Loading...
1200 Albright Rd - #22181 (1987) (METAL MANUFACTURING) (ADDITION) DOCUMENTSNAME DATE' OcT_ Z i98-1 ` LOCATION zoo D S o O' Ft BUILDING New 1°a'I A-aoiT.o S SYSTEM NO:`777 CONTRACTOR u wl S T g T 1 f1 P ; ,. , o CN CALCULATED BY CON7RAGT. N0. R,'ri` CONSTRUCTION. COMBUSTIBLE NON COMBUSTIBLE77 DRAWING NQ CEILING HEIGHT a l FT: OCCUPANCY NFPA ix.. LT.. HAZ. ORD HAZ. GR NFPA 231 Lj 1 2 , 3 ., EX HAZ; Z NFPA 231C: FIGUR E --__. OTHER y , CURVE t7 Specify) w SPECIFIC RULING` MADE DATEp BY ui w 77777-7777 AREA OF SPRINKLER OPERATION 1 500 . SYSTEM N DENSITY i 9 AREA: PER SPRINKLER 1 3Q Mpx WET_ DRY DELUGE, PRE:ACTION HOSE ALLOWANCE:GPM.:. "INSIDE cN7r,z.o SPRINK ER RN ZZ E HOSE ALLOWANOE GPM:.'OUTSIDE ,.`': Sa MAKE SIZE MODEL,': UPR 6+T: RACK SPRINKLER ALLOWANCE .' TEMPERATURE''RATING ' .2 2 CALCULATION SUMMARY GPM REQUIRED L366ji PSI REQUIRED 42 a I' AT BASE; OF RISER C" FACTOR USED OVERHEAD 1 20 11NDERGROUND L4o WATER FLOW TEST y DATE 8 TIME PUMP DATA RATED CAPACITY TANK OR R 4 RVOIR CAPACITY a STATIC PSI .. l AT PSf ELE VAT,I N RESIDUAL PSI S 5 ELEVATION GPM FLOWING o ELEVATION M T WELL Fww- PROOF FLOW GPM :- LOCATION QSs ME'' QVAILi4 LE,: AT A Pr,r' n %''n Au0 SOURCE OF INFORMATION LTY OF K1l1 ORD COMMODITY CLASS LOCATIONkw w STORAGE HEIGHT AREA AISLEnWIDTH STORAGE. METHOD: SOLID PILED % .PALLETIZED q, RACK °10 SINGLE ROW CONVENTIONAL PALLET AUTOMATIC STORAGE ENCAPSULATED DOUBLE ROW. SLAVE PALLET. - SOLIDSHELVING NON - o Y MULTIPLE ROW . ; OPEN ENCAPSULATED.. c FLUE SPACING 1N I NCkESI. CLEARANCE FROM TOP OF STORAGE TO CEILING O vLONGITUDINAL TRANSVERSE FT IN. HORIZONTAL BARRIERS PROVIDED E45-ISO vI (10-76) HYDRAULIC CALCULATIONS Abbreviations Hazen & Williams Flow. Value tine Calc " Branch Line :Being Calculated` Spkl." 3 Number of Sprinklers Being Calculated, E:H.P. 11 End Head Pressure K11 K Factor Q" Gallons .Per Minute ._@ Specific Locati on Flow" Total Gallons..Flowing Diam" Inside Diameter of Piping L/ft" Friction Loss Per. Foot FF" Friction Loss Per Foot Lgth" Length of Piping Plus Fitting Loss Len". Length of Piping Plus Fitting Loss Loss" Friction Loss for Total Length. PT" Pressure Total End P" Starting Pressure for Main Calculations P E," Pipe Elevation Loss Stat". Static Pressure Resd" Residual Pressure Avail" Pressure Available.@ System Demand VVA I EK I- LUVV TEST SUMMARY SHEET Hydrant No. Outlet I.D. inches Pitot Press. psi Flow gpm Residual psi Date: Time: Cont. No, b tzl Cont. Name: R i m m1 2 Address: l20o A Rono• r. 3 Total Flow Static Press: psi Flow 9 20 psi gpm I Scale A 100 200 300 400 S00 600 700 800 900 1000 Scale B 200 400 600 800 1000 1200 1400 1600 1800 2000 Scale- C. 400 800 1200 1600 2000 2400 2800 3200 3600 The Viking Co,DorJlion 4000 CONTRACT NO. 8 7 12 1 SHEET NO I OF Z NAME R t M M Fa DATE _ O--t 9 - 19 8-, LOCATION SRNFoa 1'LpF2,p 1 NOZZLE TYPE a LOCATION FLOW IN G.P.M.. PIPE SIZE FITTING 81 DEVICES PIPE EQUIV. LENGTH FRICTION LOSS PS-I./FT REQUIRED P.S.I. HYD. REF.PT Q ELEV. NOTES K= 5-c- I LGTH. to-o IrolB PT 16.sl I Q 22.8 FTG. — PF 1.(.I a TOT 10-o PE- .359 14 LGTH.10-o 1 663 PT Z FT G'• PF 1. r.cs Q 46.31 OT• 10-0 PE - . 359 Q 7-4.50 12 LGTH- to-o I`8F PT .13.3 FTG. — PF .684 Q,o.B T. to-o PE •-.35 Q 25.33 1,2 LGTH. wo-o 29t4 PT 20.458 14 FTG. — PF t•942 Q U-14 T. 10-0 PE - .35 t 2 T lo.o GTH. -1-o PT 23.o41 5 k` too TG• o•o PF 3.-12. Q IZ3.02 TOT. PE -5 Q LGTH- PT 26• % A-8 RS9 AT TOP of alseR NPP e • K= z3.8S FTG. PF Q TOT. PE Q GTH. PT T • PF Q TOT PE Q I„ LGTH- l0-o PT lo. 022.5 FTG- - PF .616 TOT. PE -. S9 Q 23.0 1 4 LGTH- Io-o 1 PT FTG. - PF 0 4ra.31 TOT 10 0 PE - •35-1 o Q 1'Z LGTH• zo-o o as PT 19.133 FTG- — PF . 1• S Q 46.31 TOT Zo-o PE - .116 K= . n LGTH. ,-o 0232 PT .985 Q 4(..31 2e= ,o-o FTG- 20-o PF .62G TOT. 2,-o PE - .zzs Q L H. PT 2o.3e` I C REq AT lop CC: RIS 4MR N,PPLE- K- o . z c- Q FTG- PF TOT • PE Q LGTH- PT 0 F T PF TOT. PE Q 2 LGTH z-o jo3 PT zc.53 RsER t.1.Pr E PTS- A R 23.68 T FTG. to-O PF 1.243 01z3.o2 TOT. 1z-o PE — QLGTH- PT 21•1-79 A Base 5F R• 1J. K = 23.339 FTG- PF 0 TOT. PE oLGTH- z-o PT 7.o.36 Rl segz hl,orLe PTS- C 14= c.ze- FTG- I e - PF 204 Q v1..31 TOT. 12-0 PE — Q LGTH. PT Zo.s9 c BRSE or Risea N,Pr« K= 10.2-o9 O FTG- PF TOT. PE o LGTH. JPE PT Q FTG- PF T T. I PT r --rvc, P1{„V I GU IN U.J.H. CONTRACT NO. 8-1 1 Z 1 SHEET NO 2 OF Z NAME FZ M N1 F DATE coc-s o1 - 19a-i j LOCATION F-Lorevoa NOZZLE TYPE 81 LOCATION FLOW IN G.P.M. PIPE SIZE FITTING a DEVICES PIPE EQUIV. LENGTH FRICTION LOSS P.S•I./FT REQUIRED P.S.I. HYD• REF.PT Q ELEV. NOTES 1<= 23.339 L'w' y Ll z-o o o3s AQcRossMAL" Q 123. 01 FTG. — PF .04 TOT 1'L-o PE — 23.339 A 123.10 4 LGTH. 1z-3 o1z9 PT 21•622 5 FTG• — PF .Isa Q 246.12 TOTIZ-3 PE — 1<. lo.zo9 0 54•o s- LGTH. o - ' oz lz T -.98 c FTG• 30-0 PF .9 b9 Q 300-1z T• 234-1' PE — LGTH. o a o2tz PT 32.943 ToP cr R,sg¢ Q 3oo•1Z t-T -to FTG• 44-0 PF 1-s-),+ Cr va= 22•o TOT. -14-3 PE 6.3o G GTH. PT Li Z.8n Bgse oc Rise2 TG- PF Q TOT. IPE C= }o A L H. 68-0 003o PT 42.8 1 UMME.R CROU 0Z1> 2.E FTG- Ie-o PF seQ3oo• 12 TOT. 281;-o PE -- 0 O1 T.?30-0 TH. 1-o 0030 3.e-1s A1a T R t_BRG tT ArC Coµw. TO G•.: 3-0 T •3-0 2.892 Q 300.i2 TOT. 64 kPELGTH• s(.j- 6.sz cot F1 a e SPRi--AWLEQ TG• TOT• p LGTH. PT Svsi c. FTG• PF Q TOT PE Wrw No ti 0 550.1 L T o So-o LGTH• 31-o 009 1 PT 43.615 Q s-o FTG• 33-o PF 11Z TOT gtoy-o PE a LGTH. PT s2.44-I Ar Aka-Pot-r 4. ALL8R14 uQ FTG• PF TOT- PE 9 L TH. PT 6 S. 5z1 PT. O FTG• PF TOT PE p LGTH• PT Q FTG• PF TOT. PE Q L TH PT 0 FT . PF TOT. PE Q FTGH PF Q TOT PE Q GTH• PT Q FTG• PF TOT. PE o LGTH. PT FTG• PF TOT. PE 0 LGTH_ IPE PT Q FTG• PF T T• I PT 1 f HYDRAULIC DESIGN INFORMATION SHEET i NAME R LOCATION 1200 DATE' OCT. i2, 198"I s BUILDING New`". q8 A--aoiT gu CONTRACTOR r` R P'sa 1 w 9 SYSTEM No. N LE0 CALCULATED BY CONTRACT NO.,. Z i> CONSTRUCTION: COMBUSTIBLE NON-COMBUSTIBLE OCCUPANCY " DRAWING NO; is o F 1. CEILING HEIGHT aR e`s M T A rat a Z ji NFPA 13 LT. HA ORD HAZ. GP. ' }' U 1 2 3 EX HAZ. NFPA 231 NFPA 231C•r FIGURE OTHER (Specify)77777777 CURVE ,. W SPECIFIC RULING MADE BY DATE .. , o W AREA OF SPRINKLER OPERATIONa N j N DENSITY I "9 AREA PER SPRINKLERSPRINK WET : SYSTEM TYP DRY DELUGE . PRE -ACTION_` HOSE ALLOWANCE GPM: INSIDE MAKE CCuTsia ER R N ZZ E ; HOSE ALLOWANCE GPM: OUTSIDE "' "2 So SIZE %z" MO DEL uPa 6+T.' RACK SPRINKLER ALLOWANCE- K-FACTOR s r TEMPERATURE''RATING CALCULATION GPM REQUIRED 30o i2 PSI REQUIRED 'tz. 8) AT: BASEOF RISERSUMMARY "C" FACTOR USED OVERHEAD I Zo UNDERGROUND I ' 4a' i a WATER FLOW TFS T_ DATE & TIME PL)MP DATA 4 TANK Oft RFS RVOIR d J RATED CAPACITY CAPACITY' d i STATIC PSI ': 01 F3ESIDUAL PSI 5 5 AT PSI E LEVATION a 9NELEVATION GPM .FLOWING o w ELEVATIONWELLMATE PROOF FLOW GPM:. i LOCATION FaSSuMED' QVii Ri . .."4T IRPot2T` ono Auk SOURCE OF INFORMATION STY OF Sq L4:* L R 1 r P I COMMODITY C LASS LOCAT:'ION' Uj STORAGE HEIGHT ' AREA AISLE WIDTH Q STORAGE METHOD: SOLID PILED % PALLETIZED y, RACK % o SINGLE ROW CONVENTIONAL PALLET AUTOMATIC STORAGE ENCAPSULATEDDOUBLEROW SLAVE PALLET S OLID SHELVING NON- C) Y MULTIPLE ROW OPEN ENCAPSULATED_ g v cc Q FLUE SPACING IN INCHES CLEARANCE FROM TOP OF STORAGE TO CEILINGO v LONGITUDINAL TRANSVERSE FT IN. i HORIZONTAL r BARRIERS PROVIDED E45-ISO W1 (10-76) qa HYDRAULIC CALCULATIONS 9 Abbreviations C.'= Hazen & Williams Flow. Value Line Calc " Branch Line Being Calculated Spkl." 3 Number of Sprinklers Being Calculated, E.H.P." End Head Pressure i K" K Factor Gallons Per Minute ,@ Specific .Location Flow" Total Gallons -Flowing Diam" Inside Diameter of Piping a Friction Loss Per Foot FF" Friction Loss Per Foot Lgth" Length.of Piping Plus Fitting Loss i T.en" TPnvth of . Pi nl nn Pl inn F1 tti ncr T.n:ca L-_-.- 1 .. VV<-1 I F-1-f F- f ()W 1 1= -I 1 IAAAAAQN1 C1-1 1=T Hydrant Outlet I.D. Pitot Press. Flow Residual Date: Time: Cont. No, 81121No. Inches psi gpm psi 1 Cont. Name: R I± m m 2 Address: i RoAo• SAF 3 Total Flow Static Press: psi Flow 20 psi m 9P12( V 11f 1( 10( c 90 E 80 a 70 E Lna` 60 50 40 30 20 1 10 0 Scale A Scale B Scale- C. 4UU SUU I LUU 1 6UU LUUU L9UU L?JUU IzUU -'6UU The Viking Corporalion 4000 t CONTRACT NO. B -1 121 SHEET NO I OF 2 NAME;_ R M m Fa DATE opt 9-19 n LOCATION __ SAwFoao F'Lprsp NOZZLE TYPE 81 LOCATION FLOW IN G.P.M.. PIPE SIZE FITTING 81 DEVICES PIPE EQUIV. LENGTH FRICTION LOSS P.S.I./FT REQUIRED P.S.I. HYD. REFPT Q ELEV. NOTES 0 I " LGTH. PT 1G.sl I Q 22. a rFTG. PF TOT PE- .3s9 0 14 LGTH. 10-o I663 PT Z Q yG.31 FTG. PF 1. cca TOT Io-o PE -.359 0 2.4.50 z LGTH. io _o s, T .13.3 Q i0.8 FTG. - PF 1.484 T. 1 o-o PE - . 359 Q 25.33 LGTH. o-o 29'+2 PT 20.458 Q 94.14 FTG. - PF 2.942 TO12T. l o - o PE - .359 LGTH. -I-o 13l a PT 23.041 5 Q Izs.o2 t = iooFTG. o•o PF 3.12. TOT. 2-o PE -. s 0 LGTH. PT 26. A-g Req AT Top ov R seR hl.PPLC • x=z3.aa FTG • PF 0 TOT. PE 0 GTH. PT Q T - PF TOT. PE a 1" LGTH.10-o PT . Q 22 6 FTG. — PF . ara TOT. PE -. s9 0 23.G4 14 GTH.Io-o I l,63 PT n.929 FTG. - PF I - a1:3 Q 4io.31 TOT Io-o PE-.359 I< = o 0 I Z LGTH.2o-b o-las PT 19.133 Q 4c.z1 FTG. — PF I. s TOT 20-o PE 0 T = ,o-o LGTH. ,-o 0232 PT i .°185 Q 4.31 2e= 10-0 FTG- zo-o PF .tu. TOT. 2'1-0 PE - .2z5 0 LGTH. T 2o.3e` c RE9 AT Tof> ov Rls4aR uPP e- It= 0.24Q FTG• PF TOT. PE 0 LGTH. PT Q FTG. F TOT. rp E 0 2 LGTH z-o 103r- PT 2G.53G Rise¢ PTS- A 4 Bf 23.ta8Q123.o2 T FTG. to-O PF 1.243 TOT. Iz-o PE — 0 LGTH. P 2-I.Tj9 A - 5 Bgse eF R.1.1. K = 23.339 FTG. PF Q TOT. PE 0 2 LGTH. 2 o 01 PT 2o.lal. RISER N,PrLe PTS- C 1<= I o. 2e- FTG. e-o PF .z04 Q 46.31 TOT. z-o PE - 0 LGTH. PT 20.s9 c qse oR Rise¢ NkLe K= 1o.zor9 Q FTG- PF TOT. PE 0 LGTH. PT Q FTG. PF T T. p PT CONTRACT NO. 81I2 SHEET NO 2 OF 2 g c NAME cT M n ti= DATE ocT d - LOCATION FLor,,oa NOZZLE TYPE a LOCATION FLOW IN G. P.M. PIPE SIZE FITTING sk DEVICES PIPE EQUIV. LENGTH I FRICTION LOSS P. S.I./FT REQUIRED P. S.I. HYD• REF - PT ELEV. NOTES 1<' 23.399 o LA.l. 4 MH. 12-o oo3s T z1.119 A CROSS Mate4 Q Mol FTG. — PF . 043 TOT i PE — 1<' 2 3.339 0 123. o 4„ LGTH. iz-3 t9 PT Z.622 d Q 246.12TOT. FTG- - PF 12 3 PE - 1<= Io.Zo9 54.0 t •. 5- LGTH- o- - ozlz T -? mb c Q3oo. zTOT. FTG- 3o-o PF 9fo z3Li- 1'z, PE _ Q c:,= z LGTH. io 3 o21Z PT 3Z. 943 Top or Rse2 Q 3oo. lz 40 FTG. 6ti-o PF 1.s14 cr VRr z2-o T. ,4-3 PE 6.30 q GTH. PT ti. e Bast o c Ri s r2 Q 3oo.z OT PE C= 0 e 011 L H. 6s-o 003o PT 42. gi uuo RCRou e 2.E FTG. la-o PF sa Q 300.2 TOT 286-0 PE — C Q 3oo. 12 T.= 3_ cro T . I-o 003o PT 43. 61s A a ,eT ; Al - LEA IG HT Ar. r- 04 . TQ c..: 3- o T 33 0 PF 2.8gz TOT. 64 PE — LGTH. PT 4c.sG1' AVA a6le . Re sPR, Q TG. PF TOT. PE pLGTH- PT SYST r. Q FTG- PF TOT PE ITK Hose sso.i2 L T= ao- o LGTH-31-0, 0091 PT 43.`- is Q b 3 -o v c.. FTG- 33-0 PF. .-11Z TOT PE _ e LGTH. PT 52.4'61 Av^«we c. AT AMPor- r ALL IIR. G u Q FTG- PF TOT. PE L TH. PT c S. 5zi Pr. Q FTG- PF TOT• PE p LGTH PT Q FTG. PF TOT: PE 0 LGTH PT Q FTG. PF TOT PE o LGTH. p Q FTG- PF TOT. PE o LdTH. PT Q FTG. PF TOT. PE o LGTH. PT Q FTG- PF TOT. PE o LGTH. PT FTG- PF TOT. P PT J I DATE COMMERCIAL VALUATION ' ^ PERMIT FEE 1im