Loading...
301-CPH-Amendment 02 AMENDMENT 2 FOR HIGH SERVICE PUMPING, FLOW METER MODIFICATIONS AND NEW GENERATOR AT SANFORD MAIN WATER TREATMENT PLANT TO AGREEMENT DATED DECEMBER 17, 1987 BETWEEN CITY OF SANFORD, FLORIDA CONKLIN, PORTER & HOLMES-ENGINEERS, INC. This Amendment dated this ~ 3~_ef day of in the year Nineteen Hundred and Eighty-Eight by and between the CITY OF SANFORD, FLORIDA (hereinafter called the CITY) and CONKLIN, PORTER & HOLMES-ENGINEERS, INC. (hereinafter called the ENGINEER), is mutually agreed upon and declared an authorized Amendment to an Agreement dated December 17, 1987, between the parties, herein setting forth the scope, terms and conditions of the work herein authorized. The City's Master Water Plan calls for the addition of a third high service pump at the main water treatment plant at Mayfair Golf Course. The treatment plant building was originally planned in the early 1960's for this expansion to accommodate additional pumping capacity. Discussions with City staff have indicated that it is the City's desire to retain the original architectural concepts of the building and to design the original planned expansion to house an additional pump. Piping will be planned and designed for a future fourth pump in this building addition. The existing instrumentation and control system is antiquated and has been modified over the years. The addition of another pump would call for a new control system for all three pumps, eliminating and replacing the existing system. Consideration will be given to all new instrumentation and an estimate will be given to the City in the early phase of the engineering work so the City can determine if such new instrumentation will be within budgeting constraints. Consideration will be given to remote information transmission by radio signals. The City also requires additional auxiliary power generating capacity at the auxiliary water treatment plant and has determined that the existing generator at the Main Water Treatment Plant should be so relocated to meet that need. The City will, therefore, require a new auxiliary generator, properly sized, with automatic transfer equipment, to be installedat the main water treatment plant. A new extension to the south end of the building to house a larger generator and to store chlorine cylinders will be designed. The City has recently reworked the chlorine feed equipment and provided for automatic residual analysis, and no change to that system is contemplated. A structure is needed at the auxiliary plant to house the relocated generator from the main plant. Electrical power components will also need to be added to the auxiliary plant, or modifications made to the existing components, if practical. The additional pumping capacity will require modifications to the water flow metering system. The equipment should be considered for adequate capacity, reliability, and other factors due to its age and new capacity requirements. The noise of the pumping equipment is an annoyance to the operators and it is the City's desire to incorporate sound blocking features in this improvement to make the operations area quieter. It is agreed that this will be accomplished by doubling the existing glass wall. I. SERVICES HEREIN TO BE PROVIDED: A. BUILDING CONSIDERATIONS 1. The Engineer will examine the existing building to evaluate possibilities for its expansion. 2. The Engineer will examine old Plans of the structure. 3. The Engineer will employ the services of an Architect to prepare construction plans, details and specifications for the building expansions, north and south ends. 4. In conjunction with the Architect, consider availability of materials for the expansion to match the existing building as closely as possible. 5. Provide general coordination with the Architect to do building plans, etc. 6. Provide plans for an "open-type" naturally ventilated structure at the auxiliary plant to house the generator which is to be relocated from the main plant. B. PUMPING - PRELIMINARY CONSIDERATIONS 1. Review and determine system head. 2. Cursory review of alternative pumping arrangements (i.e. horizontal split case or vertical pumping can.; sizes and prices). 3. Examine efficiencies of different pumps. Consider effects on generator sizing. 5. Review above considerations with City and select configuration and types of pumps. 6. Review capabilities of existing flow metering system. C. GENERATOR - PRELIMINARY CONSIDERATIONS We understand that it is the City's desire to move the existing generator to the auxiliar~ plant and procure a new generator for this main plant. The existing generator from the main plant is to be housed in a compatible structure adjacent to, or connected to, the existing building at the auxiliary plant. An automatic transfer switch is also to be installed and other electrical power components at the plant changed or replaced as appropriate and agreed upon b~ the City. No services in connection with the existing generator at the auxiliary plant are included in this proposal. 1. Consider regulatory requirements. 2. Consider the size of the generator needed. 3. Consider the space needed for a new generator. 4. Installation of generator at the auxiliary plant (assume adequate space is made available). D. CHLORINE HANDLING AND STORAGE 1. Sketch arrangement of building, truck unloading, and · hoist railing to provide for unloading and storing ton cylinders. 2. Review arrangement and preliminary concept with City. 3. Prepare preliminary plan. E. INSTRUMENTATION AND CONTROL SYSTEM 1. Prepare alternatives for updating instrumentation and control systems. 2. Prepare preliminary opinions of probable cost for these alternatives. 3. Review alternatives and costs with the City. F. CONSTRUCTION PLANS 1. Prepare base plan showing existing building and piping. 2. Depict new pump, with piping, valves, controls, foundation and other items needed for construction contract purposes. 3. Depict generator and load transfer gear locations and construction details. 4. Evaluate existing fuel system and depict modifications or replacements. 5. Design and draw chlorine system, hoist rail, and support system. 6. Design and draw driveway modification for chlorine delivery. 7. Coordinate with Architect on the details of the related building modification. 8. Prepare plans of needed building expansion(s) to accommodate above functions. 9. Prepare plans for new instrumentation and control system. 10. Prepare plan of site work showing miscellaneous small piping, etc. No major modifications to parking, drives, or walkways are anticipated or included, except as may relate to chlorine delivery and unloading. 11. Prepare Cost Estimate and discuss with City. 12. Prepare Specifications and construction documents. G. PERMITS 1. Prepare DER Application for Permit to construct the improvements. 2. Follow the permit, providing additional information if needed. H. AUTHORIZATION OF SERVICES AND PAYMENTS TO THE ENGINEER It is the intent of this Amendment that, upon execution of the same, all services described herein are authorized to be performed. We will work under the City's direction and control during the performance of the above scope of work. Surveying and soils engineering services, if needed, will be recommended to the City for approvals as an additional service, and are not included in this scope. For the performance of the Scope of Work described herein, payment to the ENGINEER by the OWNER shall be on the basis of cost times a multiplier of 2.10, in accordance with Section II, PAYMENT FOR SERVICES, Paragraph C of the Agreement dated December 17, 1987. The not-to-exceed fee for the scope of work herein authorized is $51,100.00, including those subcontractors' services listed in the attached Plan of Study. Any additional subcontractor or specialist services which may be required will be billed to the OWNER additionally. IN WITNESS WHEREOF, the parties have caused this Amendment to be executed as of the day and year hereinabove set forth. CONKLIN, PORTER & HOLMES-ENGINEERS, INC. Paul E. Porter, P.E., Exec. Vice-Pres. DATE: ~.;i~/~ ' CITY OF SANFORD, FLORIDA Be h, Mayor S0606 AMEND 2 PLAN OF STUDY - NEW HIGH SERVICE PUMPING, FLOW METER MODIFICATIONS AND NEW GENERATOR SANFORD MAIN WA~R PLANT Item of Work Time in Manhours Estimated Expense Cost P E T D S A. BUILDING CONSIDERATIONS I. Examine existing building for expansion 2 2. Examine old Plans of structure 2 2 - 3. Employ Architect's services to prepare construction plans, details & specifications for building expansions, north and south ends. 4 8 4 $6,000 consultant) 4. Consider availability of materials for expansion to match existing building as closely as possible. 4 4 4 5. Provide general coordination with Architect to do building plans, etc. 4 8 4 6. Provide plans for an "open-type", naturally ventilated structure at the auxiliary plant to house generator relocated from main plant. 16 32 16 40 4 PLAN OF STUDY - NEW HIGH SERVICE PUMPING, FLOW METER MODIFICATIONS AND NEW GENERATOR SANFORD MAIN WATER PLANT Item of Work Time in Manhours Estimated Expense Cost P E T D S B. PUMPING PRELIMINARY CONSIDERATIONS 1. Review and determine system head under variable flow conditions I/2 2 1/2 2. Cursory review of alternative pumping arrangements. l/2 2 2 - 3. Examine efficiencies of different pumps. l/2 2 4. Consider effects on generator sizing. I 2 - 5. Review above considerations with City and select configuration and types of pumps. I 2 - 1 6. Review capabilities of existing flew matering system, consider alternatives, report to City for decision 1/2 2 - - PLAN OF STUDY ~ NEW HIGH SERVICE PUMPING, FLOW METER MODIFICATIONS AND NEW GENERATOR SANFORD MAIN WATER PLANT Item of Work Time in Manhours Estimated Expense Cost P E T D S C.GENERATOR PRELIMINARY CONSIDERATIONS {It is the City's desire to move the existing generator to the auxiliary plant and procure a new generator for this main plant) 1. Consider regulatory requirements 1/2 t - 2. Consider size & general type of generator needed at main plant l/2 1 - 2 $500 (consultant) 3. Consider space needed for new generator. 1/2 1 1 4. Installation of generator at the auxiliary plant {assume adequate space is made available). 2 2 2 1 $1,OOO (consultant) PLAN OF STUDY - NEW HIGH SERVICE PUMPING, FLOW METER MODIFICATIONS AND NEW GENERATOR SANFORD MAIN WATER PLANT Item of Work Time in Manhours Estimated Expense Cost P E T D S D. CHLORINE HANDLING AND STORAGE I. Sketch arrangement of bldg., truck unloading, and hoist railing for unloading & storing ton cylinders. 1/2 2 4 4 2. Review arrangement & preliminary concept with City. 1 2 3. Prepare preliminary plan. l/2 2 4 8 I E. INSTRUMENTATION AND CONTROL SYSTE~ l. Prepare alternatives for updating instrumentation and control systems. 1 2 2 l 2- Prepare prel. opinions of probable cost for alternatives. 2 2 2 2 3. Review alternatives and costs w/City. 2 2 2 2 ) PLAN OF STUDY - NEW HIGH SERVICE PUMPING, FLOW METER MODIFICATIONS AND NEW GENERATOR SANFORD MAIN WATER PLANT Item of Work Time in Manhours Estimated Expense Cost P E T D S F. CONSTRUCTION PLANS 1. Prepare base plan showing existing building and piping 1 1 4 2. Show new piping needed for pump & stubs for future fourth pump 1/2 2 8 16 3. Depict generator & load transfer gear locations and construction details (main plant & auxil. plant) 1/2 2 8 16 $7,000 (consultant) 4. Electrical power & switchgear and HVAC at Main Plant. $6,000 (consultant) 5. Electrical power & switchgear at auxiliary plant. $3,000 (consultant) 6. Evaluate existing fuel system and depict modifications or replace- ments. 1/2 2 4 8 - $500 (consultant) 7. Design & draw chlorine system, hoist rail, and support system. I/2 8. Design and draw driveway mods for chlorine delivery. 1 2 8 9. Coordinate with Architect on details of related bldg. mods. 2 2 2 PLAN OF STUDY - NEI/HZGH SERVICE PUHPING, FLOW METER I40DZFICATZONS AND NEW GENERATOR SANFORD HAIN WATER PLANT Item of Work Time in Nanhours Estimated Expense Cost ) P E T D S 10. Prepare plans of needed bldg. expansion(s) to accommodate above functions. 2 4 4 ll. Prepare plans for new instrun~ntation and control system. 2 2 2 I6,000 (consultant) 12. Prepare plan of site work showing miscellaneous small piping, etc. (No major modifications to parking, drives, or walkways are anticipated or included, except as my relate to chlorine delivery and unloading.) 3 5 4 1 13. Prepare cost estimate and discuss with City. 2 5 8 14. Prepare specifications and construction documents. 2 8 8 12 PLAN OF STUDY ' NEW HIGH SERVICE PUMPING, FLOW METER MODIFICATIONS AND NEW GENERATOR SANFORD MAIN WATER PLANT Item of Work Time in Manhours Estimated Expense Cost P E T D S G. PERMITS 1. Prepare DER application for permit to construct the improvements. I 4 6 - 3 2. Follow permit, providing additional information, if needed. 1/2 4 2 65 128 102 140 47-1/2 $30,~00 SANF. PROP