Loading...
567-Ardaman-Site 10-1999 Ardarnan & Associatas, Inc. Geoteehnical, Environmental and Materials Consultants May 12, 1999 File Number 99-070 City of Sanford Department of Utilities P.O. Box 1788 Sanford, FL 32772-1788 Attention: Mr. Paul Moore Subject: Proposal for 1999 Quarterly Monitoring at Groundwater Wells for City of Sanford Reclaimed Water Reuse System at Site 10 Gentlemen: With the first quarter of the 1999 sampling and reporting, the existing annual contract expires for groundwater monitoring at 13 wells for the City of Sanford at Site 10 under FDEP Permit Number FL0020141-01. This letter proposal deals with the performance of the quarterly monitoring program for one more year beginning the second quarter of 1999. It is our understanding that the City will be responsible for the sampling and analysis program. Ardaman will provide field and office consultations and prepare the four quarterly reports. The proposed work effort includes four quarterly sampling and analysis efforts for MW-1 through MW-13 wells in accordance with the permit conditions. The quarterly sampling will be for analysis of total dissolved solids, chloride, nitrate, and fecel coliforms. Specific conductivity, pH, turbidity and water level are monitored at the time of sampling. The City should perform the sampling in June, September, December and March. The results from each quarter will be submitted by Ardaman to the FDEP through the City on FDEP report forms and signed by a professional engineer in Florida experienced in groundwater. The proposed work effort will not exceed $2,500.00 without further written authorization. The monthly invoices will be based on time expended, materials/equipment used and units performed in accordance with the enclosed 1999 fee schedule. If the proposal meets with your approval, please have the appropriate person sign the enclosed proposal acceptance forms and return one for our records. Please do not hesitate to contact the undersigned should you have questions or if you need additional information. Very truly yours, HGS:hgs:jo Enclosures D:~HGS~9-070 SANFORD Site10 pro. P01 .wpd 8008 S. Orange Avenue (32809), Post Office Box 593003, Orlanc~o, Florida 32859-3003 Phone (407) 855-3560 FAX (407) 859-8121 Offices in: Bartow, Cocoa, Fort Lauderdale, Fort Myers, Miarni, Orlando, Port Charlotte, Port St. Lucie, Sarasota, Tallahassee, Tampa, W. Palm Beach Ardaman ~'~,ssociates, Inc. PROPOSAL/PROJECT ACCEPTANCE PROJECT INFORMATION: Client Name Sanford Department of Utilities Project Name Reclaimed Water Reuse System Project Location Site 10, Sanford, Flodda Proposal Number and Date 99-070. May 12, 1999 Description of Services Quarterly MonitorinQ RePorts for Groundwater Wells Estimated Fee $2,500.00 PAYMENT RESPONSIBILITY: invoices to be paid by Sanford Department of Utilities Address P.O. Box 1788 City/State Sanford, Florida Zip Code 32772-1788 Phone 407/330-5640 Attention Mr. Paul Moore Title APPROVAL OF CHARGES: If the invoices are to be approved by a party other than the party responsible for payment above, please fill in the space below. Firm Address City/State Zip Code Phone Attention Title PROPERTY OWNER IDENTIFICATION: (If other than above) Name Address City/State Zip Code Phone Attention Title SPECIAL INSTRUCTIONS: PAYMENT TERMS: Net 39 days from invoice date; invoices will be sent every four weeks for continued or extended projects. Interest charges, 1Y2% per month following the due date. PROPOSAL ACCEPTANCE: The Terms and Conditions of this Proposal, including the Terms on this page and the General Conditions on the reverse are: Accepted this / Z./V~ day of 9,Z///L~ , 19 ~ (:~ ( dnt or~type~n~d' ~e body name) (~gnatu~~/~s~2-n ve)