Loading...
3760 Orlando Dr - BC00-000632 (GAS TANKS) DOCUMENTS0 v- �5 M ZONE _ DATE. CONTRAC ADDRESS PHONE # ,l LOCATION %CPUC f�'1 OWNER _ ADDRESS PHONE # PLUMBING CONTRACTOR nnnoccc SUBDIVISION: PERMIT # LOT NO. BLOCK: JOB `i!- SECTION: COST $ G`j / / �, UUP SQUARE FEET: FEE $ MODEL: STATE NO. OCCUPANCY CLASS: FEE $ PHONE # ELECTRICAL CONTRACTOR FEE $ ADDRESS PHONE # MECHANICAL CONTRACTOR FEE $ ennpp.q.q PHONE # MISCELLANEOUS CONTRACTOR ADDRESS SEPTIC TANK PERMIT NO. SOIL TEST REQUIREMENTS �) FINISHED FLOOR ELEVATION REQUIREMENTS ARCH ITECTURAL APPROVAL DATE: FEEnn$. rJ INSPECTIONS TYPE DATE OK REJECT BY ENERGY SECT, ,j _ _ I I CERTIFICATE OF OCCUPANCY ISSUED # FINAL DATE /EPI: r, ) �f �,j Cvn —IK( DATE: SEE SITE PLAN FOR LOCATION OF TRASH CAN MOUNTS G PS4o` I . SEE SITE PLAN FOR SPECIFIC ISLAND LAYOUT (S) 2. REFER t0 DETAIL 9/ PS -1 FOR HOSE (� BIB LOCATION RELATIVE TO BUMPER PS4 POSTS. REFER TO SITE PLAN FOR LOCATION OF HOSE B I BBS ON SITE. TYP, PUMP I SLANG DETAIL TPS`"'T N.T.S. E PS4 SEE SITE PLAN FOR LOCATION OF TRASH CAN MOUNTS 181-011 111 61..111 41-011 61-111 Ili O G PS4 ❑ 0 I. SEE SITE PLAN FOR SPECIFIC ISLAND LAYOUT (5) 2. REFER TO DETAIL 9/ PS -1 FOR HOSE BIB LOCATION RELATIVE TO BUMPER PS4 POSTS, REFER TO SITE PLAN FOR LOCATION OF HOSE 1311355 ON SITE. A , ' ALT, PUMP I SLAN O OETA I L P'S `'7 N.T.S. NOTES: I. ALL CLAMPS ON SECONDARY CONTAINMENT TO BE TORQUED TO 60 FT. LBS. 2. SEE SITE PLAN FOR SPECIFIC TANK AND DISPENSER QUANTITIES, LOCATIONS, CAPACITIES, ETC, 3A. ALL THREADED METAL PIPE CONNECTIONS TO BE MADE UP WITH GASOILA-100 OR JOMAR "THE HEAVYWEIGHT". NO SUBSTITUTIONS WILL BE ACCEPTED. 3B. ALL CONNECTIONS OF FIBER GLASS PIPE THREADED COUPLINGS TO FLEX CONNECTORS SHALL BE DONE USING 8000 SERIES ADHESIVE, 4. CONTRACTOR TO CHECK ALL FACTORY CONNECTIONS ON DISPENSER MOUNTING BOXES FOR ADEQUATE SEALING OF PRODUCT. 5. ALL FIBERGLASS PIPING E FITTINGS TO BE SMITH FIBERGLASS RED THREAD 11 6, ALL PIPING (PRODUCT, STAGE TWO VAPOR RECOVERY, SECONDARY CONTAINMENT) TO SLOPE 1/8" PER FOOT BACK TO TANK. 7. USE ONLY 8000 SERIES ADHESIVES TO JOIN PRIMARY PRODUCT AND SECONDARY CONTAINMENT PIPE AND FITTINGS (05-8014, 05-8024, 05-8055, OR DS -8069 ADHESIVE KITS) FOR ALCOHOLS AND ALCOHOL -GASOLINE MIXTURES, WHEN JOINING SECONDARY CONTAINMENT FITTINGS, A SPECIAL FILLER FROM SMITH FIBERGLASS PRODUCTS MUST BE ADDED TO THE 8000 SERIES ADHESIVES. WHEN USING THESE ADHESIVES, FOLLOW THE INSTRUCTIONS PACKAGED WITH EACH ADHESIVE KIT. 8. ALL DISPENSER BOX PENETRATIONS TO BE TESTED WITH WATER FOR LEAKS PRIOR TO BACKFILLING AROUND BOX, 9 ALL STAGE TWO VAPOR RECOVERY LINES TO BE BLOCK TESTED BY G.C. PRIOR TO PAVING OVER PIPING, 10. G.G. RESPONSIBLE FOR PAINTING ALL EXPOSED METAL ON VENT RISERS AND SUPPORTS. 11. ALL GALVANIZED RISER P (PE THAT COMES IN CONTACT WITH BACKFILL SOIL OR PEA GRAVEL 15 TO BE COATED WITH A BITUMINOUS COATING AND WRAPPED W/31M TAPE FOR CORROSION PROOFING. 12. REMOVE CLAMPS AND SLIDE TEST BOOT OR DONUT FROM SECONDARY SYSTEM, UPON COMPLETION OF TESTING (IE. AFTER PAVING IS COMPLETE.) 4211 I SPECIFICATION QUANTITY FURNISHED UNDERGROUND STORAGE TANKS Qu cr 1611 w 13 1/2" WATCO/HIGHLAND SEE PLANS 1611 ACT -100 DOUBLE WALL COMPOSITE STEEL UST - 10' 0 - 1x/000 GALLONS WATCO/HIGHLAND SEE PLANS 14 112" HOLD DOWN STRAPS/TURNBUCKLES WATCO/HIGHLAND 3/TANK I TANK EQUIPMENT J CL m 2 HP VARIABLE SPEED SUBMERGED TURBINE PUMP FE PETRO IST -2R I I I /211 OWNER 9 f/410 FE PETRO VFC I/STP I 1" VAPOR ~-_RECOVERY T_� 42" STP CONTAINMENT SUMPS °O i THROUGH SIDE `i M PETRO FIBERGLASS I/STP OWNER 4" PIPE CAP OPW 116-7085 I/STP AND I/TANK OWNER FLEXING TEE FLEX CONNECTOR ASSEMBLY UL-20X17MS-BVTE 2151 TE OWNER OPENING FOR 3/4" SPEAKER CONDUIT m FS 4 T54 1`1 Kl G.C. TO PROVIDE TEST TEE AND I" BRASS BALL VALVE (FEMALE/FEMALE) WHEN IN A STAGE 11 AREA. TEST TEE TO ATTACH TO TOP OF VAPOR SHEAR VALVE VAPOR SHEAR VALVE SUPPLIED BY OWNER. (ONLY IN STAGE 11 AREAS) . SEE DETAIL. SHEAR SECTION OF VALVE TO BE AT THE SAME ELEVATION AS THE TOP OF ISLAND. (ONLY IN STAGE 11 AREAS) . 0 I" GALV. PLUG (TYP,) FLUSH W/ TOP OF ISLAND I" GALV. PIPE TOP OF ISLAND METAL BRACE SUPPLIED W/ °'' o . p ° c a \ DISPENSER BOX ( .p ° _ p G I I V / SUMP ENTRY ADAPTER (TO BE FIBERGLASSED TO SUMP BOX) FIBERGLASS PIPING -� 1 SECONDARY CONTAINMENT 3" X 2" RUBBER BOOT INSIDE OF A BOXED BUSHING NUT SEE NOTE 12 BELOW (j:)O I SPENSER CONNECTION OETAI L PS4 � PRESSURE VENT CAP 3/4" RIGID GALV. CONDUIT TO BUILDING ELECTRICAL ROOM ' 3" 0 GALV, VENT RISERS 211 GALV. CA 5 GALV. ANGLE W/U-BOLT ANCHORS 2" GALV. PI SUPPORTS ANCHOR SUPPORTS 9 112" FROM OUTER EDGE OF FOOTING AT A FIRE EXTINGUISHER \ p IN BREAK ACCESS CABINET- N z O 11/2" SUPPLY UNIONS (2 7/16" UP FROM BASE) "A1l SIDE ELECTRICAL CONDUIT PLAN VIEW TYP, n I SPENSER BASE 01 AGRAM PI PE CON OU I T LOCAT I ONS) N.T.S. MULTI -PRODUCT DISPENSER SHEAR SECTION OF VALVE TO BE AT THE SAME ELEV, AS TOP OF ISLAND. SEALED W/BLACK SILICONE CAULK ALL SIDES IMPACT / SHEAR �. VALVE SUPPLIED W/ DISPENSER BOX (ATTACHED TO DISPENSER BOX) - --- CLAMP B sa "A" SIDE 1 1/2" X 12" TELEFLEX CONNECTOR ---- SEE NOTE 38 �I 1/2" SHOULDER NIPPLE 211 X 1 11211 REDUCING BUSHING 2" FIBERGLASS ELBOW DISPENSER MTG. BOX (TYP.) ANCHORED TO CONCRETE SHEAR POINT — VAPOR SHEAR VALVE (TO BE BOLTED TO CROSS ARM OF DISPENSER SUMP) -- E N. T. S. PIPES ARE FASTENED TO 1 1/2" X 1 1/2" X 1/4" GALV. ANGLE W/ 3/8" 0 f 3 I /2" GALV. NUTS 4 BOLTS GALV. ANGLE DEPTH OF P-6" > > < a 9 t/2" - P• P 1011 IQ11 a 12" X 12" X 36" P pV GONG. FOOTING (2) 3" � GALV. ELBOW PLAN N.T.S. N.T.S. F VENT R I SER nETA I LS �S4 N.T.S. I" GALV. PLUG - I" GALV. TEE I" BRASS BALL VALVE I" GALV. VAPOR PIPE 1\,F'54 STAGE I I AREAS ONLY N.T.S. -3/4" RIGID GALV. CONDUIT TO BUILDING ELECTRICAL ROOM USE LEAK -PROOF TIGHT CONN. ON BOX PENETRATION (211 BULKHEAD FITTING SUPPLIED BY OWNER) . 2" VAPOR RECOVER LINE (FIBERGLASS) 3/4" GALVANIZED CONDUIT FOR SPEAKER 13/4" SEAL V-011 G.C. TO PROVIDE DUPLEX OUTLET FOR PUMP TOPPER 0 (WEATHERPROOF) TOP OF ISLAND -- --c 2" M I N 3/4" GALVANIZED MPD POWER (DEDICATED -EACH MPD) - 3/4" SEAL OFF TYP, PUMP ISLAND 5EC710N I" COPPER LINE TO VAPOR PUMP VAPOR RECOVERY nETA I L PLAN V I EW S"'f N. T. S. " ELBOW 90 °) GALV. DISPENSER BOX N. T. S. IP OF ISLAND t) PUMP ISLAND ELEVATION PS4 N.T.6. PART DESCRIPTION SPECIFICATION QUANTITY FURNISHED UNDERGROUND STORAGE TANKS Qu cr °0 0� w ACT -100 DOUBLE WALL COMPOSITE STEEL UST - 10' 0 - I �/, 000 GALLONS WATCO/HIGHLAND SEE PLANS OWNER ACT -100 DOUBLE WALL COMPOSITE STEEL UST - 10' 0 - 1x/000 GALLONS WATCO/HIGHLAND SEE PLANS OWNER HOLD DOWN STRAPS/TURNBUCKLES WATCO/HIGHLAND 3/TANK OWNER TANK EQUIPMENT J --� m 2 HP VARIABLE SPEED SUBMERGED TURBINE PUMP FE PETRO IST -2R SEE PLANS OWNER VARIABLE FREQUENCY CONTROLLER FE PETRO VFC I/STP OWNER 42" STP CONTAINMENT SUMPS PETRO FIBERGLASS I/STP OWNER 4" SUMP TO TANK ADAPTER PETRO FIBERGLASS I/STP OWNER 4" PIPE CAP OPW 116-7085 I/STP AND I/TANK OWNER FLEXING TEE FLEX CONNECTOR ASSEMBLY UL-20X17MS-BVTE 2151 TE OWNER FLEXING ELBOW FLEX CONNECTOR ASSEMBLY UL-20X17MS-BV90 2/5ITE OWNER 5 GALLON SPILL CONTAINER IG -2100 I/SITE OWNER 25 GALLON SPILL CONTAINER OPW 211-25WT I/TANK OWNER VAPOR RECOVERY 4" X 4" ADAPTER OPW 1611 -AV I/SITE OWNER VAPOR RECOVERY 4" CAP OPW 17117 I/SITE OWNER 4" X 4" X 2" TEE EXTRACTOR FITTING OPW 233-4420 I/SITE OWNER 4" X 4" X 3" X 2" EXTRACTOR FITTING •+ OPW 233-4432 2/51 TE OWNER 21" BALL FLOAT VALVE OPW 30MV-3210 I/TANK OWNER 4" X 4" BRASS ADAPTER EBW 778-301-01 I/TANK OWNER 15' X 4" DROP TUBE EBW 782-204-14 I/TANK OWNER MONITORING WELL CASING WITH LOCKING CAP (ONLY WHERE REQUIRED) SEE PLAN SEE PLAN G, C. 12" MONITORING WELL MANHOLE (ONLY WHERE REQUIRED) OPW 104AOW-1200 I/WELL OWNER 18" WATERTIGHT MANHOLE POMEGO 110-18WT I/TANK OWNER 24" WATERTIGHT MANHOLE POMEGO 110-24WT !/TANK OWNER 36" WATERTIGHT MANHOLE POMECO 107-3618 I/STP OWNER 4" TIGHT FILL GAP OPW 634TT-7085 1/TANK OWNER SWIVEL ADAPTER -BRASS BASE/TOP OPW 615A-1020 I/TANK OWNER 3" SET SCREW OPW 523-LPS 1/SITE OWNER TANK IDENTIFICATION PLATES SEE PLAN I/TANK + 1 OWNER 3" X 2" TEST BOOT WITH AIR VALVE FERNCON/WEAVER/ENVIRON 2/TANK OWNER PRODUCT PIPING 2" PRIMARY FIBERGLASS PIPE WITH 3" SECONDARY FIBERGLASS PIPE AO SMITH RED THREAD II -A SEE PLAN G.C. 3" VAPOR RECOVERY TRUNK LINE AO SMITH RED THREAD II -A SEE PLAN G.C. TANK VENTS SEE PLAN SEE PLAN G. C. DISPENSER EQUIPMENT MPD W/SPEAKER KIT AND CRIND (VAPOR ONLY IN STAGE II AREAS) GILBARCO ADVANTAGE SEE PLAN OWNER MPD CONSOLE GILBARCO T51000 I/MPD OWNER BLANK DOORS (2/MPD) FOR CRIND GILBARCO 2/MPD OWNER MPD BOX WITH 3 GROSS BARS PETRO FIBERGLASS 1/MP13 OWNER MODIFIED BOX FOR RETROFIT (ONLY IF PIPING FOR FUTURE MPDS) PETRO FIBERGLASS [/FUTURE MPD OWNER DISPENSER SUMP ENTRY ADAPTER SMITH FIBERGLASS 12,08-610-0 3/MPD AND 2/TANK OWNER 11/2" X 12" FLEX CONNECTOR TITE FLEX 3/MPD OWNER TEST TEE AND 1" BALL VALVE (ONLY IN STAGE II AREAS) SEE PLAN I/MPD G.C. HOSE/NOZZEL ASSEMBLY - VAPOR (ASSEMBLED BY G.C.) VARIOUS 6/MPD OWNER HOSE/NOZZEL ASSEMBLY - NON VAPOR (ASSEMBLED BY G.C.) VARIOUS 6/MPD OWNER 3" X 2" TEST BOOT FERNCON/WEAVER/ENVIRON 3/MPD OWNER 1 1/2" EMERGENCY VALVE FEMALE * OPW IDBF 3/MPD OWNER I " X I " VAPOR SAVER SHEAR VALVE (ONLY I N STAGE I I AREAS) OPW 60VP-1001 I /MPD OWNER INTERCOM 3M 0-120V I/SITE OWNER PUMP TOPPERS SIGN VENDOR SEE PLAN OWNER ISLAND FORMS FORMER SEE PLAN G.C. MISCELLANEOUS EQUIPMENT UA 3/4" ELECTRICAL GROMMET ENVIRON FEB -3075 I/STP AND I/MPD OWNER I" ELECTRICAL GROMMET ENVIRON FEB 3100 2/MPD-2 AND 2/STP-1 OWNER 2" ELECTRICAL GROMMET ENVIRON FEB 6200 I/MPD OWNER EXPLOSION PROOF ELECTRICAL JUNCTION BOX GROUSE -HINDS SEE PLAN G. C. MONITORING EQUIPMENT TANK MONITORING SYSTEM WITH ACCESSORIES VEEDER ROOT TL5350 WITH BIR I/SITE OWNER PLANS RE V I''H` CITY OF SANFOR s E I /1 2E T REV. Qu cr °0 0� w 00 w N � < Q J J --� m W Q Z Z r j z a o O ui O W } cn U 1") O Z CD _i> -`F-_ C) 0 0 Q O Q d l.l.l U " zW I- z VI rr) Iwn a O Lj Q Q Q ¢ p w IL w w I_J w Z Lij < O L,.1 ww C� U Cn cj'- Z Z w 0 F O n C� � % , �, , ;l :' : - - ,- ;, ,, . . , . , ,: , . ,;; n ,:. .: ! f' s ? i . sx. ! .5., i:. 1 i x} � -r ..r 1 ,-: 1 Y1 r n. ;z9 �R at4 Et mrr'. f �, t s� t :. / " .. ._... .,. .. .. , .. .,. .,, ,: _ ._. .. _- ... .- ., . _ ._ .x ?4 k.y. �'^!a E ,'": ,✓%i '• a .. t: » 1 , . , s, . •.,, ,,. a - AF le`> s". s . _ A, ENERAL , I A LATI N N �. r-..-.�...4. ,' , ,., , 11I 01. , a ," , . ! ... 1, , . E ' 1 RA NTR T E T Y . 1 ,.. _ EF N E U G NE AG OR 1 D NO E ,C. ,, GO _. S G R ER, C E Q B , - . a.l , INS7ALL1 CONTRACT R ALL B `CER71F1 D NPR PER TA 1 A I 6. . N 0 E .0 0 NK NSTALL TON PROCEDURE SH E• 2.0 I » .,, THE WORK COMPLETED UNDER' THESE EC 10 $ .W L I. CLUOE AL ,, , ", , - . _ ,, , .11 , ::3 .. . , , ,. J. ,. , ., , TANK S -PIPING EQUIPMENT AND RELATED INSTALLATION W RK'N ESSA Y. FOR A COMPLE:T ,1. ,4, N ,. A K ILL MATER AL WE1. T MEET, ASTM -448 2 BEDDING A D B C F M ]~ LSH L BE WELL WASHED ANO FREE OF GE AND'SNOW AND MUS S D , _ .; _ OPERAT PETROL M PRODUCT ST RAGE: HANDLING ` N I PENS YS E ; .,,, AND INC EU P DUC Q A D_D S INC S T M, THE ASTM C 33 ANO AASHTO M 43 QUALITY AND SOUNDNESS. G.C. SHALL PROVIDE SIEVE ANALYSIS ACCEPTABLE TO ii .- - A . a 1 :: I, REQUIREMENTS SPEGIFIED`HERE N SHALL 5UPPLEMENT,TH05E SPECIFIED BY THE OWNER,.S - 7 OWNER ENGINEER, THE FOLLOWING MATERIA MAY Q S 0 G E LS BE USED L 1;INSTRUCTIONS - ,"REQUIREMENTSII ,, FOR GENERAL CON TRU TI N 1.REF R: TO T E C P OF W RK � P AN 'O S C 0 E H 5 0 E O L . R $ FROM THE OWNER SREPRESENTATIVE,FOR SITE SPECIFIC OETAILS'AND REQUIREMENTS, •• , . 4,2.1 PEA GRAVEL WITH PARTICLE SIZE NOT LESS THAN 1/8" :OR MORE THAN 3/4" DIAMETER WITH NO MORE 3% `51 I 3.0 . , � : , . ALL WORK ; SHAL L BE PERFORMED AS SHOWN ON THE PLANS AND IN 'ACCOROANGE-,WITH FEDERAL ,.. PASSING A NO. 8 EVE , ^ - >_ �� ' ° �� 1'' UNDERGROUND 5 ORAGE TANKS, TECHNICAL REQUIREMENTS .;, (4.0GPR PART•2$0), . A.2,2 CRUSHED STONE WITH PARTICLE SIZE NOT LESS THAN 1/8" OR MORE THAN I/2" DIAMETER WITH NO MORE . ' .- _.1 STATE AND MUNICIPAL REQUIREMENTS, AND MOST CURRENT EDITIONS 'OF THE APPLICABLE NPPA, PEI, THA 3x PAS A N VE. . N SING O, 8 SIE , I', AND API REFERENCE STANDARDS. •;. , ,, "" _:,• ,. , ". �� A:0 .>: ,.; { ., T G, C, SHALL KEEP SITE'FREE OF WASTES ANO RUBBISH A7 ALL TIMES, A.3` STANDARD INSTALLATION 5.0 J . . ' ,: " ;, G.C. SHALL ENSURE.COMPLIANCE WITH OSHA AND ALL' OTHER REGULATIONS AND ;, ', ' . 4.3.1 ALL TANKS SHALL BE PLACED AT A MINIMUM OF 36 INCHES BELOW FINISHED GRADE OR A5 O -' �. ", REQUIRE[) TO AC.COMMOOATE PRODUCT PIPING SLOPE REQUIREMENTS, AND SET ON A 12 I NCH THICK • Q . RACETRAOS CONTRACTUAL REQUIREMENTS, ASSOCIATED COMPLIANCE, ., : "• ' ' . '; .; (MINIMUM) BED OF APPROVED BACKFILL MATERIAL, TANK OPENINGS SHALL BE ALIGNED . . EXPENSES„ EXCEPT AS'DESCRIBED IN B-1.3,' SHALL BE;G,C, RESPQNSIBIL:.ITY, •; , . , . J VERTICALLY WITHIN A PLANE PERPENDICULAR TO THE TANKS LONGITUDINAL AXIS. 6.0 , ,. WHERE INSTALLATIONS ARE MADE AT, EXISTING STATION OR STORE,, WORK SHALL BE 4. .2 ET TANKS LEVEL ON BEDOING.MATERIAL, USE ALL'LIFTING LUGS PROVIDE AND GUIDE ROPES AT EACH 3 S D R C SCHEDULED AND PERFORMED SO AS TO MINIMIZE INTERFERENCE WITH THE OPERATION OF ". TANK END, (DO NOT SET TANKS DIRECTLY ON OEADMAN IF USED). °4W . 11 THOSE FACILITIES, .'ALL DEBRIS, EXCESS EXCAVATED MATER I ALS, MACHINERY, AND , ` . EQUIPMENT SHALL, BE REMOVED DAILY AND MAINTAINED CLEAR OF "OPEN OR AT ALL11 FI • A.3.3 ,PLACE 12 BACKFILL MATERIAL EVENLY AROUND TANKS, USE WOODEN DOWEL PROBE TO WORK BACKFILL . ' I TIMES, LIGHTED SAFETY BARRICADES' SHALL BE PROVI.DED'FOR THE PUBL.IC'S PROTECTION. ` COMPLETELY UNDER'TANK. I 11NOTIFIED WHEN IT BECOMES NECESSARY TO CLOSEA DRIVEWAY, OWNERS REPRESENTATIVE SHALL BE _ " 4.3.4 REPEAT D A.3.3 FOR NEXT 12 TO FILL ALL VOIDS. . V7 72 HRS PRIOR TO CLOSURE. , .PROBING 4.3.5 FREELY ADD ADDITIONAL BACKFILL TO TANK TOPS. PROBING NOT REQUIRED). 7.0 ALL EQUIPMENT, MATERIALS, PIPING, .TANKS AND, ACCESSORIES SHALL BE INSTALLED , ; ,(ADDITIONAL - IN ACCORDANCE WITH, THE APPLICABLE MANUFACTURER'S INSTRU11 4.4 ALTERNATE INSTALLATION (I N LIEU OF SHORING) , 11 . �CTIONS. B. REMOVAL $ OI$P051TION OF XI TING TANKS (WHEN REQ'q.) E S '. 4, 4,I 'PLACE MINIMUM 18" BEDDING. MATERIAL AT ENOGAP LOCATIONS. 11 I,0 . EVACUATE PRODUCT FROM TANKS AND LINES. . ', 4.4.2 -SET TANKS LEVEL ON ENOCAP BEDS. USE ALL FITTING -LUGS PROVIDED AND GUIDE ROPES AT EACH TANK 1.1.:.. END. (00 NOT SET TANKS DIRECTLY ON DEAOMEN IF USED.) 1,1 FOR STP SYSTEM DRAIN LINES INTO TANK BY REMOVING STP CHECK VA VE ANO, OPENING SAFETY VALVE TEST'PORT, . �. . -. A . , A BACKFILL AT EACH N APSTABILIZE TANK. RAM BACKFILL T WITHIN F F T q; 4.3 DD B C LL E C EOG TO P B CK ILL O W 3 T. O EXCAVATION TOP. . , ,: . DISCONNECT STP UNION /SWING ANO RA N PRODUCT INTO AN APPROVED CONTAINER. . D. • ' 4.A.4 Apo BACKFILL ALONG SIDES OF TANK ADJACENT TO EXCAVATION SI,OEWALLS BY PUMPING A FULL BUCKET 1,2 , 00 NOT BLOW OUT LINES WITH COMPRIrS5EO AIR. � . . OF BACKFILL IN ONE PLACE FROM A MINIMUM OF LIFT ABOVE TANK TOP USE A LANG HANDLE PROBE WITH ' ,.�,, . ,_ , •,; . CURVED ENO (OR AIR JET PER TANK MANUFACTURES SPECIFICATION) WHILE STANDING AT TOP OF EXCAVATION I . I'll, PRODUCT REMOVED FROM LINES BECOMES PROPERTY& G.C. AND.MAY B11 .E'USED AS MOTOR,FUEL :': .1. , ; , TO,.MOVBAGKFI LL UNDER TANK SIDES. REPEAT THIS PROCEDURE UNTIL BACKFILL I S 121 N, UP THE TANK .' 1.3 . • REMOVE LIQUID. ,TANK BOTTOMS USING A'VACUUM:TRUGK ,IN LIEU OF ON-SITE STORAGE CONTAINERS.' . SIDE. , DEPENDING ON LOCAL.REGULATIQNS, RECOVERED MATERIAL;MAY BE MANAGED, AS OFF -,SPEC PRODUCT, , 4,5 WET EXCAVATION CONDITIONS r ,. • ,. T ,a A A AHA AR W T SQL p INDUSTRIAL"OR HAZARDOUS WASE IF MATERIAL MUST BE.,M AS ,,. Z OOUS AS E,' . . • , .N,,,GEO ,FOLLOW OWNER'S ENVIRONMENTAL REQUIREM'' ' ' QR HANDLING 'MANIFESTING AND D.ISPO AL , ,. S . •, ,, , , . 4.5,1 G.C. SHALL BE RESPONSIBLE TO EVACUATE WATER FROM EXCAVATION. IF CONDITIONS 1. ,.., , .. , . .. ONLY OWNER APPROVED HAZARDOUS WASTEDI$POSA, FACILITIES.'SHAL E USEQ,' CONSULT THE :' L,B D REQUIRE SHORING, CONSULT OWNER'S ENGINEER, METHOD MUST BE APPROVED BY OSHA AND OWNER'S ENGINEER, APPROPRIATE ENVIRONMENTAL ENGINEERING CONTACT FOR PROCESSING ASSISTANCE IN ALLcCASES.;' , ,,, , 4,5.2^ MINIMIZE SURFACE WATER ENTERING EXCAVATION BY CONSTRUCTING DIVERSION DAMS AROUND TANK FIELD '4 1- •° 1 2.0 EXCAVATE T TANK TOP :REMOVE ALL TANK�A P »RTENANCES PL AL , RENIN S'REMOVE TANK � ' I, 0 7 A P ,U UG , L. G, •,EXCAVATION AND PIPING TRENCHES. . • `. ' `' ', .. AND PLACE IN A'SECURE LOCATION. ONE TANK, PLUG MUST HAVE AN I/84' HOLE' IN PLUG FOR. VENTING. ` ` ` ' : '. 3.0 , 1. .11 "` REPEAT 5-41.3 T ROUGH ALL TANK. NGS TQ' RENO E REMAINING N I N. RESIDUE. RESIDUE '$HALL BE MANAGED PER 8-1: 3. H K TI V A 4 5 3 A •CONTINGENCY PLAN SHALL BE DEVELOPED BY G.C. OUTLINING EMERGENCY PROCEDURES FOR , 11 TANK OBTAINING THE NECESSARY EQUIPMENT'AND/OR PERSONNEL TO HANDLE UNEXPECTED WATER ENTRY INTO THEA ,, . 4.0 • DECREASE TANK T0, LESS THAN 10% 0 THE LOWER EXPLOSION L MIT (LEL) PER 'THE FOLLOWING.; F F11 TRE WHEN WATER TAN HYDROCARBONS CONSULT OWNER'S FIELD EXCAVATION OR PIPING TRENCHES. ER MAY CON I H [)CARBON GON ENVIRONMENTAL ENGINEER. PREFERRED METHOD (INERTING): 4..5 .3 INSTALL TANKS PER 4:3 OR 4.A I` INERT VAPORS BY ADDING A MINIMUM :OF 1,5 R IQ0,'GALLONS OF TANK CAPACITY. -: <_ , LBS ORY ICE, PE A,6 ANCHORING t I ALTERNATE METHOD (PURGING): • 4.6.1 TANK ANCHORING, WHERE REQUIRED BY EXISTING GROUNDWATER CONDITIONS, SHALL BE I VENTILATE TANK _ SING AN EVACATOR R pIFFUSER. E C VATOR MUSTUSING U 0 (X A '.. *STRAPS U L KS ACCOMPLISHED IN TRAP ANO TURNB GKLE ASSEMB IES BY THE TAN MANUFACTURER AND EXTEND 12 FT,'.MINLMUM;ABOVE TAN,K`TQP. , A VENT LINE ;,I. :> INSTALLED IN STRICT ACCORDANCE WITH THE TANK MANUFACTURER'S REQUIREMENTS. ALL EXTENDING 12. FT, MINIMUM ABOVE, TANK TOP MUST BE ATTACHED `, '` TURNBUCKLE ASSEMBLY HARDWARE TO BE COATED WITH KOPPERS 300M EPDXY APPLIED IN . ;TO TANK WHEN USING A DIFFUSER), `; , , " . ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. 5,0 ... ALL TANKS MUST BE DEGASSED AND CERTIFIED "CLEAN I BY1.0IC . ING AN WRA N , 5,0 RISER COAT D _PPI G ,1. I . 6.0 . , PRIOR TO TRANSPORTING ANY TANK FROM SITE, `LEGIBLY LABEL AS FOLLOWS. ;, 5.1 PRIOR TO COMPLETION OF BACKFILL AND AFTER PRESSURE TESTING TANK, COAT ALL CORRODIBLE COMPONENTS ,, u T ;; : TANK' HAS CON A I N ED FLAMMABLE L I QUI DS, ; ` EXPOSED TO BACKFILL WITH COAL TAR EPDXY AND WRAP WITH FELT OR 3M TAPE. ALL COMPONENTS SHALL BE ., .; CLEAN AND CORROSION FREE BEFORE APPLYING COATING, EXTEND COATING 3" ONTO ADJACENT FRP COMPONENTS. . NOT CAS FREE: NOT SUI TABLE r FOR FOOD , `, . , , OR ORINONG WATER," . , . 6.0 BALLASTING 7.0 QWNER'S ENGINEER $HALF INSPECT OPEN EXCAVATION FOR EVIDENCE OF ALL HYDROCARBON 6.1 WATER BALLASTING ,. RELEASE, I. ' 6,1.1 ATTACH ONLY STP RISER ANO MANIFOLD HOUSING TO TANK. G.C, SHALL PROTECT AND STORE REMAINING "' ' ` STP COMPONENTS. COVER TOP OF STP MANIFOLD WITH PLYWOOD SECURED THROUGH EXISTING BOLT HOLES. G. EXCAVAT I ON _ . ., I.0 SIDES OF TANK HOLE EXCAVATION SHALL BE SLOPED IN ACCORDANCE WITH O.S:H.A. ' ', :,, 6.1.2 WATER TO BE PROVIDED BY CONTRACTOR. G.C. TO ASSUME RESPONSIBILITY FOR COMPLETE REMOVAL AND ,, , I I, ,. '' ' • : . ,. .� . i; - I CONSTRUCTION SAFETY HEALTH REGULATIONS",SUBPART P-EXCAV TIONS, TRENCHING � �, . 1562650 THRU 1926653, RECOMMENDATIONS. 'FILTER FABRIC, SHALL BE TO UNE ' ' DISPOSAL OF WATER BALLAST AND SCHEDULING GASOLINE DELIVERY PRIOR TO PRODUCT PIPING PURGE S 'ETC. ' .CLOTH ;,, _ SER, START-UP, CALIBRATION, O I SPEN :, -, ,:'.- .^ BOTTOM AND 51095 OF HOLE PRIOR TO GRAVEL BACKFILL. FILTER- AERIC CLOTH.SHALL , F _ , :, . • _. .. ,TANK LAP T P F TAN S T PREY NT'INFILTR TI F EARTH IN T NK RE , • - ALSO . 0 O K 0 E. �► :ON 0 TO A A AS , .. Y ,I. M V PLYWOOD COVER FROM ,STP MANIFOLD. COMPLETE STP INSTALLATION ONLY AFTERREMOVING WATER 6 3 RE 0 E 0S ;, , , .. . I „ Y • , TANK. FROM AN . 20,; . EXCAVATION SHALL BE SIZED TO'PROVIDE A MINIMUM IFT TANK BED, 2FT BETWEEN TANKS ANO 2FT 114 - - -., :,. BETWEEN TANK 51pE5/ENDS AND EXCAVATION WALLS, , ; 7,0 TESTING (AFTER PAVING 15 COMPLETE) . , • 1. .. HAVE PRECISION N PRIMARY TANK AFTER PAVING 15 COMPLETE, 7,1 G.G. SHALL CONTACT R.T. OWNERS ENGINEER TO VE REC S10N TEST 0 E CO E, { ' 3.0 OWNER RESERVES THE RIGHT TO DESIGN ANO OR CONSTRUCT SH RING UNDER AN AMENDED AGREEMENT . / Q "PRODUCT HAS BEEN PLACED IN TANKS DISPENSERS HAVE BEEN INSTALLED AND PRIOR TO FINAL PROJECT ACCEPTANCE. qU S B L E E WITH G.C. OR SEPARATELY WITH ANOTHER COMPANY, IF OWNER ENGAGES G.C.,`'G.C, SHALL SUBMIT SHORING DESIGN TO OWNER'S ENGINEER FOR APPROVAL, SUPPLEMENTAL JOB SCOPE AND COST SHALL BE AGREED E, PIPING' TO IN TERMS OF A CONTRACT CHANGE ORDER PRIOR TO COMMENCING WORK, SHORING SHALL.BE REMOVED : ' 1,0 ' PIPE MANUFACTURER'S INSTALLATION CHECKLIST SHALL BE INITIALED AND SIGNED BY G,C AND OWNER'S ENGINEER, AS PRIOR TO INSTALLING ' PRODUCT PIPING, DO NOT ABANDON SHORING IN PLACE, . . APPROPRIATE, AS EACH STEP 15 COMPLETED. _ D, TANKS 2.0 ALL MATERIAL WORKMANSHIP AND INSTALLATION PRACTICES SHALL BE IN ACCORDANCE WITH NFPA APPLICABLE CODES. ' 1.0 TANK MANUFACTURER'S INSTALLATION CHECKLIST SHALL BE INITIALEO/SIGNED BY G,C ANO OWNER'S �' . ' ENGINEER, AS APPROPRIATE, AS EACH STEP IS COMPLETED, 3.0 MATERIALS 2.0 LIFTING EQUIPMENT .SHALL BE ADEQUATE TO HANDLE TANK WITHOUT DRAGGING. USE ALL LIFTING LUGS AND 3,1 ALL VENT AND VAPOR RETURN SHALL BE FRP SMITH FIBERGLASS "RED THREAD 11-A" (WITH 058000 SERIES ADHESIVES) „ GUIDELINES WHEN LIFTING TANKS. THE INCLUDED ANGLE BETWEEN LIFTING LINES AND TANKS SHALL NOT . . BE LESS THAN 450. REST TANKS ON .SMOOTH AND DEBRIS FREE GROUND.` CHOCK, TANKS WITH TIRES 7O PREVENT 3.2 PRIMARY PRODUCT AND SECONDARY CONTAINMENT LINES SHALL BE FRP PIPE AS SPECIFIED IN E-3.1 . ROLLING. DO NOT DRAG TANKS. ' , 3.3 TANK RISER SHALL BE SCHEDULE 40 (ASTM -5-120) GALVANIZED IRON PIPES, FITTING SHALL BE 300 PSI GALVANIZED 3.0 TANK'TESTING MALLEABLE IRON.. ALL COUPLINGS AND FITTINGS SHALL BE SHOULDER STYLE. NO STREET COUPLINGS OR FITTING SHALL BE ALLOWED. . 3.1, STANDARD VACUUM TEST THE USE OF CLOSE, CONTINUOUSLY THREADED STEEL PIPE NIPPLES SHALL NOT BE PERMITTED. LY 3, 1 I T RSTLCE VACUUM ON TANKS SHALL BE VERIFIED PRIOR 70 UNLOADING AT SITE AND IMMEDIATE ' 3,4 LOL BE TREATED WITH GASOILA 100 OR JOMAR 100 "THE HEAVY WEIGHT." (IOOx COMPATIBLE -ALL FUEL OAFTER UNLOADING AT SITE AND AFTER TANKS ARE SET BACKFILL D. TO ENSURE THAT THE TANKS . ARE INTACT. VACUUM LOGS, TO BE MAINTAINED DAILY BY G.C.' 1. 3,5 G,G. SHALL DEMONSTRATE TO OWNER'S ENGINEER ALL INSTALLED MATERIALS ARE NEW AND CONFORM TO ABOVE SPECIFICATIONS. . 3.2 ALTERNATE PRESSURE TESTING 'a CAUTION--" DO NOTi . ' . A.0 INSTALLATION I) LEAVE PRESSURIZED TANKS UNATTENDED, A.I INSTALLATION CONTRACTOR SHALL BE CERTIFIED BY PIPING MANUFACTURER. 2) APPROACH TANK ENDS OR PLUGS OF PRESSURIZEO'TANKS, .. , 3) EXCEED 5,P5I INANNULAR SPACE OR PRIMARY TANK. 4.2 CORRODIBLE COMPONENTS SHALL BE USED ONLY WHERE SPECIFIED AND IN THE ARRANGEMENT SHOWN IN THESE DRAWINGS. 4) ATTEMPT TO REPAIR A DAMAGED TANK. I 11 5) APPLY AIR PRESSURE TO ANY TANK WHICH HAS CONTAINED MOTOR FUEL, 4.3 BEDDING AND BACKFILL MATERIAL SHALL BE THE SAME A5 THE TANK FIELD, SAND SHALL NOT BE USED UNDER ANY GIRGUMS.TANGES, , PRODUCT LINE TRENCH SUB -GRAPE SHALL BE COMPACTED TO 90% PROCTER DENSITY PRIOR TO INSTALLING BEDDING ANO • , 3.2.1 TIGHTEN ALL TANK PLUGS. USE MANIFOLD AND TEST GAUGE WITH ,0.15 PSI RANGE IN 1/4LB. INCREMENTS BACKFILL MATERIAL. 3.2.2 OUTER WALL TEST: r I I I .11 4.4 PIPING SHALL BE MINIMIZED, NOT PLACED UNDER BUILDINGS AND SHALL BE INSTALLED WITH MINIMUM SPACING AND 3.2.2,1 CLOSE MANIFOLD VALVE, PRIMARY TANK TO 5 PSI MAX, VE, P CLEARANCES SHOWN BELOW, IF PIPING ROUTING 15 NOT SPECIFIED, G.0 SHALL INSTALL IN THE MOST DIRECT ROUTE, SUBJECT 3.2.2.2 CLOSE AIR SUPPLY VALVE AND DISCONNECT AIR SUPPLY, (THIS STEP GUARDS . TO APPROVAL BY OWNER'S ENGINEER. ' AGAINST OVER PRESSURIZING PRIMARY TANK). 4.5 PRODUCT LINE SHALL SLOPE CONTINUOUSLY UPWARD FROM STP SUMP A MINIMUM OF 1/8" PER FT. STAGE I AND STAGE II 3.2.2.3 PRESSURIZE ANNULAR SPACE BY OPENING MANIFOLD VALVE. VAPOR RECOVERY LINES AND VENT LINES SHALL SLOPE CONTINUOUSLY UPWARD FROM VAPOR MANIFOLD A MINIMUM OF 1/8" 3.2,2,4 MAINTAIN PRESSURE FOR 30;MINUTES MINIMUM, SOAP ENTIRE TANK.- REJECT ANY TANK PER FT. WHICH FAILS OUTER WALL TEST, PAVING (6" THICK) 3.2.3 INNER WALL TEST:• 3.2.3,1 CLOSE MANIFOLD VALVE AND RELEASE PRIMARY TANK PRESSURE BY. OPENING AIR SUPPLY VALVE, o •1. 3,2.3.2 MONITOR ANNULAR SPACE PRESSURE FOR AT LEAST 30 MINUTE5•AND NO MOR THAN PIPE LINES a 60 MINUTES. REJECT ANY TANK WHICH FAILS INNER WALL TEST OR ANY.TAN WHICH 7" MLN, I / HAS BEEN DROPPED OR IMPACTED. CONTACT TANK MANUFACTURER FOR REPAIR. PRIMARY UNE ��E��L-1- 3.2.3,3 FOLLOWING TANK PRESSURE TEST A VACUUMSECONDARY LINE SHALL BE. PLACED BACK ON. THE INTERSTICE • AT THE SAME LEVEL AS WHEN THE. TANKS ARRIVED ON SITE. G.C. SHALL MAINTAIN `A DAILY , LOG OF VACUUM READINGS ON ALL TANKS FROM THIS POINT FORWARD UNTILPAVING 15 . I I� I�I . . I. � ' . �. II I .�I I I I I I . . . :I .I II I II I . I 7� I I • . COMPLETE. A" MIN AIR SUPPLY VALVE--- I ,,� I FOLD HOSE , 2-1/2" . ,, MIN . „. " TO -AIR SUPPLY ANNULAR SPACE :.'' d ,' MIN PRIMARY TANK PRESSURE GAUGE - PRE55URE GAUGE MANIFOLD ,. ;, MIN . _" u , VALVE . PRESSURIZE PRIMARY. TANK .ANNULAR. SPACE TO 5. P51 MAXIMUM PRESSURE FITTING II MARY T .' -. . PR ANK ,.,FITTING , r ,, Y .r..r'N , t ,V.,}'^ r..,.. "4 f i, x.,a :..:.n >mr .,....W :..:,v.,1 ,•.•: :9.f'.,Y. ... ' nX` ,.--1777 . .,,' - 1. ,Y .+,. f .. 'w - .. ?, ,, , , v�Y.. hf, . - .M..J, 1. , . ,. 1. - J, f:..'.Y. - I , r r .. as r. - , .<. ,. � �. -M1 t ,,..f,.s, �.'.ti � --- - F ., _ „< _ N I : ' 5:0 GO . EC S . O . _ , T,: I• HRE DED CONNECTIONS , S A C ONS 1.1 THREADS HALL F I I .1 . 5, E OS S E G ` EAN 0 ALL AN AN THREAD CUTTING NG DI L' PRIOR TO JOINING, B L SAND D U 5.1,2 APPLY THREAD SEALANT PER e- 3.4 START ALL THREADED CONNECTIONS BY HAND, SECURE FRP COMPONENTS USING ONLY A STRAP RECLEAN. WRENCH. DO NOT FORCE THREADS. IF CONNECTION BINDS RE VE. AND EGLE C G MO .1, 3 NOT OVERTI HTE . TORQUE F P T TEL CONNECTIONS TO 7 F.T, LBS, WHEN USING POWER TONGS. 5 DO O G NR 0 5 E C 0 5 5 U 5.2 , FRP BONOED CONNECTIONS: ' 5.2.1 TAPER ESCORT PIPE ENDS PER PIPE MANUFACTURER'S INSTRUCTIONS. CLEAN BONDING SURFACEUSING ONLY PIPE MANUFACTURE'S APPROVED CLEANER. DO NOT ALLOW CLEANER 70 COME INTO CONTACT WITH TANK SURFACE OR SUMP SEALING DEVICES. 5.3.2 MIX ANDI IAPPLY ADHESIVES PER MANUFACTURE'S INSTRUCTIONS. AVOID SKIN CONTACT WITH CLEANER, ADHESIVES AND HARDENER DO NOT INHALE FUMES. ' 5,'2,3 JOIN COMPONENTS PER MANUFACTURES INSTRUCTIONS. CURE CONNECTION PER PIPE MANUFACTURER'S SPECIFICATIONS USING • FRP PIPE MANUFACTURER APPROVED ELECTRIC HEATING COLLAR OR CHEMICAL HEAT PACK WHEN TEMPERATURE 15 BELOW OR WILL . . BE BELOW 60°F PRIOR 70 CURING, HEAT GUNS ARE STRICTLY PROH I B I TED. 5.3 FLEX LINE CONNECTIONS: . 5,3.1 INSTALL FLEXIBLE LINE CONNECTORS PER MANUFACTURER'S INSTALLATION INSTRUCTIONS, 5.3:2 IMMEDIATELY AFTER INSTALLING FLEX LINE COUPLING, PLACE'CAP OR PLUG ON COUPLINGS TO PREVENT DEBRIS FROM ENTERING INES. L . r 1 6.0 LINE TESTING . CAUTION: NITROGEN FROM A GROUNDED SOURCE SHALL BE.USED'IN , LIEU 0F AIR FOR TESTING IF LINES HAVE BEEN EXPOSED T0 GASOLINE. NOTE: OWNER'S ENGINEER SHALL WITNESS ALL LINE TESTING 6,1 G.C. SHALL NOTIFY OWNER'S ENGINEER TWO DAYS PRIOR TO TESTING,' CAUTION: CAP FLEX CONNECTOR OR FLEXIBLE LINE AT STP PRIOR TESTING. APPLY e RELEASE PRESSURE SLOWLY. 6.2 PRODUCT LINE SHALL BE TESTED FROM STP TO SAFETY VALVE. 6.3• VENT/VAPOR. SYSTEM SHALL BE TESTED FROM TOP OF VENT, THROUGH MANIFOLD, EXTRACTOR BASE AND RISER, STAGE I CONTAINMENT MANHOLES S 0 TAGS II VAP R LINES TO ISLAND E STAGE II FLEX CONNECTORS AT OISPENSER'S, REPLACE BALL FLOAT CAGES WITH ' PLUGS. - AND REPLACE STAGE I VAPOR RECOVERY SPILL CONTAINER DRAIN VALVES WITH PLUGS. CAUTION ENGINEER ANG G.C. SHALL VERIFY FY EXTRACTOR PLUG . 1.INSTALLED AND CAP 15 REMOVED FROM TANK MONITOR RISER PRIOR TO PRESSURE TESTING VENT/ VAPOR SYSTEM. 6.•A FRP LINES 6.4,1 SLOWLY PRESSURIZE PROOUCT:LINES AND VENT/ VAPOR LINES TO 50 PSI. SOAP TEST ENTIRE PIPE SURFACES INCLUDINGJOINTS:ANO FITTINGS, CORRECT ANY LEAKS AND RETEST. 6.4.2 IMMEDIATELY LOWER PRESSURE FROM VAPOR/ VENT SYSTEM`To I I 5 PS1 , REMOVE EXTRACTOR PLUGS, REDUCE PRIMARY LINE PRESSURE TO 30 PSI, MONITOR DAILY UNTIL ALL PAVING 15 COMPLETE.. • 6.4,3 ASSEMBLE SECONDARY SYSTEM AND PRESSURIZE TO 5 PSI. SOAP TEST ENT I RE PI PE SURFACES I NCLUOI NG 'JOI NTS AQ ,I ITT I NG5. CORRECT ANY LEAKS AND RETEST. MONITOR DAILY UNT( ALL PAVING IS COMPLETE. . 6.A.4 AFTER TESTING HAS BEEN SATISFACTORILY COMPLETED AND PRIOR TO BACKFILL, ALL EXPOSED GALVANIZED PIPE THREADS, JOINTS, WRENCH MARKS AND ANODE CONNECTIONS ARE TO BE COATED WITH COAL TAR 4 3M TAPE, EPDXY APPLIED . IN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS, 6.5 RT', SHALL PERFORM PRECISION TEST ON PRODUCT LINES AFTER PAVING 15 COMPLETE, PRODUCT HAS BEEN PLACED IN TANKS, OISPENSERS HAVE BEEN INSTALLED, AND FINAL TO PRIOR PROJECT ACCEPTANCE. F. DISPENSER; I. 1.0 DISPENSER SHALL BE SECURELY ATTACHED 70 ANCHOR BOLTS WHICH SHALL BE SET IN CONCRETE ISLAND, QUANTITY AND SIZE OF ANCHOR BOLTS SHALL BE AS SPECIFIED IN DISPENSER MANUFACTURER'S INSTALLATION INSTRUCTIONS.. , .0 DISPENSER SHALL BE ACTIVATED ONLY IN PRESENCE OF AN AUTHORIZED' DISPENSER REPRESENTATIVE, G.C. HAS SOLE RESPONSIBILITY FOR DAMAGE TO • DISPENSER I F THIS INSTRUCTION I S NOT FOLLOWED, 3,0 PURGING AIR: ,rI 1, ; . 3,1 ACTIVATE ANY 0I SPENSER. DO NOT OPEN A' NOZZLE, LEAVE' DISPENSER ON FOR 5MINUTES. TURN DISPENSER OFF AND ALLOW TO .STAND FOR 5 MINUTES, 3,2 ACTIVATE DISPENSER MOST REMOTE FROM TP'AND OI P N E (I50 GALLONS FROM THE FARTHEST EST TWO DISPENSERS AND 50 GALLONS FROM ALL OTHERS) INTO A`GROUNOEO CONTAINER APPROVED FOR STORAGE AND HANDLING OF CLASS I FLAMMABLE LIQUIDS. REPEAT FOR EACH HOSE AND DISPENSER. MOVING PROGRESSIVELY CLOSER TO STP. REPLACE PRODUCT USED FOR LINE PURGE INTO RESPECTIVE TANK, 4.0 ELECTRICAL CHECKOUT: 4,1 TURNOFF ALL STP CIRCUIT BREAKERS, 11 I 4.2 CONFIRM ALL NOZZLES ARE IN THEIR BOOTS, 4.3 VERIFY ALL STP'S ARE OFF, A.4 TURN ON CIRCUIT BREAKER FOR ONE STP, ONE HOSE AT A TIME FOR PRODUCT GRAOE,MATCHING ACTIVATED 5TP, PERFORM THE FOLLOWING AT EACH DISPENSER: 4, A. I REMOVE NOZZLE , . 4.4.2 ACTIVATE OPERATING HANDLE AND DISPENSE PRODUCT INTO AN APPROVED GROUNDED CONTAINER, . s) 4. A.3 VERIFY ONLY CORRECT STP TURNS ON. 4.4.4 VERIFY BRAND PANELS ON EACH SIDE OF DISPENSER MATCHES PRODUCT BEING DISPENSED BY STP. 4.4,5 VERIFY CORRECT NOZZLE TYPE IS INSTALLED: REPEAT F -A:4 FOR EACH PRODUCT GRADE, I, 5.0 ACTIVATE ALL STP CIRCUIT BREAKERS ONE HOSE AT A TIME, FOLLOW F-4.4.2 AND F-4,4.3 FOR EACH HOSE, 6.0 IF MISCONNECTIONS OR OTHER PROBLEMS ARE DETECTED, MAKE CORRECTIONS AND REPEAT ENTIRE DISPENSER CHECK-OUT PROCEDURE: NOTE. SUCCE55FUL COMPLETION OF F-4.0 AND F-5.0 WILL. CONFIRM COMPLETE \ INTEGRITY AND CONTINUITY -OF DISPENSING ELECTRICAL AND PIPING SYSTEMS. 7.0 DISPENSER CALIBRATION: SUBSEQUENT TO START UP OF NEW DISPE145ER_ BY THE OWNERS AUTHORIZED SERVICE REPRESENTATIVE, THE G,C, SHALL PROVIDE A STATE CERTIFIED 5 GALLON CALIBRATION CAN ANO ADJUST CALIBRATION OF EACH DISPENSER HOSE TO ZERO TOLERANCE FOR EACH 5 GALLONS OF PRODUCT DISPENSE[), ON BOTH FAST AND SLOW RUNS, OR AS DIRECTED BY LOCAL WEIGHTS AND MEASURES AUTHORITY, PRODUCT USED FOR CALIBRATION OF DISPENSERS SHALL BE RETURNED TO ITS RESPECTIVE STORAGE TANK, REPLACE ALL METER SEALS. FURNISH OWNER WITH CALIBRATION REPORT SHOWING FINAL CALIBRATION TO ZERO TOLERANCE. BEFORE STORE STOCKING, 8.0 INSTALL NEW DISPENSER FILTERS AFTER COMPLETING ALL LIQUIOJESTING. , • ACTIVATE EACH PRODUCT AND EACH DISPENSER AND INSPECT FILTER FOR LEAKS, • .RECHECK PRIMARY LINE CONNECTIONS AT DISPENSER BASE AND STP FOR LEAKS, .CALIBRATION TEST SHALL BE GIVEN 70 RACETRAG ENGINEER PRIOR TO STOCKING STORE. G, MISCELLANEOUS REQUIREMENT. 11 4.1 SET ALL TANK SLAB MANHOLES AND STREET BOX ELEVATIONS 2" ABOVE FINISHED GRADE. SLOPE (I 5/16 INCH PER FOOT) CONCRETE AWAY FROM RIM TO MEET SLAB GRADE 4,.2 PRIOR TO INSTALLATION, CONTRACTOR SHALL SET SUBMERGED TURBINE LENGTH SO THAT MOTOR IS 6" OFF OF TANK BOTTOM. 4.3 UNLESS OTHERWISE INDICATED, ALL CONTROL AND ELECTRICAL WIRING SHALL Be RUN IN 3/4" GALVANIZED CONDUIT IN ACCORDANCE WITH NFPA 70 CLASS. I, GROUP D REQUIREMENT, 4,4 PRODUCT DISPENSERS (MPG'S) TO BE SET AND CONNECTED IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS. INSTALL HOSES, BREAKAWAYS, SWIVELS AND NOZZLES AND CHECK FOR PROPER OPERATION, REMOVE ALL' PACKAGING MATERIALS, TAPE. TAPE RESIDE AND THOROUGHLY CLEAN EACH DISPENSER TO REMOVE OUST. FINGERPRINTS, SMUDGES, ETC, 4,5 'PRESSURE LINE LEAK DETECTORS- ALL (NEW AND EXI5TING).PRESSURE LINE LEAK DETECTORS SHALL BE CHECKED AND TESTED FOR PROPER OPERATION. LEAK DETECTOR CHECKS AND TEST SHALL BE WITNESSED BY THE OWNERS REPRESENTATIVE. H. CONCRETE � .I 11 . 1.0 CONCRETE SHALL BE IN ACCORDANCE WITH OWNER'S PAVING SPECIFICATIONS AND DETAILS. I 1. A5 -BUILT DRAWINGS , . -.,; r-� _. WIN T , E . 0 G.G. SHALL PROVIDE A COMPLETE SET , OF AS BUILT ORA GS O SCALE DEPICTING PRECISE LOCATION OF ALL COMPONENTS INSTALLEO,(INCLUDING CITY �"'. ,r,•, ��°,�1 PRODUCT/ VAPOR LINE I AND LOCATIONS, CONDUIT SIZES AND LOCATIONS U / SIZES N LOG S, 0 E.TC.) PRIOR TO OWNER'S ENGINEER PROJECT ACCEPTANCE. ' ,., _ , � ala III IN N z 0 V) > w O 2 z v) O W Q F- 0 � ry o Z > Q w0 y (f) z Z Q Q 0-- (p I- W U 4 rn � � O cl� J CL 7, 12 Ld 0 0 8 x 9. o LL z 0 Ld. s Lf) uj 10 U V) V) w s • _. . :. : r :, . _ � U. V-- " _ . _-_ ,..r _ zu - uo � ::3 O a Q � o W >_ < k'0 _.1 0 - I', AQL �� f-- O m O Q 0 :lz.---N °4W Qo Vow < � V7 z v) O W Q F- 0 � ry o Z > Q w0 y (f) z Z Q Q 0-- (p I- W U 4 rn � � O cl� J CL 7, 12 Ld 0 0 8 x 9. o LL z 0 Ld. s Lf) uj 10 U V) V) w s • _. . :. : r :, . _ . _-�_ _ . _-_ ,..r _ , _ N x. ! v' r. � � �. ' � i � .. _ Iii � i� � �' It (' �.,, 1 it y t^ �i .`' � ~`/ I 4 , r. r _ 1 FIB R LA S NOTE: ,. A R y 0 ;. i P DUCT P Q P N C: 0 R , " 1 _ GONG. SLAB W „ 1 FRP EDU R $ / R G RY 3 X2 R G , s . _ _ .. S R TRA EI LD NGINEER _ . _. . , SAW GUT ,TA K LAB. PER ACE G E E GONDAR „ . _ N , , A REBAR i . G. 3 ; r 8 , ,, E WAY , • r 6 T 7777 REG w , , r : PLUS , 1 :.'; ..,.. ,.. — — — -- J-- — �". •t. Jam.—�.. !ti. .-_ ..rtA• :. 4L..--.�.. .. •4:� PA I N•. .PRE• III 1 , 1111 1. 7 1V '. I ul n v u a r , I, LI E/ J I II —_ A R I ,a s 3/ IG D 1 COATED�, I II C0 TED 1 _ ,. GALV. CONDUIT 11 ,. , . , .. r _. ON U . , _ , � A METAL _; r r,. .. ,. r I � GAL CONDUIT /.: .1:1 I _�.I _ ,I,I _ I I Il � I ,., I (I II V. GONDU , . PLANSN 9�6S�C1I '�Cl-1 N KLONGITUDINAL 1ACITY wa Ows.,Jr rn a Q V• Z m V) z 0 w C� Of Q Z Z Q Z Q ill 1,1.1 QL a<<<<<7 Is. z 1- N N (n ry 0. n 0 z Z LLJ o C7 3n Un V J -_ Dao < (J-) Li Q <Qc). Q N L W 0 � w N W Z z �ny9Y (D E---- (D ci�ory�- U) z z Q I- -1 O ED l� w o W V) LAJ U.. >- w Lr. L 0 1O K.-. Ld 1 SHEET NO. RE'V op 0 z 1- N N (n ry 0. n 0 z Z LLJ o C7 3n Un V J -_ Dao < (J-) Li <Qc). U V7 W 0 � w Qbi OII� 0 (D E---- o ci�ory�- U) z z I- -1 O ED l� w o W �- V) o.,. L 0 �1 -C 1 SHEET NO. RE'V QW<L� w o >- U o Q r1r) V) ry op 0 tx N (n n 0 z Z LLJ o C7 3n Un V J -_ < (J-) n, U V7 W 0 � w Qbi � N E---- o Q U) z z ED Q w U Q w �- V) V) Q PS2 1 SHEET NO. RE'V ,. 2 SI -IEE C N0. ". r cn , , �n1l — , 00 g g,,, D. N a - , ,r , , , 0o r , I w U , r CITY OF SANFORD F— Qry 0 < P Q , , 2 Q N U Q �- , , �. u , (n 00 � � N v O 2 cn Z U w v z F , z O +r { �D a Uj N X w N � w � w ? >-w . r. , r ¢ FCL i' UU7 N w fi , `• r , !- .. f.. is , , , .. . ,.', y �., .. :-. •, m :, r. ,. .�. ..,. .. .. .. ,. ,•..::. .. a -( , r a z ac T V) u.► z z p O in O > w cv_ c x t ac T O Ez LLw ZE N F U_ � O z LU cn F- _j U U � arc 4n U Q�G J C) ►u >- a T w LU 4 l7 z T � U tx Cr 2 SI -IEE C N0. 00 cn z�c\j _ �n1l — � 00 N a - z (D 0o _ w U a X111 F— Qry 0 < �j Q U 2 Q N U Q �- W �. (n 00 � � N v O 2 cn Z U w v z F r a z ac T V) u.► z z p O in O > w cv_ c x t ac T O Ez LLw ZE N F U_ � O z LU cn F- _j U U � arc 4n U Q�G J C) ►u >- a T w LU 4 l7 z T � U tx Cr 1� 2 SI -IEE C N0. 00 z�c\j �n1l — � 00 N a - z (D 0o _ w U a X111 F— Qry 0 z ? �j Q U 2 Q Q U nK �- W �. (n 00 N � N v O 2 cn Z U w w z F QZ J z O 't!7 z �D a Uj N X w N � w � w ? >-w . T CD ¢ FCL UU7 N w 1� 2 SI -IEE C N0. 00 z�c\j �n1l — � 00 N a - z (D 0o D U a X111 F— Qry 0 z ? �j Q U q Q U nK �- W �. 00 C)~ � o� cn Z U V) CL U F z U U z Q � o Q T Lij a UU7 N w PS3 2 SI -IEE C N0. 00 �n1l cy)cn N a - z 0 o F— Qry 0 z ? U) W W �. 00 C)~ � V) cn V) CL U z Q z Q � o Q T Lij a N w PS3 2 SI -IEE C N0. REV: ..y II vr: yr I JL/HV V ry I P Y, .. _.' -.E7 - ..: .. eno In/`w'nlnu ne Ixnec:;n loo�nu na•rr , ,_... , .. .... ., ..,. .. .... - -..:, :�.,.. _ - ... � .. �. _. .. �N'R' ,. •' _. .--.s.�,....... V "... .' �. ,-/� � ,. � :�' -. � � �. .. � �'�� �� 1 ,i7 111 �1 .. � 1 I � I,I �DaT EpS 2 E R V -, `° E Z Q 00ry l -- _3 -jy� w ,. -- ry00 Cq W O O U � O 00 W1 w Q W J - O n W CL 000 _ 4 � W w )1 Cl0Cy�_ <C G O Nw U O LJ zw N LL V) r ? O LAJ O �Vh `J J < QLU0 � Z ry W W V)(=) O z ry S iS O Z po O its 0 a ���I�1�rf,A, ry V)77 EpS 2 E R V -, `° E Z Q 00ry l -- F -- ry00 Cq W O O U � O 00 Z w Q W O N O n W CL 000 _ 4 � W w Cl0Cy�_ <C G O Nw U O LJ zw N LL V) O ? O LAJ O < QLU0 � ry W W V)(=) O ry S iS O ¢ po O its aw, a EpS 2 E R V -, `° E Z Q 00ry l -- CN -- ry00 D O ` r � O 00 Q W (Y o� Qmo n z 000 � U Cl0Cy�_ <C f— V) rq w O LJ zw U QLU0 ry V)(=) F- ry S W O >-- U O ���I�1�rf,A, ry V)77 EpS 2 E R V -, `° E Z Q 00ry (n �wLLJ� ` r � EpS 2 E R V -, `° E Z Q 00ry (n �wLLJ� Q W (Y o� Qmo n z U <C f— V) zw U V)(=) S H EpS 2 E R V -, `° E (J. C -A z C4 ckj :3 Q) Q) C4 C4 Lu Ld -ZT :z Lu Z, V-1 (Z) c1l) (j) t jSHEET NO. r��_ G) n n: ;d u� at A. G NE RAI_ J. 4 ? 1. ALILATION. z L 4 ;CONNECTIONS: t 1.0 RVERENCEilO GEN ERAL` CONTRACTOR, IS-.: DEN t, r OTEO'BY G. C,. t, �31­f WORK 'GO (NST'Al J NK I NSTALLAT 1, A NO "ChN RACTOR SHALL'LBE,�C RTI'F­IE'O ON PROPER TA ON. PROC t THREADED CONNECTION3 2. 0. MPL9TEO. UNDER THESE ;SE tt I ON W I LL_ I NCLUQE AL� t < K( Ut, M T`A T, I�TXLLAT ibN TAN 5),� PI,PI NG, Ea IP eN NO.RELA EO'I� A NORKiNECrSS RYIFOR� -COMPLE1 ."t'. -2 ��BEDDI K AL iS WASHED NG ANO:BAC Fa ILL, MATER I' HALL,�'k WELL'* AN0,FREE OF I CE�a ANP iSNOW AND MUST� MEET ASTM O -A48. - t i% 1, THREADS SHALL': BE CLEAN'OF ALL SANO AND THREAD CUTTING OILi'PRIOR 11 TO JOININd'.. < M, PRoOUC AND, OPERAT ING PETROLEQ ,T STORAGIE,`H.ANO�IN6 AN 3 QUALITY AND 5OU1 0 C­$HALL'P9QVIOF_ AN LYSIS "ACCEPT ASTM C-33 ANO.-AASHTO -4, AD TO', N k LE .5.1 LLJ V) iSHALL �SUPPLLEiA�N T''Tr� REQUI EMENTS, 5P CI IM HEREIN�,, ',Ir!Ec, ER 5 g E Ho iiY14,OWN SE *PEP ., T'5 M A' E: 10�'OWNERIS ENGINEER-� H rOLLO WING T R I ALS MAY BE' us 6 1.2 APPLY THREAD SEALANT PER E-3.4 STARTALL THREADEO CONNECTIONS BY''HAND. SECURE FRP COM PO . NENTS USING ONLY A STRAP REQUIREMENTS FOR"GE CONSTRUCTION 1.'�tREFER TOTHe'SCOPE WORK,�, A. NERAL; OF,' PL NS �01?i R 11: 21'� OEA�GI?AvEL, WITH* PARTiCU. SliE�NOT LESS THAN, I/tr'OR'.mdR -'THAN'�3/4'1 �'OIAMETER WIT NO MORE'3% IN TRPC OM IE. OWNE1R.S_REPRESrNTATIVE'FOR SITE sPECiFid WAIL,;, "H 5 IT IREMaN WRENCH :00 NOT FORCE THREADS. I F CONNECTION BINDS REMOVE,ANO RECL_EAN.�, "IONS 3 AIiL'WORK�'�,N, L THE PLANSANO IN E14ITH,FEOERAL A .5 N L,BE PERFORMED AS' HOW ON ACCOROANG, PA -5511 0 A NO. -6, SIEVE.' !% 76'HEO'S'TON'E''V'VIT'H.�PAO�i(�L 5.13 00 Of OVERT,IGH.TEN. 'TORaUE FRP. TO STEEL CONNECTIONS TO 75FT., LBS. WHEN'OSING POWER TONGS. -RO TEGHN1,CA4`RFaUIREMENTS, 40CPR PAR' UN*OERG NO`SfIORAG� Aks,'' '' , '' ` ­ , :� , , , � �i, - , LESS' 2'2 'aGR 5 M" E SIZE No 'THAN 1181 0 MORE JHAN 12 DIAM TER WITH NO ORE R E H STATE ON Id P'&'�REWI REMENTS, NO,MO$f CURRENT -EO ION 0 EAPPd A N _�,�SIEVE,, AN 3% PASS NG'A 0. �FRP BONVED,CONNECTION*. 0 NO API RtF'ERE N�� CE STANDARDS. EEP,5 REE OF WASf 4 0 'G"C,,'SHALL'Y I TE'FJ ES AND R U B D 15 H "A LL- T I 3 sT 0 RO NSTALLATI I ON 5 1 TAPER ESCORT PIPE ENDS PER PIPE MANUFACTUR .2 N'BONOING7 SURFACE USING ONL.Y PIPE MANUFACTURE'S EWS INSTRUCTIONS. CLEA : '. ., . I " 1 A COMPLIANCE `65HA AND'�L�L�'OTHER REGULATIONS �.��A 3. ALI-, TANKS. �HA L�BE PLA A MINIMUM,OF,,:36 INCHES 0 GRADE OR AS,'," ED, AT APPROVED CLEANER. 00 NOT ALLOW.GLEANER TO COME INTO CONTACT WITH TANK'SURFACE OR SUMP SEALING OEVICE5. 50ALL�.ENSURE WITH Q � ; ­� �4'. �': , , 0 RAdTRA"C' $ CONTRACTUAL �R.EQU I REM '.G.IkEb C MPLIA E TO ACCOMMODATE, PRODUCT PIPING, SLOPE REQUIREM NT AND SET,ON_AJ2 INCH THICK� , - �,� REQU I RED , i.� E 5 "K, APPLY AND': �Ab -.5 2.2 MIX"' HESIVES PER MANUFACTURE'S INSTRUCTIONS. AVOID SKI N CONTACT VVITH CLEANER,, ADHESIVES AND HARDENER Ld _j < P AS 1) SCRIBEQ.14 3 "SHALL B G RESP (MINIMUM) BED A PPROVeO:bA FIL ANK"OPEININGS 5 GNEO it L, MATE k I X�, HALL D6�Ab DO. NOT INHALE FUMES. _QNSI I PLANEi, PERPEN I? I CMAR. TO T F VERTICALL.Y TH114 A _JANKS,LONG� 0 1 NAL'AXI 5, 6� 9 A, fl-bWoO Sf6kt.:Wom�s AT)ON,_ A 1!�ISTING STA Ei:_ LL 5 "ARE MAI), T HALL BE` 2 SET i4K 5 LeVEL-ON BEO0 I NO MATER I AL USE ALL L 1 FT I NO LUOS. PROVIDED AND GUIDE ROPES �'AT EACH .2,3 MANUFACTURES INSTRUC JOIN COMPONENTS PER TI.ONS. CURE CONNECTION,PER PIPE MANUFACTURER'S SPECIFICATIONS USING RFERENCE-WIT T'I a N SCHEDULED AND -PERFORMEO,50 AS TO'MINIMIZEa,'INTE H THE OPERA b j -3,-' � W.- NOT 5 OEAOMAN', I F U �:, FRP PIPE MANUFACTURER APPROVED ELECTRIC HEATING COLLAR OR CHEMICAL HEAT PACK WHEN -TEMPERATURE 15 BELOW OR WILL '60OF R' �ACH I N`E9Y,' TH FAC T I ES. ALL:� DIED I S,, EXCESS E, GAVXTeD �MATER) 11�1 AND �, n 1 1 '� : 6E'BELOW GLINS AR'"STRIC PRIOR To CURING. HEAT IE TLY PROHIDITED. w U I PMENT, SHALI. BE REMOVED D, Y'AND'MAINTAINEP CL AR OF, OP N OR VEWAYS AIL 15 AT ALL, A.3.3, P 1ATiR'IALi'EVENLY,AkbQNO TANKS,�`IISE BACKF I LL N WOOOMOOK To WORK BACKFIL,L T.I'MES,': LIGHTED SAFETY, 'I'' 1, 1, BARR, CAOE$ SHALL, BE- PROVI OEO FOR THE PQDiL I C_5'PFOTE T I ON, ,L�'PRO13e �),i�COMPI__f LY.0 DER, ANK.' F E_ T _3,` FLEX E CONNECTIONS. LIN il q �'Wliil 11 .� � .1 1 L i ..,. IT-DECOMI ",-Yajo EW'AY, 0 NERS,REPRE5EN TATIVE'SHA �13 -WHEN 'ES NECESSAO CL05E A ORV , : 1 1,,,; '' , I . I 1 -11 , 1 0 '�'A' REPEAT 0 R NEXT 121!,PR051NG TO,FIWALL�VOIOS��," F 0 5'3.1 'ASTALL� FLEXIBLE LINE CONNECTORS PER MANOFACTURERIS IN,5TALLATIC)N'INS�k'U"'CTIONS, j Nor I S,'PRIOR TO, R CL95URE' a:' TO:,T,6.NK. TOP$,,. B ADQ AQI?,ITIONAL,BACKFILL` (AOO1'IT1.1QNP4� PRO ING N T" REWIRED). 0'4 "7, Q P I P I ALL, - EQU I PMENT,,� MATEk (ALS, N ANK AND ACCESSORIES, S". INSTALL'�q .-FREELY - AFTER INSTALLING FLEX,LINE COUPLING., PLACE CAP. OR PLUG -ON COUPL I NOS TO PREVENT DEBRIS FROM ENTERING IN, OANCE,wiTH 4HE '.APPL (CABLE FAG: 'T`QR E R 5 INSTRUCTIONS` ACCQR' MAN 4 ALTERNATE INSTALLATION IN LIEU OF 5HORING LINES., WHEN REQ'Q), ��%P 1: - ­: , 4`1,"LP�ACE MINIMUM I'D'" a .,BEOO.ING� MATERIAL,"AT,ENE?CAP,,LOCATIQN$ , 1"� L, 1: �,?� . � 1-11, i, 51' � , ", . I 6 LINE EST NO , EVACUATE`PROOUCT FROM TAN0 ANQ�LINES(, t. �: , - 1'� � 1 - i'4 2 �:$Ef fXNK6'(�VEL� ON. ENOCAP DEOS,nn'' USE ALL FITTING. LUGS PROVIDED 'AND GUIOE,RQpES!AT EA A' 'SHALL. 't tV E 00 NOT SE ji TANKS 0( YON OEAQMI F., USED.' CA LIT I ON., N I TROGEN FROM A GROU NoEb SOURCE Be USED I N I A FOR STP "SYS TEm _RA,1N:LINES INTO' �ANK:BY REM V Ve OPEN I NcP TEST., PORT. 0 AqTYV�LVE Q ING:�STP CHECK AND A 4.43, ADO C L AT:EAG L I �:TANK, RAMP BACKFI jO'WI, HN,3FT.�'OF EXCAVATION Kn, C: -AP, TOP. H; E N PC, TO, 5TAI31 LIE U OF AIR �FOR TESTING IF. LINES HAVE,DEEN EXPOSED TO t SCOkN;ECf`­6TP LINION1 SWIN MQ, N DI G, PROPUCT" INTO AN - , '� le. �'. 11�j, �i; , ',: _QRAI 'APPROVE[) CONTAJNER�' t 4 k��'�CiJXCENT-�TO'EXC-AVATION.,5 DE A' P LL Y -OF, �f* T t 4. 4 A 0 DACKP I L'� 'ALONG 51 DES, N S,D 'PUMPING A, FULL" BUM PA5C� ALL -IN NOTE: 0 W 5 ALL LINE TESTING NER'S ENGINEER SH WITNE,5 1 2 0( NOT�:B Oil OUT LINES WITH,COMP9EWO A, R, �,i­or BACKFILL� IN -ADOVE f AN k''T P i�USe,A LONG - HANDLE, PROBE, W1 TH L CE�:FR6MA MIN .1L FT ONE P �A MUM `0� 'I 6.1 G.C.."SHALL NOTIFY OWNER'S ENGINEER TWO DAYS PRIOR TO.TE5TING. OCT*; kE`MoVib` FROM Ll Ni PROD Of� S*BECOMES PROP R e GiC,,��b USEQ'!AS' MOTOR 'FUtL NI CLIRVEO END R NK' UFKTURE'S SPECIFICATION L 0 NO TOP OF, E CAVA ON (0' A19,JET PER, TA e'StAN At! - A C CAUTION:, AP FLEX CONNECTOR OR FLEXIBLE LINE AT STP PRIOR C, T6 To MOVE� BA KF I W,'� UNDER 4ANK SIOES,":REPEAT� 15��ROCEQU I L,, PA REt.UNT CKF I LLA S: 12 IN T Up f�', TEST I NG,', APPLY 41 RELEASE: PRESSURE 5LOWL y j -1.,3 :REMPVE.LIQUI9,4 TANK�.bO4,roms TRUCK�IN LIEUQF ON S1,TE STORAGE -,CONTAI.NERS, t 'U tL FROM ILATIQNS,,: RE DEPENDING ON'LOCAL REGIL CO) M t VERW MATERIALLMAY':Da ANAGED AS OFFSPEQ,!PR( 'scLJO L t 5 ET EXCA ION,GQND1ITION,5;.* - 4 VAT 2 PROD C T-1 E'SkALL`BE:.TE5TEO N STP TO SAFETY VALVE. AT L NAG 0 AS A . . 1�.. . INOUSTRIAL:O .;MUST:6E,MA E' -HAZAR 0 6 0 WASTE.: IF ERiA 66 :,� , , , . I , � t. '� ' ` "a'". ';1 VENT/VAPOR SY5TEWSHALL�B E TESTED FROM TOP OF VENT, THROUGH �5, LLoW:,qYI ENVIR OLI NO.: MANIFESTING NO QISPOSALi''"'­i;"� FO REMEkfS,'r0R'HAN _ONMENTAL-�RWUI A' '� A,-5. 'a-,G.-,'-5HALL'BE RESPONSIBLE,`TO EVACUATe,VVATER -FROM 'IF CONO f X AV TIO t E C A. I IONS -MAN [FOLO, EXTRACTOR BASE AND RISER, �57`AGE`I CONTAI NMENT R E ZAkQQUS WASTE, 0 1 SPOSAL., FAG L. ALL':DE, USE ONLY OV.VNER�APP OV Q, H,� ONSULT THE,,, -Ii .,I.TIES �H. Q1 -APPROVED '-t NE' BaYL OSHA NQ OWNER 5 �IRE SHORING, CONSULT �rgl?'S ENO! ER.�METI46Q MUST BE A MANHOLES, STAPE,11' VAPOR LINES TO ISLAND 4 STAGE I I. FLEX 'C APPROPRIATE ENVIRONM�NTAL:I.�N.GI.NEERINC;& CON -FACT FOR" PROCfSSINGAS51STANCE� IN.,,A�L `6 NNECTORS AT DISPENSER'S. REPLACE 5 BALL� FLOAT CAGES WITH PLUG, t ZE, SUR C. 4 .2,�MINIMI FA �,iWATERiENTERING EXCAV QNSTR 0 0 Q 5 `A OLIN TANK F,I ELI) ATION,DYC N AM 0' 1j, U YPS, ANOREPLA C E STAGE, I VAPOR RECOVERY �SPI,LL ONTAI*NER DRAIN VALV C ES TOP6 PLUG tALL'' OPEN I NOS, REMOVE TANK, 2 0 bItAVATE,"TO TANK REMOI �ALL.l TANK'AOPURft�ANCES,' 1. EXCAVATION AND PIPING TRENCHES, WITH PLUGS. �GAUTI,ON ENGINEER ANG G.C,,�$HALL VERIFY EXTRACTOR PLUG' AND P�Aa I,N,A SE MUST,.HAVE`AN 11611 JG FOR VEN'T 6UR LOCA ONE TANK, PLUC. HOLE"INIP'Ll T'o ''t INSTALLED ANO,,QAP 15 REMOVED FROM TANK MONITOR RISER PRIOR TO,,� t." , r -:. - �:; "', t "ISI, �ONTiNGEN6"Y" PLAN ',5HALLtE.,:BY'G.C� OUTLINING EMERGENC EOURES FOR Y, PR6C PRE55UR E TE5TING'VENT/ VAPOR SYSTEM. EAT B-�I,�3 THROUGH'ALL E ,13-1.3, , - _ a IA N U 10: REP], I TTINGS, TO REMOYE REMAINING RESIO E, 0 PER R 5, 0 E SHALL BgtMANA.0 - In n OBTAI N NG THE� ECES5A E L HA 'TH JANK," k RY, E UIPMENT,ANO/OR. P R$ONNE,, TO NOLE UNEXPECTE �IN 9 WATER ENTR TO El 6.A FRP L INES 4.0 �,QECRIEAS94ANK TO L [0%ii,QF'TH LI�MIIT,'f LEL). PER..THE'F LOWING E*S: THAW FIELb=ON 'OR NS CONSULT OWNER 5,�. PIP-INIG TR'ENGI­It�., WHEN iWATER MAY CONTAIN DO, ENVIR ENGINE 6. 4 1 'SLOWLY PRESSURIZE PRODUCT LINES AND VENT/ VAPOR LINES TO 50 A M 'OREFER9 (INERTING ED, ETH ';'IN T LL." 4A 4 5 3 S A TAN KS PER,A3 OR' IRE.PIPF SURFACES INCLUDING SOAP TEST ENT JOINTS AN FITTING5.�'CORRECT ANY LEAKS AND RETEST DOI NG IN I..MUM f ANK CAPAC IT� A R, 10.0, G LLONS. Q ANEFT Y�PoRS'13Y.AO', C� E A -W dR'I'N.G c 6 4.2 MMEOIATELY LOWER PRESSURE FROM VAPOR/ VENT SYSTEM TO 5 PSI,� I .'REMOVE EXTRACTOR PLUGS. REDUCE PRIMARY LINE PRESSURE TO A LTERNATE METHOD P URGjNG - A.6.1 JANK ANCHORING HER�, REQUIRED BY, EXISTING GROUNQW TER CONOITIi N*,, AL W A 0 sH 1:13E 30 PSI.' MON I TOR DAILY UNTIL ALL�PAVING IS COMPLETE, - T I LATE TANK�.U� CATOR OR OIFFU5eR (EXCAVATOR 5HEO USING STRAP5.ANO TURN5UCKL MBILIES BY,THI, UFACTUR4ER, AND,' CcOMPLI e X�SE ElAkS MAN 'TANK 6.4.3 ASSEMBLE SECONDARY SYSTEM AND, PRESSURIZE TO 5 PSI. ,MUST TEN0,12 K TOP �`A VEk T'L, I N E EX FT. MINIMUM ABOVE'TAN 1 5 A 0 CT GORDAN E vvi f�H, THE N T LLE 1,N'S.fRl AC MA UFACTUReR $ REU N UIREMMTS.�, AL PJEST ENTIRE PIPE SURFA SOA NCLUDING JOINTS AN 0 FITTINGS. EXTENDING OP MUST BE ATTAC n'; i�w .12 F�,` MIN IMUM,XbQVE:TANK,'T H OE To BE COA PPERS �00MIPDXY,'APPL I ED: I N CORREG T AN.Y,LEAK 5 AN 0 RETEST. MONITOR DAILY UNTIL ALL PAVING 15�COMPLETE, L Y HAR WA TEL) WITH,KO 'ER'S'RECOM TO.,,ifANK 41 USIN G I E WITH MANUFACTU MENOATIONS, 6 A A 4AFTeR,TESTING HAS BEEN SATISFACTORILY COMPLETED AND PRIOR TO BACKFILL" ALL EXPOSED GALVANIZED PIPE THREADS, 5.0'�ALL T E6A: Q) TI-F'I'EO. if n WS MUSTBE DEGAS* N C R "'-CLEAN. BY Goc,�T"',, 5,0 RISER COATI NG'ANO, NRAPPI NG JOINTS WRENCH MARKS AND ANODE CONNECTIONS ARE TO BE COATED WITH COAL TAR 4 3M TAPE, EPDXY APPLIED INACCOROANCE WITH THE MANUFACTURERS RECOMMENDATIONS, 6. 0' PRIORiTO TRA A N SPORtIN&MY TA ROM 5 TE,� !LEG I 13LY L. BEL AS FOLLOWS" 5.1 PRIOR TO COMPLETION OF BACKFI LL. AND AFTER, PR _ESSURE TESTING TANK, CQAT ALL,GdOdblbu COMPONENTS c�, 1ANK H CONI AMEQ:�, F L blbs,., I' A EXPOSED TO BACKF I LL WITH COAL,TAR EPDXY AND WRAP. WITH FELT,OR 3M TAPE. ,-ALL 'COMPONENTS SHAL�' BE ' - I . i :;615 ':RT,,5HALL PERFORM PRECISIONJEST ON PRODUCT LINES AFTER PAVING 15 I I 4. , . CLEAN AND CORRO ION FREE�BEFORE LY!NG. COAT ING., eXTENO, COAT NTc NO V_,ONTO ADJACENT FRP OMPONEI COMPLETE, PRODUCT HAS BEEN PLACED IN TANKS, DISPENSERS HAVE 'NO.T,�'GAS'FREE.-�,NOT,�$UITABL FOR FOOD BEEN INSTALLED, AND FINAL TO PRIOR'PRojECT ACCEPTANCE. T QR OR I KING�WA ER;! �6 ALLASf ING :�o I OPEN EXCAVATION FOR. EVIDEN 7'0`t�6�NER. 5 ENGINEER SHALL, N$PECT CE "OF ALL- HYDROCARBON AS 6.1 YI BALL TING r'. 0, 1 SPE NSER'' ReLEA$ 6 6 1 'G,� 0 TAN TECT AND STORE REMAINING U I 'I AfTA)CH:ONLv STP RISER AND MANIFOLD HO N, K '��G.C, SHALL: PRO 1. 0, DISPENSER SHALL BE SECURELY ATTACHED TO ANCHOR BOLTS WHICH SHALL BE t �;60VER fop n COMPONENTS." OF:STP MANIFOLD WITH PLYWOOD SECURED THROUGH EXISTING DO t 'H L in §.P L 0 ES, �ET:IN CONCRETE:ISLANI). ANCHOR BOLTS SHALL. i BE AS��,' allANTITY AND SIZE OF % C. , EXCAVAT I ON SPECIFIED IN 01 SPENSER �MANUFA TURERS',IN5TALLA' 6N,�j ri NSTRU` 4 1 6 sibes�'oF'TANK H VATIoN SHALL B 5LQP Q N'AC ROW A. ni OLE Ea XGA' I" Go ','E, KI tH 6.S. H. -6. 1, 2'" :'10 ASSUME RESPoNs1B1L.1TY F R C P ETE TO'BE: PROVI DED BY CONTRACTOR,.. G.G d 6M_ L REMOVAL AND "CONSTRUCTION SAFETY,4 HEAL.TH kEGULATIONS'I 5UBP RT P -EXCAVATIONS,' TRENCHING 0 SCHEOLIONG. GASOLI.:' I ., , - DISPOSAL OF,tWATER BALLAST AN N'E DELIVERY PR[CR TO. PRODUCT PIPING PURGE, ISPENSE R sHALI_i;BE ACTIVA10"bNLY'N ORESENCE"bF AN AUTHORIZED I � , . 4_ t E :)TH� SHALL,,' ,­56.266Q,THRU 1926653'. -RECOMM NVATIONS, FILTER FABRIC 'CLI BE USE TO ", I a. . .!� , , a It n :ST* DISPENSER ART. -;UP, CALIBRATION Ef E NTATIA,­ G G.' HAS' LE RESP NSIBILITY FO R DAM i, OISP NSER REPRESE so 0. AGE TO RIOR T 0 GRAVEL 13A BOTTOM ANO,SIOES 'OF TANK HOL� P CKFILL, FIL�ER �ABR M, t -9 DISPENSER IF THIS INSTRUCTION 15 NOT FOLLOWED. t :t ALSO..,LAO !bF T A EAS OF -TANKS TO PREVIENT,"INFILTRATION OF�EAR H INTO TANK 6 1 3 REMOVE PLYWOOD COVER FROM STP, MAN I FQLo. COMPLETE STP I s LLAT bN ONLY Ah A T TER,REMOVING ER.', : f I �FRO m TANK., t 3.0i,PURGING AIR. :'n n ". " �a .2.0, EXCAVAT ON $HALL BE SIZED TO OVI�O" i'A, MINIMU9'IFT FT B E , . 9' 1 TANK, BED,, 2 f V VEEN -TANKS ANO)FT, 3A ACTIVATE,'ANY OISPENSER,� 00a NOT OPEN A'NOZZLE. LEAVE OISPM50",, BETWEEN tANK 541.0ES/Eh"US -AND. EXCAVATION, III 11�t 't" ;� , � ,i,. � �� .1 a n n R PAVjNG,1S COMPLETE) J ON FOR,. N "MINUTES. TURN DISPENSER OFF AND'ALLOW TO STAID FOR MINUTES. - n /0 ':� 3.0, OWNER RESERVE. HEn,RIGH ' N Lit �t, T T TO LE IN NQER AN:AMENOEO SIG R.CONSTRUCT SHOR G AN T IA G. C. SHALL� GONTAC R.T. 'OWNERS LENGINEER 10 HAVE PRECISION TES N PRIMARY TANKWTER PAVING 15 COMPLETE, I 3.2 ACTIVATE DISPENSER MOST REMOTE:FROM STP AND DISPENSE (150 GALLONS 'FROMTHE FARTHEST�,, 'n .,AGREEMENT . P . I ' - ' ' ' I � , '. 1 1 'H--N WI, IF'OWNER ENG E5 G.C,,j, G.C. $HAL UBMIT 5 ORI G TH'G.'C,' OR,,5EPARXTELY WITH ANOTHER COMPANY, A 4 1 . 'PRODUCT HAS BEEN PLACED IN TANKS,' OISPENS RS HAVE DEEN'.INSTALLEC),'ANE) PRIOR To FINAL PRQJ ecr ACCEPTANCE. ALLONS FROM TWO DISPENSER$ AND 50 G ERS) INTO A GROUNOED,�CONTAINER APPROVED FOR ALL OITH N JO. OWNER 5 ENGINEER FOR'APPROVAL, ,.SUPP E L JOB: SCOPE: AND, 5, LEM NTA CQ T� SHALL BE'A STORAGE AND HANOI-ING OF CLASS I FLAMMABLE LlaUlOS, REPEAT FOR EACH �HOSE AND, DISPENSER. n 'n, TO� I N TERM$ OF A" CONTRACT '�*HOR E ;iE QRQER,PRIQR:lT0 COMMENCING WORK. ING'SH CHANG ALL;5 E, REMOVED, ');'OR P ING" n n. I P _T -0- PIPE MANUF ACT URER'S LL' A60N CHiCkLIST, INSTA 5 HA 'BE.INITIALED ANO SIGNED BY G,C�ANO OWNER 5 ENGINEER, As MOVING PROGRESSIVELY CLOSER TO STP. REPLACE PRODUCT USED FOR L'INETURGE INTO E, R SP C IVE TANKi I OR'40 IN5TALLINGnPRQOUCT . PI.PING.'vQ,N r,ABANQqNT6HORING IN, PLACE.. , 'CH t "t ; TANKS, APPROPRIATE, AS EA 71 STEP C QMPLETEO, '�4.0 ELtCTR I CAL CHECKOUT: 't TAL�AT 16N PRACTI' ES SHALL BE IN ACCOROANG KMANSH I P �AND N C 2.0,'ALL MATERIAL WOR S WITH NFPA APPLICABLE CODES. n: "TANK' A KLIST SHALL -)/SIGNEO BY G. C, AND OWNER' 5 a, 1 0 MAL r CTURER, 5 IN5TALLATj6W:CHEC BE I,NITIALEL '4.1 TURN OFF ALL STP CIRCUIT BREAKERS.� NGINEER, AS APPROPRIATE, AS EACH 1STEP, 15 COMPLETED t 10 MATERIAL$ EQUIPMENT SHALL BE ADEQUATE TO.HANDLE TANK'WITHO GIN UT,ORAG G,` USEIALL.111 NG�LUGSANO I,, ALL'VENT, ANO,VAPOR R TURN,SHALL BE FRP SMIT F I BERGLASS REO,THREAO II TH 058000 SERIES AOHES 7A (wj IVES) 4.2 CONF IRM ALL� NOZZLES ARE IN THEIR BOOTS. GUIOEtINE5,,jWHEN.LJFT,I UVEV,�ANGL K HALI,:� OT, n THE.-iNcL "-E.DETVVEEN�LIFTINGIL-INES,ANC) TAN 5 5' ' '"'N' ,NG'TANr ':'PO 4.3 'VERIFY ALI- StP'S ARE OFF,' B LESS� THAN �50., REST TANK 1 5 ON TH'ANO DEBRIS FREE ojRoUNo.,cHocK -TANKS WITH N I I RES To, PR 9 T, n 2 MARY PRODUCT AND SECON ARY CONTAINMEN, LINES�SHALL'BE FR P I T I PE AS SPECIFiED IN �E-3.1', P 4.4 ON CIRCUIT OR �ONE -AT NOT DRAG JANKS., TURN BREAKER FL ONE STP, HOSE A TIME FORL -5-12 A 6 -3.3 TANK RISER SHALL BE SCHEOME AO: ASTM �VAN I ZED, IRON PI PES., FITTIN 'SHALL�, 13E 300 PSI GALVANIZED PRODUCT GRADE MATCHING ACTIVATED STP, PERFORM THE FOLLO ING A cH 0 1 SPENSER, W T 64ANK.TESTING MALLEABLE IRO�'L ALL 7COUPLINGS AND. FITTINGS SHALL'BE SHOULDER STYLE. -Not STREET COUPLINGS OR F I ff I NO SHALL' IDE' ALLOWED' E ZLE 3. 1, STAN OARO VACUUM T 5 E i ' ' ' n OF, CLOS CONTINUOUSLY THREADED STEEL,PIPE, NIPPLES SHALL� NOT 13E PERMITTED � .1 a . . I A.A TO AN .2 ACT I'VATE OPERAT I NG HANDLE AND DISPENSE PRODUCT IN D ONTAINER, 3. 1,1 ANTERST Ce VACUUM:ON TAN A�L',BE VER FIED'PRIOR TO UNLOAOING'AT 5 KS 15H I ITE AI IMMEDIATELY AFTER UNLOADING AT'SITE,, AND AFTER TANKS ARE SET I 5ACKFI LLED TO ENSURE TH T. THE TANKS n., t I ALL,THREAM) CONNEc ALL, BE TREATED WITH GASOI[LA'.100 0R.JOMAR 100 I1THE'H' W'I 11 i( 06t �q- TIONS SH EAVY, E dHT. I" QMPAtl Dle -ALL, F'UeL$ . A.A.3 -,VERIFY ONLY CORRECT STP TURNS ON. 'AR INTACT..'. VACUU TAIN E M LQGS'TQ.BE�MAIN E d, DAILY 6Y,G G ��,-3 , 5HALL OEMONSTRATEJO OWNER �'NGINEER ALI�,,'INSTALLEQ MATERIALS AREAEW AND CONFORM TO A13OVE SPECIFICATIONS G G. A.4,4 VtRIFY BRA'NO PANELS'ON EACH SIDE OF DISPENSER MATCHES PRODUCT BEING DISPENSED BY STP. 3 SURE TE �,,;�,ALTERNATE,PRE,S ING V� 4.4. ERIFY T NOZZLE TYPE IS: IN'STALLED. CQRReC CAUTION-�-`OO NOT., A10 AT ALL ION REPEAT F -�A, A FOR EACH PROOUCT'GRAOE, LEAVE PRESSUR I Z ED TARKS-UNATTE NO 4.1 INSTAL I -ATION CONTRA TOR SHALL BP CERTIFIED BY PIPINGAANUFA TURER.: �5 0 ACTIVATE ALL. 5TP CIRCUIT BREAKERSONE HOSe'AT A TIME.,:FOLLOW �2 .-APPROAGH TANK'ENOS., OR PLUGS,OF PRE, 5SLIRIIED TANKS' F 4.2 AN 1) F 4' -4.k3 FOR EACH HOSE. :3) EX 51 1 ANNULAR S Y CeEO 6 P, PACE a, OR PRI.MAR TANK, CORROP I BLE COMPO �4.2 5H E US0 0 5PEC FIEO AND IN THE ARRA NENTS ALL*� B NLY WHERE. NGEMENT, 5HOWN, IN THESE DRAWINGS, 6.0 IF MISCONNE , CTIONS OR OTHER PROBLEM S'ARE DETECTED, MAKE CORRECTIONS :.A) :ATTE E A T TO 0 PAiR A OAM PEOJANK,�, , . ANO REPEAT ENTIRE DISPENSER CHECK -OUT PROCEDURE. APPLY AIR PRES SURE TQ'ANY,,TANK WHICHAAS CONTAINED, MOTOR FUEL,, A, 3 BEDDING A NO BACKFILL MATERIAL:,SHALL'BE THE SA A M * THE_'TANK FIELO.''SANO SHALL- NOT BE USED UNDER AN Y'CIRCUMSTANCE*, j,7 PRO UCT LINE TRENCH SUB- A A R OE SH 'LL BE COMPACTED TO 90% PRQCTER DENSITY PRIOR:TO, INSTALLJNG.DEVOING AND AOTE, SUCCE55FUL COMPLETION .0 F F .0 AND F-5,0 LL CONFIRM COMPLETE 'WI �Ahl) .2, IGHTEN 'ALL TANK PL UPS, 'USE MANIFOLD AND TEST'GAUGE­ WITH' 0.- 15 PSI RANGE .1�41_B.`,, I NCREMENTS BACKF I LL, MATER I AIL CONTIN INTEGRIT UITY OF DISPENSING ELECTRICAL'ANO PIPING SYSTEMS. 7.0 DISPENSER CALIBRATION: -��UBSEdUENT TO ST ART UP OF NEW DISPENSER BY THE QUT, L TEST, -4.A iPI _EO" km PLACED LINDER BUILDING L L' B S;ANO S AL PING SHA e INIM17 H L.BE.INSTALLEO WITH MINIMUM'5PAC,ING,ANO OWNERS AUTHORIZED SERVICE REPRESENTATIVE, THE G,C. SHALL PROVIDE A STATE CERTIFIED 5 GALL�ON CALIBRATION CAN AND ADJUST CALIBRATION OF PRE �MAX, '';'3.2.2.1 ,,,CLOSE MXNJFdLO,�_,L E 5SURIZE PRIMM XANKTO.�' PSI, BELd' CLEARANCES SHOWN' W IF PIPING ROUTING 1.5 NOT SPECIFIED' G,C SHALL INSTALL IN THE MOST OIRECTiRO UTE, SUBJECT EACH DISPENSER H05E TO ZERO TOLERANCE FOR EACH 5 GALLONS OF PRODUCT j "6LOSE,'AIR SUPPL.Y, VALV' 3.)_2.' E AN0,01SCONNECTAR.SUPPLY. ,(THIS STEP GUARDS -TO APPROI BY ­OWN ERIS ENGINEER, ON BOTH FAST ANO SLOW RUNS, -OR AS DIRECTED BY LOCAL. WEIGHTS R PRESS U AGAINSTbVE RIZINdPRIMARY TANK),;: A NO MEASURES AUTHORITY. PRODUCT USED FOR CALIBRATION OF DISPENSERS SHALL j3`0RESSU'RIZE ANNULX0,SPACF_ .4 5.,� PRODUC LINESHALL, SLOP ONTINUOU5LY UPWARD FROM 5 TP SUMP'A'MiNIMUM OF 1 'PER F T.; -'STAGE I ANO'ST�GEJI C BE RETURNED TO I T5 RESPECTIVE STORAGE. TANK. REPLACE ALL METER 5 EALS. ­ 'FURNISH,OW WIfH .2 PENIhb'MANIFOLO VALVE1,:,:,`,i 3 BY 0 -"VAPOR RECOVERY LINES AND, VENT. LINES-5HALL SLOPE CONTINUOUSLY UPWARD FROM VAPOR, MANI FOLO A MINIMUM NER CAL15RATION REPORTSHOWING FINAL CALIBRATION TO ZERO T OLERANCE, M.INUTES,MINIM SOAP ENT R RE 3t'2,2 MAINTAIN PRE55URE FOR 30 E'TAN K JECT ANY -PER FT., BEFORE STORE STOCKMG. 'INSTALL. I CH, FAI Ls OUTER VI TEST. "THICK 8.0 NEW OISPEN5 LT RS'AFTER COMPLETING ALL LIQUID TESTING... rR F1 E iN,5PECT PAV NO 6, EACH DI ACTIVATE EACH PRODUCT AND SPENSER AND FILTER FOR LEAKS.� 2 3 INNER WALL,,TESTt, RECHECK PRIMARY LINE.CONNECTIONS AT DISPENSER BASE AND STP FOR LEAKS. I r 7 CAL I BRAT ION TES 'SHALL BE'GIVEN TO RACETRAC ENGINEER PRIOR TO 5 TOCKING STORE, .3 L MAN I FOL URE�BY,'OPEN 'C 05E OiVALVE,ANO RELE.A$E�PRWARYJANK'PRES5 I iIIiIG Xlk SUPKY VALVE, G. MISCELLANEOUS REQUIREMENT.' MON I TOR ANNULAR SPACE'PRESSLIRE FOR �AT LEAST,30 MINUTES AN 1) No MORE. THAI E L PIP 1'N'E5 '4 t " L : � L , , I ' . E FIN15HED ORADE. o,:;, I SET, �ALL TANK: SLAB MANHOLES AND STREET BOX EL EVATIONS 2" ABOV 60 MINUTES.;, REJECT ANY-JANK WHICH FAI,L51NNER WALL,, TEST OR ANY, TANK VI I CH PNIAC HAS BEEN DROPPED OR IMPACTED. C I JANK,MANUFACTURER FOR REPAIR, t'711 MIN'_', , , 4 , : ct/ PRIMARY'Ll AV, L , $LOPE 5/16 INCH PER FOOT) CONCRETE AWAY FROM RIM TO MEET SLAB GRADE 3 2 �-;FOLLOWI NO TANK PRESSURE JEST A ACUUM $.H1ALL�BE'PLACEO.BACK,ON THE INTERSTICE SECO NoARY, '4,2 PRIOR 10, INSTALLATION CONTRACTOR SHALL SET SUBMERGED TURBINE LENGTH �50 TH AT MOTOR I S V' OFF OF TANK DOT -TOM, 3 At THE MAINTAIN A SAME LEVEL AS WHEN, THE 4ANKS:ARRIVE0 ON SITE G.C,��'SHALL �,OAI LV 4.3 UNLE550THERWISE INOIbAl 1), ALL.'CONTROL AND ELECTRICAL WIRING SHALL BE RUN IN LOG,OF N , Y�CUIUM READING$ ON!AL-L, TA KS FROM THIS POINT - FORWARD UNTIL, ALL, PAVING _ - 11 1 1 . 1. 11 � 1, I 1.11. . '': ,.. 4 I 1 3/14" GAL.VANIZEO CONDUIT IN ACCORDANCE WITH NFPA 7.0 CLASS 1, GROUP 0 RE(2UIREMENT, . .. I � I � :COMPLET E, I FOLD HOSE A MIN . . I : L .4 PROD UCT,I)ISPENkRS (MPO 5 TO 13E SET AND CONNECTED IWACCOROANCEATH MANUFACTURER'S REQUIREMENTS. LY VALVE AIR SUPPLY VALVE j 'A R 'INSTALL 1­1YS, SWIVEL$ AND NOZZLES AND CHECK FOR P OPER OPERATION. MIN REMOVE ALL PAC KAGINO MATERIALS, TAPE. TAPE RESIOE ANO'THOROUGHLY CLEAN EACH DISPENSER TO REMOVE DUST, FINGERPRINTS, SMUDGES, ETC. a 4.a5 PRESSURE L I NE LEAK, DETECTORS., _I_ (NEW AND EXISTING) PRESSUREA.INE LEWOETECTOR5 SHALL DE CHECKED �A[ AIR SUPPL?t" "ANNULAR SPACE A 0 TESTED FOR PROPER OPERATION, LEAK DETECTOR CHECKS AND TEST SHALL'13E WITNESSED 13Y THE OWNERS REPRESENTATIVE. 'TO Y PRJMAR TANK,', PR E55U R G E PRESSURE GAUGE �MIN n, mi N n H CONCRETE 'PAU MAN L I FQ V 7. 0 CO 1.� NC�RETE SHALL BE,IN ACCORDANCE TH OWNER 5 PAVING SPECIFICATIONS AND OETAI LS. PRESSUR I ZE, PR I MARY TANK VALVE a AS BUILT'ORAWINGS PLAP XIMI I ITO 5 PSI, MA, PRESS 1.0 G.C.':SHALL PRQVIO -A C E OMPLETE SET OF AS BUIL11)RAWINGS TO SCALE, CITY OF lForm sm r DEPICTING PRECISE LOCATIONL OF ALL COMPONENTS I NS TALLEO (INCLUDING PRIMARYJA N K PRODUCT/ VAPOR LINE. sizEs AND LOCATfONS, GONOUIT SIZES AND LOGAT I IONS 1 ,FITTING,. E TC.) IOR T 0 OVI ENO INEE R PROJECT ACCEPTANCE� in - -tA in 77-­7777- L (J. C -A z C4 ckj :3 Q) Q) C4 C4 Lu Ld -ZT :z Lu Z, V-1 (Z) c1l) (j) 0 jSHEET NO. r��_ G) - CD u� 0 AW LIJ z �7_ < I-_ V) 0 LLJ < 0 z > cl� < LLJ V) V_ (J. C -A z C4 ckj :3 Q) Q) C4 C4 Lu Ld -ZT :z Lu Z, V-1 (Z) c1l) (j) P s 0 jSHEET NO. r��_ G) - CD u� 0 Ln V) 0- LIJ z �7_ < I-_ V) 0 LLJ < 0 z > cl� < LLJ V) Z u < < z _:c LLJ q < V) 0 ILL LLJ L.Li Ld _j < V) _j In < �V) V) P s 0 jSHEET NO. j RE7V] i _ -- - - �,� t �` �i a� ,i . d '.O I� i �� I.. i. I i. r Fy:. _ .. i _ _ __ _ `�` "4 .,. i:; � `. ,.