Loading...
947-Magnolia Ave. Change ord 1 SECTION 00950 CHANGE ORDER FORM Change Order No.: Project Title: Bid No,: Owner: Contractor: Agreement Date: 1 Magnolia Avenue Reclaimed Water Main Extension IFB 01 / 02- 40 City of Sanford Central Florida Tapping and Construction Services, Inc. October 8, 2002 This Change Order is necessary to cover changes in the work to be performed under this Agreement. The GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, and STANDARD SPECIFICATIONS apply to and govern all work under this Change Order. THE FOLLOWING CHANGES ARE MADE TO THE CONTRACT DOCUMENTS: (1) Original Contract Price (2) Current Contract Price (Adjusted By Previous Change Orders) (3) Total Proposed Change in Contract Price (4) New Contract Price (Item 2 + Item 3) (5) Original Contract Time (6) Current Contract Time (Adjusted By Previous Change Orders) (7) Total Proposed Change in Contract Time (8) New Contract Time (Item 6 + Item 7) (9) Original Contract Substantial Completion Date (10) New Contract Substantial Completion Date $ 39,903.00 $ 39,903.00 $ 4,640.00 $ 44,543.00 75 Days 75 Days Additional 52 Days 127 Days December 24, 2002 February 14, 2003 SP~OLIB120902 00950-1 CHANGES ORDERED ITEM 1 Description of Change: Reason for Change: Change in Contract Price: Change in Contract Time: Add 160 LF of 4" DR-11 polyethylene pipe to be installed by the directional drilling method, including fusing, MJ adapters, and service connections (approximate Sta 21+22 to Sta 22+82). To protect 2 large oak trees (at 609 Magnolia Avenue) from possible root damage due to pipe installation by open-cut methods. Additional $6,080.00. No change. ITEM 2 Description of Change: Reason for Change: Change in Contract Price: Change in Contract Time: Delete 160 LF of 4" DR-18 PVC pipe to be installed by open-cut methods. Replaced by Item 1 above. Deduct $1,440.00. No change. ITEM 3 Description of Change: Reason for Change: Time adjustment. To postpone the reclaimed water main construction until after the holidays because of the "Holiday Tour of Homes". Change in Contract Price: No change. Change in Contract Time: Additional 52 days. SPECLIB120902 00950'2 CHANGE ORDER SUMMARY No. I Description t ~Change in I Change in ~,ontract Price Contract Time Add 160 LF of 4" DR-11 polyethylene 1 pipe, installed by directional drilling. $6,080.00 No change Deduct 160 LF of 4" DR-18 PVC pipe, 2 installed by open-cut. ($1,440.00) No change 3 Add 52 days to Contract Time No change Add 52 days TOTAL $4,640.00 52 Days WAIVER This Change Order constitutes full and mutual accord and satisfaction for the adjustment of the Contract Price and Contract Time as a result of increases or decreases in cost and time of pedormance caused directly and indirectly from the change. Acceptance of this Waiver constitutes an agreement between OWNER and CONTRACTOR that the Change Order represents an equitable adjustment to the Agreement and that CONTRACTOR shall waive all rights to file a Contract Claim or claim of any nature on this Change Order. Execution of this Change Order shall constitute CONTRACTOR's complete acceptance and satisfaction that it is entitled to no more costs or time (direct, indirect, impact, etc.) pursuant to this Change Order. SPECLIB120902 00950'3 APPROVAL AND CHANGE ORDER AUTHORIZATION ACKNOWLEDGMENTS The aforementioned change, and work affected thereby, is subject to all provisions of the original Agreement and specifically changed by this Change Order; and It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original Agreement other than matters expressly provided herein. ATTEST: Central Florida Tappinq & Construction Services, Inc. (Secretary) Date I ' (Corporate Seal) Printed Name and Title of,O'ffid'er' By (Signature) Date ATTEST: ~ignature) Cate (Seal) City of Sanford END OF SECTION SPECLiB120902 00950-4 ~ · Central Florida T~pping & [] · ~c~ion Ser,~[~es, ]pc. CU C055705 C0 C045852 CONT V 139429000119? January 10, 2003 Tom Zinker, P.E. CPH Engineers P.O. Box 2828 Sanford, FI. 32722-2808 Re: Proposed Cha~ge ;Dear M~, Zinkcr, We propose the following, Item ~ DeecHpfion Quanti~ Unit Unit Price Tolal 1 Add 4" SDR-11 including Fusing 160 LF $ 3800 $ 6,080 00 and MJ adapters 2 Deduct 4" DR-lB PVC 160 LF $ (900) $ (1,~40.00) Totll Addition $ If the City wants to make ~kis change the pipe is in Tampa and may rake a couple of days to get here. If you have any questions please call. Sincerely, Kicg Bullington P.O. Box 521279 · Longwoocl, FL 32752-1279 - Phone: 407-834-8271 - Fax: 407-834-3859