10. Preliminarily analyze existing facilities for
future flow conditions and evaluate and study
results. Generally evaluate existing
rights-of-way from previous area work or as
furnished by the CITY and identif~ the need ~or
property easements, or right-of-way for
conveyances, structures and detention facilities.
11, Preliminarily size remedial or supplementary
facilities needed or proposed including
determining alternative solutions.
12. Preliminarily cost two alternative solutions
selected in conference with City staff and
summarize advantages and disadvantages.
13. Review results with City staff and choose
recommended solution.
14. Go over recommended solution informally with
County and applicable regulatory agencies.
C. REPORT PREPARATION, CONCLUSION AND RECOMMENDATION
PHASE:
1. Determine a phased or prioritized program
including land or right-of-way needs.
2. Prepare opinion of probable cost to construct the
prioritized program.
3. Prepare a rough evaluation or listing of funding
sources or financing methods.
4. Review final results with City staff.
5. Prepare written report including maps, plans, and
charts.
D. ADDITIONAL SERVICES:
If authorized in writing by the CITY, the ENGINEER
shall furnish or obtain from others, Additional
Services which are not included in the Scope of
Services of Sections I-A, B and C, nor included in the
maximum fee of Section II-B. These additional services
will be paid for by the CITY as indicated in' Section
II-A, if subsequently authorized by the CITY in
writing.
1. Preliminary drainage studies in connection with other
drainage basins than Mill Creek.
CITY:
CITY OF- SANFORD, FLORIDA
By authority of the City Commission of
the City of Sanford, Florida granted for
the CITY on date of
ATTEST & SEAL:
ENGINEER:
CONKLIN, PORTER AND HOLMES-ENGINEERS,
INC.
Date: /~~