301-CPH-Amendment 58 AMENDMENT NO. 58
AGREEMENT FOR CONTINUING SERVICES
FOR
ROOSEVELT AVENUE / 19th STREET VICINITY
WATER MAIN EXTENSION - PHASE II
BETWEEN
THE CITY OF SANFORD, FLORIDA
AND
CPH ENGINEERS, INC.
This Agreement made on the ~;~Y~ day of ~ ,a~etween the City of
Sanford, Flodda (hereinafter called CITY) and CPH Engineers, Inc. (hereinafter called
ENGINEER), iS mutually agreed upon and declared an authorized Amendment to an Agreement
dated December 17, 1987, between the parties, herein setting forth the scope, terms, and
conditions of the work herein authorized.
In case of any conflict between this Amendment and the aforementioned Agreement of
December 17, 1987, this Amendment shall govern for the work described herein.
1
~\CPH_SANF_1\VOL3~Z6582.0O\WP-WORE)~PROPOSAL\SanfOrd\R0OSeVelt Ave, - 19th Street Vicinity WM Phase ll.doc
WHEREAS Water and Sewer improvements have been identified for the Goldsboro area of
Sanford; and
WHEREAS the ENGINEER has previously provided design services for the Mulberry Avenue /
19th Street Water and Sewer Extensions (Phase 1); and
WHEREAS, the second phase of the design of water main improvements in the Goldsboro area
has been identified and the CDBG funds (through the Seminole County Community
Development Division) are available for this work; and
WHEREAS the ENGINEER is intimately familiar with and qualified for this project work and has
experience on the City's water system including hydraulic analyses and utility distribution
system design and permitting, and has personnel and capabilities to perform the designated
services; and
NOW THEREFORE, the CITY and the ENGINEER for the considerations named herein agree
as follows:
SECTION 1
General
1.1 Introduction
1.1.1 This Amendment work is to generally provide for engineering services for the design
and permitting of a water main extension in the Goldsboro area. The water main will
extend along 19 h Street from Peach Avenue to Tangerine Avenue, along Roosevelt
Avenue from 16th Street to 19th Street, along 16th Street from Roosevelt Avenue to
Peach Avenue, and along 18th Street from Roosevelt Avenue to Tangerine Avenue.
Additionally, the water main will be extended along Merthie Drive, Pear Avenue, and
Tangerine Avenue between 18th Street and 19th Street. The total length of water
main extensions associated with this project is approximately 3990 linear feet.
Attached as Exhibit "B" is a map of the proposed water main extension.
1.1.2 Surveying and geotechnical subconsultant services are included. The surveying
consists of preparation of a route survey, which includes topographic information,
physical culture, and identification of utilities located in the field. The geotechnical
investigations consist of drilling soil bodngs at a number of locations along the route
to assess soil and groundwater conditions.
1.1.3 Additional subconsultant services including land acquisition, title searches, boundary
surveys, preparation of legal descriptions or sketches of description, environmental
assessments (including wetlands, surface water, or hazardous material surveys) are
not included. If these services are subsequently determined advisable dudng the
course of work, they may be considered for authorization as an additional service
under Section 3 of this Amendment or separately provided by the CITY or
consultants employed directly by the CITY.
2
SECTION 2
Scope of Services
2.1 General Description
2.1.1 The ENGINEER agrees to perform professional engineering services in connection
with the project as hereinafter stated.
2.1.2. The ENGINEER will serve as the CITY's professional engineering representative in
those phases of the project to which this Scope of Services applies, and will give
consultation and advice to the CITY during the performance of his services.
2.1.4 Attached as Exhibit "A" to this Amendment is a manhour breakdown for the project
Scope of Services.
2.2 Final Design
2.2.'1 The ENGINEER will attend kick-off meeting with City staff, review route, available
information.
2.2.2 The ENGINEER will obtain a route survey from surveyor of the proposed water main
route.
2.2.3 The ENGINEER will prepare monthly progress reports during design phase (8
months).
2,2.4 The ENGINEER will prepare 30% drawings (utilizing survey and existing drawings)
showing proposed route.
2.2.5 The ENGINEER will prepare 60% drawings (utilizing survey and existing drawings)
showing proposed route, valves, and connections.
2.2.6 The ENGINEER will prepare an Opinion of Probable Construction Cost based on the
60% design.
2.2,7 The ENGINEER will meet with City staff and review the 60% drawings. (The CITY
will invite Seminole County Community Development representatives to attend this
meeting).
2.2.8 The ENGINEER will prepare 90% construction plans for the project (total length of
3990 linear feet), which will consist of the following:
A. Cover Sheet
B. Summary of Quantities
C. Key Sheet and General Notes
D. Plan and Profile (8 sheets) - 1" = 20' Scale
E. Utility Details (2 Sheets)
2,2.9 The ENGINEER will prepare utility specifications.
3
\\CPH_SANF_1\VOL3~Z6582.00\WP-WORD~PROPOSAL\SanfOrd~ROOSevelt Ave, - 19th S~reet Vicinity WM Phase II.doc
2.2.10 The ENGINEER will meet with City staff and review the 90% drawings. (The CITY
will invite Seminole County Community Development representatives to attend this
meeting).
2.2.11 The ENGINEER will prepare permit applications for construction authorization from
FDEP. The CITY will pay for the associated permit application fees.
2.2.12 The ENGINEER will assist City with analysis of future utility extensions in project
area
2.2.13 The ENGINEER will update the previously prepared Opinion of Probable
Construction Cost based on the final plans.
2.2.14 The ENGINEER will modify plans as necessary based on CITY and regulatory
agency review.
2.2.15 The ENGINEER will prepare the Project Manual, consisting of bidding requirements,
contract documents, and specifications.
2.2.16 The ENGINEER will submit 3 sets of 100% plans and project manual to the CITY.
SECTION 3
Additional Services of the ENGINEER
3.1 If authorized by the CITY, the ENGINEER shall furnish or obtain from others the
following additional services, or the CITY may provide these services separately or
directly with the provider. Such additional services will be paid for by the CITY as
outlined in Section 5.
3.1.1 Additional services due to major changes in the scope of the project or its design
including, but not limited to, changes in size, complexity, character of construction or
due to time delays in initiating or completion of the work as described herein.
3.1.2 Provide through subconsultants, surveying, geotechnical testing; wetland
identification and preparation of mitigation plans; land acquisition boundary surveys,
title searches, preparation of legal descriptions or sketches of description; or other
specialist services including real estate or right-of-way agents, project or construction
management, financial or budgetary consultants, and bookkeeping or accounting
services. If these services are subsequently determined advisable dudng the course
of work, they may be considered for authorization as an additional service under this
section or separately provided by the CITY.
3.1.3 Except as otherwise provided herein, services or additional costs associated with
revising previously accepted studies, reports, or other documents prepared by the
ENGINEER when such revisions are due to causes beyond the ENGINEER's
control.
4
3.1.4 Additior~al services resulting from public protests, administrative hearings, or similar
matters.
3.1.5 Preparirg to serve and/or serving as an Expert Witness for the CITY in any litigation,
public hearing, condemnation proceeding, right-of-way or easement acquisition or
negotiat on, or other legal / administrative proceeding.
3.1.6 Furnishing additional sets of pdnts of drawings and other Documents beyond those
designated in Section 2.
3.1.7 Additional engineering services required by revisions to regulations (after the date of
this Amendment) as applicable to the Florida Department of Environmental
Protecticn, the St. Johns River Water Management District, Corps of Engineers,
Seminole County, FDOT, or other regulatory agency requirements or revisions
necessary due to changes in the Road Improvement Plans.
3.1.8 Additional services in connection with the project including services normally
furnishec by the CITY as described in Section 4 herein and services not otherwise
provided for in this Agreement.
3.1.9 Construction Engineering and Inspection Services shall be provided under separate
authorization.
SECTION 4
CITY Responsibilities
4.1 The CITY will:
4.1.1 Advise the ENGINEER of his requirements for the project and designate a person to
act as the CITY's representative with respect to the work to be performed under this
Amendment, and such person shall have complete authority to transmit instructions,
receive irformation, interpret and define the CITY's policies and decisions pertinent
to the work covered by this Amendment.
4.1.2 Obtain and provide data requested that is reasonably available on the project along
with operational and maintenance requirements and easement and right-of-way
requirements.
4.1.3 Guarantee access to and make all provisions for the ENGINEER to enter upon public
and private lands as required for the ENGINEER to perform his work under this
Amendment.
4.1.4 Make facilities accessible for inspection.
4.1.5 Examine aft studies, reports, sketches, schedules, and other documents presented
by the ENGINEER and render decisions pertaining thereto within a reasonable time
so as not to delay the work of the ENGINEER. Assist in obtaining approval of all
governroe ~tal authorities having jurisdiction over the project, and such approvals and
5
\\CPH_SANF_1\VOL3~Z6582.00\WP-WORD~PROPOSAL\SanfOrd~RooSevelt Ave. * 19th Street Vicinity WM Phase It.dec
consents from such other individuals or bodies as may be necessary for completion
of the Project.
4.1.6 Furnish or direct the ENGINEER in writing to provide at the CITY's expense, any
sub-consultant services not designated in Section 2, if advised by the ENGINEER
and CITY concurs that they are necessary.
4.1.7 Provide such legal, accounting, financial and insurance counseling services as may
be required for the project, and such auditing services as the CITY may require.
4.1.8 Give prompt written notice to the ENGINEER whenever the CITY observes or
otherwise becomes aware of any defect in the Project.
SECTION 5
Payment
5.1 General Payment Provisions
5.1.1 Compensation paid ENGINEER for services described herein and rendered by
principals and employees assigned to the Project will be computed by multiplying
Standard classification billing rates for all classifications of employees directly
engaged on the project, times the numbers of hours worked on the project.
5.1.2 The engineering fee for the services described herein is estimated to be $38,936.00,
inclusive of out-of-pocket expenses. invoices will be submitted periodically,
indicating the hours expended dudng that billing cycle.
5.1.3 The CITY will make prompt monthly payments in response to ENGINEER's monthly
statements without retention for all categories of services rendered under this
Agreement and for reimbursable expenses incurred.
5.1.4 Charges for the services rendered by principals and employees as witnesses in any
litigation, hearing or proceeding will be computed at a rate of $1200.00 per day or
any portion thereof (but compensation for time spent in preparing to appear in any
such litigation, hearing or proceeding will be computed in accordance with the
payment method as set forth in Paragraphs 5.1.1).
5.1.5 If this Agreement is terminated during prosecution of the services prior to completion
of the services of Section 2, payments to be made in accordance with Paragraph
5.1.1 and 5.1.2 on account of that and all prior work under this Amendment shall be
due and payable, and shall constitute total payment for services rendered. In
addition, upon termination, the ENGINEER shall be paid for any additional services
authorized and rendered under Section 3.
6
SECTION 6
General Conditions
6.1 Since the ENGINEER has no control over the cost of labor, materials, or equipment
or over any construction Contractor's method of determining prices, any opinion of
probable construction cost which may be provided in the services of this Amendment
are made on the basis of his experience and qualifications and represent his best
iudgment as a design professional familiar with the construction industry, but the
ENGINEER cannot and does not guarantee that bids or the construction cost will not
vary from opinions of probable cost prepared by him. Similar limitations apply to
construction schedules reviewed or prepared by the ENGINEER.
6.2 The CITY and the ENGINEER each binds himself and his partners, successors,
executors, administrators and assigns to the other party of this Agreement and to
partners, successors, executors, administrators, and assigns of such other party in
respect to all covenants of this Amendment. Nothing herein shall be construed as
creating any personal liability on the part of any officer or agency of any public body
which may be a party hereto, nor shall it be construed as giving any rights or benefits
hereunder to anyone other than the CITY and the ENGINEER.
6.3 The ENGINEER agrees to initiate work promptly upon receipt of authorization to
proceed and to prosecute the work in an expeditious and timely manner until the
Project is completed.
IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment the day
and year first above written.
ENGINEER:
Linda M. Gardne,'SFz<;~e~cretary/Treasurer David A. Gierach, P.E. - President
7
EXHIBIT "A"
SCOPE OF SERVICES
TIME AND COST ESTIMATE
Roosevelt Avenue / 19th Street Vicinity Water Main Extension - Phase II
ESTIMATED
TASK NO. DESCRIPTION P E T D S EXPENSES
Attend kick-off meeting with City staff,
review route, available information; obtain
route survey from surveyor; prepare
monthly progress reports; prepare 30%
drawings (utilizing survey and existing
1 drawings) showing proposed route. 2 5 9 28 2 $50.00
Prepare 60% drawings (utilizing survey and
existing drawings) showing proposed route,
valves, and connections; prepare monthly
progress reports; prepare Opinion of
Probable Construction Cost; meet with City
2 staff and review 60% drawings. 2 10 18 40 1 $65.00
Prepare 90% construction plans (3390
linear feet); Utility specifications; prepare
monthly progress reports; Review 90%
plans and specifications with City staff; fill
out FDEP permit applications and submit
applications; assist City with analysis of
3 future utility extensions in project area 6 30 59 131 13 $100.00
Update previously prepared opinion of
probable construction based on 90% plans;
Revise plans based on City review and
regulatory agency review;Prepare Project
Manual (Front end contract documents and
specifications); submit 3 sets of 100% plans
4 and Project Manual to City I 10 13 19 4 $135.00
'?OTAL 11 55 99 218 20 $350.00
Sub-total (Based on Standard BillingRates) $26,936.00
Reimbursed Expenses $350.00
Survey Consultant (Route Survey and Project Area) $9,150.00
Geotechnical Consultant (Soils Report - Project Area) $2,500.00
TOTAL $38,936.00
j:~z6582.00\\excel\Roosevelt Ave. - 19th Street Water Main - Phase II.xls 02/13/2002 4:48 PM
~JE AND 19TH STREET WATERMAIN EXTENSION PHASE II
Legend
WATER LINES
~ ..... PHASE I iCOMPLETED
PHASE 2 ,[~ROPO~ED,