Loading...
701-Cox AssociatesCOX ASSOCIATES ArchitectffRoofConsultants c~ 2901 Cuny Ford Road Q Suite 207 Q Orlando, Horida 32806 c~ Ph (407) 8964341 c~ Fax (407) 896-2238 April 7, 1998 City of Sanford Engineering Department ENGIN~"F:!:~'7 'G DEPT. e/o Chris Smith, Project Director ~l'fY OF ,S?,i':FORD, FL~2 P.O. Box 1788 Sanford, Florida 32772 Re: SANFORD MUSEUM 520 East First Street Sanford, Florida Construction Documents & Construction Observation Dear Mr. Chris: Cox Associates is pleased to present the following proposal for the above referenced building for your consideration: ACTIVITY I - CONSTRUCTION I)OCUMENT$ Preparation of a Project Manual suitable for obtaining bona fide contractor bids. The project manual will contain construction documents (design details and specifications) based on the recommendations presented in the Cox Associates Report dated March 5, 1998. It will also include contractual documents (bonds and contracts), and any sopplementaty conditions of the contract which you organization wishes to use. At your direction Project Manuals will be distributed to invited bidders. Bids received will be evaluated to ensure complianee with the requirements ofthe Project Manual. Contractor's submittals will be verified for complianco with the Project Manual. Our fee for performing Activity I is $1,550.00, plus reimbursable expenses, which shall be due upon completion of Construction documents. Rebidding will be billed at Cox' Standard Hourly Rates (see Exhibit "A"). ACTIVITY II - CONSTRUCTION OBSERVATION A. Conduct an on-site preeonstruction conference with the selected contractor and an Owner's representative. The purpose of the conference is to establish areas for material storage, work hours, utilities access, and to ensure the contractor's understanding of design details and specifications. Contractor's submittals will be verified for compliance with the Project Ph (904) 371-3068 Fax (904) 371-7011 Ph (407) 833-0755 Fax (407) 8334903 Mr. Mike Kirby Sanford Museum Page 2 B. Perform part time on-site observations of the work'm-progress. A written report of observatiom will be provided to the Owner's representative and contractor after each on-site visit. C. Perform a Substantial Completion Inspection and document any deficiencies noted in a "punch list" format. D. A Final Completion Inspection to ensure satisfactory correction of any "punch list" items. This inspection will be performed by a representative of the City of Sanford: Our fee for performing Activity II will be as follows and billed momhiy: A. Pre-Construction Conference $250.00 B. On-site observation $300.00/per visit (2) = $600.00 C. Substantial Completion Inspection Report $450.00 Reimbursable expenses are in addition to the Architect's compensation and include expenditures made by the Architect and by the Architect's employees in the interest of the project, and shall be limited to the following expenses: long distance communications, postage, fax, overnight mailings, handling of documents, reproduction, photography, and travel mileage @ 30¢ per mile. This proposal is included as part of the Standard Form of Agreement, two (2) copies are enclosed for your review and signature. Receipt of one (1) fully executed copy of this Agreement in our office shall serve as our authorization for us to proceed with the work. Thank you for your consideration of our proposal. We look forward to serving you with competence and enthusiasm. Sincerely, COX ASSOCIATES Architect COX ASSOCIATES ROOF CONSULTANTS/ARCHtr~CTS 2901 CURRY FORD ROAD, SUITE 207 ORLANDO, FLORIDA 32806 Arehitect/Sr. Roof Consultant .................... $100.00 Roof Consultant ................................. 85.00 Project Manager ................................. 75.00 Sr. Roof Technician .............................. 70.00 Field Technician ................................. 55.00 Designer ....................................... 55.00 Draftsman ..................................... 50.00 Secretarial ..................................... 38.00 LITIGATION HOURI .Y RATES Litigation Preparation ............................ 100.00 Expert Witness ................................. 125.00 "Exhibit A" 2901 Curry Ford Road, Suite 207 Orlando, Florida 32806 ~ (407) 896-4341 Fax (407) 896-2238 c~ He AA0002713 STANDARD FORM OF AGREEMENT CLIENT: CITY OF SANFORD P. O. BOX1788 SANFORD, FLORIDA 32772 THE ARCHITECT: COX ASSOCIATES 2901 CURRY FORD ROAD, SUITE 207 0~0o FLORIDA 32806 DATED: APRIL 7, 1998 FOR: Preparation of Construction Documents and Construction Observation service for repairs to the Sanford Museum, located at 520 East First Street, Sanford, Florida for the City of Sanford in accordance with our proposal letter dated April 7, 1998, attached to and forming a part of this agreement). TERMS AND CONDITIONS OF AGREEMENT ARTICLE 1 ARCHITECT'S SERVICES AND RESPONSH~H, ITIES 1.1 The Architect°s services shah consist of the two (2) Activities described in the proposal ARTICLF, 2 THE CLIENT'S RESPONSIBILITIES 2. 1 The Client shah provide full information regarding requirements for the project. 2.2 The Client shall designate, when necessary, a representative authorized to act in the Owner#s behalf with respect to the Project. The Client or such aathori~ed representative shall examine the documents submitted by the Architect and shall render decisions pertaining thereto promptly to a~oid unreasonable delay in the progress of the Architect °s services. 2.3 The Client shall furnish required information as expeditiously as necessary for the orderly progress of the Work and the Architect shall be entitled to rely upon the accuracy and completeness thereof. ARTICLE 3 REIMBURSABLE EXPENSES 3. 1 Reimbursable Eapenses are in addition to the Architect ° s compensation and include expenditures made by the Architect and the Architect's employees and other consultant°s in the interest of the Project as listed in the following subparagraph.' long distance 6ommunicatlons~ postage, fax, overnight mailing, handling of documents, Page 1 of 2 reproduction, photography, and travel mileage at 30C per mile. ARTICLE 4 COMPENSATION TO THE ARCHITECT 4. 1 rnej~e.~rpe~f~rming Activities I and II is outlined in the attached proposal letter an is described in Article 4.4 of this Agreement. 4. 2 Any follow-up services will be billed at the Architect's Standard Hourly rates (see Exhibit "A ~), plus reimbursable expenses as outlined in Article 3. 4. 3 Should the Owner decide to reject any and all bids received and to rebid the project, Owner will be billed at the Architect's Standard Hourly Rates (see Exhibit "A "), plus eapenses as outlined in Article 3 of this Agreement. 4. 4 Fee schedule for service provided: Activity l- Construction Documents (due in Jhll upon completion): $1,550.00 Activity 1l - Construction Observation (billed monthly): Preconstruaion Conference - $250.00 On-site observations - 2 Visits @ $300. O0/per visit = $600.00 Substantial Completion - $450.00 All Activities shall be provided for a not-to-exceed fee of $2,850.00, plus reimbursable expenses as outlined in Article 3 of this Agreement, unless otherwise provided by written authorization. 4. 5 Invoices for the Architect's services and/or reimhrsabie e~zpertses will be submitted in accordance with the ~e schedule '. Payment by the client shall be due upon receipt of the invoice. Unpaid invoices beyond thirty (30) days shall bear interest at the rate of 1.5% per month. Terms and condiaons as defined above and eisewhere on this form are acceptable and the Architect is authorized to perform the services specified. CLIENT: CITY OF SANFORD ARCHITECT: COX ASSOCIATES TITLE: C / 2'~ /~ ~/c/~' ~,/~ TITLE: Architect DATE: z/.//f~/ ~'<W DATE: April 7. 1998 CONTACT: Chris Smith CONTACT: Bill Rogers PHONE: 40Z 330.5674 PHONE: 40Z 896. 4341 FAX' 40Z330.5679 FAX' 40Z 896.2238 Page 2 of 2