Loading...
205-CPH-Amendment 12 j ; I I IN WITNESS WHEREOF, the parties have caused this Amendment to be executed as of the day and year heretnabove set forth. CONKLIN, PORTER & HOLMES-ENGINEERS, INC. BY:;pau~E,~~. .... Porter, P.E.P , Exec. Vice-Pres. ATTEST: DATE: CITY OF SANFORD, FLORIDA By: ~.ai~son, Fra City Manager Please refer to Exhibit A (Plan of Study) attached. 6/17AMEN12 SCHEDULE & COST OF FACILITIES PLANNING WORK FOR LAND DISPOSAL OF EFFLUENT AT AIRPORT, GOLF COURSE AND OTHER CITY-OWNED LAND Sanford, Florida Time in Manhours Ite~ of Work P E T D S Estimated Expense Cost I. General A. Sched. ling, planning, budgeting and 2 30 4 8 $100.00 orientation of personnel. 8. Progress meetings and coordination 12 12 4 with City. Six (6) meeting estimated at two hours per meeting. IX. Coordination with Airport Authority and FAA A. Gather and compile miscellaneous maps, 1 4 8 2 aerials, etc,, for Airport. 8. ~4eetings, correspondence and coordination 20 20 8 $200.00 with FAA and Airport Authority regarding Airport developoent plan, potential locations for spray irrigation tracts, restrictions of use and other criteria. NOTE: lhe scope of this work does not include any special studies which may be required by FAA such as bird and fog studies. etc. SCHEDULE & COST OF FACILITIES PLANNING WORK FOR LAND DISPOSAL OF EFFLUENT AT ' AZRPORT, GOLF COURSE AND OTHER CITY-OWNED LAND Sanford, Florida Time in Hanhours Item of Work P E T D S Estimated Expense Cost III. Soils Testing A. Soils, hydrologic and geologic studies $23,00D - Soils Subcontract of Airport site. See attached Agreement with with Ardaman & Associates B. Soils, hydrologic & geological studies of $7,500 Soils subcontract ) golf course site. {see attached agr~ ment with Ardaman & Associates) $2,500 Soils Subcontract Groundwater Monitoring Plan C. Limited soils, hydrologic & geological studies $1,000 Soils Subcontract of the minor public access sites to assess the spray irrigation accepting capacity. D. Coordination, direction, supervision and 24 40 8 8 $50 evaluation of soil consultant's work. % SCHEDULE & COST OF FACILITIES PLANNING WORK FOR LAND DISPOSAL OF EFFLUENT AT ', AIRPORT, GOLF COURSE AND OTHER CITY-OWNED LAND Sanford, Florida Time in Manhours Its of Work P E T D S Estimated Expense Cost V. Report Preparation A. Compiling data, reports, and report writing. 4 40 20 B. Drafting (figures, graphs, etc.) 2 4 60 C. Typing. 32 O. Proof reading, review by City, FAA, Airport 12 40 12 4 16 ) Authority, modifications, revisions and changes. E. Report, final reproduction - print 4 18 $750 - Reproduction drawings and photocopying and binding. TOTALS: 111 268 88 100 104 $41,440.00 I IN WITNESS WHEREOF, the parties have caused this Amendment to be executed as of the day and year hereinabove set forth· · Vice-Pres. ATTEST: DATE: CITY OF SANFORD, FLORIDA By: /~-~ J Fra~ A. Faison, City Manager ATTEST: '~ ~ ~. Please refer to Exhibit A (Plan of Study) attached. 6/17AMEN12 SCHEDULE & COST OF FACILITIES PLANNING WORK FOR LAND DISPOSAL OF EFFLUENT AT AIRPORT, GOLF COURSE AND OTHER CITY-OWNED LAND Sanford, Florida Time in Manhours Ite~n of Work P E T D S Estimated Expense Cost I. General A. Scheduling, planning, budgeting and 2 30 4 8 $100.00 orientation of personnel. D. Progress meetings and coordination 12 12 4 with City. Six (6) neeting estimated at two hours per meeting. 11. Coordination with Airport Authority and F~ A. Gather and compile miscellaneous ~aps, 1 4 8 aerials, etc,, for Airport. B. Meetings, correspondence and coordination 20 20 8 $200.00 with FAAand Airport Authority regarding Airport development plan, potential locations for spray irrigation tracts, restrictions of use and other criteria. NOTE: The scope of this work does not include any special studies which may be required by FAA such as bird and fog studies, etc. SCHEDULE & COST OF FAC[L[TZES PLANNING I~ORK FOR LAND DISPOSAL OF EFFLUENT AT AIRPORT, GOLF COURSE AND OTHER CZTY-ONNEO LANO Sanford, Florida Its of Mork Time in Manhours Estimated EXpense Cost I¥. Preliminary Engineering P E T D S A. Based upon results of FAA and Airport 24 24 8 ]6 2 $ 2,000 (Subconsultant) AUthority meetings, and soils report, $200 (Expenses) prepare preliminary layout sketches for for facilities at airport, golf course, and other sites. B. Perform preliminary engineering of system 8 32 8 8 2 $1,500 (Subconsultant) to include design flows, effluent $100 (Expenses) characteristics, force main, effluent storage, pumping and irrigation system details. C. Prepare planning type cost estimates for 2 ]6 ]6 8 2 $500 (Subconsultant) facilities. $20 (Expenses) O. Discuss management practices including 2 8 2 $2,000 (Subconsultant) spray schedules, crop or grass maintenance, $20 (Expenses) monitoring of the system and monitoring of the groundwater. Coordinate with Ardamn Report. SCHEDULE & COST OF FAC[LiT]ES PLANNZNG WORK FOR LAND DXSPOSAL OF EFFLUENT AT AIRPORT, GOLF COURSE AND OTHER CITY-OWNED LAND Sanford, Florida Time in Manhours ]te~ of Mork P E T D S Estimated Expense Cost V. Report Preparation A. Compiling data, reports, and report writing. 4 40 20 8. Orafting (figures, graphs, etc.} 2 4 60 C. Typing. 32 D. Proof reading, review by City, FAA, Airport 12 40 12 4 16 Authority, modifications, revisions and changes. E. Report, final reproduction - print 4 18 $750 - Reproduction drawings and photocopying and binding. TOTALS: 111 268 88 100 104 $41,440,00