724-Teng Associates-SeawallContract for Phase 1 - Condition Study and Report in Support of Refurbishment of the Lake Monroe Seawall Teng Proposal Number 1389-13 SCOPE OF SERVICES Task 1 - Project Mobilization: A project procedures memorandum will be written summarizing schedule, communications procedures, and quality assurance/control procedures to be used on the seawall rehabilitation project. A kick-off meeting will be held with the City at its office. Task 2 - Review of Record Documents: Record drawings, maps, aerial photographs, inspection reports, and other applicable documents will be reviewed to gain a full understanding of seawall history and past maintenance activities. Task 3 - Above and Below Water Inspection: A thorough visual and tactile inspection wilt be made of all exposed portions of the wall above and below water to determine the cause of the areas of subsidence along the wall. Deficiencies will be mapped and photographed and documented in a condition assessment report. Task 4 - Geotechnical Exploration and Testing and Inspection of Ties: Exploratory drilling and testing will be performed at five locations, to be determined in task 3 above. Laboratory grain size analyses will be performed on select samples. Hand excavations will be performed to allow visual inspection of the ties at selected locations. Task 5 - Preparation of a Condition Assessment Report: Upon completion of all field work, a report will be prepared describing in detail the condition of the seawall. The physical condition of the seawall will be illustrated by photographs and sketches. We will evaluate the condition of the wall with particular emphasis on what is causing the areas of subsidence along the wall. The report will include recommendations for repair of observed deficiencies. Recommendations for work to be performed as part of Phase 2 will also be included in the report. SCHEDULE We propose to complete the above mentioned services within 2 months upon your notice to proceed. ADDITIONAL SERVICES If additional studies or services are required for some unforeseen condition, they will be paid for in addition to the costs estimated below in accordance with Schedule C. We do not anticipate such studies at this time. Teng & Associates, Inc. /,~ ~ ESTIMATED COST FOR ENGINEERING SERVICES A detailed cost estimate breakdown is artached for your information. We propose that these services be performed on an Hourly Basis in accordance with the Schedule of Architectural and Engineering Billing Rates (SCHEDULE Ca, 1/13/98) attached hereto and incorporated herein, subject to the maximum fee of $23,470.00. This proposal is predicated on the attached Terms and Conditions (Revised July 1, 1998) which will form the basis of our Agreement upon your authorization to proceed. Please sign all six (6) copies of this agreement and return one (1) copy to us. Accepted: TENG &ASSOCIATES, iNC. TENG &ASSOCIATES, INC. Richard J. Jannakowicz, P.E. Ivan J. Dvorak, P.E. Regional Manager President CITY OF SANFORD Signatur/e~/~ Name & Title (Please type or print) Date SCHEDULE Ca SCHEDULE OF ARCHITECTUREIENGINEERING BILLING RATES Teng & Associates, Inc. ARCHITECTURAL AND ENGINEERING SERVICES Expires December 31, 1998 HOURLY RATES PER CLASSIFICATION CLASSIFICATION 1998 Sr. Architect and Sr. Engineer ' ' 113.00 Architect and Engineer 88.00 Technician 76.00 Teclmical Aide 58.00 Technical Manager 158.00 REI.MBURSABLE EXPENSES: Special consultant costs, auto usage, travel, outside duplication/blue prints/photos/film, out-of-pocket monies, and other reasonably identifiable costs. Unless specifically stated otherwise in the Project Agreement, reimbursable expense items are in addition to the fees stated for services. \\cpq-03\sI,'s\corpklin\rates\98 rates.doc l/I. 3/98 Teng & Associates, Inc. /~.%, ~ Contract for Phase 2 - Design Study and Report For Refurbishment of Lake Monroe Seawall _ . - Teng ProjectNo: 13-2593-01 DEC 17 PB q: SCOPE OF SERVICES Refer to Attachment A for the Scope of Services SCHEDULE We propose to complete the above mentioned services within 90 days of your notice to proceed. ADDITIONAL SERVICES If additional studies or services are required for some unforeseen condition, they will be paid for in addition to the costs estimated below in accordance with Schedule C. We do not anticipate such studies at this time. ESTIMATED COST FOR ENGINEERING SERVICES The detailed cost breakdown is attached for your information as part of Attachment A. We propose that these services be performed on an Hourly Rate Basis in accordance with the Schedule of Architectural and Engineering Billing Rates (SCHEDULE Ca 1/13/98) attached hereto and incorporated herein, subject to the maximum fee of $43,108. This proposal is predicated on the attached Terms and Conditions (Revised July 1, 1998) which will form the basis of our Agreement upon your authorization to proceed. Please sign all six (6) copies of this agreement and return all six (6) to us. We will execute all copies and return five (5) to you. Accepted: TENG & ASSOCIATES, INC. TENG & ASSOCIATES, INC. Richard J. Jarmakowicz, P.E. Ivan J. Dvorak, P.E. Regional Manager President CITY OF SANFORD Signatu/re~'~~D Tnny VanDP nTp, Clty Manager Name & Title (Please type or print3 f 1 /qd/ Date AaN~S N~)ISqa - ~ 9SVHd S:9OIAtdqS :10 qdOgS 1N;31NHSIglgN_-I;!~t aNV NOIIO:gdSNI IqVMV:3S aUO=INVS - V ~N~tlNH::)VJ_LV 'sllsM t sd,~l Jo ),UgLUGO~IdGJ Ile~A ~OZ~ ~OZ~ 98~ 8 JoJ sele~llsa lsoo psu!JaJ dOI~AeQ :sele~ls~ ~soO pau~ g'g 'SIleM J 9d&1 Jo 1uG~GoeJd~J JoJ s~sXleue ~l~J~qels pue u6~ssp leJnlonJls 9gO' ~ 9gO'~ gg~ ~ ~eu~JleJd doleAga :lugmgaejde~ Joj u6~sea ~eu~leJd ~'~ · GlepdoJdd8 GJaqM sHelGp pue guo~jo9s-ssoj3 leo]dXl 'lno~el ueld leJ~uG~ 8 6u~pnlou~ 'gJ~edGJ 8Og$ 9Og$ gZ~ ~ pssodoJd 9ql Jo qge9 6u~leJlsnJl~ sl!q~qx9 dolgAga :S6U~MeJ. ~'g 'SlleM I 9d~ le sJ~edsJ HeM JoJ · GlepdoJdde GJ~qM 'lleM 6U~JS~XG GqJ Jo 6U~UGql6U~JlS JeJnlonJls JoJ ~lS~S ~3eq9~1 ' doIgA9a 'lleM puNsq ~ojj 6u~le9s pue 6u~qgled snsJ~A '~IUO SlIeM JO 9gej 1uoJJ Jo 6u~qoled 9lenleA] '19aJ g ~6'Z Jo Ielol e JoJ ~+~ uo~lels ol ~6+g uo]iels ~oJj ~ qoeg~ u~ pue ol 00+0 uo~lels ~ojj L qgeg~ u~ s] s~ql 'SlleM I 9dXl le sJ~edgJ ~ L'~$ ~ ~'~ 885 ~ IleM ~eu~m,Gjd dolgA9a :sj~eda~ Joj u6~saa ~eu]~lgJd 'e~epdoJdds sl~slep pue suo~loes-ssoJo Iso~d~l 'ueld 4e~ IajaueB ~ 6u~pnlou~ 8095 8095 gZ$ 9 'eeJnpeoojd J~daJ gq~ 6u~l~JisniH s]~q~qxa dolgAg~ :s6u~sJ ~'~ 'sllsJina Je~es ~Jols jo J~sdgJ GN~ JoJ se]~sg lsoo puE gO~'~$ 90~'~$ g95 9~ sl~a~ep 'spa~e~ Jl~dgj doleAeQ :sgis~l~s~ pus sejnpaoojd; ~'~ · elepdojdde ajgqM sHelsp pue suo~loGs-gsojo ~6~ ~65 9Z$ ~ 'lnoXel ueld leJaus6 6u~pnlou~ sl~q~qx9 dolgAsQ :S6U~M~Ja~ ~'g ' ~ qOeS~ le sJ~edsJ .Z~ ~OZ$ 88~ 9 JoJ ssle~lsg lsoo pguggJ dol~Aaa :sgle~ls~ lsoO lepg$e~ 8s~ '~ qgeG~ le sj~edGJ IleM JOJ s~s~leue ~lH~qeJs ~ ~'~ ~ ~'~ 885 ~ pue U6~gGp leJnlonJls ~eu~,sjd doigAga :u6~sga ~eu~m~lgja ~'g : · · . ..:. '-..~......= .........:.:..:.:: .: ...... , :.-.. ;..,......,.: .., ....: '. :., :s, . . ..'.:...'?~.:.,-:':.> .~ ::: .=.'~ ........: ~.,,..' '..:.~:.".',~:.,:':....:..:...'.'... ,,..:....'=.:.,.......gO+s~'9~,:~.~l~i~ ,::'::' ...: .::'.: .".:.:.:.'::'...:..,.":: :,.::"...'..... .:'.:.,.~;':~d' h..:.:'.:.'..:',..:'.:~:.?:' .....?.,.. .~',.: :', ;':. :':..::'...:...~::~.':::' ....:'~. ';.:".~.. ::',: ".~,:'."':':".::..'~:'.:....; "' .:~ ..'."',...."'. ;: .. ....~= · F]'~'~'.i~:"'j~1I",~ '::';1~65'1~j~'." 'iiOO~qe']':~: ~1~8:"~~' :' .T~'~H>:~· ':""";'.'::'.:"-:. L:"':::.:.d""':::' .,:":.~:..:..' ..' ..:"]~. ;..':,..., [:-".:': ~j~ij~:~ ':.: .: :. '.." .. ':.: :..::"........: .: ..:.: ~::.:......,:. :...:, ,'~ ....: ...~.:.= '...%..' ':., ....:: ':.' ..',:L:..:"'.: ='::..: ,.: .:...: .'...~,~:-.."'~..:: ." .' :.' ..........'." .. "' .. :. '.' '..'....'. :.. ;.....~ Aan~s NDISgQ - Z 9SVHd S3OlAI~gS 40 9dOOS /N9bIHSlaI~Ra9~ aNY NOI/OgdSNI llVMVgS aUO4NVS - v ,LNgblHOV,LIV ATTACHMENT A - SANFORD SEAWALL INSPECTION AND REFURBISHMENT SCOPE OF SERVICES PHASE 2 - DESIGN STUDY 56 Drawings: Develop exhibits including general plan layouts. 8 $76 $608 $608 typical cross-sections and details where appropriate. .:: .. Type'iFSea.Wali,C6iiStructjon:.~:.:: !:.!:~::::.": .....,i.....:':!:.:... '..,:..:...'.' ....:.:::.:.. ':.:;.:'~,.,:::.":. ::,':.,~ ;:::..' .: ::..? ' .".':,~.':....':'.:..;.: ....:..... 6.1 Prelimina~ Design for Repairs: Develop prelimina~ wall 40 $88 $3,520 $3.520 repairs at Type II walls. This is in Reach 1 from station 43+78 to 57+30, in Reach 2 from station 0+00 to station 3+42 and in Reach 3 from station 0+00 to station 5+91 for a total of 2,285 feet. This is essentially in the Marina area. Evaluate patching of front face of walls only, versus patching and sealing from behind wall 6.2 Refined Cost Estimates: Develop refined cost estimates for 8 $88 $704 $704 wall repairs at Type II walis. Provide data for each of the three systems in Item 6.1, basing estimates on published construction cost data from Means as well as verification with manufacturers and local contractors. 6.3 Drawings: Develop exhibits illustrating each of the proposed 8 $76 $608 $608 repairs, including a general plan layout, typical cross-sections and details where appropriate. ~.........: '.. s. Rep0~':,...., .: :. ::.'. ::: .......: ,:~ ....'..:~:~:...:.: :.~ ..... ::~ .. :'.. :..':...:c.... :~:' :::.:., ~.::: ? .: ...:..:: .~/....::':.:.:.., :. :..2.~...: ...,,., ':' .:. '.. .,:. '::: .~.~ ,....:: '. :.::.:: 7.1 Permitting: Identi~ permitting requirements for the preferred 16 $88 $1,408 $1 alternate (SJRWMD, FDEP. USACOE, USEPA, Seminole County and City of Sanford). 7.2 Repo~: Assemble final repo~, to include and Executive 64 $88 $5,632 $5.632 Summa~ and all items above, 7.3 QNQC: Provide quality assurance and review of the repo~. 8 $88 $704 $704 SCHEDULE Ca SCHEDULE OF ARCHITECTURE/ENGINEERING BILLING RATES Teng & Associntes, Inc. ARCHITECTURAL AND ENGINEERING SERVICES Expires December 31, 1998 HOURLY RATES PER CLASSIFICATION CLASSIFICATION 1998 Sr. Architect and Sr. Engineer ' ' 113.00 Architect and Engineer 88.00 Technician 76.00 TeclmicaI Aide 58.00 Technical Manager 158.00 REI~'IBURSABLE EXPENSES: Special consultant costs, auto usage, travel, outside duplicatio~'folue prints/photos/film, out-of-pocket monies, and other reasonably identifiable costs. Unless,specifically stated othepMse in the Project Agreement, reimbursable expense items are in additiofi to the fees stated for services. \\cpq-O3Xsys\corpXfin\rates\98 rates.docl/13/98