625-CPH-Sanford Municipal Stadi SANFORD, FLORIDA 32772-280B TEL407-322-6841 TEL407,,831-5717 FAX #407-330-0~39 Mr. Robert J. Walter, P.E. City of Sanford P O Box 1788 Sanford, Florida 32772-1788 Re: Proposal for Engineering Services Sanford Municipal Stadium CPH lob No. Z6582.00 Dear Mr. Walter: We are pleased to respond to your request for a proposal for an engineering study for the Sanford Memorial Stadium. It is our understanding that you want a study for a sum not to exceed $5,000, and to result in an assessment of the condition of the stadium, and a cost estimate for effecting the needed repairs to bring the stadium into original condition. The study will include a field investigation to determine the extent of deterioration of the structure, the general condition of the electrical service, the points of connection for sanitary and storm sewer, and the ADA access and accommodations. We will also meet with a contractor approved by the City to discuss repair and painting alternafxves for the stadium structure and thek associated costs. We will coordinate with the C~ty Recreation Department to obtain their input as to the recreational functions of the facility, and incorporate their recommendations and suggestions as to needed improvements. We will provide the City with a report summarizing the findings of our investigation. The report will include recommended repairs and painting procedures for the grandstand, including the roof, decking, handrails, structural members, dugout storm drainage, plus general recommendations for electrical, lighting, and stadium club roof. We will also include an evaluation of the stadium for ADA access for seating and restroom facility requirements. The ADA evaluation will include a general summary of requirements. No negotiations for alternative accommodations with any regulatory agencies will be included such as alternative seating and restroom areas or variances, etc. We will include a preliminary opinion of probable construction cost for the recommended improvements in the study. The study will not include any survey, detailed drawings, structural design, or structural certification of structure. The repair recommendations will be predicated on the assumption the original design of the structure is sufficient for current loads and repairs will be intended to restore the structure to its original condition. The scope of services is further defined by the enclosed Plan of Study. We will agree to provide the services as described for a lump sum fee of $5,000. Conkiln, Porter and Holmes Tft~s propos~J meets ~th your ~pp~o~, ~as~ so i~ic~t~ by sing ~ ~e~g o~ ~o~y fo~ ou~ Sincerely, CO~ POK~K ~ HOL~S-ENG~EKS, ~C. David A. Te~lleger, P.E. Project M~ager Enclosures ACCEPTANCE: For City of S~ord, Flo~da Date Conkiln, Porter and Holmes SANFORD, FLORIDA 32772-2808 TEL407-322-6841 TEL407-831~5717 FAX #40'7-330-0639 PLAN OF STUDY H'EM DESCRIIYHON P E T D S ES'FIM,XTI.~D E X PEN S F.S 1. Field Evaluation: Photographics 2 Sketches, rough field 4 4 measurements Mapping and notation of 4 4 damage Investigate drainage system for 2 2 dugouts Evaluate sewer connection; 1 3 - determine methods by which building plumbing would be upgradod and replac~l Evaluate main electrical service: 2 $500.00 Provide comments or need for rewiring of concession room, stadium club and restrooms Coy subconsultant) 2. General evaluation of stadium for 8 ADA access and accommodations; requirements for restrooms, emergency lighting and exits 3. Meet with and coordinate with a 8 - contractor or contractors to review findings and discuss project. Obtain input and costs and scope for the work. 4. Prepare a Summary Report to include 16 12 - 4 items listed below: Conkiln, Porter and Holmes SANFORD, FLORIDA 32772-2i~)8 TEL407..322-6841 TEL407-831-5717 FAX #407-330-0639 ITE31 DI:~SCRIIrrlON P E i, D S ESTIMA'FED EXPENSES Recommended repairs for grandstand including roof, decking, handrails, structural members and stadium dub roof Paint recommendation for surface preparation, priming and painting Restroom facility requirements for lighting plumbing and handicap access Concession room lighting, plumbing and electrical including smoke detection Stadium dub room requirements for lighting and electrical Recommendations for dugout drainage system Costs of repair and renovation work TOTALS 0 45 27 0 5 $500.00 J:~OBS~Z6582.00\WI~PROFOSAL'~TAD1UM,JM8 '~'~Subject: Memorandum To: Bill Simmons P.E., City Manager ~e cc: Jay Marder, Director of Planning and nt From: Robert Walter P.E., Professional Engineer ~ Per the request of the City Commission, We have requested proposals from two Engineering Firm to conduct an "Engineering Study" of the Sanford Memorial Stadium. Please find attached a copy of the proposal from Conklin Porter and Holmes. Gee and Oenson Inc. has been involved in similar work and was invited to submit a proposal, but could not complete this study for the $5000 threshold. Attachments: 08.'fi5'96 16r,~2 FAX 14076602852 GEE & JE,NSON ~001 ;~ost~lt~FaxN0te 7671 ha~ l~tq}~ #~{ )' b~j~ept C~, CITY OF SANFORD SANFORD MEMORIAL STADIUM SCOPE OF SERVtCES 1. Conduct a cursory field examination of [he Structural Members~ Roof Structure, Electrical and Plumbing of Grand Stand, Restrooms, Concession Stand and Stadium Ciub and provide an opinion of the general condition, 2 Perform a cede compliance evaluation of the above noted facilities. 3. Provide a general order of magnitude budget estimate of the costs to refurbish the stadium, 4, Prepare a written report of findings. c:\sanford memorial scope