Loading...
449-Henry Shelton Sanford Museulira BURKE, BALES &MILLS ASSOCIATES, INC. Ai~CHIT~CTUI~E ~ PLANNING · iNTEriOr: DESIGN 111 N. ORANGE AVE., SUITE 650 ~ OR~J~NDQ. FLORIDA 32801 "(407) ~224747 AAC000233 RECEIVE~ February 17, 1992 Mr. W.A. Simmons, City Manager FEB City of Sanford ' Post Office Box 1778 CI~ OF SANFOR~ Sanford, Florida 32772 RE: HENRY SHELTON SANFORD ~USEUM ~nford, Florida BBM Project No. 910q0 Dear Mr. Simmons: This Jettar is to serve as a means of amending the "Owner and Architect Standard Form of Agreement' dated May 23, 1991 for the above referenced project. The agreement was assigned to Burke, Bales 8 Mills Associates, Inc. by letter on January 31, 1992. The amendments which must be agreed upon by the Architect, Burke, Bales 8 Mills Associates, Inc., and Owner, City of Sanford, are as follows: 1. Page 1: Delete Architect's name and address as shown and substitute the following: Burke, Bales 8 Mills Associates, Inc. 111 N. Orange Ave. Suite 650 Orlando, FL 32801 2. Psr 11.2.1 Change to read: See Attachment "A' 8 3. Par 11.3.1 Delete and substitute the following: The professional fee shall be a fixed fee as follows: Phase I (Base Project) $30,620 Phase il (Chase Family Addition) $2q,988 TOTAL ~,608 This fee is bssed on various percentages of estimated construction costs to establish a fixed fee as outlined in BBM's Proposed Project Development Budget dated 2/11/g2 which is to become Attachment "D' of this agreement. ~ ~. Attachment "A": DeJete in its entirety and substitute the "Revised Attachment ~A~" enclosed with this amendment. 5 Attachment "B': Delete in its entirety and substitute the "Revised Attachment ~Bn~ enclosed with this 8mendment. Member of The HEPY Group Detroit Demur Los A~ge[es Or)ando Sea~ie Windsor, Ontario Mr. W.A. Simmons February 17, 1992 Page 2 6.' Attachment "C": Delete in its entirety and substitute the "Revised Attachment 'C"' enclosed with this amendment. 7. Attachment "D" : Delete in its entirety and substitute the "Revised Attachment 'D'" dated 2/11/92 enclosed with this amendment. With these modifications to the original 5-23-91 agreement for services on this proiect the City of Sanford may authorize Burke, Bales & Mills Associates, Inc. to proceed with Phase I or both Phase I and 11 by written directire. It is the intent of the agreement and amendment for this project that if funding for Phase II is not made available by the Chase Family or approved by the City, all references to Phase II will be voided from this agreement and the City will only be liable for fees associated with the "Basic Project". Please notify this office if there are any changes to the material contained in this amendment. If it is acceptable as submitted, please return one signed copy for our files initialing and dating each page of the attachments. Sincerely, .._ SOCIATES, INC. President RHB:dr enclosures Signed ~ ~_--------~ Date / REVISED ATTACHMENT "A" ADDITIONAL BASIC SERVICES 1. Interior Design Services: Interior Design Services related to the programming, design, selection, bidding and installation supervision of furnishings. The Interior Design firm, for the purposes of this agreement, is identified as Burke, Bales & Mills Associates, Inc. with a fixed fee of: Phase I $630 Phase I 1 $525 2. Landscape Architectural Services: Landscape Architectural Services shall be provided by a registered Florida Landscape Architect selected by the Architect to provide the service as defined in the scope of services. THe professional fee compensation for these services shall be as follows: Phase I $880 Phase 11 $770 3. Special Engineering: Special Structural Engineering Services, if found to be required because of unusual site soil or geographical conditions (generally described as excessive muck or clay in soil, sinkholes, caverns or similar unusual conditions). In the event such conditions are found to exist, the Architect/Engineer will provide the necessary services, if authorized by the Owner, at an additional fee in an amount which shall be established, based upon the conditions discovered and the complexity of services necessary to correct said conditions. 4. Construction Management: In the event the Owner elects to utilize a Construction Manager, as generally defined, then the Architect and Engineers shall be entitled to additional compensation normal to said services, including compensation for multiple bid packages. 5. Site Identification/Graphic Design: Provide Graphic Design Services associated with the design, bidding and construction observation of building identification. Professional fees for these services are established at a fixed fee of $300.00 based upon a construction budget of $1,200.00. REVISED ATTACHMENT "A" ADDITIONAL SERVICES PAGE 2 6. Construction Observation: The Owner may elect, on a project of this complexity, to employ a "Clerk of the Works" who would maintain a daily on-site presence. This individual must be an experienced person with an architectural background. The Architect shall provide the Owner with a fee proposal for purposes of negotiation if such services are deemed necessary. 7. Visits to the Site: The Architect, under terms of this agreement, wilt normally visit the site a minimum of Tour (4) times per month and will, as part of basic services, prepare a written report to document such visits, and copies to be sent to the designated representative of the Owner. 8. Exhibit Lighting Specialist: The Architect shall utilize the services of a qualified MuSeum Lighting Designer at a professional fee established at: Phase I $1,000 Phase II $1,000 9. Site Civil Engineering: The Architect shall utilize the services of a professional civil engineer to provide services related to the design of the storm water system and utility hook-ups at a professional fee of: Phase I $1,200 Phase II $1,000 10. Model: The Architect will not re required to prepare a model under basic services. 11. As-Built Drawings: The Architect shall review as-built drawings prepared by Architects Design Group for the existing facility in such detail as to understand and be aware of the conditions as they exist. The Architect shall be entitled to a fixed fee of $800.00. I1 "Revised Attachment B" Rate Schedule BURKE, BALES & MILLS ASSOCIATES, INC. Effective 1/1/92 Principal Architect/Engineer $90.00 Project Architect/Engineer/Designer $70.00 Designers $65.00 Senior Technical Support $65.00 Draftspersons $55.00 Intern Architect $50.00 Clerical $30.00 Specifications Writer* $55.00 Cost Estimator* $55.00 * Consultant REVISED ATTACHMENT "C" OTHER CONDITIONS OR SERVICES 1. Additional Services: The Owner reserves the right to authorize additional work on the part of the Architect, or his consultants through the Architect. Said work shall be related to facilities for the City of Sanford, including but not limited to feasibility studies, design of additional facilities and master planning, grant applications and further renovations to existing buildings. 2. Professional Liability Insurance: The Architect shall maintain, during the term of construction for this project, Professional Liability Insurance providing coverage for errors and omissions in the amount of $500,000. The Architect shall provide the Owner with a certificate showing such coverage and providing that the insurance will not lapse or be cancelled except upon ten (10) days written notice to the Owner. As compensation for the cost of such insurance, the Owner will pay the Architect the surcharge value of: 2.1 Six and two tenths percent (6.2%) of the total Architectural/Engineering fee. 3. Public Presentations: The Architect, if authorized by the Owner, shall participate in public presentations of the proposed facilities and shall prepare a slide presentation for purposes of assisting the City in the public process for the following fixed fee: 3.1The Architect shall provide the Owner with one set of slides, of said presentation, at no additional cost to the Owner. 3,2 Presentations to the public, by the Architect, shall be provided at no cost for up to two (2) presentations. Additional public presentations shall be provided on the basis of an hourly cost as stipulated in Attachment "B", when authorized by the Owner. 4. Limits of Basic Engineering Services: Engineering Services related to utilities serving the existing building and/or additions to the existing building, identified as water, gas, sewer, stormwater, power and telephone shall be provided as a Basic Service. The limit of the Basic Services shall be to a point ten (10) feet from the building. The Architect has included in Attachment "A", the cost of Civil Engineering Services for on-site services. REVISED ATTACHMENT "C" OTHER CONDITIONS OR SERVICES PAGE 2 5. General: 5.1 Pursuant to Section 287,055 (6) (a), Fla. Statute, the Architect warrants that he has not employed or retained any company or person other than a bona fide employee working solely for the Architect to solicit or secure this Agreement and that he has not paid or agreed to pay any person, company, corporation, individual or firm, other than a bona fide employee working solely for the Architect any fee, commission, percentage, gift or other consideration contingent upon or resulting from the award or making of this Agreement. I11 February 11, 1992 Burke, Bales & Mills Associates, Inc. Proposed Project Development Budget Henry Shelton Sanford Museum BBM Project #91040 The following is a line item allocation of funds for the proposed renovation and additions to the Henry SheIron Sanford Museum. The items noted are approximate values and are subject to revision by the owner as circumstances warrant. 1. Project Funding: The proposed project is funded by three (3) sources identified as follows: Base Project Chase Family 1.1 Seminole County TDC Grant $150,000 1.2 City of Sanford Contribution $100,000 1.3 Private Sector Contributions $ 25,000 $240,000 1.4 Total Estimated Funding $275,000 $240,000 1.5 Less Previous Architecture Fees $ 28,111 1.6 Total Funding Available $246,889 2. Project Development Budget: Expenses associated with renovations and additions to the museum: 2.1 New Construction: °2026 square fee @ $86.66/s.f. $175,573 °1432 square feet @ $95.00/s,f $136,040 2.2 Renovation of Existing Facilities: °Base Project $ 30,796 °840 square feet @ $62.00/s.f. $ 52,080 2.3 Landscape Improvements - 0 - $ 7,000 2.4 Site Identification Signage (allowance) $ 1,200 N/A ATTACHMENT "D" Proposed Project Development Budget Henry Shelton Sanford Museum February 11, 1992 Page 2 2.5 Site Survey: Illustrating existing facility, configuration of property, existing site improvements, location of utilities, roadway, etc. (in receipt) N/A 2,6 Site Soils Analysis: Soil borings, analysis and engineering recommendations relative to areas of proposed expansion - 0 - $ 800 2.7 Furnishings Allowance: Public seating in lobby area, miscellaneous furnishings for gift shop and reception area of administration section (allowance) $ 4,200 $ 3,500 2.8 Exhibit Cabinetry - 0 - $ 10,492 2.9 Subtotal $211,769 $209,912 2.10 Contingency $ 4,500 $ 4,000 2.11 Total Project Development Budget $216,269 $213,912 3. Project Professional Fees: Professional fees associated with Architectural, Engineering, Landscape Architecture and Interior Design Services. 3.1 Architectural/Engineering Services: 11.9% of line item 2.1 (175,573) and 2.2 (30,796) $ 24,500 $ 20,693 3.2 Landscape Architectural Services: (Design to be completed only) $8,000 ~ 11.0% $ 880 $ 770 3.3 Interior Design Services: $4,200 @ 15.0% $ 630 $ ~ ~'/~/~ ATTACHMENT "D" Proposed Project Development Budget Henry Shelton Sanford Museum February 11, 1992 Page 3 3.4 Graphic Design Services: $ 300 N/A 3.5 Exhibit Lighting Design $ 1,000 $ 1,000 3.6 Site Civil Engineer: Design of on-site storm water retention system, connections to existing utilities Fixed Fee $ 1,200 $ 1,000 3.7 Reimbursable Expenses: Reproduction of plans, long distance calls, postage etc. (allowance) $ 1,310 $ 1,000 3.8 Model: Construction of a scale model showing proposed expansion and utilized for fund raising and grant purposes - 0 - N/A 3.9 As-Built Drawings: Preparation of as-built documents illustrating existing improvements (review and concurrence with previous architect's work) $ 800 N/A 3.10 Exhibit Cabinetry Design: - 0 - $ 1,100 3.11 Subtotal $ 30,620 $ 26,088 4. Project Cost Summary: 4.1 Project Development Budget $216,269 $213,912 4.2 Project Professional Fees $ 30,620, $ 24,988 4.3 Total Project Costs (estimated) $246,889 $240,000