Loading...
230 Coastline Rd Ste 120 - BC98-002106 (1998) (INTER COMM REMODEL) DOCUMENTS (A)n 7 Rc ,00 SUBDIVISION: ZONE DATE � f PERMIT # <) LOT NO. CONTRACTOR-���-�'-�-��Y- ���1 '�"" JOB �.-0`✓vn r`niV1..n,CK��. ADDRESS PHONE # / LOCATION 30 OWNER ADDRESS PHONE # PLUMBING CONTRACTOR ��• ADDRESS PHONE # ELECTRICAL CONTRACTOR ADDRESS PHONE # MECHANICAL CONTRACTOR ADDRESS PHONE # MISCELLANEOUS CONTRACTOR ADDRESS SEPTIC TANK PERMIT NO. SOIL TEST REQUIREMENTS FINISHED FLOOR ELEVATION REQUIREMENTS ARCHITECTURAL APPROVAL COST $ �, 00C� FEE $ STATE NO. FEE $ r FEE $ 3 6) FEE $ SECTION: SQUARE FEET: MODEL: (� OCCUPANCY CLASS: `�--' r\, �` FEE $ — ENERGY SECT. CERTIFICATE OF OCCUPANCY DATE: ISSUED # DATE: FINAL DATE_7 .��-// � O t EPI: i V It COAFL INE ROAD BUILDING E SITE P LEGAL DESCPIPTION, LOT I, SANFORD CENTRAL PARK, AS RECORDED IN PLAT BOOK 33, PAGES 64 THROUGH 66 OF THE PUBLIC RECORDS OF SEMINOLE COUNTY, FLORIDA f i I ! � - �._ �I � .� � �� I I MAIN-rAIN "T- I I CLEARANCE` BASE - SEE - FINISH HOTE5 r9IBREAK. RM. ELEVATION n ENLARGED RESTRM. PLAN DOOR SCHEDULE MARK NO. SIZE THICK CORE MAT'L TYPE FRAME THRES, HARDW, CLOS, KICK REMARKS 1 2 _= 3 ___------ 4 1 2 - 3'-0'X 6'-8' 3'-0'X 6'-8' 3'-0'X 6'- 8' 1 3/8' 1 3/8' 1-3/8' SOL, SOL, -SOL, WD, WD. WD. FLUSH FLUSH FLUSH WD. WD,- WD, - - - LOCK - LOCK PASSAGE _- YES - �- -- - _� - PAINT GRADE PAINT GRADE -_ PAINT GRADE_- -m---- 4 1 3'-0'X 6'-8' 1 3/8' SOL.- WD. FLUSH - WD,-- PRIVACY YES _-- PAINT GRADE _-'- """''''":.D LIGHT MIRROR MIN. 1 1/2" DIA. GRAB BARS - CONTRACT( To PROVIDE BLoca BETWEEN STUDS AS REQ'D. SURFACE MOUNTED TOILET TISSUE HOLDE I� RESTROOM ELEVATION � RESTROOM ELEVATION RELFECTED CEILING PLAN KNEE CLEARANCE 8 MIN. x ¢ v, z M o +,,ARANCE 6 MAX, 17 NU DEPTH LAVATORY DETAIL SCALE: N.'I'.S. 17 MIN. -_---- :----_- _ CLEAR CD SPACE L----_--_. BAT"r IN ,L.AT[ON GENERAL NOTES AND REQUIREMENTS NT, . TOP PLATE SECURED TG C 1. All work shall comply with the SBCCI Standard Building Code ( / EILING GRID p and all other applicable rules and regulations. 2. 'The plans and specifications are the property of the Architect and shall not be used or reproduced in any form �._ without the expressed written permission of the Architect. - CEILING TILE & GRID 3. The Architect shall not have control or charge of and shall `-1'-0" A.F.F. not be responsible for construction means, methods, techniques, sequences or procedures, or for safety precautions or programs in connection with the work, for the acts or omissions of the Contractor, Sub -Contractors or any f1cT: STUDS @ 24" O.C. other persons performing any of the work, or for the failure W/ 1/2" GWI3 ON EACH SIDE of any of them to carry out the work in accordance with the contract documents. 4. The General Contractor and all Sub -Contractors shall verify all conditions, details and dimensions before proceeding with the work and shall be responsible for coordination of r the some. Architect shall be notified of any discrepancies. 5. Dimensions supersede scale on drawings. 6. It is intended that all work be first quality, and accomplished in a workmanlike manner by skilled craftsmen using accepted practices and methods appropriate to the trade involved. °i ;;MASE PER FINISH SCHEDULE 7. All products and materials shall be installed as per ' manufacturer's instructions and specifications unless specifically otherwise directed by the Architect. FLOORING PER FINISH SCHEDULE 8. The General Contractor, all Sub -Contractors and Suppliers shall be responsible for coordinating their work and certifying that their products and installations meet the Florida Accessibility Code. Coordinate all work in question with the Architect. 9. Unless otherwise indicated in these specifications, all Sub - Contractors and Suppliers shall provide guarantees based on industry recognized standards for their products andTALL SECTION services. In no case shall these guarantees remain in rJ effect for less than one year from the date of substantial completion. A-1 SCALE: 1 1/2" = 1'-0" 10. Sub -Contractors shall provide the General Contractor with such plans and information as may be required for the issuance of Acceptance Certificates. i 11. The General Contractor shall be responsible for obtaining all applicable permits and providing the Owner with all applicable certificates, operating manuals, warranties, etc. 12. All work in question including materials, finishes and j� colors shall be coordinated with appointed project manager. R-Iq ( BATT INSULATION 13. Fire sprinkler supplier shall be responsible for submitting plans and obtaining all applicable permits when fire j sprinkler system modifications are required. Z/` ..-, . ' 14. Provide size, number and type of fire extinguishers as / / ) required by code where located by Fire Marshall. 15. All fabricated items shall be made from field measurements. Provide shop drawings or submittals for approval prior to fabrication. CEILING TILE & GRID 16. Mechanical and Electrical Contractors shall be responsible �j for submitting drawings and obtaining their respective EXISTING MASONRY WALL � permits. 1 / � 17. All Contractors shall not avail themselves of any ` unintentional error or ornission and shall be charged with / the responsibility of furnishing a complete portion of his contract according to the reasonably implied spirit and intent of the drawings. Change orders will not be granted R-4.2 FOIL PACED INSULATION after the General Contractors contract is signed, unless OVER F,I RRING, 5TRIPS SPACED they can be substantiated as on unforeseeable item, beyond / @ 241, O.C. the general intent and scope of the work. PLAN NOTES 1/2' GYP. DRYWALL 1. All dimensions are plus or minus and subject to BASE PER FINISH SCHEDULE verification of existing dimensions in field by job superintendent. 2. All dimensions shown are finish dimensions and all FLOORING PER FINISH SCHEDULE walls are 4-1/2 thick unless otherwise indicated. ;I 3. All storefronts, walls, ceilings, doors, etc. are existing unless otherwise indicated. 4. All interior non-bearing wall partitions shall be 2 x 4 wood or 3-5/8" metal studs at 24" o.c. maximum with -WALL SECTION 1/2" drywall each side unless otherwise indicated. 4 5. Seal any penetrations to existing firewalls to preserve A-1 fire rating, per code. SCALE' 11�2" 6. Provide R-19 Bott insulation over ceiling at all LJT.IiX1Y IMPACT FEES conditioned areas. 7. Provide R-11 Bott insulation in stud walls separating conditioned spaces from non -conditioned spaces. Ciu--�l� ��J�9�. Provide R-4.25 foil faced barrier insulation over furring on all C.M.U. or concrete walls separating conditioned spaces from non -conditioned spaces. R -1q BATT INSULA"PION NTL. TOP PLATE 9• All architectural glazing material and installation shall comply with all applicable codes and regulations of the S.B.C. ti 10. All interior finishes shall meet the restrictions of S.B.C. 11. Coordinate finish and hardware schedule with project manager. BLDG. STAND. CELING TILE & GRID 0 q'-0' A,FF. 12. Saw cut concrete as required for new plumbing and pour 2 new cover slab as required. 3 5/8' 25 GA. NET. STUDS 9 24' O.C. 13. Verify exact location of all switches, electrical, W/ 1/2' GWD ON EACH SIDE telecommunication and phone outlets with project - manager. -- R-11 BATT INSULATION .. BETWEEN 5TUD5 H,C. ACCESSIBILITY NOTES OFFICE I+ WAREHOUSE 1. All work shall comply with all applicable provision's of the SIDE -' SIDE Florida Accessibility Code. 2. Work shall include, but shall not be limited to, all thresholds, clearances, heights, corridors, doors, hardware and �-� restroom requirements. +` 3. Provide lever type hardware on all personnel doors and NTL. BOT. SECURED TO sinks. CONC. SLAB 4. All accessories for restrooms shall meet all applicable h BASE - " / �; -- 4" VINYL BASE ®WAREFIOUSE SIDE ONLY requirements of the Florida accessibility Code. 5. Maintain 'T' turn area In restrooms as indicated on plan. 6. Provide blocking in restrooms to receive grab bars. Grab bars shall support 250 lbs. min. WALL SECTION � " 7. Insulate drain and hot water pipes in restrooms as per code. �� ` 8. See interior elevations and details for further information not shown on plan. SCALE: 1 1/2" = 1'-0" iYlriS 1'YIC I 1"� . �1ccCS5 CQC)CS CUb G S' �� rt r S -%'�o x `S �y DOOR NOTES I. ALL EXIT DOORS SHALL BE OPERABLE FROM THE IN51DE WITHOUT SPECIAL 3. PROVIDE AN ADDITIVE' ALTERNATE FOR UPGRADED PANELED DOORS KNOWLEDGE OR EFFORT OR THE USE OF A KEY AND SHALL FOLLOW ALL AS SELECTED BY LANDLORD. I APPLICABLE CODES. 2. ALL DOORS SHALL BE EQUIPPED WITH N.C. ACCESSIBLE HARDWARE UNLESS OTHERWISE INDICATED. - - EXISTING PERS NEL DOOR EXISTING O.H. FOOR 2 FLOOR PLAN LEGEND, MIN. 747 7 EXISTING CONC. BLOCK WALL ;, ` OFFICE 4 NEW INTERIOR WALLS EXISTING I HR. RATED FIRE WALL PER UL U465 WAREHOUSE o ;��0 ( ) 42" HIGH WALL W/ WOOD CAP -- I� C1, NEW DUPLEX OUTLET 12" Q NEW TELEPHONE OUTLET F OFFICE 3- a' 11'-4" 4'-3" ( I� DOOR DESIGNATION 3 , q A-1 5 ( A -1 WALL SECTION db FILES -� I SHOWROOM BREAK i 3 a E f ('/;�-FI UI.! tJc`�I/ l_l T16>1.1 _ _� , A.F.F. q A-1 � REFLECTED CEILING LEGEND (����-4�l}' t -J g A-1 44 A.F.F. i qp _ -- -- =- - -' -- 2x4 SUSPENDED ACOUSTICAL O1` ! } TILE AND GRID CEILING RR^R. I 7 t A-I a LOBBY 0- 2,4 FLuoRESCEwr LIGHT FIXTURE OPEN OFFICE FLUORESCENT STRIP LIGHT FIXTURE (1 t 6'-0" c' - WALL MOUNTED LIGHT 4-8 11-0- __ ( \ - EXHAUST FAN Q GLASS MGR. EXIT LIGHT 7 > XIT 0 OFFICE 1 12" - EMERGENCY LIGHT N. qP.0 4 SINGLE POLE SWITCH 3 THREE WAY SWITCH 0 FT,nnR. PLAN """''''":.D LIGHT MIRROR MIN. 1 1/2" DIA. GRAB BARS - CONTRACT( To PROVIDE BLoca BETWEEN STUDS AS REQ'D. SURFACE MOUNTED TOILET TISSUE HOLDE I� RESTROOM ELEVATION � RESTROOM ELEVATION RELFECTED CEILING PLAN KNEE CLEARANCE 8 MIN. x ¢ v, z M o +,,ARANCE 6 MAX, 17 NU DEPTH LAVATORY DETAIL SCALE: N.'I'.S. 17 MIN. -_---- :----_- _ CLEAR CD SPACE L----_--_. BAT"r IN ,L.AT[ON GENERAL NOTES AND REQUIREMENTS NT, . TOP PLATE SECURED TG C 1. All work shall comply with the SBCCI Standard Building Code ( / EILING GRID p and all other applicable rules and regulations. 2. 'The plans and specifications are the property of the Architect and shall not be used or reproduced in any form �._ without the expressed written permission of the Architect. - CEILING TILE & GRID 3. The Architect shall not have control or charge of and shall `-1'-0" A.F.F. not be responsible for construction means, methods, techniques, sequences or procedures, or for safety precautions or programs in connection with the work, for the acts or omissions of the Contractor, Sub -Contractors or any f1cT: STUDS @ 24" O.C. other persons performing any of the work, or for the failure W/ 1/2" GWI3 ON EACH SIDE of any of them to carry out the work in accordance with the contract documents. 4. The General Contractor and all Sub -Contractors shall verify all conditions, details and dimensions before proceeding with the work and shall be responsible for coordination of r the some. Architect shall be notified of any discrepancies. 5. Dimensions supersede scale on drawings. 6. It is intended that all work be first quality, and accomplished in a workmanlike manner by skilled craftsmen using accepted practices and methods appropriate to the trade involved. °i ;;MASE PER FINISH SCHEDULE 7. All products and materials shall be installed as per ' manufacturer's instructions and specifications unless specifically otherwise directed by the Architect. FLOORING PER FINISH SCHEDULE 8. The General Contractor, all Sub -Contractors and Suppliers shall be responsible for coordinating their work and certifying that their products and installations meet the Florida Accessibility Code. Coordinate all work in question with the Architect. 9. Unless otherwise indicated in these specifications, all Sub - Contractors and Suppliers shall provide guarantees based on industry recognized standards for their products andTALL SECTION services. In no case shall these guarantees remain in rJ effect for less than one year from the date of substantial completion. A-1 SCALE: 1 1/2" = 1'-0" 10. Sub -Contractors shall provide the General Contractor with such plans and information as may be required for the issuance of Acceptance Certificates. i 11. The General Contractor shall be responsible for obtaining all applicable permits and providing the Owner with all applicable certificates, operating manuals, warranties, etc. 12. All work in question including materials, finishes and j� colors shall be coordinated with appointed project manager. R-Iq ( BATT INSULATION 13. Fire sprinkler supplier shall be responsible for submitting plans and obtaining all applicable permits when fire j sprinkler system modifications are required. Z/` ..-, . ' 14. Provide size, number and type of fire extinguishers as / / ) required by code where located by Fire Marshall. 15. All fabricated items shall be made from field measurements. Provide shop drawings or submittals for approval prior to fabrication. CEILING TILE & GRID 16. Mechanical and Electrical Contractors shall be responsible �j for submitting drawings and obtaining their respective EXISTING MASONRY WALL � permits. 1 / � 17. All Contractors shall not avail themselves of any ` unintentional error or ornission and shall be charged with / the responsibility of furnishing a complete portion of his contract according to the reasonably implied spirit and intent of the drawings. Change orders will not be granted R-4.2 FOIL PACED INSULATION after the General Contractors contract is signed, unless OVER F,I RRING, 5TRIPS SPACED they can be substantiated as on unforeseeable item, beyond / @ 241, O.C. the general intent and scope of the work. PLAN NOTES 1/2' GYP. DRYWALL 1. All dimensions are plus or minus and subject to BASE PER FINISH SCHEDULE verification of existing dimensions in field by job superintendent. 2. All dimensions shown are finish dimensions and all FLOORING PER FINISH SCHEDULE walls are 4-1/2 thick unless otherwise indicated. ;I 3. All storefronts, walls, ceilings, doors, etc. are existing unless otherwise indicated. 4. All interior non-bearing wall partitions shall be 2 x 4 wood or 3-5/8" metal studs at 24" o.c. maximum with -WALL SECTION 1/2" drywall each side unless otherwise indicated. 4 5. Seal any penetrations to existing firewalls to preserve A-1 fire rating, per code. SCALE' 11�2" 6. Provide R-19 Bott insulation over ceiling at all LJT.IiX1Y IMPACT FEES conditioned areas. 7. Provide R-11 Bott insulation in stud walls separating conditioned spaces from non -conditioned spaces. Ciu--�l� ��J�9�. Provide R-4.25 foil faced barrier insulation over furring on all C.M.U. or concrete walls separating conditioned spaces from non -conditioned spaces. R -1q BATT INSULA"PION NTL. TOP PLATE 9• All architectural glazing material and installation shall comply with all applicable codes and regulations of the S.B.C. ti 10. All interior finishes shall meet the restrictions of S.B.C. 11. Coordinate finish and hardware schedule with project manager. BLDG. STAND. CELING TILE & GRID 0 q'-0' A,FF. 12. Saw cut concrete as required for new plumbing and pour 2 new cover slab as required. 3 5/8' 25 GA. NET. STUDS 9 24' O.C. 13. Verify exact location of all switches, electrical, W/ 1/2' GWD ON EACH SIDE telecommunication and phone outlets with project - manager. -- R-11 BATT INSULATION .. BETWEEN 5TUD5 H,C. ACCESSIBILITY NOTES OFFICE I+ WAREHOUSE 1. All work shall comply with all applicable provision's of the SIDE -' SIDE Florida Accessibility Code. 2. Work shall include, but shall not be limited to, all thresholds, clearances, heights, corridors, doors, hardware and �-� restroom requirements. +` 3. Provide lever type hardware on all personnel doors and NTL. BOT. SECURED TO sinks. CONC. SLAB 4. All accessories for restrooms shall meet all applicable h BASE - " / �; -- 4" VINYL BASE ®WAREFIOUSE SIDE ONLY requirements of the Florida accessibility Code. 5. Maintain 'T' turn area In restrooms as indicated on plan. 6. Provide blocking in restrooms to receive grab bars. Grab bars shall support 250 lbs. min. WALL SECTION � " 7. Insulate drain and hot water pipes in restrooms as per code. �� ` 8. See interior elevations and details for further information not shown on plan. SCALE: 1 1/2" = 1'-0" iYlriS 1'YIC I 1"� . �1ccCS5 CQC)CS CUb G S' �� rt r S -%'�o x `S �y