Loading...
1258 CFE - Cloud Branch Ph 2, Ch Ord 3❑ Mayor's signature ❑ Recording ❑ Renderin' ® Safe ke peing (Vault) ❑ Payment Bond ❑ City Manager Signature ❑ City Clerk Signature Ir PURCHASING DEPARTMENT TRANSMITTAL MEMORANDUM To: City Clerk RE: Central FL Environmental Corp., Change Order # 3 G6 �q The item(s) noted below is /are attached and forwarded to your office for the following action(s): El Development Order Final Plat (original mylars) Letter of Credit Maintenance Bond Ordinance Performance Bond Resolution Once completed, please: ❑ Return original ❑ Return copy El Special Instructions: Original Change order # 3 for $314,890.80 Please advise if you have any questions regarding the above. Thank you! From 1(-30-1( 1 &,A Date z lot TADept_formACity Clerk Transmittal Memo - 2009.doc �•yl CHANGE ORDER FORMy 7 Change Order No. 3 Project Title Cloud Branch Drainage Improvements - Ph. 2 �a Bid No. IFB 08/09 -14 Owner: City of Sanford Contractor: Central Florida Environmental Corporation Agreement Date: Auqust 31, 2009 This Change Order is necessary to cover changes in the work to be performed under this Agreement. The GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, and STANDARD SPECIFICATIONS apply to and govern all work under this Change Order. THE FOLLOWING CHANGES ARE MADE TO THE CONTRACT DOCUMENTS: (1) Original Contract Price (2) Current Contract Price (Adjusted by Previous Change Orders) (3) Total Proposed Change in Contract Price (4) New Contract Price (Item 2 + Item 3) (5) Original Contract Time (6) Current Contract Time (Adjusted by Previous Change Orders) (7) Total Proposed Change in Contract Time (8) New Contract Time (Item 6 + Item 7) (9) New Contract Substantial Completion Date Change Order No. 3 - Cloud Branch Page 1 of 5 2.358.902.00 $ 2,584,830.46 $ 314,890.80 $ 2,899,721.26 180 Days 283 Days 279 Days 562 Days 4/13/2011 CHANGES ORDERED ITEM 1 Description of Change: Time Adjustment by City for Holidays Reason for Change: Time granted to Contractor to allow for holidays that occurred during construction. Change in Contract Price: $0.00 Change in Contract Time: 4 Days ITEM 2 Description of Change: Time Adjustment by City Due to Unavailability of Sod, Trucking Reason for Change: Sod farms have had limited sod available for purchase due to the extremely dry weather followed by very wet weather during the summer; additionally, there was a shortage of available trucks for hauling since independent truckers have not always been available for work. Change in Contract Price: $0.00 Change in Contract Time: 50 Days ITEM 3 Description of Change: Quantity Adjustments - Contract Work Items Reason for Change: Final construction quantity adjustments to reflect installed work, Cloud Branch Ph. 2. Change in Contract Price: ($12,572.85) Change in Contract Time: 0 Days Page 2 of 5 Change Order No. 3 - Cloud Branch ITEM 4 Description of Change: Fencing at Coastline Park Reason for Change: In lieu of the standard 6' high fence that was specified, a higher fence (10') is proposed to be installed adjacent to the basketball courts. Change in Contract Price: $1,424.68 Change in Contract Time: 0 Days ITEM 5 Description of Change: Upgrade 6th St. Culvert Crossing at Cloud Branch Reason for Change: The 6 th St, crossing of Cloud Branch is undersized and has been part of the approved planning documents under the State Revolving Fund (SRF) Loan program and was part of the St. Johns River Water Management District (SJRWMD) permit. Construction was not part of the initial project for Cloud Branch due to the contamination in the ditch north of 6 th St. that has been cleaned as part of the Former Sanford Gasification Plant (SGP) Remediation project. Due to the proposed reconstruction of 6 th St. as part of the SGP project, it is recommended that the 6 th St. culvert crossing be upgraded with a proposed new double 5' x 12' concrete box culvert. Since the 6 th St. project was part of the approved SRF loan documents, SRF funding is available for the culvert replacement. Associated with the culvert replacement are sanitary sewer replacement at the crossing and the installation of new guardrail at 6 th St. and 8 th St. at the open Cloud Branch channel, as needed for safety. Change in Contract Price: $326,038.98 Change in Contract Time: 150 Days ITEM 6 Description of Change: Time To Allow For 6th St. Crossing Design, Pricing, Commission Approval Reason for Change: The substantial completion date for the current Cloud Branch construction is 8/31/10. Time is needed to allow for surveying and designing the crossing, including the preparation of construction drawings, developing construction quantities and pricing, including reviewing proposed prices presented by the Contractor, and obtaining Commission approval of the proposed work. The proposed time, when added to 8/31/10 results in a construction start of 11/15/10. Should the Commission approve this proposed change Page 3 of 5 Change Order No. 3 - Cloud Branch order, and the Contractor complete its closeout of the current Cloud Branch project prior to 11/15/10, then the Contractor would be allowed to start work prior to 11/15/10, as authorized by the City. Change in Contract Price: $0.00 Change in Contract Time: 75 Days CHANGE ORDER SUMMARY No. Description Change In Contract Price Change In Contract Time 1 Time Adjustment by City for Holidays $0.00 4 Days 2 Time Adjustment by City Due to Unavailability of Sod, Trucking $0.00 50 Days 3 Quantity Adjustments - Contract Work Items ($12,572.85) 0 Days 4 Fencing at Coastline Park $1,424.68 0 Days 5 Upgrade 6th St. Culvert Crossing at Cloud Branch $326,038.98 150 Days 6 Time To Allow For 6 th St. Crossing Design, Pricing, Commission Approval $0.00 75 Days TOTAL $314,890.80 279 Days WAIVER This Change Order constitutes full and mutual accord and satisfaction for the adjustment of the Contract Price and Contract Time as a result of increases or decreases in cost and time of performance caused directly and indirectly from the change. Acceptance of this Waiver constitutes an agreement between OWNER and CONTRACTOR that the Change Order represents an equitable adjustment to the Agreement and that CONTRACTOR shall waive all rights to file a Contract Claim or claim of any nature on this Change Order. Execution of this Change Order shall constitute CONTRACTOR's complete acceptance and satisfaction that it is entitled to no more costs or time (direct, indirect, impact, etc.) pursuant to this Change Order. Page 4 of 5 Change Order No. 3 - Cloud Branch APPROVAL AND CHANGE ORDER AUTHORIZATION ACKNOWLEDGMENTS The aforementioned change, and work affected thereby, is subject to all provisions of the original Agreement and specifically changed by this Change Order, and It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original Agreement other than matters expressly provided herein. WITNESS to CONTRACTOR: • 1(7 -oy- 2U yo Date Central Florida Environmental Corporation Contractor David E. Stalowy - President Printed'f4ame and T of Officer By (Signature) Date (Corporate Seal) ATTEST: Qt &x - Signature) Date (Seal) City of Sanford Owner Thomas J. George - Interim City Manager Printed Name and Title -�� z��./ By (Signs re) CJ � Date END OF SECTION 14�a / �5 fl� 0 W n , a virtu 44 li i F Page 5 of 5 Change Order No. 3 - Cloud Branch CITY OF SANFORD CLOUD BRANCH DRAINAGE IMPROVEMENTS - PHASE 2 (IFB 08/09 -14) CHANGE ORDER NO. 3 ATTACHMENT ITEM 1 - TIME ADJUSTMENT BY CITY FOR HOLIDAYS TOTAL PROPOSED PRICE $0.00 TOTAL PROPOSED TIME ADJUSTMENT 4 Days ITEM 2 - TIME ADJUSTMENT BY CITY DUE TO UNAVAILABILITY OF SOD AND TRUCKING TOTAL PROPOSED PRICE $0.00 TOTAL PROPOSED TIME ADJUSTMENT 50 Days ITEM 3 - QUANTITY ADJUSTMENTS - CONTRACT WORK ITEMS ITEM NO. IDESCRIPTION UNITS QUANTITY UNIT COST TOTAL COST Work Items With Quantity Increases 5 Staked Silt Fence LF 645 $0.65 $419.25 35 36" RCP LF 3 $70.00 $210.00 54 Remove Existing 24" storm pipe LF 165 $15.35 $2,532.75 55 Remove Existing 15" storm pipe LF 85 $15.25 $1,296.25 57 Remove Existing Concrete inlet structures /manhole at South End of Park EA 1 $1,200.00 $1,200.00 58 Plug Existing Storm Pie EA 1 $355.00 $355.00 62 Sodding Bahia - Pond 4 SY 1039 $1.65 $1,714.35 63 Sodding (Bahia) - Along 4'x11' BC and swale on south side of pond SY 260 $1.65 $429.00 64 Sodding Bahia -Alon 4'x13' BC SY 1009 $1.65 $1,664.85 65 12" Reclaimed Water Main Around Pond PVC or DI LF 3 $16.55 $49.65 94 Sodding Bahia Fill Area within RR R/W SY 106 $1.65 $174.90 95 Sodding Bahia Along Ditch SY 130 $1.65 $214.50 96 Sodding Bahia fill area SY 301 $1.65 $496.65 75 Remove 8" Abandoned Water Main LF 105 $7.90 $829.50 Work Items With Decreased Quantities 13 36" RCP LF -11 $67.75 $745.25 27 Floating Turbidity Barrier LF -7 $7.50 $52.50 31 Treatment of Dewatered Groundwater in Fuel Contaminated Area DAYS -14 $427.00 $5,978.00 46 4'x11 B.C. at 11th St. to Pond LF -9 $456.45 $4,108.05 51 Concrete Rip-Rap at Endwalls SY -237 $18.10 $4,289.70 69 12" RWM Fitting -45 Deg. Bend EA -4 $428.00 $1,712.00 77 Relocate Existing Power Service for Park LS -1 $1,200.00 $1,200.00 81 Remove Existinp Endwalls EA -2 $1,339.00 $2,678.00 87 Fill Depression Within at Crossing oor ination w /CSX) LS -1 $3,396.00 $3,396.00 TOTAL PROPOSED PRICE TOTAL PROPOSED TIME ADJUSTMENT ($12,572.85) 0 Days Change Order No. 3 Attachment - Cloud Branch Page 1 of 4 CITY OF SANFORD CLOUD BRANCH DRAINAGE IMPROVEMENTS - PHASE 2 (IFB 08/09 -14) CHANGE ORDER NO. 3 ATTACHMENT ITEM 4 - FENCING AT COASTLINE PARK ITEM NO. DESCRIPTION UNITS QUANTITY UNIT COST TOTAL COST 1 Delete 6' High Chain Link Fence at Coastline Park LF -110 $12.20 $1,342.00 2 Add 10' High Chain Link Fence at Coastline Park LF 110 $25.1516 $2,766.68 TOTAL PROPOSED PRICE TOTAL PROPOSED TIME ADJUSTMENT ITEM 5 - UPGRADE 6TH ST. CULVERT CROSSING AT CLOUD BRANCH $1,424.68 0 Days ITEM DESCRIPTION UNITS QUANTITY UNIT COST TOTAL COST 1 Erosion and Sediment Control LS 1 $3,175.00 $3,175.00 2 Staked Silt Fence LF 330 $0.65 $214.50 3 Floatina Turbidit Barrier LF 125 $7.50 $937.50 4 Demolition (Remove Existing Pavement, Curb and Gutter, Inlets, Culvert, Endwalls) - Incl. Line locates, video, as- builts LS 1 $27,278.00 $27,278.00 5 Install Temporary Crossing (Incl. 60" culvert) in Cloud Branch N. of 6th St. to provide access to parcel north of 6th St. and west of Cloud Branch LS 1 $11,789.00 $11,789.00 6 Bypass Pumping of Cloud Branch Around Construction Area LS 1 $31,973.00 $31,973.00 7 Clearing, Ditch Re radin g at Culvert LF 181 $31.35 $5,674.35 8 Seed Ditch Side Banks and Install Erosion Control Mat SF 3900 $0.29 $1,131.00 9 Concrete Ditch Paving SY 108 $38.00 $4,104.00 10 Install Double 5'x 12' Concrete Box Culvert LF 48 $1,475.80 $70,838.40 11 Concrete Endwalls / Win walls CY 23.5 $793.75 $18,653.13 12 New Curb Inlet Top and Riser on Top of Box Culvert (USF 5115 -6224 Inlet Top) EA 2 $1,833.00 $3,666.00 13 Install New 18" RCP LF 85 $38.55 $3,276.75 14 Connect New 18" RCP to Box Culvert EA 1 $1,553.00 $1,553.00 15 Install New Curb Inlet Top (USF 5115 -6224) w/ Type P Bottom EA 2 $2,850.00 $5,700.00 16 2" Type S -1 Asphalt SY 299 $18.00 $5,382.00 17 8" Soil Cement Base SY 299 $31.75 $9,493.25 18 12" Stabilized Sub grade SY 355 $4.20 $1,491.00 19 Type 'F' Curb and Gutter LF 200 $21.00 $4,200.00 20 Guardrail 6th St. - with asphalt andspecial posts LF 292 $92.75 $27,083.00 21 Guradrail 8th St. - With Asphalt LF 180 $61.65 $11,097.00 22 Sodding Within Road R/W Bahia Sod SY 500 $1.65 $825.00 23 Set up and remove by pass pumping sanitary sewer flow around work area LS 1 $7,016.00 $7,016.00 24 Bypass Pumping of Sanitary Sewer Flow Around Work Area DAY 13 $917.00 $11,921.00 25 Remove Existing 15" Clay Sanitary Sewer and Replace with 14" D.I. Pol lined PC 350 Pipe LF 63 $236.75 $14,915.25 26 Remove Existing 8" Clay Sanitary Sewer and Replace with 8" D.I. Polylined PC 350 Pipe LF 68 $153.00 $10,404.00 27 Concrete Encase New 8" D.I. San. Sewer at Ditch Crossing LF 40 $130.10 $5,204.00 Change Order No. 3 Attachment - Cloud Branch Page 2 of 4 CITY OF SANFORD CLOUD BRANCH DRAINAGE IMPROVEMENTS - PHASE 2 (IFB 08/09 -14) CHANGE ORDER NO. 3 ATTACHMENT 28 Remove Existing Sanitary Sewer Manhole and Install New San. Sewer Manhole EA 2 $3,760.00 $7,520.00 29 Connect New Sanitary Sewer D.I. Pipe to Existing San. Sewer Clay Pipe With Fernco Coupler EA 2 $270.00 $540.00 30 Connect Existing San. Sewer to New Manhole EA 2 $1,845.00 $3,690.00 31 Type "B" Fence - 6 -Ft High, Vinyl Coated Black LF 714 $14.75 $10,531.50 32 Double Swing Fence Gate - 16' O enin EA 1 $1,325.00 $1,325.00 33 Rip Rap - South side of box culvert along west bank (If Needed ) SY 50 $38.75 $1,937.50 34 Open Cut Remove and Replace Concrete Drivewa 6" SY 27 $55.55 $1,499.85 TOTAL PROPOSED PRICE TOTAL PROPOSED TIME ADJUSTMENT ITEM 6 - TIME TO ALLOW FOR 6TH ST. CROSSING DESIGN, PRICING, COMMISSION APPROVAL TOTAL PROPOSED PRICE TOTAL PROPOSED TIME ADJUSTMENT CHANGE ORDER SUMMARY - CHANGE ORDER NO. 3 (CONTRACT PRICE) Item No. Description Amount 1 Time Adjustment by City for Holidays $0.00 2 Time Adjustment by City for Unavailability of Sod, Truck in $0.00 3 Quantity Adjustments - Contract Work Items $12,572.85 4 Fencing at Coastline Park $1,424.68 5 lUpgrade 6th St. Culvert Crossing at Cloud Branch $326,038.98 1 6 1 Ime to Allow tor 6th bt. Design, Fricing, Uommission Approval $0.00 Total Contract Summary $314,890.80 Original Contract Amount $2,358,902.00 Change Order No. 1 $225,928.46 Change Order No. 2 $0.00 Current Contract Price $2,584,830.46 Proposed Change Order No. 3 $314,890.80 Pro osed New Contract Price 1 $2,899,721.26 CHANGE ORDER SUMMARY - CHANGE ORDER NO. 3 (CONTRACT TIME) Item No. Description Time Adjust 1 Time Adjustment b City for Holidays 4 Days 2 Time Adjustment b City for Unavailability of Sod, Truck in 50 Days 3 Quantity Adjustments - Contract Work Items 0 Days 4 Fencing at Coastline Park 0 5 U rade 6th St. Culvert Crossing at Cloud Branch 150 Days 6 Time to ow or t t. rlcing, ommisslon Approval 751 Total 279 Days $326,038.98 150 Days $0.00 75 Days Change Order No. 3 Attachment - Cloud Branch Page 3 of 4 CITY OF SANFORD CLOUD BRANCH DRAINAGE IMPROVEMENTS - PHASE 2 (IFB 08/09 -14) CHANGE ORDER NO. 3 ATTACHMENT Contract Summary - Contract Time Original Contract Time 180 Days Change Order No. 1 97 Days Change Order No. 2 6 Days Current Contract Time 283 Days Miscellaneous Days Added By City (Holidays) - Item 1 4 Days Miscellaneous Days Added By City (Unavailability of Sod and Trucks for Hauling) - Item 2 50 Days Current Contract Time After Adjusted by City 337 Days Notice to Proceed Date 9/28/2009 Current Substantial Completion Date After Time Adjustments by City (C.B. Ph. 2) 8/31/2010 Contract Time From Substantial Completion to Final Completion 30 Days Current Final Completion Date (Cloud Branch Ph. 2) 9/30/2010 Proposed Change Order No. 3 Items 3 -5 150 Days Proposed Days for Design, Review of Prices, City Commission Review and Approval 75 Days Proposed Substantial Completion Date (Work Added By Change Order No. 3 4/13/2011 Time From Substantial Completion to Final Completion 30 Days Pro osed Final Completion Date 6th St. Crossin 5/13/2011 Change Order No. 3 Attachment- Cloud Branch Page 4 of 4 ' WS X Item No. G CITY COMMISSION MEMORANDUM 10.142.H OCTOBER 11, 2010, AGENDA To: Honorable Mayor and Members of the City Commission PREPARED BY: Robert Beall, Project Manager SUBMITTED BY: Tom George, Interim City Manager / t SUBJECT: Increase funds for the Cloud Branch Phase II Drainage project. SYNOPSIS: Approve application for a State Revolving Fund (SRF) Companion Loan, change order #3 to Central Florida Environmental (CFE) Corp., increase purchase orders to CPH Engineers and Ardaman and Associates is requested. FISCAL/STAFFING STATEMENT: The total amount requested is $496,333 and will be funded through an SRF Companion Loan through the Stormwater Utility fund. BACKGROUND: The City Commission approved the Cloud Branch Drainage Improvement Project Phase II to be funded through the State Revolving Fund (SRF) with American Recovery and Reinvestment Act (ARRA) stimulus funding. Near completion of this project staff met with CPH Engineers to determine if funding would be available to complete the box culvert road crossing at W. 6th Street north of the existing project. In conjunction with the work being completed at the Sanford Gasification site this will complete all of the proposed stormwater improvements for the north end of the Cloud Branch Drainage system. Staff discussed additional funding through SRF and their grant administrator stated the project was eligible for a companion loan associated with the existing Cloud Branch Phase II project. The change order to CFE Corporation is to replace an existing 5'x12' box culvert with a double 5' x 12' box culvert across W. 6 Street. The existing crossing is undersized and would not sustain an abnormal rain event at this location. CPH Engineers increase is for additional design, engineering, permitting and grant application over -site of the original drainage plan. Ardaman and Associates' purchase order is to install and monitor six 2" wells and extract one water sample per Florida Department of Environmental Protection requirements for the new pond at Coastline Park. LEGAL REVIEW: All contracts are being reviewed by the City Attorney for content, awaiting approval. RECOMMENDATION: It is staff's recommendation that the City Commission approve the application for the SRF loan, change order #3 to CFE, increase purchase orders to CPH Engineers for continuing design services and to Ardaman and Associates for well installation and monitoring. SUGGESTED MOTION: "I move to approve the application for the SRF Loan in the amount of $496,333, change order #3 to CFE for $314,890.80 and increasing purchase orders to CPH Engineers for $64,670 and Ardaman and Associates for $32,401." Attachment: Change Order # 3, CPH Engineers Work Order, Ardaman and Associates Work Order