Loading...
301-CPH-Amendment 54BAMENDMENT NO. 54B AGREEMENT FOR CONTINUING SERVICES FOR CUP RENEWAL - RAI RESPONSES Saltwater Intrusion Modeling and Monitoring Plan Development / Wetlands Monitoring Plan BETWEEN THE CITY OF SANFORD, FLORIDA AND CPH ENGINEERS, INC. This Agreement made on the 2-~ day of ~ , ~etween the City of Sanford, Florida (hereinafter called CITY) and"t~PH Engineers, Inc. (hereinafter called ENGINEER), is mutually agreed upon and declared an authorized Amendment to an Agreement dated December 17, 1987, between the parties, herein setting forth the scope, terms, and conditions of the work herein authorized. In case of any conflict between this Amendment and the aforementioned Agreement of December 17, 1987, this Amendment shall govern for the work described herein. WHEREAS the CITY desires to renew its Consumptive Use Permit (CUP) for a twenty (20) year period, and WHEREAS the ENGINEER is intimately familiar with and qualified for this project work and has experience on the City's raw water supply including hydraulic analyses and utility distribution system design and permitting, and has personnel and capabilities to perform the designated services; and WHEREAS the CITY has requested the ENGINEER to perform engineering services relating to the submission of the City's CUP renewal to St. Johns River Water Management District (SJRWMD); NOW THEREFORE, the CITY and the ENGINEER for the considerations named herein agree as follows: 1.1 1.1.1 1.1.3 SECTION 1 General Introduction This Amendment work is to generally provide for engineering services for submitting the CITY's CUP renewal to the SJRWMD. The services to be provided shall be in response to the SJRWMD's Request for Additional Information (RAI). This Amendment generally provides for additional hydrogeologic and environmental services required by the SJRWMD as part of their RAI, not covered by previous Amendments. 2.1 1. SECTION 2 Scope of Services General Description Hydrogeologic Services: (Detailed Description Provided as an Attachment) a. Data collection and selection of target wells. b. Saltwater intrusion modeling c. Development of combined regional monitoring plan d. Preparation of reports and attendance at meetings Ecological Consulting Services: (Detailed Description Provided as an Attachment) a. Data collection pertinent to the study area b. Meetings/consultation with the SJRWMD c. Field assessments of select wetlands d. Data evaluation e. Meetings with City and/or Engineer f. Develop long-term monitoring protocol g. Preparation of biological summary report 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.1.7 3.1.8 3.1.9 SECTION 3 Additional Services of the ENGINEER If authorized by the CITY, the ENGINEER shall furnish or obtain from others the following additional services, or the CITY may provide these services separately or directly with the provider. Such additional services will be paid for by the CITY as outlined in Section 5. Additional services due to significant changes in the scope of the project or its design including, but not limited to, complexity, character of consb'uction or due to time delays in initiating or completion of the work as described herein. Provide through subconsultants, land acquisition boundary surveys, title searches, preparation of legal descriptions or sketches of description; or other specialist services including real estate or right-of-way agents, project or construction management, financial or budgetary consultants, and bookkeeping or accounting services. If these services are subsequently determined advisable during the course of work, they may be considered for authorization as an additional service under this section or separately provided by the CITY. Except as otherwise provided herein, services or additional costs associated with revising previously accepted studies, reports, or other documents prepared by the ENGINEER when such revisions are due to causes beyond the ENGINEER's control. Additional services resulting from public protests, administrative hearings, or similar matters. Preparing to serve and/or serving as an Expert Witness for the CITY in any litigation, public hearing, condemnation proceeding, right-of-way or easement acquisition or negotiation, or other legal / administrative proceeding. Furnishing more than 5 sets of prints or drawings and other Documents. Additional engineering services required by revisions to regulations (after the date of this Amendment) as applicable to the Florida Department of Environmental Protection, the St. Johns River Water Management District, Corps of Engineers, Seminole County, FDOT, or other regulatory agency requirements or revisions. Additional engineering services that may be required for potential wetlands investigations as part of the CUP renewal process may be considered for authorization as an additional service under this section or separately provided by the CITY. Additional services in connection with the project including services normally furnished by the CITY as described in Section 4 herein and services not otherwise provided for in this Agreement. 4.1 4.1.1 4.1.2 4.1.3 4.1.4 4.1.5. 4.1.6 4.1.7 4.1.8 SECTION 4 CITY Responsibilities The ClTY wlII: Advise the ENGINEER of his requirements for the project and designate a person to act as the CITY's representative with respect to the work to be performed under this Amendment, and such person shall have complete authority to transmit instructions, receive information, interpret and define the CITY's policies and decisions pertinent to the work covered by this Amendment. Obtain and provide data requested that is reasonably available on the project along with operational and maintenance requirements. Guarantee access to and make all provisions for the ENGINEER to enter upon public and private lands as required for the ENGINEER to perform his work under this Amendment. Make facilities accessible for inspection. Examine all studies, reports, sketches, schedules, and other documents presented by the ENGINEER and render decisions pertaining thereto within a reasonable time so as not to delay the work of the ENGINEER. Assist in obtaining approval of all governmental authorities having jurisdiction over the project, and such approvals and consents from such other individuals or bodies as may be necessary for completion of the Project. Furnish or direct the ENGINEER in writing to provide at the CITY's expense, any sub-consultant services not designated in Section 2, if advised by the ENGINEER and CITY concurs that they are necessary. Provide such legal, accounting, financial and insurance counseling services as may be required for the project, and such auditing services as the CITY may require. Give prompt written notice to the ENGINEER whenever the CITY observes or otherwise becomes aware of any defect in the Project. 5.1 5.1.1 SECTION 5 Payment General Payment Provisions Compensation paid ENGINEER for services described herein and rendered by principals and employees assigned to the Project will be computed by multiplying Standard classification billing rates for all classifications of employees directly engaged on the project, times the numbers of hours worked on the project. 5.1.2 5.1.3 5.1.4 5.1.5 5.1.6 The engineering fee for the services described herein is estimated to be $54,460, inclusive of out-of-pocket expenses determined as follows: $38,960 $10,500 $ 5,000 Hydrogeologic Services (Andreyev Engineering Inc.) Ecological Services (Lotspeich and Associates, Inc.) Project Coordination and Response to SJRWMD (CPH Engineers, Inc.) Invoices will be submitted periodically, indicating the hours expended during that billing cycle. The CITY will make prompt monthly payments in response to ENGINEER's monthly statements without retention for all categories of services rendered under this Agreement and for reimbursable expenses incurred. Charges for the services rendered by principals and employees as witnesses in any litigation, hearing or proceeding will be computed at a rate of $1200.00 per day or any portion thereof (but compensation for time spent in preparing to appear in any such litigation, hearing or proceeding will be computed in accordance with the payment method as set forth in Paragraphs 5.1.1). If this Agreement is terminated during prosecution of the services prior to completion of the services of Section 2, payments to be made in accordance with Paragraph 5.1.1 and 5.1.2 on account of that and all prior work under this Amendment shall be due and payable, and shall constitute total payment for services rendered. In addition, upon termination, the ENGINEER shall be paid for any additional services authorized and rendered under Section 3. 6.1 6.2 6.3 SECTION 6 General Conditions Since the ENGINEER has no control over the cost of labor, materials, or equipment or over any construction Contractor's method of determining prices, any opinion of probable construction cost which may be provided in the services of this Amendment are made on the basis of his experience and qualifications and represent his best judgment as a design professional familiar with the construction industry, but the ENGINEER cannot and does not guarantee that bids or the construction cost will not vary from opinions of probable cost prepared by him. Similar limitations apply to construction schedules reviewed or prepared by the ENGINEER. The CITY and the ENGINEER each binds himself and his partners, successors, executors, administrators and assigns to the other party of this Agreement and to partners, successors, executors, administrators, and assigns of such other party in respect to all covenants of this Amendment. Nothing herein shall be construed as creating any personal liability on the part of any officer or agency of any public body which may be a party hereto, nor shall it be construed as giving any rights or benefits hereunder to anyone other than the CITY and the ENGINEER. The ENGINEER agrees to initiate work promptly upon receipt of authorization to proceed and to prosecute the work in an expeditious and timely manner until the Project is completed. IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment the day and year first above written. (ATTEST & SEAL) CITY: City of Sanford, Florida Roger Dixon, A'ctim3 City Manager ENGINEER: CPH Engineers, Inc. David A. Gierach, P.E. President