Loading...
567-Ardaman-1996 Site 10 Ardarnan & Associates, Inc. PROPOSAL/PROJECT ACCEPTANCE PROJECT INFORMATION: Client Name City of Sanford Project Name Site 10 Project Location Sanford, Florida Proposal Number and Date 95-074A, ADdl 11. 1996 Description of Services Quaderly Monitoring at Groundwater Wells - Reclaimed Water Reuse System Estimated Fee $9,500.00 PAYMENT RESPONSIBILITY: Invoices to be paid by City of Sanford Address P~ O. Box 1788 - Department of Utilities City/State Sanford, Florida Zip Code 32772-1788 Phone 407-330-5640 Attention Mr. Paul Moore Title APPROVAL OF CHARGES: If the invoices are to be approved by a party other then the party responsible for payment above, please fill in the space below. Firm Address City/State Zip Code Phone Attention Title PROPERTY OWNER IDENTIFICATION: (If other than above) Name Address City/State Zip Code Phone Attention Title SPECIAL INSTRUCTIONS: PAYMENT TERMS: Net 30 days from invoice date; invoices will be sent every four weeks for continued or extended projects. Interest charges, 1~% per month following the due date. PROPOSAL ACCEPTANCE: The Terms and Conditions of this Proposal, including the Terms on this page and the General Conditions on the reverse are: Accepted this //y~/-Z dayof .,4/,/) ~- , 19 ?( (Pdnt or type name of authorized representative and title) Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants April 11, 1996 File Number 95-074A City of Sanford Depadment of Utilities P.O. Box 1788 Sanford, Florida 32772-1788 Attention: Mr. Paul Moore Subject: Proposal for 1996 Quarterly Monitoring at Groundwater Wells for City of Sanford Reclaimed Water Reuse System at Site 10 Gentlemen: With the first quarter of the 1996 sampling and reporting, the existing annual contract expires for groundwater monitoring at 13 wells for the City of Sanford at Site 10 under FDEP Permit Number DO59-246220. This letter proposal deals with the performance of the quarterly monitoring program for one more year beginning the second quarter of 1996. In accordance with your letter to us dated Apdl 2, 1996, the annual report work element has been deleted from our proposed scope of work. The proposed work effort includes four quarterly sampling and analysis efforts for MW-1 through MW-13 wells in accordance with the permit conditions. The quarterly sampling will be for analysis of total dissolved solids, chloride, nitrate, total phosphorus, total coliform and fecal coliform. Specific conductivity, pH, turbidity and water level are monitored at the time of sampling. The City will be notified in advance as to the sampling dates. The results from each quarter will be submitted to the FDEP through the City on FDEP report forms and signed by a professional engineer in Florida experienced in groundwater. The estimated costs for the proposed work effort are summarized in Table 1. The monthly invoices will be based on time experttied, materials/equipment used and units performed in accordance with the enclosed 1996 fee schedule. The maximum budget not to be exceeded without further written authorization is $9,500.00. If the proposal meets with your approval, please have the appropriate person sign the enclosed proposal acceptance forms and return one for our records. Please do not hesitate to contact the undersigned should you have questions or if you need additional information. Very truly yours, land, Jr., J .E. J hn E. Gadanger, Ph.D., P.E. Senior Water Resources E ~gineer pal Florida Registration No. 16 713 HGS/ed Enclosures D:~HGS',B-95074A.P01 8008 S. Orange Avenu~ (32809), Post Office Box 593003, Orlando, FIo~'ida 32859-3003 Phone (407) 855-3880 FAX (407) 859-8121 Offices in: Badow, Cocoa, Fort Lauderdale. Fort Myers. Miarni, Orlando, Pod Charlotte, Pori St, Lucje, Sarasota, TalJahassee. Tampa, W, Palm Beach Table 1 ESTIMATED COSTS Water Quality Sampling Quarterly Trip (4 @ $800.00 each) $ 3,200.00 Analytical Laboratory Program Indicator Parameters (4 @ $100.00 x 13) 5,200.00 Reporting Quarterly ($1,100.00) .1,100.00 TOTAL ESTIMATED COSTS $9,500.00