Loading...
205-CPH-Amendment 09 The specific services to be provided are as follows: 1.1 Bidding or Negotiation Phase The OWNER will provide the ENGINEER with a written authorization to proceed. After written authorization to proceed with the bidding phase, the ENGINEER will provide the following services: 1.1.1 Prepare advertisement for bid for placement in appropriate publications by OWNER. 1.1.2 Distribute and keep records of the distribution of Documents to bidders and suppliers. 1.1.3 Issue addenda to the Documents as required. 1.1.4 Conduct a pre-bid conference prior to the bid opening. 1.1.5 Answer questions of bidders and suppliers. No interpretations of the Documents shall be made other than through issuance of Addenda to the Documents. 1.1.6 Attend the bid opening and OWNER's meetings at which bids are opened and contracts awarded. 1.1.7 Evaluate the bids and assist the OWNER in his selection of the construction Contractor. 1.1.8 Assist in the preparation of necessary documentation for evaluation of Contractor's bidding information and other data required for submission to the U. S. Environmental Protection Agency or Florida Department of Environmental Regulation to allow award of the Contract and issuance of Notice to Proceed. 1.1.9 Consult with the OWNER and participate in all decisions as to the acceptability of subcontractors and other persons and organizations proposed by the general Contractor for those portions of the work for Which subcontractor approval is required by the Documents. 1.1.10 Prepare and review contracts, bonds, insurance certificates, construction schedules and other portions of the contracts in order to assist the OWNER in his determination as to whether to issue a Notice to Proceed to the Contractor. = ~om ~::snoa.--,~ .--,. ;o'~ ~'u~ ..-,.c~..-..,a.~m~ ~c;-s:' :=cm:x:,n 1.4 Plan of Operation Under this phase of the work, the ENGINEER will: 1.4.1 Prepare a Final Plan of Operation for the Sewer Rehabilitation Project in accordance with applicable regulations of the Florida Department of Environmental Regulation and the U.S. Environmental Protection Agency. The schedule for the completion of submission of the Final Plan of Operation will be in accordance with applicable grant conditions and EPA and FDER Regulation. 1.5 Infiltration/Inflow (I/I Removal) Evaluation Under this phase of the work, the ENGINEER will: 1.5.1 Based upon sewer plant flow data and/or individual line reach weir reading data provided by the Contractor, estimate the actual percentage of I/I removal after rehabilitation and prepare a post rehabilitation flow summary report for submission to the agencies. 1.6 Project Performance Certification Under this phase of the work, the ENGINEER will: 1.6.1 Certify in writing to the OWNER and FDER, one year after project completion, that based upon the data available, the project meets the performance and operational requirements applicable to the project and the requirements and specifications to which the project was planned, designed and built to meet. --,.-.. ~,~,=n=mcr< ==m,~, o -.. -~.a' --,.n.m c~.~,- =ram x OWNER: CITY OF SANFORD, FLORIDA ATTEST 2~, SEA~~ By authority of the City Commission of the City of Sanford, Florida - ENGINEER: CONKLIN, PORTER & HOLMES- ENGINEERS, INC. ~T~EST: : EXHIBIT A EPA SPECIAL CONTRACT CONDITIONS PROFIT OBJECTIVES WORK~-tF~T .. "' Sewer System Rehab - Contracts A,B, & C ~ Incremental PROJECT NO. C-06- STEP NO. A/E: Conklin, Porter & Holmes-En~rs., Inc. COST ASSIGNED WEIGtT WEIC~ITED PROFIT PROFIT FACTORS OIL~CTIVE MEDIAN MAXIMUM ~DIAN M/kXIMIJM l. Direct Labor $ 16,744.86 209 239 3,348.97 3,851.32 (Item 2. Indirect Costs $ 24,156.13 13% 159 3,140.30 3,623.42 (Item lb) 3. Other Direct $ 2,300.00 5% 7% 115.00 161.00 Costs (Items la, ld ~ lc) 4. Total Subcontract $ None Costs (Item 2 ) a. 509 or Less * 9 89 Total Estimated Cost b. More Than 50% * 9 6% Total Estimated Cost TOTALS $ 43,200.99 6,604.27 7,635.74 '~ledian" Profit $ 6,604.27 = 15.29 % Maximum Profit Allowed $ 7,635.74 = 17.67 %, but not more than 16% for CPFF and 18% for LS A/E Proposed Profit $ 6,773.91 = 15.68 *Assigned weights for subcontracted percent of total estimated cost: 0-30=8 41-50=6 61-70=4 81-90=2 31-40=7 S1-60=5 71-80=3 91-100=1 EXHIBIT B PLAN OF STUDY FOR CONSTRUCTION PHASE SERVICES FOR SEWER SYSTEM REHABILITATION CONTRACTS A, B, & C - EPA ("CORE") GRANT APPLICATION DATED FEBRUARY 1985 SANFORD, FLORIDA CONTRACT A, B, & C - EPA ESTIMATE OF COSTS Bidding Services $ 6,050.19 Construction Administration 11,020.01 Resident Project Services 27,652.15 Project Performance / I/I Removal 5,252.55 TOTAL $49,974.90 Bidding Services Hrs. Rate Total P = Principal 2 23.18 $ 46.36 E = Engineer 34 19.43 660.62 T = Technician 56 ll.2g 632.24 D = Draftsman 0 7.70 0 S = Secretary 72 8.58 617 76 Direct Labor $1,956 98 Fringe Benefits (39.11%) 765 37 Gen. & Admin. (105.t5~) 2,057 76 Travel & Per Diem 50 O0 Equip., Mats., & Supplies 400 O0 Total "Cost" 5,230 ll Fixed Fee (15.68%) 820 08 Total - Bidding Services $6,050 19 Construction Administration Hrs. Rate Total P = Principal 4 23.18 $ 92.72 E = Engineer 64 19.43 1,243.52 T = Technician 154 11.29 7,738.66 D: Draftsman 0 7.70 0 S: Secretary 58 8.58 497.64 Direct Labor $ 3,572.54 Fringe Benefits (39.11%) 1,397.22 Gen. & Admin. (105.15%) 3,756.53 Travel & Per Diem 200.00 EQuip., Mats., & Supplies 600.00 Total "Cost" 9,526.29 Fixed Fee (15.68%) 1,493.72 Total Const. Administration $11,020.01 Resident Project Services Hrs. Rate Total P = Principal 8 23.18 $ 185.44 E = Engineer 72 19.43 1,398.96 T: Technician 658 11.29 7,428.82 D = Draftsman 0 7.70 0 S = Secretary 40 8.58 343.20 Direct Labor $ 9,356.42 Fringe Benefits (39.11%) 3,659.30 Gen. & Admin. (105.15%) 9,838.28 Travel & Per Diem 800.00 Equip., Mats., & Supplies 250.00 Total "Cost" 23,904.00 Fixed Fee (15.68%) 3,748.15 Total- Resident Proj. Serv. $27,652.15 I/I Removal Certification Hrs. Rate Total P: Principal 4 23.18 $ 92.72 E = Engineer 40 19.43 777.20 T = Technician 80 11.29 903.20 D = Draftsman 0 7.70 0 S = Secretary lO 8.58 85.80 Direct Labor $ 1,858.92 Fringe Benefits (39.11%) 727.02 Gen. & Admin. (105.15%) 1,954.65 Travel & Per Diem 0 Equip., Mats., & Supplies 0 Total "Cost" 4,540.59 Fixed Fee (15.68%) 711.96 Total I/I Removal Cert. $ 5,252.55 DETAILED WORK PLAN - CONSTRUCTION ADMINISTRATION SEWER SYSTEM REHABILITATION CONSTRUCTION Time in Manhours Travel Equip., Mats., Item of Work P E T D S & Per Diem Supplies Bidding Services: 1. Advertisement for bids, contacting interested 2 16 16 parties, etc. 2. Reproduction of Plans, Contract Documents, and 40 300.00 Technical Specifications for Bidders. 3. Bid opening, bid evaluation and recommendations 8 8 2 concerning bid award. 4. Coordination with EPA, bid award, issuance of 1 12 16 6 60.00 lO0.O0 Notice to Proceed. 5. Miscellaneous questions and addenda during 1 12 16 8 bidding. SUBTOTAL BIDDING SERVICES 2 34 S6 0 72 $SO.O0 $400.00 DETAILED WORK PLAN ~ CONSTRUCTION ADMINISTRATION SEWER SYSTEM REHABILITATION CONSTRUCTION Time in Manhours Travel EQuip., Mats., Item of Work P E T D S & Per Diem Supplies _ Construction Administration: ). Attendance and preparation for preconstruction I 4 8 2 meeting. 2. Monthly progress reports. I 6 16 8 $150.00 3. Processing of pay estimates. I 20 50 16 $100.00 $100.00 4. Review of submittals, etc. 4 8 4 $ 75.00 5. Processing of change orders. 20 40 20 $ 75.00 6. Final acceptance, project closeout. 1 10 32 H $100.00 $200.00 SUBTOTAL CONSTRUCTION ADMINISTRATION 4 64 154 0 58 $200.00 DETAILED WORK PLAN - CONSTRUCTION AOMINISTRATION SEWER SYSTEM REHABILITATION CONSTRUCTION Time in Manhours Travel E~uip., Mats., Item of Work P E T O S & Per Diem Supplies Resident Project Services: 1. Onsite Resident Project Services & Supervision 8 60 618, 40 $750.00 $250.00 of Project Representative. 2. Final inspection, punch lists, etc. 12 40 $ 50.00 SUBTOTAL RESIDENT PROJECT SERVICES 8 72 658 0 40 $800.00 $250.00 * Est(mate based upon 206 contractor working days P 3 hrs./day Project Performance / I/I Removal Certification: 1. Using Contractor's data and plant flow data, 4 40 80 0 10 estimate I/I removal and submit postrehabilitation flow summary. SUBTOTAL PROJECT PERFORMANCE 4 40 80 0 lO GRANT TOTAL - ALL PHASES 18 210 948 0 180 $l,050.00 $l,250.00 EXHIBIT C EPA FORM No. 5700-41 (to be signed when contract is executed) JCOST OR PRICE $Uiv~ARY FOrmAT FOR SUBAGREEMENTS UNDER U.P'~,PA GRANTS J F~m Annroved (~Pc accompany', inslruetion~ before co~etin~ Ibis for~)' 0~ ~o. 158-R0144 PARTI-GENERAL City of Sanford, Florida C].20586080 Conklin, Porter and Holmes-Engineers, Inc. October 2]., ]..985 Consultinfi Eneineerino Services- Post Office Drawer ].976 Construction Phase for Sewer System Sanford, FL 32772-].976 Rehabilitation, Contracts A,B, & C "Core" PART I)oCOST SUMMARY ESTIo HOURLY ~ZSTIMATED DIRECT LABOR (Spec$Iy labor ceteloriee) MATED TOTALS Princi0al 18 S 23,18 s 417.24 Enqineer 210 19.43 4,080,30 Technician 948 11.29 10,702,92 Draftsman 0 7.70 0n Secretary 180 8.58 1,5~L4~__ DIRECT LABOR TOTAL: b~,::~:.,~:::':: . :-T ~, ,S 16,744 86 q~rm n~ ,, _.:;.. .' '~.~.L~Z~.:~': ........ ~ ~ ~.z:~.: . :' . ..~ .: ~.. _ ' ................ ~ ..... -' . ........................................... J.. ~RAV~L SUBTOTAL' ] ..... ~ ' 5 1 t~q ,~D - ~ .... : ......... ..... ~ ........,. ~ 9 .... D'il~.s, J~.~.I,~Lc<?;:. :.~S~.J.c~fi.~2~ ~rI~= '5 ............ s ! ESTIMATED ~"" " ~.. ESTIMATED ~ ' s .00 ~: , '...'. '-.' OTHER SUBTOTAL: . e, OTHER DIRECT COSTS TOTAL: .' ~0. TOTAL ~STIMATED COST $ 43,200.99 ~,. p.o~,T (15.68%) S 6,773.91 ~2. TOTAL PRICE $ ~Q ,QTd QQ ~.., ..- . .:,~ .......... ~ .................. "'~" ~'~"'"~: .7. ................ . . ,:-.~.. ~..i' .........._' .................................. '_E' .........."" · .,.. ':.~.' ~__ ............................................ · ,':~,,, ~.!:~:;. ,....' .~ ~.~':~:-:"' ----: ........."" :':"::__:i'__'.'. :.".:: ': '.':':: .'.' '.'.'._'7_'i'_.'.'::7 February 22, 1985 02/01/83- 01/31/84 FRINGE RATES: Holiday Pay 3.27 Vacation 4.37 Sick Pay 3.03 Payroll Taxes 9.21 Employee Insurance 6.45 Pension Plan 12.78 39.11% G & A RATES: Overhead Labor 21.37 Occupancy 8.~5 General Insurance 4.12 Travel & Auto .66 Communications 5.45 Equipment Rental 3.56 l.laintenance & EDP Office Supplies 12.14 Outside Professional 1.31 (CPA, act.) Depreciation 3.95 Corporate Licenses .73 Dues, Subscriptions Incentive Pay 39.49 Personnel Expenses 1.25 Taxes 2.17 105.15% TOTAL FRINGE AND G&A 144.26) EXHIBIT D Memorandum of Negotiation Memorandum of Negotiation The breakdown for the various phases was as follows: Bidding or Negotiation Phase $ 6,050.19 Construction Administration ll ,020.01 Resident Project Services 27,652.15 Project Performance/I/I Removal 5,252.55 TOTAL $ 49,974.90 The Owner has reviewed the proposal for technical adequacy and cost and agrees that the total price of $49,974.90 is reasonable. S'O ' Fra n, City Manager