986-Maxwell Contracting CO #1CHANGE ORDERFORM CITY OF SANFORD CHANGE ORDER NO. 1 Project: Airport Blvd. Phase II and Old Lake Mary Rd. Utility Construction (IFB 02/03-11) FDEP No.: CS120586220, DW5906010 Contractor: Maxwell Contracting, Inc. This Change Order is necessary to cover changes in the work to be performed under this Agreement. The GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, and STANDARD SPECIFICATIONS apply to and govern all work under this Change Order. THE FOLLOWING CHANGES ARE MADE TO THE CONTRACT DOCUMENTS: (1) (2) (3) (4) (5) (6) (7) (8) (9) Original Contract Price Current Contract Price (Adjusted By Previous Change Orders) Total Proposed Change in Contract Price New Contract Price (Item 2 plus Item 3) Original Contract Time Current Contract Time (Adjusted By Previous Change Orders) Total Proposed Change in Contract Time New Contract Time (Item 6 plus Item 7) New Construction Substantial Completion Date $ 1,373,000.00 $. 0.00 $ 48,755.00 $ 1,421,755.00 180 Days 180 Days 44 Days 224 Days December22,2003 :CHANGE ORDER FUNDING SUMMARY FDEP CWSRF Funding ($8,300.00) FDEP DWSRF Funding $38,635.00 Miscellaneous Funding $18,420.00 TOTAL $48,755.00 Page 1 of 6 September 17, 2003 CHANGES ORDERED ITEM 1 Description of Change: Reason for Change: Change in Contract Price: Funding Source: Change in Contract Time: Reclaimed Water Main Extension Extension of approximately 390 LF of existing 6" reclaimed water main along Airport Blvd. in order to provide reclaimed water service to a future apartment complex on Live Oaks Blvd. This change was requested by the City. $13,620.00 FDEP CWSRF - $0.00 FDEP DWSRF - $0.00 Miscellaneous Funding - $13,620.00 30 Days ITEM 2 Description of Change: Reason for Change: Change in Contract Price: Funding Source: Change in Contract Time: Directional Bore of HDPE Water Main Additional 8" HDPE Directional Bore requested by the City. $ 4,800.00 FDEP CWSRF - $0.00 FDEP DWSRF - $0.00 Miscellaneous Funding - $4,800.00 14 Days Page 2 of 6 September 17, 2003 ITEM 3 Description of Change: Reason for Change: Change in Contract Price: Funding Source: Change in Contract Time: Ductile Iron Water Main Carrier Pipe Ductile Iron Carrier Pipe requested by the City for roadway crossings, in lieu of PVC carrier pipe through steel casings. $ 4,765.00 FDEP CWSRF - $0.00 FDEP DWSRF - $4,765.00 Miscellaneous Funding - $0.00 0 Days ITEM 4 Description of Change: Reason for Change: Change in Contract Price: Funding Source: Additional Bore and Jack The length of bore and jack at stations 231+15, 245+28, 259+30, 269+30, 266+77, 245+47, and 268+90 were increased to avoid undermining the existing utilities along Airport Boulevard. This item addresses increased bore and jack costs (due to length increases). A future change order will address contract price deducts due to simpler construction since there is no longer the need to support/protect existing utilities at these crossing locations. $10,410.00 FDEP CWSRF - $1,940.00 FDEP DWSRF - $8,470.00 Miscellaneous Funding - $0.00 Change in Contract Time: 0 Days ITEM 5 Page 3 of 6 September 17, 2003 Description of Change: Reason for Change: Change in Contract Price: Funding Source: Change in Contract Time: Additional Gate Valves at Stations 231+15, 245+28, and 259+30 Gate Valves were added at stations 231+15, 245+28, and 259+30 This change was requested by the City. $ 4,160.00 FDEP CWSRF - $0.00 FDEP DWSRF - $4,160.00 Miscellaneous Funding - $0.00 0 Days ITEM 6 Description of Change: Reason for Change: Change in Contract Price: Funding Source: Change in Contract Time: Additional Tapping Sleeve and Valve The connection to the existing 18" force main at station 220+90 will be made using an 18" x 18" tapping sleeve and valve in lieu of temporarily shutting down the existing force main. This change was requested by the City. $11,000.00 FDEP CWSRF o $11,000.00 FDEP DWSRF - $0.00 Miscellaneous Funding - $0.00 0 Days ITEM 7 Description of Change: Reason for Change: Change in Contract Price: Funding Source: FDEP Funding Correction The 20" steel casing pipe (open-cut and bore and jack) cost for the water main system (FDEP DWSRF) had inadvertently been shown under the force main system (FDEP CWSRF). This item corrects the funding source allocation. $ 0.00 FDEP CWSRF - ($21,240.00) FDEP DWSRF - $21,240.00 Miscellaneous Funding - $0.00 Change in Contract Time: 0 Days Page 4 of 6 September 17, 2003 SUMMARY OF CHANGES ORDERED CHANGE IN CHANGE IN ITEM FUNDING CONTRACT CONTRACT NO. DESCRIPTION SUMMARY PRICE TIME Miscellaneous 1 Reclaimed Water Main Extension Funding $13,620.00 30 Days Directional Bore of HDPE Water Miscellaneous 2 Main Funding $4,800.00 14 Days 0 Days 3 Ductile Iron Water Main Carrier Pipe FDEP DWSRF $4,765.00 FDEP DWSRF $8,470.00 4 Additional Bore and Jack FDEP CWSRF $1,940.00 0 Days Additional Gate Valve at Stations 5 231+15, 245+28, and 259+30 FDEP DWSRF $4,160.00 0 Days 6 Additional Tapping Sleeve and Valve FDEP CWSRF $11,000.00 0 Days FDEP DWSRF $21,240.00 5 FDEP Funding Correction FDEP CWSRF ($21,240.00) 0 Days TOTAL $48,755.00 44 Days Page 5 of 6 September 17, 2003 WAIVER This Change Order constitutes full and mutual accord and satisfaction for the adjustment of the Contract Price and Contract Time as a result of increases or decreases in cost and time of performance caused directly and indirectly from the change. Acceptance of this Waiver constitutes an agreement between OWNER and CONTRACTOR that the Change Order represents an equitable adjustment to the Agreement and that CONTRACTOR shall waive all rights to file a Contract Claim or claim of any nature on this Change Order. Execution of this Change Order shall constitute CONTRACTOR's complete acceptance and satisfaction that it is entitled to no more costs or time (direct, indirect, impact, etc.) pursuant to this Change Order. APPROVAL AND CHANGE ORDER AUTHORIZATION ACKNOWLEDGMENTS The aforementioned change, and work affected thereby, is subject to all provisions of the original Agreement and specifically changed by this Change Order; and It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original Agreement other than matters expressly provided herein. ATTEST: R~nee L. Maxwell (Secretary) Maxwell Contr. m~. Contractor Bryan L.~xwe~r' (President) September 18, 2003 Date September 18, 2003 Date (Corporate Seal) Date Page 6 of 6 September ] 7, 20C3 CHANGE ORDER NO. 1 ATTACHMENT CITY OF SANFORD AIRPORT BLVD. PHASE II AND OLD LAKE MARY RD. UTILITIY CONSTRUCTION (IFB 02/03-11) CHANGE ORDER NO. 1 ATTACHMENT ITEM 1 - RECLAIMED WATER MAIN EXTENSION PAY ITEM NO. I DESCRIPTION UNITS QUANTITY UNIT COST TOTAL COST ~ECLAIMED WATER MAIN SYSTEM 1611-140 Fittings TN 0.395 $6,000.00 $2,370.00 1613-130-516 / r613-140-716 Pipe(Furnish and Install) PVC or DI (Push On Joint) 6" RWM LF 400 $20.00 $8,000.00 1642-156-16 Valve (Gate/ Furnish and Install (D.I.) (6") EA 2 $750.00 $1,500.00 1648-100-2 3onnect to Existing 6" RWM EA I $1,750.00 $1,750.00 TOTAL $13,620.00 ITEM 2 - DIRECTIONAL BORE OF HDPE WATER MAIN PAY ITEM NO. DESCRIPTION WATER MAIN SYSTEM 1618-190-518 18" HDPE WM (driectional/ QUANTITY UNIT COST TOTAL COST 1 $4,800.00 $4,800.00 TOTAL $4,800.00 ITEM 3 - DUCTILE IRON WATER MAIN CARRIER PIPE PAY ITEM NO. I DESCRIPTION UNITS QUANTITY UNIT COST TOTAL COST WATER MAIN SYSTEM 1613-130-518 Pipe(Furnish and Install) PVC(Push On Joint/ 8" WM LF -120 $15.00 ($1,800.001 1613-130-520 Pipe(Furnish and ~nstall) PVC (Push On Joint) 10" WM LF -105 $20.00 ($2,100.00 1613-130-521 Pipe(Furnish and Install) PVC (Push On JointI 12" WM LF -229 $25.00 ($5,725.00) 1613-140-718 Pipe(Furnish and Install) DI (Push On Joint) 8" WM LF 120 $26.00 $3,120.00 1613-140-720 Pipe(Furnish and InstallI Dr (Push On Joint) 10" WM LF 105 $31.00 $3,255.00 1613-140-721 Pipe(Furnish and Install) DI (Push On Joint) 12" WM LF 229 $35.00 $8,015.00 TOTAL $4,765.00 ITEM 4 - ADDITIONAL BORE AND JACK PAY ITEM NO. I DESCRIPTION UNITS QUANTITY UNIT COST TOTAL COST WATER MAIN SYSTEM 730-76-113 24" Steel Casing - Open Cut - Station 245+28 LF -5 $265.00 ($1,325.00) 730-76-213 24" Steel Casing - Bore and Jack - Station 245+28 LF 5 $425.00 $2,125.00 730-76-116 30" Steel Casing Pipe - Open Cut - Station 259+30 LF -34 $230.00 ($7,820.00/ 730-76-216 30" Steel Casing Pipe - Bore and Jack - Station 259+30 LF 26 $330.00 $8,580.00 730-76-116 30" Steer Casing Pipe - Open Cut - Station 269+30 LF -6 $230.00 ($1,380.00) 730-76-216 30" Steel Casing Pipe - Bore and Jack - Station 269+30 LF 9 $330.00 $2,970.00 730-76-119 36" Steel Casing (0.375") - Open Cut - Station 266+77 LF -26 $280.00 ($7,280.00) 730-76-219 36" Steel Casing (0.375") - Bore and Jack - Station 266+77 LF 21 $600.00 $12,600.00 SUBTOTAL $8,470.00 =ORCE MAIN SYSTEM 730-76-116 30" Steel Casing Pipe - Open Cut - Station 245+47 LF -5 $320.00 ($1,600.00) 730-76-216 30" Steel Casing Pipe - Bore and Jack - Station 245+47 LF 5 $500.00 $2,500.00 730-76-111 20" Steel Casin~] Pipe - Open Cut - Station 268+90 LF -4 $190.00 ($760.00) 730-76-211 20" Steel Casing Pipe - Bore and Jack - Station 268+90 LF 6 $300.00 $1,800.00 SUBTOTAL $1,940.00 TOTAL $10,410.06 ITEM 5 -ADDITIONAL GATE VALVES AT STATIONS 231+15, 245+28, AND 259+30 PAY ITEM NO. I DESCRIPTION WATER MAIN SYSTEM 1642-156-18 1642-156-20 1642-156-21 Valve (Gate} Furnish and Inst~ll (D.I.} (8") Valve (Gate) Furnish and Install (DJ.) (10") Valve (Gate) Furnish and Install (D.I.) (12") UNIT COST TOTAL COST I $1,285.00 $1,285.00 I $1,375.00 $1,375.00 1 $1,500.00 $1,500.00 TOTAL $4,160.00 ITEM 6 - ADDITIONAL TAPPING SLEEVE AND VALVE 3AY ITEM NO. DESCRIPTION =ORCE MAIN SYSTEM t533-141-436 ITapping Sleeve and Valve (18"x 18") QUANTITY UNIT COST TOTAL COST 1 11,000.00 $11,000.00 TOTAL $11,000.00 ITEM 7-FDEP FUNDING CORRECTION PAY ITEM NO. I DESCRIPTION WATER MAIN SYSTEM 730-76-111 730-76-211 SUBTOTAL 20" Steel Casin, Cut - Station 231+15 20" Steel Casing Pipe - Bore and Jack - Station 231+15 QUANTITY UNITCOST TOTALCOST 36 $190.00 $6,840.00 48 $300.00 $14,400.00 $21,240.00 FORCE MAIN SYSTEM 730-76-111 730-76-211 SUBTOTAL 20" Steel Casin~l Pipe - Open Cut- Station 231+15 LL~ 20' Steel Casin~l Pipe - Bore and Jack - Station 231+15 -36 $190.00 -48 $300.00 TOTAL $0.00 CHANGE ORDER SUMMARY FORCE MAIN SYSTEM WATER MAIN SYSTEM RECLAIMED WATER MAIN SYSTEM TOTAL ($8,300.00) $43,435.00 II $13,620.00 I $48,755.00 Original Contract Amount C.O. No. 1 New Contract Amount $1,373,000.00 $48,755.00 $1,421,755.00 CITY OF SANFORD AIRPORT BLVD. PHASE II AND OLD LAKE MARY RD. UTILITIY CONSTRUCTION (IFB 02/03-11) CHANGE ORDER NO. 1 ATTACHMENT TIME SUMMARY TIME CHANGE TEM 1 - RECLAIMED WATER MAiN EXTENSION 30 Days TEM 2 - DIRECTIONAL BORE OF HDPE WATER MAIN 14 Days TEM 3 - DUCTILE IRON WATER MAIN CARRIER PIPE 0 Days TEM 4 - ADDITIONAL BORE AND JaCk 0 Days TEM 5 - ADDITIONAL GATE VALVES AT STATIONS 231+15, 245+28, AND 259+30 0 Days TEM 6 - ADDITIONAL TAPPING SLEEVE AND VALVE 0 Days TEM 7 - FDEP FUNDING CORRECTION 0 Days TOTAL 44 Days CONTRACT TIME SUMMARY Date of Notice to Proceed Contract Time Original Substantial Completion Date Original Final Completion Date Time Change - Change Order No. 1 Revised Substantial Completion Date Revised Final Completion Date 5/12/03 180 11/8/03 12/8/03 44 Days 12/22/03 1/21/04