205-CPH-Amendment 12
j
; I I
IN WITNESS WHEREOF, the parties have caused this Amendment to be
executed as of the day and year heretnabove set forth.
CONKLIN, PORTER & HOLMES-ENGINEERS, INC.
BY:;pau~E,~~. ....
Porter, P.E.P , Exec. Vice-Pres.
ATTEST:
DATE:
CITY OF SANFORD, FLORIDA
By: ~.ai~son,
Fra City Manager
Please refer to Exhibit A (Plan of Study) attached.
6/17AMEN12
SCHEDULE & COST OF FACILITIES PLANNING WORK
FOR LAND DISPOSAL OF EFFLUENT AT
AIRPORT, GOLF COURSE AND OTHER CITY-OWNED LAND
Sanford, Florida
Time in Manhours
Ite~ of Work P E T D S Estimated Expense Cost
I. General
A. Sched. ling, planning, budgeting and 2 30 4 8 $100.00
orientation of personnel.
8. Progress meetings and coordination 12 12 4
with City. Six (6) meeting estimated
at two hours per meeting.
IX. Coordination with Airport Authority and FAA
A. Gather and compile miscellaneous maps, 1 4 8 2
aerials, etc,, for Airport.
8. ~4eetings, correspondence and coordination 20 20 8 $200.00
with FAA and Airport Authority regarding
Airport developoent plan, potential
locations for spray irrigation tracts,
restrictions of use and other criteria.
NOTE: lhe scope of this work does not include
any special studies which may be required
by FAA such as bird and fog studies. etc.
SCHEDULE & COST OF FACILITIES PLANNING WORK
FOR LAND DISPOSAL OF EFFLUENT AT '
AZRPORT, GOLF COURSE AND OTHER CITY-OWNED LAND
Sanford, Florida
Time in Hanhours
Item of Work P E T D S Estimated Expense Cost
III. Soils Testing
A. Soils, hydrologic and geologic studies $23,00D - Soils Subcontract
of Airport site. See attached
Agreement with
with Ardaman &
Associates
B. Soils, hydrologic & geological studies of $7,500 Soils subcontract )
golf course site. {see attached agr~
ment with Ardaman
& Associates)
$2,500 Soils Subcontract
Groundwater
Monitoring Plan
C. Limited soils, hydrologic & geological studies $1,000 Soils Subcontract
of the minor public access sites to assess the
spray irrigation accepting capacity.
D. Coordination, direction, supervision and 24 40 8 8 $50
evaluation of soil consultant's work.
%
SCHEDULE & COST OF FACILITIES PLANNING WORK
FOR LAND DISPOSAL OF EFFLUENT AT ',
AIRPORT, GOLF COURSE AND OTHER CITY-OWNED LAND
Sanford, Florida
Time in Manhours
Its of Work P E T D S Estimated Expense Cost
V. Report Preparation
A. Compiling data, reports, and report writing. 4 40 20
B. Drafting (figures, graphs, etc.) 2 4 60
C. Typing. 32
O. Proof reading, review by City, FAA, Airport 12 40 12 4 16 )
Authority, modifications, revisions and changes.
E. Report, final reproduction - print 4 18 $750 - Reproduction
drawings and photocopying and binding.
TOTALS: 111 268 88 100 104 $41,440.00
I
IN WITNESS WHEREOF, the parties have caused this Amendment to be
executed as of the day and year hereinabove set forth·
· Vice-Pres.
ATTEST:
DATE:
CITY OF SANFORD, FLORIDA
By: /~-~ J
Fra~ A. Faison, City Manager
ATTEST: '~ ~ ~.
Please refer to Exhibit A (Plan of Study) attached.
6/17AMEN12
SCHEDULE & COST OF FACILITIES PLANNING WORK
FOR LAND DISPOSAL OF EFFLUENT AT
AIRPORT, GOLF COURSE AND OTHER CITY-OWNED LAND
Sanford, Florida
Time in Manhours
Ite~n of Work P E T D S Estimated Expense Cost
I. General
A. Scheduling, planning, budgeting and 2 30 4 8 $100.00
orientation of personnel.
D. Progress meetings and coordination 12 12 4
with City. Six (6) neeting estimated
at two hours per meeting.
11. Coordination with Airport Authority and F~
A. Gather and compile miscellaneous ~aps, 1 4 8
aerials, etc,, for Airport.
B. Meetings, correspondence and coordination 20 20 8 $200.00
with FAAand Airport Authority regarding
Airport development plan, potential
locations for spray irrigation tracts,
restrictions of use and other criteria.
NOTE: The scope of this work does not include
any special studies which may be required
by FAA such as bird and fog studies, etc.
SCHEDULE & COST OF FAC[L[TZES PLANNING I~ORK
FOR LAND DISPOSAL OF EFFLUENT AT
AIRPORT, GOLF COURSE AND OTHER CZTY-ONNEO LANO
Sanford, Florida
Its of Mork Time in Manhours Estimated EXpense Cost
I¥. Preliminary Engineering P E T D S
A. Based upon results of FAA and Airport 24 24 8 ]6 2 $ 2,000 (Subconsultant)
AUthority meetings, and soils report, $200 (Expenses)
prepare preliminary layout sketches for
for facilities at airport, golf course,
and other sites.
B. Perform preliminary engineering of system 8 32 8 8 2 $1,500 (Subconsultant)
to include design flows, effluent $100 (Expenses)
characteristics, force main, effluent
storage, pumping and irrigation system
details.
C. Prepare planning type cost estimates for 2 ]6 ]6 8 2 $500 (Subconsultant)
facilities. $20 (Expenses)
O. Discuss management practices including 2 8 2 $2,000 (Subconsultant)
spray schedules, crop or grass maintenance, $20 (Expenses)
monitoring of the system and monitoring
of the groundwater. Coordinate with
Ardamn Report.
SCHEDULE & COST OF FAC[LiT]ES PLANNZNG WORK
FOR LAND DXSPOSAL OF EFFLUENT AT
AIRPORT, GOLF COURSE AND OTHER CITY-OWNED LAND
Sanford, Florida
Time in Manhours
]te~ of Mork P E T D S Estimated Expense Cost
V. Report Preparation
A. Compiling data, reports, and report writing. 4 40 20
8. Orafting (figures, graphs, etc.} 2 4 60
C. Typing. 32
D. Proof reading, review by City, FAA, Airport 12 40 12 4 16
Authority, modifications, revisions and changes.
E. Report, final reproduction - print 4 18 $750 - Reproduction
drawings and photocopying and binding.
TOTALS: 111 268 88 100 104 $41,440,00