Loading...
1069-Progressive CO 1-AirportCHANGE ORDER FORM Change Order No. 1 Project Title Airport Lift Station and Force Main Improvements Bid No. IFB 03/04 -26 Owner: City of Sanford Contractor: Progressive Contractors, Inc. Agreement Date: October 22, 2004 This Change Order is necessary to cover changes in the work to be performed under this Agreement. The GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, and STANDARD SPECIFICATIONS apply to and govern all work under this Change Order. THE FOLLOWING CHANGES ARE MADE TO THE CONTRACT DOCUMENTS: (1) Original Contract Price $ 1,270,975.85 (2) Current Contract Price (Adjusted by Previous Change Orders) $ 1,270,975.85 (3) Total Proposed Change in Contract Price $ 315,784.01 (4) New Contract Price (Item 2 + Item 3) $ 1,586,759.86 (5) Original Contract Time 270 Days (6) Current Contract Time (Adjusted by Previous Change Orders) 270 Days (7) Total Proposed Change in Contract Time 150 Days (8) New Contract Time (Item 6 + Item 7) 420 Days (9) New Contract Substantial Completion Date December 29, 2005 CHANGE ORDER FUNDING SUMMARY Miscellaneous Funding $315,784.01 TOTAL $315,784.01 Page 1 of 4 Change Order#l.doc CHANGES ORDERED ITEM 1 Description of Change: Reason for Change: Change in Contract Price: Change in Contract Time ITEM 2 Description of Change: Reason for Change: Change in Contract Price: Change in Contract Time: Alamo Water Main Extension The City provided a 10" water main stub -out for the Alamo Rental Site, as requested by Alamo. Alamo will separately reimburse the City for this cost. $5,584.71 0 Days Quantity Adjustments Incorporate actual constructed quantities into the contract ($24,705.20) 0 Days ITEM 3 Description of Change: Beardall Water Main and Force Main Extension Reason for Change: This item proposes adding the construction of the Beardall Water Main and Force Main extension to this contract. This construction will provide the required connection to the existing system in anticipation of the proposed completion of the new Sanford South Reclamation Facility. The proposed price increase is based on original bid unit pricing. The advantage for adding this work to the contract is to save the City from separately bidding the work. (The likely result is a cost savings to the City) Change in Contract Price: $327,404.50 Change in Contract Time: 150 Days Page 2 of 4 Change Order#1.doc ITEM 4 Description of Change: Sludge Disposal from Demolished Wastewater Treatment Facility Reason for Change: The existing Digester for the abandoned Wastewater Plant had waste sludge remaining, which was unknown prior to construction. The Contractor during demolition had to have it removed and disposed of by Shelley Environmental Services. Change in Contract Price: $7,500.00 Change in Contract Time: 0 Days CHANGE ORDER SUMMARY No. Description Change In Contract Price Change In Contract Time 1 Alamo Water Main Extension $5,584.71 0 Days 2 Quantity Adjustments ($24,705.20) 0 Days 3 Beardall Water Main and Force Main Extension $327,404.50 150 Days 4 Sludge Disposal from Demolished Wastewater Treatment Facility $7 50000 . 0 Days TOTAL $315,784.01 150 Days WAIVER This Change Order constitutes full and mutual accord and satisfaction for the adjustment of the Contract Price and Contract Time as a result of increases or decreases in cost and time of performance caused directly and indirectly from the change. Acceptance of this Waiver constitutes an agreement between OWNER and CONTRACTOR that the Change Order represents an equitable adjustment to the Agreement and that CONTRACTOR shall waive all rights to file a Contract Claim or claim of any nature on this Change Order. Execution of this Change Order shall constitute CONTRACTOR's complete acceptance and satisfaction that it is entitled to no more costs or time (direct, indirect, impact, etc.) pursuant to this Change Order. Page 3 of 4 Change Order#1.doc APPROVAL AND CHANGE ORDER AUTHORIZATION ACKNOWLEDGMENTS The aforementioned change, and work affected thereby, is subject to all provisions of the original Agreement and specifically changed by this Change Order; and It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original Agreement other than matters expressly provided herein. ATTEST: Progressive Contractors, Inc. Contractor e Gerald Randall - President cretary Printed Name and Title of Officer Date By (Signature) q_' 310 (Corporate Seal) Date ATTEST: City of Sanford Owner Signature) Printed Name and Tit ia, an� Date By (Signatur (Seal) Date END OF SECTION Page 4 of 4 Change Order#1.doc CITY OF SANFORD AIRPORT LIFT STATION AND FORCE MAIN IMPROVEMENTS (IFB 03/04 -26) CHANGE ORDER NO. 1 ATTACHMENT ITEM 1 -ALAMO WATER MAIN EXTENSION DESCRIPTION UNITS QUANTITY UNIT COST TOTAL COST Fittings 12'x10" tee, 10" ca TN 0.153 $ 3,070.00 $ 469.71 10" Polyethylene Water Main Directional Drill LF 50 $ 75.00 $ 3,750.00 10" Gate Valve LF 1 $ 1,365.00 $ 1,365.00 10OAL ITEM 2 - QUANTITY ADJUSTMENTS $5,584.71 DESCRIPTION UNITS QUANTITY UNIT COST TOTAL COST Concrete Sidewalk Remove and Replace) SY 87.30 $ 20.00 $ 1,746.00 Concrete Driveway Remove and Replace) SY - 142.00 $ 30.00 $ 4,260.00 Asphalt Drivewa Remove and Replace) SY - 305.00 $ 28.00 $ 8,540.00 Asphalt Street Remove and Replace) SY 2.30 $ 45.00 $ 103.50 Sodding Bahia SY - 3,982.30 $ 2.00 $ 7,964.60 Remove Abandoned Wastewater Plant LS -0.10 $ 45,000.00 $ 4,500.00 Fittings Force Main TN .1.68 $ 5,240.00 $ 8,803.20 10" PVC Sewer Force Main LF - 198.00 $ 24.50 $ 4,851.00 10" Polyethylene Sewer Force Main Directional Drill LF 198.00 $ 75.00 $ 14,850.00 Sewer Manhole 10' -12' Depth) EA 1.00 $ 2,305.00 $ 2,305.00 Air Release Valve EA 1.00 $ 4,265.00 $ 4,265.00 Air Release Valve Offset Type) EA -1.00 $ 4,570.00 $ 4,570.00 12" Water Main PVC or D.I. LF -67.00 $ 35.10 $ 2,351.70 12" Polyethylene Water Main Directional Drill LF 67.00 $ 85.00 $ 5,695.00 Series 405 Raven Liner in Lift Station Wet Well LS 0.50 $ 7,249.00 $ 3,624.50 Lift Station Electrical and Controls LS -0.10 $ 38,016.00 $ 3,801.60 Series 405 Raven Liner in Lift Station Wet Well LS 0.50 $ 6,969.00 $ 3,484.50 Lift Station Electrical and Controls LS $3,000.00 Staked Silt Fence WM Share 3,801.60 .l Recompact Access Road Between Abandone and , Micro - oveday (0.5 ") SY $1,329.00 Clearing and Grubbing WM Share 7,335.00 (24,705.20) ITEM 3 - BEARDALL WATER MAIN AND FORCE MAIN EXTENSION DESCRIPTION FORCE MAIN SYSTEM UNITS QUANTITY UNIT COST TOTAL COST Mobilization FM Share LS 1 $23,000.00 $23,000.00 Preconstruction Video FM Share LS 1 $450.00 $450.00 Maintenance of Traffic FM Share LS 1 $3,000.00 $3,000.00 Staked Silt Fence FM Share LF 1409 $1.00 $1,409.00 Clearing and Grubbing FM Share LS 1 $2,000.00 $2,000.00 Sodding SY 2035 $2.00 $4,070.00 Fittings TN 0.52 $11,955.00 $6,216.60 Pie Furnish and Install DI or PVC Push On Join[ 20" FM LF 1284 1 $104.00 1 $133,536.00 Pie Furnish and Install 20" PE FM Directional Drill LF 125 $295.00 $36,875.00 Valve (Plug) Furnish and Install 20" EA 1 $6,775.00 $6,775.00 Air Release Valve EA 1 $5,075.00 1 $5,075.00 Remove Plug and Connect to Existing Force Main EA 2 $5,185.00 $10,370.00 Subtotal Force Main Construction 1 $232,776.60 WATER MAIN SYSTEM Mobilization WM Share LS 1 $10,307.60 $10,307.60 Preconstruction Video tWM Share LS 1 $600.00 1 $600.00 Maintenance of Traffic WM Share LS 1 $3,000.00 $3,000.00 Staked Silt Fence WM Share LF 1329 $1.00 $1,329.00 Clearing and Grubbing WM Share LS 1 $3,000.00 $3,000.00 Sodding SY 1861.7 $2.00 $3,723.40 Fittings TN 0.50 $3,070.00 $1,535.00 Pie Furnish and Install DI or PVC Push On Joint 12" WM LF 1279 $35.10 $44,892.90 Pie Furnish and Install 12" PE WM Directional Drill LF 50 $85.00 $4,250.00 Valve Gate Furnish and Install D.I. 12" EA 2 $1,595.00 $3,190.00 Tem ora Jum er Connection EA 1 $1,125.00 $1,125.00 Remove Plu and Connect to Existin Water Main EA 3 $1,785.00 $5,355.00 j \s0620.17 \evicen2- Change Order 1 attachment As 9/28105 1 :59 PM Cut and Connect to Existing Water Main EA 1 $5,000.00 $5,000.00 Ahal s t Pavement Remove and Replace) SY 11 $60.00 $660.00 Mill and Resurface As halt Pavement SY 81 $20.00 $1,620.00 Fencin Remove and Reinstall LP 630 $8.00 $5,040.00 Subtotal Water Main Construction 594,627.90 TOTAL ITEM 4 - SLUDGE DISPOSAL FROM DEMOLISHED WASTEWATER TREATMENT FACILITY $327,404.50 DESCRIPTION UNITS I QUANTITY UNIT COST TOTAL COST $327,404.50 Item 4 $7,500.00 TOTAL $315,784.01 Sludge Disposal Truck Load 5 $1,500.00 $7,500.00 w I,. CHANGE ORDER SUMMARY Item 1 $5,584.71 Item 2 $24,705.20 Item 3 $327,404.50 Item 4 $7,500.00 TOTAL $315,784.01 Ori final Contract Amount $1,270,975.85 Proposed C.O. No. 1 Proposed New Contract Amount $315,784.01 $1,586,759.86 $7,500.00 j:\s0620.17 \excel\2- Change Order 1 allachrnent.xls 9/28105 1 :59 PM CITY OF SANFORD AIRPORT LIFT STATION AND FORCE MAIN IMPROVEMENTS (IFB 03104 -26) CHANGE ORDER NO. 1 ATTACHMENT TIME SUMMARY 150 Days CONTRACT TIME SUMMARY Contract Time 270 Days Proposed Change Order No. 1 Change in Contract Time 150 Days New Contract Time 420 Days Date of Notice to Proceed 11/4/04 Total Adjusted Contract Time 420 Days Revised Substantial Completion Date 12/29/05 Contract Time From Substantial Completion to Final Completion 30 Days Revised Final Completion Date 1/28106 i:\s0620.17 \excehChange Order 1 attachment.xls 9/28/05 1:58 PM TIME CHANGE ITEM 1 - ALAMO WATER MAIN EXTENSION ITEM 2 - QUANTITY ADJUSTMENTS 0 Da vs ITEM 3 - BEARDALL WATER MAIN AND FORCE MAIN EXTENSION 0 Da s ITEM 4 - SLUDGE DISPOSAL FROM DEMOLISHED WASTEWATER TREATMENT FACILITY 150 Da s TOTAI 0 Days 150 Days CONTRACT TIME SUMMARY Contract Time 270 Days Proposed Change Order No. 1 Change in Contract Time 150 Days New Contract Time 420 Days Date of Notice to Proceed 11/4/04 Total Adjusted Contract Time 420 Days Revised Substantial Completion Date 12/29/05 Contract Time From Substantial Completion to Final Completion 30 Days Revised Final Completion Date 1/28106 i:\s0620.17 \excehChange Order 1 attachment.xls 9/28/05 1:58 PM