1258 CFE - Cloud Branch Ph 2, Ch Ord 3❑
Mayor's signature
❑
Recording
❑
Renderin'
®
Safe ke peing (Vault)
❑
Payment Bond
❑
City Manager Signature
❑
City Clerk Signature
Ir
PURCHASING DEPARTMENT
TRANSMITTAL MEMORANDUM
To: City Clerk
RE: Central FL Environmental Corp., Change Order # 3
G6
�q
The item(s) noted below is /are attached and forwarded to your office for the following action(s):
El
Development Order
Final Plat (original mylars)
Letter of Credit
Maintenance Bond
Ordinance
Performance Bond
Resolution
Once completed, please:
❑ Return original
❑ Return copy
El
Special Instructions:
Original Change order # 3 for $314,890.80
Please advise if you have any questions regarding the above.
Thank you!
From
1(-30-1(
1 &,A
Date
z
lot
TADept_formACity Clerk Transmittal Memo - 2009.doc
�•yl
CHANGE ORDER FORMy
7
Change Order No. 3
Project Title Cloud Branch Drainage Improvements - Ph. 2
�a
Bid No. IFB 08/09 -14
Owner: City of Sanford
Contractor: Central Florida Environmental Corporation
Agreement Date: Auqust 31, 2009
This Change Order is necessary to cover changes in the work to be
performed under this Agreement. The GENERAL CONDITIONS,
SUPPLEMENTARY CONDITIONS, and STANDARD SPECIFICATIONS
apply to and govern all work under this Change Order.
THE FOLLOWING CHANGES ARE MADE TO THE CONTRACT DOCUMENTS:
(1) Original Contract Price
(2) Current Contract Price (Adjusted by Previous Change Orders)
(3) Total Proposed Change in Contract Price
(4) New Contract Price (Item 2 + Item 3)
(5) Original Contract Time
(6) Current Contract Time (Adjusted by Previous Change Orders)
(7) Total Proposed Change in Contract Time
(8) New Contract Time (Item 6 + Item 7)
(9) New Contract Substantial Completion Date
Change Order No. 3 - Cloud Branch
Page 1 of 5
2.358.902.00
$ 2,584,830.46
$ 314,890.80
$ 2,899,721.26
180 Days
283 Days
279 Days
562 Days
4/13/2011
CHANGES ORDERED
ITEM 1
Description of Change: Time Adjustment by City for Holidays
Reason for Change: Time granted to Contractor to allow for holidays that occurred during
construction.
Change in Contract Price: $0.00
Change in Contract Time: 4 Days
ITEM 2
Description of Change: Time Adjustment by City Due to Unavailability of Sod, Trucking
Reason for Change: Sod farms have had limited sod available for purchase due to the
extremely dry weather followed by very wet weather during the
summer; additionally, there was a shortage of available trucks for
hauling since independent truckers have not always been available
for work.
Change in Contract Price: $0.00
Change in Contract Time: 50 Days
ITEM 3
Description of Change: Quantity Adjustments - Contract Work Items
Reason for Change: Final construction quantity adjustments to reflect installed work,
Cloud Branch Ph. 2.
Change in Contract Price: ($12,572.85)
Change in Contract Time: 0 Days
Page 2 of 5
Change Order No. 3 - Cloud Branch
ITEM 4
Description of Change: Fencing at Coastline Park
Reason for Change: In lieu of the standard 6' high fence that was specified, a higher fence
(10') is proposed to be installed adjacent to the basketball courts.
Change in Contract Price: $1,424.68
Change in Contract Time: 0 Days
ITEM 5
Description of Change: Upgrade 6th St. Culvert Crossing at Cloud Branch
Reason for Change: The 6 th St, crossing of Cloud Branch is undersized and has been part
of the approved planning documents under the State Revolving Fund
(SRF) Loan program and was part of the St. Johns River Water
Management District (SJRWMD) permit. Construction was not part
of the initial project for Cloud Branch due to the contamination in the
ditch north of 6 th St. that has been cleaned as part of the Former
Sanford Gasification Plant (SGP) Remediation project. Due to the
proposed reconstruction of 6 th St. as part of the SGP project, it is
recommended that the 6 th St. culvert crossing be upgraded with a
proposed new double 5' x 12' concrete box culvert. Since the 6 th St.
project was part of the approved SRF loan documents, SRF funding
is available for the culvert replacement. Associated with the culvert
replacement are sanitary sewer replacement at the crossing and the
installation of new guardrail at 6 th St. and 8 th St. at the open Cloud
Branch channel, as needed for safety.
Change in Contract Price: $326,038.98
Change in Contract Time: 150 Days
ITEM 6
Description of Change: Time To Allow For 6th St. Crossing Design, Pricing, Commission
Approval
Reason for Change: The substantial completion date for the current Cloud Branch
construction is 8/31/10. Time is needed to allow for surveying and
designing the crossing, including the preparation of construction
drawings, developing construction quantities and pricing, including
reviewing proposed prices presented by the Contractor, and
obtaining Commission approval of the proposed work. The proposed
time, when added to 8/31/10 results in a construction start of
11/15/10. Should the Commission approve this proposed change
Page 3 of 5
Change Order No. 3 - Cloud Branch
order, and the Contractor complete its closeout of the current Cloud
Branch project prior to 11/15/10, then the Contractor would be
allowed to start work prior to 11/15/10, as authorized by the City.
Change in Contract Price: $0.00
Change in Contract Time: 75 Days
CHANGE ORDER SUMMARY
No.
Description
Change In
Contract Price
Change In
Contract Time
1
Time Adjustment by City for Holidays
$0.00
4 Days
2
Time Adjustment by City Due to Unavailability of
Sod, Trucking
$0.00
50 Days
3
Quantity Adjustments - Contract Work Items
($12,572.85)
0 Days
4
Fencing at Coastline Park
$1,424.68
0 Days
5
Upgrade 6th St. Culvert Crossing at Cloud Branch
$326,038.98
150 Days
6
Time To Allow For 6 th St. Crossing Design,
Pricing, Commission Approval
$0.00
75 Days
TOTAL
$314,890.80
279 Days
WAIVER This Change Order constitutes full and mutual accord and satisfaction for the
adjustment of the Contract Price and Contract Time as a result of increases or decreases in cost
and time of performance caused directly and indirectly from the change. Acceptance of this
Waiver constitutes an agreement between OWNER and CONTRACTOR that the Change Order
represents an equitable adjustment to the Agreement and that CONTRACTOR shall waive all
rights to file a Contract Claim or claim of any nature on this Change Order. Execution of this
Change Order shall constitute CONTRACTOR's complete acceptance and satisfaction that it is
entitled to no more costs or time (direct, indirect, impact, etc.) pursuant to this Change Order.
Page 4 of 5
Change Order No. 3 - Cloud Branch
APPROVAL AND CHANGE ORDER AUTHORIZATION
ACKNOWLEDGMENTS
The aforementioned change, and work affected thereby, is subject to all provisions of the original
Agreement and specifically changed by this Change Order, and
It is expressly understood and agreed that the approval of the Change Order shall have no effect
on the original Agreement other than matters expressly provided herein.
WITNESS to CONTRACTOR:
•
1(7 -oy- 2U yo
Date
Central Florida Environmental Corporation
Contractor
David E. Stalowy - President
Printed'f4ame and T of Officer
By (Signature)
Date
(Corporate Seal)
ATTEST:
Qt &x -
Signature)
Date
(Seal)
City of Sanford
Owner
Thomas J. George - Interim City Manager
Printed Name and Title
-�� z��./
By (Signs re)
CJ �
Date
END OF SECTION
14�a / �5 fl� 0 W n ,
a virtu 44
li
i F
Page 5 of 5
Change Order No. 3 - Cloud Branch
CITY OF SANFORD
CLOUD BRANCH DRAINAGE IMPROVEMENTS - PHASE 2 (IFB 08/09 -14)
CHANGE ORDER NO. 3 ATTACHMENT
ITEM 1 - TIME ADJUSTMENT BY CITY FOR HOLIDAYS
TOTAL PROPOSED PRICE $0.00
TOTAL PROPOSED TIME ADJUSTMENT 4 Days
ITEM 2 - TIME ADJUSTMENT BY CITY DUE TO UNAVAILABILITY OF SOD AND TRUCKING
TOTAL PROPOSED PRICE $0.00
TOTAL PROPOSED TIME ADJUSTMENT 50 Days
ITEM 3 - QUANTITY ADJUSTMENTS - CONTRACT WORK ITEMS
ITEM NO. IDESCRIPTION UNITS QUANTITY UNIT COST TOTAL COST
Work Items With Quantity Increases
5
Staked Silt Fence
LF
645
$0.65
$419.25
35
36" RCP
LF
3
$70.00
$210.00
54
Remove Existing 24" storm pipe
LF
165
$15.35
$2,532.75
55
Remove Existing 15" storm pipe
LF
85
$15.25
$1,296.25
57
Remove Existing Concrete inlet structures /manhole at South
End of Park
EA
1
$1,200.00
$1,200.00
58
Plug Existing Storm Pie
EA
1
$355.00
$355.00
62
Sodding Bahia - Pond 4
SY
1039
$1.65
$1,714.35
63
Sodding (Bahia) - Along 4'x11' BC and swale on south side
of pond
SY
260
$1.65
$429.00
64
Sodding Bahia -Alon 4'x13' BC
SY
1009
$1.65
$1,664.85
65
12" Reclaimed Water Main Around Pond PVC or DI
LF
3
$16.55
$49.65
94
Sodding Bahia Fill Area within RR R/W
SY
106
$1.65
$174.90
95
Sodding Bahia Along Ditch
SY
130
$1.65
$214.50
96
Sodding Bahia fill area
SY
301
$1.65
$496.65
75
Remove 8" Abandoned Water Main
LF
105
$7.90
$829.50
Work Items With Decreased Quantities
13
36" RCP
LF
-11
$67.75
$745.25
27
Floating Turbidity Barrier
LF
-7
$7.50
$52.50
31
Treatment of Dewatered Groundwater in Fuel Contaminated
Area
DAYS
-14
$427.00
$5,978.00
46
4'x11 B.C. at 11th St. to Pond
LF
-9
$456.45
$4,108.05
51
Concrete Rip-Rap at Endwalls
SY
-237
$18.10
$4,289.70
69
12" RWM Fitting -45 Deg. Bend
EA
-4
$428.00
$1,712.00
77
Relocate Existing Power Service for Park
LS
-1
$1,200.00
$1,200.00
81
Remove Existinp Endwalls
EA
-2
$1,339.00
$2,678.00
87
Fill Depression Within at Crossing oor ination
w /CSX)
LS
-1
$3,396.00
$3,396.00
TOTAL PROPOSED PRICE
TOTAL PROPOSED TIME ADJUSTMENT
($12,572.85)
0 Days
Change Order No. 3 Attachment - Cloud Branch Page 1 of 4
CITY OF SANFORD
CLOUD BRANCH DRAINAGE IMPROVEMENTS - PHASE 2 (IFB 08/09 -14)
CHANGE ORDER NO. 3 ATTACHMENT
ITEM 4 - FENCING AT COASTLINE PARK
ITEM NO.
DESCRIPTION
UNITS
QUANTITY
UNIT COST
TOTAL COST
1
Delete 6' High Chain Link Fence at Coastline Park
LF
-110
$12.20
$1,342.00
2
Add 10' High Chain Link Fence at Coastline Park
LF
110
$25.1516
$2,766.68
TOTAL PROPOSED PRICE
TOTAL PROPOSED TIME ADJUSTMENT
ITEM 5 - UPGRADE 6TH ST. CULVERT CROSSING AT CLOUD BRANCH
$1,424.68
0 Days
ITEM
DESCRIPTION
UNITS
QUANTITY
UNIT COST
TOTAL COST
1
Erosion and Sediment Control
LS
1
$3,175.00
$3,175.00
2
Staked Silt Fence
LF
330
$0.65
$214.50
3
Floatina Turbidit Barrier
LF
125
$7.50
$937.50
4
Demolition (Remove Existing Pavement, Curb and Gutter,
Inlets, Culvert, Endwalls) - Incl. Line locates, video, as- builts
LS
1
$27,278.00
$27,278.00
5
Install Temporary Crossing (Incl. 60" culvert) in Cloud
Branch N. of 6th St. to provide access to parcel north of 6th
St. and west of Cloud Branch
LS
1
$11,789.00
$11,789.00
6
Bypass Pumping of Cloud Branch Around Construction Area
LS
1
$31,973.00
$31,973.00
7
Clearing, Ditch Re radin g at Culvert
LF
181
$31.35
$5,674.35
8
Seed Ditch Side Banks and Install Erosion Control Mat
SF
3900
$0.29
$1,131.00
9
Concrete Ditch Paving
SY
108
$38.00
$4,104.00
10
Install Double 5'x 12' Concrete Box Culvert
LF
48
$1,475.80
$70,838.40
11
Concrete Endwalls / Win walls
CY
23.5
$793.75
$18,653.13
12
New Curb Inlet Top and Riser on Top of Box Culvert (USF
5115 -6224 Inlet Top)
EA
2
$1,833.00
$3,666.00
13
Install New 18" RCP
LF
85
$38.55
$3,276.75
14
Connect New 18" RCP to Box Culvert
EA
1
$1,553.00
$1,553.00
15
Install New Curb Inlet Top (USF 5115 -6224) w/ Type P
Bottom
EA
2
$2,850.00
$5,700.00
16
2" Type S -1 Asphalt
SY
299
$18.00
$5,382.00
17
8" Soil Cement Base
SY
299
$31.75
$9,493.25
18
12" Stabilized Sub grade
SY
355
$4.20
$1,491.00
19
Type 'F' Curb and Gutter
LF
200
$21.00
$4,200.00
20
Guardrail 6th St. - with asphalt andspecial posts
LF
292
$92.75
$27,083.00
21
Guradrail 8th St. - With Asphalt
LF
180
$61.65
$11,097.00
22
Sodding Within Road R/W Bahia Sod
SY
500
$1.65
$825.00
23
Set up and remove by pass pumping sanitary sewer flow
around work area
LS
1
$7,016.00
$7,016.00
24
Bypass Pumping of Sanitary Sewer Flow Around Work Area
DAY
13
$917.00
$11,921.00
25
Remove Existing 15" Clay Sanitary Sewer and Replace with
14" D.I. Pol lined PC 350 Pipe
LF
63
$236.75
$14,915.25
26
Remove Existing 8" Clay Sanitary Sewer and Replace with
8" D.I. Polylined PC 350 Pipe
LF
68
$153.00
$10,404.00
27
Concrete Encase New 8" D.I. San. Sewer at Ditch Crossing
LF
40
$130.10
$5,204.00
Change Order No. 3 Attachment - Cloud Branch Page 2 of 4
CITY OF SANFORD
CLOUD BRANCH DRAINAGE IMPROVEMENTS - PHASE 2 (IFB 08/09 -14)
CHANGE ORDER NO. 3 ATTACHMENT
28
Remove Existing Sanitary Sewer Manhole and Install New
San. Sewer Manhole
EA
2
$3,760.00
$7,520.00
29
Connect New Sanitary Sewer D.I. Pipe to Existing San.
Sewer Clay Pipe With Fernco Coupler
EA
2
$270.00
$540.00
30
Connect Existing San. Sewer to New Manhole
EA
2
$1,845.00
$3,690.00
31
Type "B" Fence - 6 -Ft High, Vinyl Coated Black
LF
714
$14.75
$10,531.50
32
Double Swing Fence Gate - 16' O enin
EA
1
$1,325.00
$1,325.00
33
Rip Rap - South side of box culvert along west bank (If
Needed )
SY
50
$38.75
$1,937.50
34
Open Cut Remove and Replace Concrete Drivewa 6"
SY
27
$55.55
$1,499.85
TOTAL PROPOSED PRICE
TOTAL PROPOSED TIME ADJUSTMENT
ITEM 6 - TIME TO ALLOW FOR 6TH ST. CROSSING DESIGN, PRICING, COMMISSION APPROVAL
TOTAL PROPOSED PRICE
TOTAL PROPOSED TIME ADJUSTMENT
CHANGE ORDER SUMMARY - CHANGE ORDER NO. 3 (CONTRACT PRICE)
Item No.
Description
Amount
1
Time Adjustment by City for Holidays
$0.00
2
Time Adjustment by City for Unavailability of Sod, Truck in
$0.00
3
Quantity Adjustments - Contract Work Items
$12,572.85
4
Fencing at Coastline Park
$1,424.68
5
lUpgrade 6th St. Culvert Crossing at Cloud Branch
$326,038.98
1 6
1 Ime to Allow tor 6th bt. Design, Fricing, Uommission
Approval
$0.00
Total
Contract Summary
$314,890.80
Original Contract Amount
$2,358,902.00
Change Order No. 1
$225,928.46
Change Order No. 2
$0.00
Current Contract Price
$2,584,830.46
Proposed Change Order No. 3
$314,890.80
Pro osed New Contract Price
1 $2,899,721.26
CHANGE ORDER SUMMARY - CHANGE ORDER NO. 3 (CONTRACT TIME)
Item No.
Description
Time Adjust
1
Time Adjustment b City for Holidays
4 Days
2
Time Adjustment b City for Unavailability of Sod, Truck in
50 Days
3
Quantity Adjustments - Contract Work Items
0 Days
4
Fencing at Coastline Park
0
5
U rade 6th St. Culvert Crossing at Cloud Branch
150 Days
6
Time to ow or t t. rlcing, ommisslon
Approval
751
Total
279 Days
$326,038.98
150 Days
$0.00
75 Days
Change Order No. 3 Attachment - Cloud Branch Page 3 of 4
CITY OF SANFORD
CLOUD BRANCH DRAINAGE IMPROVEMENTS - PHASE 2 (IFB 08/09 -14)
CHANGE ORDER NO. 3 ATTACHMENT
Contract Summary - Contract Time
Original Contract Time
180 Days
Change Order No. 1
97 Days
Change Order No. 2
6 Days
Current Contract Time
283 Days
Miscellaneous Days Added By City (Holidays) - Item 1
4 Days
Miscellaneous Days Added By City (Unavailability of Sod and Trucks for Hauling) - Item 2
50 Days
Current Contract Time After Adjusted by City
337 Days
Notice to Proceed Date
9/28/2009
Current Substantial Completion Date After Time Adjustments by City (C.B. Ph. 2)
8/31/2010
Contract Time From Substantial Completion to Final Completion
30 Days
Current Final Completion Date (Cloud Branch Ph. 2)
9/30/2010
Proposed Change Order No. 3 Items 3 -5
150 Days
Proposed Days for Design, Review of Prices, City Commission Review and Approval
75 Days
Proposed Substantial Completion Date (Work Added By Change Order No. 3
4/13/2011
Time From Substantial Completion to Final Completion
30 Days
Pro osed Final Completion Date 6th St. Crossin
5/13/2011
Change Order No. 3 Attachment- Cloud Branch Page 4 of 4
' WS X
Item No. G
CITY COMMISSION MEMORANDUM 10.142.H
OCTOBER 11, 2010, AGENDA
To: Honorable Mayor and Members of the City Commission
PREPARED BY: Robert Beall, Project Manager
SUBMITTED BY: Tom George, Interim City Manager / t
SUBJECT: Increase funds for the Cloud Branch Phase II Drainage project.
SYNOPSIS:
Approve application for a State Revolving Fund (SRF) Companion Loan, change order
#3 to Central Florida Environmental (CFE) Corp., increase purchase orders to CPH
Engineers and Ardaman and Associates is requested.
FISCAL/STAFFING STATEMENT:
The total amount requested is $496,333 and will be funded through an SRF Companion
Loan through the Stormwater Utility fund.
BACKGROUND:
The City Commission approved the Cloud Branch Drainage Improvement Project
Phase II to be funded through the State Revolving Fund (SRF) with American
Recovery and Reinvestment Act (ARRA) stimulus funding. Near completion of this
project staff met with CPH Engineers to determine if funding would be available to
complete the box culvert road crossing at W. 6th Street north of the existing project. In
conjunction with the work being completed at the Sanford Gasification site this will
complete all of the proposed stormwater improvements for the north end of the Cloud
Branch Drainage system. Staff discussed additional funding through SRF and their
grant administrator stated the project was eligible for a companion loan associated with
the existing Cloud Branch Phase II project.
The change order to CFE Corporation is to replace an existing 5'x12' box culvert with
a double 5' x 12' box culvert across W. 6 Street. The existing crossing is undersized
and would not sustain an abnormal rain event at this location.
CPH Engineers increase is for additional design, engineering, permitting and grant
application over -site of the original drainage plan.
Ardaman and Associates' purchase order is to install and monitor six 2" wells and
extract one water sample per Florida Department of Environmental Protection
requirements for the new pond at Coastline Park.
LEGAL REVIEW:
All contracts are being reviewed by the City Attorney for content, awaiting approval.
RECOMMENDATION:
It is staff's recommendation that the City Commission approve the application for the
SRF loan, change order #3 to CFE, increase purchase orders to CPH Engineers for
continuing design services and to Ardaman and Associates for well installation and
monitoring.
SUGGESTED MOTION:
"I move to approve the application for the SRF Loan in the amount of $496,333,
change order #3 to CFE for $314,890.80 and increasing purchase orders to CPH
Engineers for $64,670 and Ardaman and Associates for $32,401."
Attachment: Change Order # 3, CPH Engineers Work Order, Ardaman and