF BACKFI LL. AND AFTER, PR
_ESSURE TESTING TANK, CQAT ALL,GdOdblbu COMPONENTS
c�,
1ANK H CONI AMEQ:�, F L blbs,., I'
A
EXPOSED TO BACKF I LL WITH COAL,TAR EPDXY AND WRAP. WITH FELT,OR 3M TAPE. ,-ALL 'COMPONENTS SHAL�' BE
' - I . i
:;615 ':RT,,5HALL PERFORM PRECISIONJEST ON PRODUCT LINES AFTER PAVING 15
I I
4.
, .
CLEAN AND CORRO ION FREE�BEFORE LY!NG. COAT ING., eXTENO, COAT NTc
NO V_,ONTO ADJACENT FRP OMPONEI
COMPLETE, PRODUCT HAS BEEN PLACED IN TANKS, DISPENSERS HAVE
'NO.T,�'GAS'FREE.-�,NOT,�$UITABL FOR FOOD
BEEN INSTALLED, AND FINAL TO PRIOR'PRojECT ACCEPTANCE.
T
QR OR I KING�WA ER;!
�6 ALLASf ING
:�o
I OPEN EXCAVATION FOR. EVIDEN
7'0`t�6�NER. 5 ENGINEER SHALL, N$PECT CE "OF ALL- HYDROCARBON
AS
6.1 YI BALL TING
r'. 0, 1 SPE NSER''
ReLEA$
6
6 1 'G,� 0 TAN TECT AND STORE REMAINING
U I
'I AfTA)CH:ONLv STP RISER AND MANIFOLD HO N, K '��G.C, SHALL: PRO
1. 0, DISPENSER SHALL BE SECURELY ATTACHED TO ANCHOR BOLTS WHICH SHALL BE
t
�;60VER fop n
COMPONENTS." OF:STP MANIFOLD WITH PLYWOOD SECURED THROUGH EXISTING DO t 'H L in
§.P L 0 ES,
�ET:IN CONCRETE:ISLANI). ANCHOR BOLTS SHALL. i BE AS��,'
allANTITY AND SIZE OF
%
C. , EXCAVAT I ON
SPECIFIED IN 01 SPENSER �MANUFA TURERS',IN5TALLA' 6N,�j
ri NSTRU`
4
1 6 sibes�'oF'TANK H VATIoN SHALL B 5LQP Q N'AC ROW A. ni
OLE Ea
XGA' I" Go ','E, KI tH 6.S. H.
-6. 1, 2'" :'10 ASSUME RESPoNs1B1L.1TY F R C P ETE
TO'BE: PROVI DED BY CONTRACTOR,.. G.G d 6M_ L REMOVAL AND
"CONSTRUCTION SAFETY,4 HEAL.TH kEGULATIONS'I 5UBP RT P -EXCAVATIONS,' TRENCHING
0 SCHEOLIONG. GASOLI.:' I ., , -
DISPOSAL OF,tWATER BALLAST AN N'E DELIVERY PR[CR TO. PRODUCT PIPING PURGE,
ISPENSE R sHALI_i;BE ACTIVA10"bNLY'N ORESENCE"bF AN AUTHORIZED
I � , . 4_
t E :)TH� SHALL,,'
,56.266Q,THRU 1926653'. -RECOMM NVATIONS, FILTER FABRIC 'CLI BE USE TO
", I a. . .!� , , a It n
:ST*
DISPENSER ART. -;UP, CALIBRATION Ef
E NTATIA, G G.' HAS' LE RESP NSIBILITY FO R DAM
i, OISP NSER REPRESE so 0. AGE TO
RIOR T 0 GRAVEL 13A
BOTTOM ANO,SIOES 'OF TANK HOL� P CKFILL, FIL�ER �ABR M,
t -9
DISPENSER IF THIS INSTRUCTION 15 NOT FOLLOWED. t
:t
ALSO..,LAO !bF T A EAS
OF -TANKS TO PREVIENT,"INFILTRATION OF�EAR H INTO TANK
6 1 3 REMOVE PLYWOOD COVER FROM STP, MAN I FQLo. COMPLETE STP I s LLAT bN ONLY Ah
A
T TER,REMOVING ER.',
: f I
�FRO m TANK.,
t
3.0i,PURGING AIR.
:'n n ". " �a
.2.0, EXCAVAT ON $HALL BE SIZED TO OVI�O" i'A, MINIMU9'IFT FT B E
, . 9' 1 TANK, BED,, 2 f V VEEN -TANKS ANO)FT,
3A ACTIVATE,'ANY OISPENSER,� 00a NOT OPEN A'NOZZLE. LEAVE OISPM50",,
BETWEEN tANK 541.0ES/Eh"US -AND. EXCAVATION, III 11�t 't" ;� , � ,i,. � �� .1 a
n
n
R PAVjNG,1S COMPLETE) J
ON FOR,. N
"MINUTES. TURN DISPENSER OFF AND'ALLOW TO STAID FOR MINUTES. -
n
/0 ':�
3.0, OWNER RESERVE. HEn,RIGH ' N Lit �t,
T T TO LE IN NQER AN:AMENOEO
SIG R.CONSTRUCT SHOR G
AN
T
IA G. C. SHALL� GONTAC R.T. 'OWNERS LENGINEER 10 HAVE PRECISION TES N PRIMARY TANKWTER PAVING 15 COMPLETE,
I
3.2 ACTIVATE DISPENSER MOST REMOTE:FROM STP AND DISPENSE (150 GALLONS 'FROMTHE FARTHEST�,,
'n
.,AGREEMENT
. P . I
' - ' ' ' I � , '. 1 1
'H--N
WI, IF'OWNER ENG E5 G.C,,j, G.C. $HAL UBMIT 5 ORI G
TH'G.'C,' OR,,5EPARXTELY WITH ANOTHER COMPANY, A
4 1 . 'PRODUCT HAS BEEN PLACED IN TANKS,' OISPENS RS HAVE DEEN'.INSTALLEC),'ANE) PRIOR To FINAL PRQJ ecr ACCEPTANCE.
ALLONS FROM
TWO DISPENSER$ AND 50 G ERS) INTO A GROUNOED,�CONTAINER APPROVED FOR
ALL OITH
N JO. OWNER 5 ENGINEER FOR'APPROVAL, ,.SUPP E L JOB: SCOPE: AND, 5,
LEM NTA CQ T� SHALL BE'A
STORAGE AND HANOI-ING OF CLASS I FLAMMABLE LlaUlOS, REPEAT FOR EACH �HOSE AND, DISPENSER.
n
'n,
TO� I N TERM$ OF A" CONTRACT '�*HOR E
;iE QRQER,PRIQR:lT0 COMMENCING WORK. ING'SH
CHANG ALL;5 E, REMOVED,
');'OR
P ING" n n.
I P _T -0- PIPE MANUF ACT URER'S LL' A60N CHiCkLIST,
INSTA 5 HA 'BE.INITIALED ANO SIGNED BY G,C�ANO OWNER 5 ENGINEER, As
MOVING PROGRESSIVELY CLOSER TO STP. REPLACE PRODUCT USED FOR L'INETURGE INTO
E,
R SP C IVE TANKi
I OR'40 IN5TALLINGnPRQOUCT .
PI.PING.'vQ,N r,ABANQqNT6HORING IN, PLACE..
,
'CH
t
"t ;
TANKS,
APPROPRIATE, AS EA 71 STEP C QMPLETEO,
'�4.0 ELtCTR I CAL CHECKOUT:
't
TAL�AT 16N PRACTI' ES SHALL BE IN ACCOROANG
KMANSH I P �AND N C
2.0,'ALL MATERIAL WOR S WITH NFPA APPLICABLE CODES.
n:
"TANK' A KLIST SHALL -)/SIGNEO BY G. C, AND OWNER' 5 a,
1 0 MAL r CTURER, 5 IN5TALLATj6W:CHEC BE I,NITIALEL
'4.1 TURN OFF ALL STP CIRCUIT BREAKERS.�
NGINEER, AS APPROPRIATE, AS EACH 1STEP, 15 COMPLETED t
10 MATERIAL$
EQUIPMENT SHALL BE ADEQUATE TO.HANDLE TANK'WITHO GIN
UT,ORAG G,` USEIALL.111 NG�LUGSANO
I,, ALL'VENT, ANO,VAPOR R TURN,SHALL BE FRP SMIT F I BERGLASS REO,THREAO II TH 058000 SERIES AOHES
7A (wj IVES)
4.2 CONF IRM ALL� NOZZLES ARE IN THEIR BOOTS.
GUIOEtINE5,,jWHEN.LJFT,I UVEV,�ANGL K HALI,:� OT,
n THE.-iNcL "-E.DETVVEEN�LIFTINGIL-INES,ANC) TAN 5 5' ' '"'N'
,NG'TANr
':'PO
4.3 'VERIFY ALI- StP'S ARE OFF,'
B LESS� THAN �50., REST TANK 1 5 ON TH'ANO DEBRIS FREE ojRoUNo.,cHocK -TANKS WITH N
I I RES To, PR 9 T,
n
2 MARY PRODUCT AND SECON ARY CONTAINMEN, LINES�SHALL'BE FR P
I T I PE AS SPECIFiED IN �E-3.1',
P
4.4 ON CIRCUIT OR �ONE -AT
NOT DRAG JANKS.,
TURN BREAKER FL ONE STP, HOSE A TIME FORL
-5-12 A
6
-3.3 TANK RISER SHALL BE SCHEOME AO: ASTM �VAN I ZED, IRON PI PES., FITTIN 'SHALL�, 13E 300 PSI GALVANIZED
PRODUCT GRADE MATCHING ACTIVATED STP, PERFORM THE FOLLO ING A cH 0 1 SPENSER,
W T
64ANK.TESTING
MALLEABLE IRO�'L ALL 7COUPLINGS AND. FITTINGS SHALL'BE SHOULDER STYLE. -Not STREET COUPLINGS OR F I ff I NO SHALL' IDE' ALLOWED'
E ZLE
3. 1, STAN OARO VACUUM T 5
E i
' ' ' n
OF, CLOS CONTINUOUSLY THREADED STEEL,PIPE, NIPPLES SHALL� NOT 13E PERMITTED
� .1 a . . I
A.A TO AN
.2 ACT I'VATE OPERAT I NG HANDLE AND DISPENSE PRODUCT IN D ONTAINER,
3. 1,1 ANTERST Ce VACUUM:ON TAN A�L',BE VER FIED'PRIOR TO UNLOAOING'AT 5
KS 15H I ITE AI IMMEDIATELY
AFTER UNLOADING AT'SITE,, AND AFTER TANKS ARE SET I 5ACKFI LLED TO ENSURE TH T. THE TANKS n.,
t I
ALL,THREAM) CONNEc ALL, BE TREATED WITH GASOI[LA'.100 0R.JOMAR 100 I1THE'H' W'I 11 i( 06t �q-
TIONS SH EAVY, E dHT. I" QMPAtl Dle -ALL, F'UeL$
.
A.A.3 -,VERIFY ONLY CORRECT STP TURNS ON.
'AR INTACT..'. VACUU TAIN
E M LQGS'TQ.BE�MAIN E d, DAILY 6Y,G G
��,-3 , 5HALL OEMONSTRATEJO OWNER �'NGINEER ALI�,,'INSTALLEQ MATERIALS AREAEW AND CONFORM TO A13OVE SPECIFICATIONS
G G.
A.4,4 VtRIFY BRA'NO PANELS'ON EACH SIDE OF DISPENSER MATCHES PRODUCT BEING DISPENSED BY STP.
3 SURE TE
�,,;�,ALTERNATE,PRE,S ING
V�
4.4. ERIFY T NOZZLE TYPE IS: IN'STALLED.
CQRReC
CAUTION-�-`OO NOT.,
A10 AT
ALL ION
REPEAT F -�A, A FOR EACH PROOUCT'GRAOE,
LEAVE PRESSUR I Z ED TARKS-UNATTE NO
4.1 INSTAL I -ATION CONTRA TOR SHALL BP CERTIFIED BY PIPINGAANUFA TURER.:
�5 0 ACTIVATE ALL. 5TP CIRCUIT BREAKERSONE HOSe'AT A TIME.,:FOLLOW
�2 .-APPROAGH TANK'ENOS., OR PLUGS,OF PRE,
5SLIRIIED TANKS'
F 4.2 AN 1) F
4' -4.k3 FOR EACH HOSE.
:3) EX 51 1 ANNULAR S Y
CeEO 6 P, PACE a, OR PRI.MAR TANK,
CORROP I BLE COMPO
�4.2 5H E US0 0 5PEC FIEO AND IN THE ARRA
NENTS ALL*� B NLY WHERE. NGEMENT, 5HOWN, IN THESE DRAWINGS,
6.0 IF MISCONNE , CTIONS OR OTHER PROBLEM S'ARE DETECTED, MAKE CORRECTIONS
:.A) :ATTE E A
T TO 0 PAiR A OAM PEOJANK,�,
, .
ANO REPEAT ENTIRE DISPENSER CHECK -OUT PROCEDURE.
APPLY AIR PRES SURE TQ'ANY,,TANK WHICHAAS CONTAINED, MOTOR FUEL,,
A, 3 BEDDING A NO BACKFILL MATERIAL:,SHALL'BE THE SA A
M * THE_'TANK FIELO.''SANO SHALL- NOT BE USED UNDER AN Y'CIRCUMSTANCE*,
j,7
PRO UCT LINE TRENCH SUB- A A
R OE SH 'LL BE COMPACTED TO 90% PRQCTER DENSITY PRIOR:TO, INSTALLJNG.DEVOING AND
AOTE, SUCCE55FUL COMPLETION .0 F F .0 AND F-5,0 LL CONFIRM COMPLETE
'WI
�Ahl)
.2, IGHTEN 'ALL TANK PL UPS, 'USE MANIFOLD AND TEST'GAUGE WITH' 0.- 15 PSI RANGE .1�41_B.`,, I NCREMENTS
BACKF I LL, MATER I AIL
CONTIN
INTEGRIT UITY OF DISPENSING ELECTRICAL'ANO PIPING SYSTEMS.
7.0 DISPENSER CALIBRATION: -��UBSEdUENT TO ST ART UP OF NEW DISPENSER BY THE
QUT, L TEST,
-4.A iPI _EO" km PLACED LINDER BUILDING
L L' B S;ANO S AL
PING SHA e INIM17 H L.BE.INSTALLEO WITH MINIMUM'5PAC,ING,ANO
OWNERS AUTHORIZED SERVICE REPRESENTATIVE, THE G,C. SHALL PROVIDE A
STATE CERTIFIED 5 GALL�ON CALIBRATION CAN AND ADJUST CALIBRATION OF
PRE �MAX,
'';'3.2.2.1 ,,,CLOSE MXNJFdLO,�_,L E 5SURIZE PRIMM XANKTO.�' PSI,
BELd'
CLEARANCES SHOWN' W IF PIPING ROUTING 1.5 NOT SPECIFIED' G,C SHALL INSTALL IN THE MOST OIRECTiRO UTE, SUBJECT
EACH DISPENSER H05E TO ZERO TOLERANCE FOR EACH 5 GALLONS OF PRODUCT
j "6LOSE,'AIR SUPPL.Y, VALV'
3.)_2.' E AN0,01SCONNECTAR.SUPPLY. ,(THIS STEP GUARDS
-TO APPROI BY OWN ERIS ENGINEER,
ON BOTH FAST ANO SLOW RUNS, -OR AS DIRECTED BY LOCAL. WEIGHTS
R PRESS U
AGAINSTbVE RIZINdPRIMARY TANK),;:
A NO MEASURES AUTHORITY. PRODUCT USED FOR CALIBRATION OF DISPENSERS SHALL
j3`0RESSU'RIZE ANNULX0,SPACF_
.4 5.,� PRODUC LINESHALL, SLOP ONTINUOU5LY UPWARD FROM 5 TP SUMP'A'MiNIMUM OF 1 'PER F T.; -'STAGE I ANO'ST�GEJI
C
BE RETURNED TO I T5 RESPECTIVE STORAGE. TANK. REPLACE ALL METER 5 EALS.
'FURNISH,OW WIfH
.2 PENIhb'MANIFOLO VALVE1,:,:,`,i
3 BY 0
-"VAPOR RECOVERY LINES AND, VENT. LINES-5HALL SLOPE CONTINUOUSLY UPWARD FROM VAPOR, MANI FOLO A MINIMUM
NER CAL15RATION REPORTSHOWING FINAL CALIBRATION TO ZERO T OLERANCE,
M.INUTES,MINIM SOAP ENT R RE
3t'2,2 MAINTAIN PRE55URE FOR 30 E'TAN K JECT ANY
-PER FT.,
BEFORE STORE STOCKMG.
'INSTALL.
I CH, FAI Ls OUTER VI TEST.
"THICK
8.0 NEW OISPEN5 LT RS'AFTER COMPLETING ALL LIQUID TESTING...
rR F1 E
iN,5PECT
PAV NO 6,
EACH DI
ACTIVATE EACH PRODUCT AND SPENSER AND FILTER FOR LEAKS.�
2 3 INNER WALL,,TESTt,
RECHECK PRIMARY LINE.CONNECTIONS AT DISPENSER BASE AND STP FOR LEAKS.
I
r 7
CAL I BRAT ION TES 'SHALL BE'GIVEN TO RACETRAC ENGINEER PRIOR TO 5 TOCKING STORE,
.3 L MAN I FOL URE�BY,'OPEN
'C 05E OiVALVE,ANO RELE.A$E�PRWARYJANK'PRES5 I iIIiIG Xlk SUPKY VALVE,
G. MISCELLANEOUS REQUIREMENT.'
MON I TOR ANNULAR SPACE'PRESSLIRE FOR �AT LEAST,30 MINUTES AN 1) No MORE. THAI
E L
PIP 1'N'E5
'4
t " L : � L , , I
'
. E FIN15HED ORADE.
o,:;, I SET, �ALL TANK: SLAB MANHOLES AND STREET BOX EL EVATIONS 2" ABOV
60 MINUTES.;, REJECT ANY-JANK WHICH FAI,L51NNER WALL,, TEST OR ANY, TANK VI I CH
PNIAC
HAS BEEN DROPPED OR IMPACTED. C I JANK,MANUFACTURER FOR REPAIR,
t'711 MIN'_',
, , 4 , :
ct/
PRIMARY'Ll AV, L
,
$LOPE 5/16 INCH PER FOOT) CONCRETE AWAY FROM RIM TO MEET SLAB GRADE
3 2 �-;FOLLOWI NO TANK PRESSURE JEST A ACUUM $.H1ALL�BE'PLACEO.BACK,ON THE INTERSTICE
SECO NoARY,
'4,2 PRIOR 10, INSTALLATION CONTRACTOR SHALL SET SUBMERGED TURBINE LENGTH �50 TH AT MOTOR I S V' OFF OF TANK DOT -TOM,
3
At THE MAINTAIN A
SAME LEVEL AS WHEN, THE 4ANKS:ARRIVE0 ON SITE G.C,��'SHALL �,OAI LV
4.3 UNLE550THERWISE INOIbAl 1), ALL.'CONTROL AND ELECTRICAL WIRING SHALL BE RUN IN
LOG,OF N ,
Y�CUIUM READING$ ON!AL-L, TA KS FROM THIS POINT - FORWARD UNTIL, ALL, PAVING
_ - 11 1 1 . 1. 11 � 1, I
1.11. . '': ,.. 4
I 1
3/14" GAL.VANIZEO CONDUIT IN ACCORDANCE WITH NFPA 7.0 CLASS 1, GROUP 0 RE(2UIREMENT,
. .. I � I �
:COMPLET E,
I FOLD HOSE
A MIN
. . I : L
.4 PROD UCT,I)ISPENkRS (MPO 5 TO 13E SET AND CONNECTED IWACCOROANCEATH MANUFACTURER'S REQUIREMENTS.
LY VALVE
AIR SUPPLY VALVE
j
'A
R
'INSTALL 11YS, SWIVEL$ AND NOZZLES AND CHECK FOR P OPER OPERATION.
MIN
REMOVE ALL PAC KAGINO MATERIALS, TAPE. TAPE RESIOE ANO'THOROUGHLY CLEAN EACH DISPENSER TO REMOVE DUST, FINGERPRINTS, SMUDGES, ETC.
a
4.a5 PRESSURE L I NE LEAK, DETECTORS., _I_ (NEW AND EXISTING) PRESSUREA.INE LEWOETECTOR5 SHALL DE CHECKED
�A[
AIR SUPPL?t"
"ANNULAR SPACE
A 0 TESTED FOR PROPER OPERATION, LEAK DETECTOR CHECKS AND TEST SHALL'13E WITNESSED 13Y THE OWNERS REPRESENTATIVE.
'TO
Y
PRJMAR TANK,',
PR E55U R G E
PRESSURE GAUGE
�MIN
n,
mi N
n
H CONCRETE
'PAU
MAN L
I FQ V
7.
0 CO
1.� NC�RETE SHALL BE,IN ACCORDANCE TH OWNER 5 PAVING SPECIFICATIONS AND OETAI LS.
PRESSUR I ZE, PR I MARY TANK
VALVE a
AS BUILT'ORAWINGS PLAP
XIMI I
ITO 5 PSI, MA,
PRESS
1.0 G.C.':SHALL PRQVIO -A C
E OMPLETE SET OF AS BUIL11)RAWINGS TO SCALE, CITY OF lForm
sm
r
DEPICTING PRECISE LOCATIONL OF ALL COMPONENTS I NS TALLEO (INCLUDING
PRIMARYJA N K
PRODUCT/ VAPOR LINE. sizEs AND LOCATfONS, GONOUIT SIZES AND LOGAT I IONS
1
,FITTING,.
E TC.) IOR T 0 OVI ENO INEE R PROJECT ACCEPTANCE�
in
-
-tA
in
77-7777-
L
(J. C -A
z C4 ckj
:3 Q)
Q)
C4 C4
Lu Ld -ZT
:z
Lu
Z, V-1
(Z)
c1l) (j)
0
jSHEET NO.
r��_
G)
-
CD
u�
0
AW
LIJ
z
�7_
<
I-_
V)
0
LLJ
<
0
z
>
cl�
<
LLJ
V)
V_
(J. C -A
z C4 ckj
:3 Q)
Q)
C4 C4
Lu Ld -ZT
:z
Lu
Z, V-1
(Z)
c1l) (j)
P s
0
jSHEET NO.
r��_
G)
-
CD
u�
0
Ln
V)
0-
LIJ
z
�7_
<
I-_
V)
0
LLJ
<
0
z
>
cl�
<
LLJ
V)
Z
u
<
<
z
_:c
LLJ
q
<
V)
0
ILL
LLJ
L.Li
Ld
_j
<
V)
_j
In
<
�V)
V)
P s
0
jSHEET NO.
j RE7V]
i _
-- - -
�,�
t
�`
�i
a�
,i .
d
'.O I�
i
��
I..
i.
I
i.
r
Fy:. _
..
i _
_ __ _
`�`
"4
.,.
i:; � `.
,.