205-CPH-Change Order 1CONTRACT CHANGE ORDER CPH Project No.: II S0628.09 Change Order No.: ~_ 1 Date: November 8, 2005 Location: Sanford South Water Resource Center (SSWRC) Type: Additive Description of Change: This change order addresses items required to ensure a complete, safe and fully operational wastewater treatment facility to meet the demands of the City of Sanford's new SSWRC. The first modification associated with this change order will reinstate the originally designed and bid 3.0 million gallon Reclaimed Water ground storage tank in lieu of the 1.0 million gallon Reclaimed Water ground storage tank proposed and originally accepted as a cost saving measure during initial value engineering reviews performed tol~ bring the project to within budgeted funds. Subsequent value engineering indicated that the cost for an increase in the tank storage capacity was a viable alternative and would a ow for storage of the initial SSRC's startup production. The cost for a 2.0 MG tank was considered but the tank contractor was willing to hold the original bid price for the 3.0 MG tank and final evaluation found this to be the most cost effective alternative for additional reclaimed water storage. The second modification associated with this change order is for the purpose of increasing the base slab thickness on the two (2) secondary clarifiers to ensure the structures are sufficiently weighted to prevent flotation during the event of maximum high ground water table. The 2001 preconstruction soils reports indicated an expected high water table at three feet below grade (The base of the secondary clarifiers are approximately seven feet below grade). During recent tropical events the groundwater level has been observed at or near the ground surface elevation. Evaluation of the floatation calculations with the ground water at these levels indicated the need to increase the weight of thesecondary clarifierS¢~xPtrr;Vme~qti~ )ossibility of floatation of the structures should they ever be emptied during a time period o ground water table. Reason for Change: This change order is for adjustments to the contract cost to complete miscellaneous improvements and upgrades to the project to provide a more complete, durable and functional process. Funding is available from additional funding to be acquired from the SRF programincorporated into the project budget. Reclaimed Water Ground Storage Tank b.) flotation of structures. $490,000.00 $32,300.00 DEDUCTS Subtotals: $522,300.00 $0.00 in Contract Cost: $522,300.00 2 3 Total of all Previous Change Orders (Change Order No. - ) $0.00 4 Current Contract Price: (Total of Items 2 and 3 above) $15,667,000.00 5 New Total Contract Price: (Total of Items 1 and 4 above) $16,189,300.00 6 Original Contract Time (days): 540 7 Additional Time (days) approved: (Change Order No. -) 0 8 Current Contract Time (days): (Total of Items No. 6 and 7) 540 9 Additional Days Proposed in this Change Order 0 10 New Contract Time (days): (Total of Items No. 8 and 9) 540 ~ Engineer f"-"~ ' Date Accepted by: Date Accepted by: - Owner Date